HomeMy WebLinkAboutAGENDA REPORT 1991 0206 CC REG ITEM 08Q f(y.,)S7
MOORPARK ITEM S. Q .
MOORPARK, CALIFORNIA
PAUL W. LAWRASON JR. City Council Meeting STEVEN KUENY
Mayor
00.9.-.011.111,1) Ciry Manager
BERNARDO M. PEREZ °t /l'rl��w�— CHERYL J. KANE
Mayor Pro Tem ACTION:L��/ 7,Lco P449% City Attorney
SCOTT MONTGOMERY / - ai kzir� PATRICK RICHARDS,A.I.C.P.
Councilmember o�/Ii . Director of
JOHN E. WOZNIAK 'I/1 Oq��/�7Community Development
Councilmember �' ""' �O jdy JOHN F. KNIPE
LILLIAN KELLERMAN City Engineer
City Clerk JOHN V. GILLESPIE
Chief of Police
MEMORANDUM RICHARD T. HARE
City Treasurer
TO: The Honorable City Council
FROM: Kenneth C. Gilbert, Director of Public Works C
DATE: January 28, 1991 (Council Meeting 2-6-91)
SUBJECT: Authorization to Proceed with the Design for
the Construction of a Sidewalk on the North Side
of Los Angeles Avenue from Spring to Millard
OVERVIEW
This requests authorization to proceed with the design for the
construction of the subject sidewalk construction project.
DISCUSSION
A. Grant
•
The City has received approval of a grant application for this
project under the Pedestrian/Bicycle Facilities Program (SB-
821) . The amount of the grant is equal to one-half of the then
estimated project costs ($90,400 x 0.5 = $45, 200) . The fifty
percent (50%) local share dollars for this project is to be
funded by the L A AOC Fund.
B. Budget
The Budget for Fiscal Year 1990/91 shows this project to be one
hundred percent (100%) funded by the L A AOC Fund . The amount
budgeted (ref Acc. # 027-142-903-0098: $95,200) reflects the
amount of the revised cost estimate for the project. In order
for the budget to accurately reflect the anticipated funding
described above, it is necessary to amend the budget as follows:
Fund 27 Fund 15
L A AOC (S) TDA Article 3 (S)
Current Budget: 95,200 0
Revised Budget 50,000 45,200
799 Moorpark Avenue Moorpark, California 93021 (805) 529-6864
Los Angeles Avenue Sidewalk
February 6, 1991
Page 2
C. Design
On behalf of Charles Abbott Associates, Dwight French &
Associates (their design associate) has prepared a Proposal for
the design of this project. The firm is qualified to perform
this type of civil engineering work. The Proposal (attached)
adequately outlines the steps necessary to develop the design.
The amount of the fee is $10,343 .
RECOMMENDATION
Staff recommends that the City Council take the following actions:
1 . approve revisions to the amounts appropriated and budgeted
for this project as set forth herein;
2. approve the selection of Charles Abbott and Associates to
prepare the design (for the amount of the fee quoted) in a
manner consistent with the Proposal submitted by Dwight
French & Associates; and,
3 . authorize the City Manager to sign necessary consultant
contract documents.
November 8, 1990
Mr. Kenneth C. Gilbert
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
RE: Los Angeles Road
Dear Mr. Gilbert:
Pursuant our discussion, we have revised our proposal to meet your
needs. Our new submittal includes for your review a scope, project
team, schedule, and estimated fee. Dwight French & Associates
understands the project has the resources to produce a quality
product meeting the City's timetable.
We appreciate this opportunity and hope we can be of assistance to
you on this matter.
Sir -rely,
rr
4irar ► ri
110"i
Enclosures
HCL:cf
prop\B169-1.hcl Ref: B169-1
.CECEIVEU
0V 0 9 1990
:t$v o{ Vitrirrr.
■ 706 N. Diamond Bar Boulevard, Diamond Bar, California 91765 ■
• (714)860-3566 Fax No. (714) 860-3476 •
November 8, 1990
APPENDIX A
SCOPE OF WORK
TASK 1 - REVIEW SURVEY INFORMATION
Evaluate survey data for adequacy. Transfer information into our
automated system.
TASK 2 - CALTRANS COORDINATION
Meet with Caltrans staff and discuss project. Obtain base
information from Right-of-Way and roading plans and utility
agreements.
