Loading...
HomeMy WebLinkAboutAGENDA REPORT 1994 0202 CC REG ITEM 08LIT&JI 6* Lo C I T Y O F MOOR PARK _,r ,r 7 �G TO: The Honorable City Council / FROM: Kenneth C. Gilbert, Director of Public Works DATE: January 25, 1994 (CC Meeting of 2/2/94) SUBJECT: Consider Authorizing Recordation of the Notice of Completion for the Construction of an Access Road to Serve the Sunnyslope Debris Basin BACKGROUND The City maintains a number of storm drain debris /siltation basins located south of certain lots in Tract 2865. Pursuant to the Conditions of Approval for that development, the cost of maintaining these basins is to be funded by a portion of the Zone 2 benefit assessments levied upon the lots in that Tract. One of the storm drain debris /siltation basins is located south of Lot 226 on Sunnyslope Place (See Exhibit 1). This debris basin was constructed in a manner which does not provide for vehicular access to the floor of the debris /siltation basin. This makes it difficult to impossible to provide required maintenance (silt removal, etc.) at this location. The purpose of this project is to construct a maintenance access road to enable the City to provide this maintenance. On November 3, 1993, the City Council awarded a contract for the construction of an access road to facilitate maintenance of this debris basin. That Project is now completed. DISCUSSION A. Final Proiect Costs Both this and the Tierra Rejada Slope Restoration Project were funded by surplus AD 84 -2, Zone 2 improvement assessments. At its November 3, 1993, meeting, the City Council increased the budget amount for both of these projects. A summary comparison of the revised budget figures and the final total actual project costs for these projects is list in Exhibit 1. sunycmp Sunnyslope Access Road February 1994 Page 2 B. FY 1994295 Zone 2 Improvement Assessment As noted in Exhibit 1, the total cost of these two projects exceeded the amount of the surplus Zone 2 Improvement Assessments by $9,265. Pursuant to the direction given by the City Council on November 3, 1993, it is the intent of staff to include this amount as an additional Zone 2 improvement assessment for FY 1994/95. This and other assessment matters will be discussed at the public hearings to be scheduled to consider the amount of the assessments to be levied for AD 85 -1 and AD 84 -� for next fiscal year. C. Construction Complete The construction of the subject project is completed and it is, therefore, appropriate for the City Council to consider acceptance of these improvements. RECOMMENDATION Staff recommends that the City Council take the following actions: 1. Accept the work as complete. 2. Instruct the City Clerk to f ile the Notice of Completion. 3. Authorize the release of the retention upon clearance of the thirty -five (35) day lien period. sunycnp Exhibit 1 Zone 2 Improvement Assessment Summary Maintenance Assessments Expended sur.y—p T.R Slope Sunnyslope Description Restoration Access Road Total Initial Budget Amount 31,000 11,640 52,640 Additional Appropriation 1,256 14 000 15,256 from Surplus Maintenance Assessments (11/3/93) Revised Budget Amount 32,256 35,640 67,896 Actual Cost Sunary Design 3,300 �,2s5 Construction 22,360 21,443 Landscaping 417 0 Admin & Inspection 6,000 —3 -.1 B0 Total Actual Cost 32,077 �� +.8i8 61,905 Actual Amount of Surplus 9,265 Maintenance Assessments Expended sur.y—p