Loading...
HomeMy WebLinkAboutAGENDA REPORT 1994 0706 CC REG ITEM 11K / 1401 ITEM iis K. coun II MeeIn 1993/ ACTION:40( AGENDA REPORT CITY OF MOORPARK TO: Honorable City Council FROM: Mary K. Lindley, Assistant to the City Manager DATE: June 30, 1994 (CC Meeting of 7/6) SUBJECT: Consider Redesign of the Dorothy Wall Project Background On May 18 , City Council awarded a contract for the Dorothy Wall Project to Pacific Central Construction at a cost not to exceed $24, 017. Council had previously appropriated $26, 100 for the demolition and construction of the wall. Upon a physical inspection of the existing wall and the site parameters with the contractor and the Public Works Director, staff has identified two new concerns regarding the current job specifications and design. Mainly, the difference in elevation between the Metrolink parking lot and the back of the private properties along Dorothy Avenue varies by up to two feet. Construction of a six foot wall facing the parking lot will result in a four foot wall for some of the private properties. In addition to the problems with the height of the wall, the difference in the property elevation also affects the wall's footings. The result is that some of the existing footings are exposed. If the wall is constructed as is to maintain the six foot height facing the private properties, the exposed footings may compromise the strength of the wall. Staff recommends that the City Council rescind its original action to award the contract to Pacific Central Construction, and instead reject all bids and direct staff to redesign the project to accommodate these additional factors. The contract between the City and Pacific Central has not been signed and no Notice to Proceed has been issued. Dorothly Wall Project June 29, 1004 Page 2 The redesign of the wall will include an additional course of block and lowering the footings eight inches where necessary. The new project specifications were provided to Council under a separate memo. Such steps will require additional funds. Staff will report back to Council upon receipt of new proposals for construction of the wall for approval of any additional funding requests. Recommendation Staff recommends that the Council: 1. Rescind its earlier action of awarding the Dorothly Wall contract to Pacific Central, 2. Reject all bids, 3 . Approve the modified Dorothy Wall specifications, and 4. Direct staff to solicit new bid proposals.