TASK 3 - INITIAL UTILITY COORDINATION
Contact affected utilities including phone, gas, electric and
others to determine existing locations and receive understanding
of easement and Right-of Way entitlements.
TASK 4 - IMPACT OF 6-LANE IMPROVEMENT
Review of result of six lane improvement on existing roadway. The
proper location of curb will be identified along with determination
of structure section for inside lane. This information will be
reviewed with staff for concurrence of the concept.
TASK 5 - PREPARE CONSTRUCTION PLANS
Complete roadway plans at required scale for Caltrans with
necessary details to design improvements meeting City criteria and
Caltrans.
TASK 6 - PREPARE TRAFFIC CONTROL PLANS
Prepare the necessary plans to properly guide traffic through work
site. Necessary traffic control devices and markings will be
designed and plans prepared before meeting Caltrans criteria.
TASK 7 - REVIEW WITH CITY STAFF
Meet with City Staff to review design concepts and construction
details. Revise plans as required to meet suggested
recommendations.
TASK 8 - FINAL UTILITY COORDINATION
Coordinate with utilities companies on any required adjustment of
lines.
TASK 9 - OUANTITIES, ESTIMATE AND SPECIFICATIONS
Using approved plans determine quantities needed for construction.
Determine approximate cost for construction. Develop
specifications along with plans for the City to receive bids for
construction. Assist City in the interpretation of these plans.
TASK 10 - CALTRANS REVIEW
Based on comments from Caltrans plans and specification will be
revised to meet their requirements. In addition, all final city
comments will be incorporated.
TASK 11 - CONSTRUCTION ASSISTANCE (OPTIONAL)
Provide city assistance in bid, contract and/or cost management or
administration.
November 8, 1990
APPENDIX B
SCHEDULE
DAYS
EFFORT FROM NTP
TASK 1 - SURVEY 14 14
TASK 2 - CALTRANS COORDINATION 14 21
TASK 3 - INITIAL UTILITY COORDINATION 21 21
TASK 4 - EVALUATE 6-LANE IMPACT 30* 51
TASK 5 - PREPARE CONSTRUCTION
PLANS 21 72
TASK 6 - PREPARE TRAFFIC CONTROL PLANS 14 72
TASK 7 - REVIEW WITH CITY STAFF 30* 102
TASK 8 - FINAL UTILITY COORDINATION 10 102
TASK 9 - QUANTITIES, ESTIMATES AND
SPECIFICATIONS 7 109
TASK 10- FINAL CALTRANS AND CITY REVIEW 30* 139
TASK 11- CONSTRUCTION ASSISTANCE NE NE
* Includes estimated City review time of 7 days and Caltrans of
30 days.
November 8, 1990
APPENDIX C
DESIGN TEAM
The team shall consist of experienced designers and engineers along
with drafting and technical support. These include:
1. Henry Pao, RCE - Project Manager; will manage project and
insure quality product; coordinate with utilities and
design traffic control plans.
2. Mario Garcia, RCE - Design Engineer; responsible for
compilation of roadway and drainage design; prepare
construction specifications.
3. Margaret Burleigh, - Lead Designer; in charge of
production of construction and traffic control plans
meeting engineered guidelines.
4. Harry Lorick, RCE, TE - Principal in Charge; overall
project direction to insure quality and schedule
compliance.
In addition to these staff members, Dwight French & Associates will
provide technical support of 25 professionals as necessary to meet
City needs. In addition, Dwight French & Associates has 10 CADD
work stations and 8 other support computer stations with the latest
design and transportation software to insure a quality product.
Finally, Dwight French & Associates has a specific quality control
procedure that will insure a construct and operational product
meeting City criteria.
November 8, 1990
FIGURE C.1
DWIGHT FRENCH & ASSOCIATES
Year of
Member Experience Education Position
H.Lorick, RCE, RTE 17 BSCE,MBA, Project Dir.
MSCE President
H.Pao, RCE 10 BSCE,MSCE, Project
Phd Candidate Manager
F. Smith, PE 15 BSCE Sr. Engineer
M. Garcia, RCE 8 BSCE Design Engr.
D. Chow, EIT 7 BSCE,BSEE Engineer
D. Lovett, RCE 6 BSCE Engineer
S. Dhuldhoya 4 BSCE Engineer
A. Kalan, EIT 5 BSCE,BS Engineer
P. Crask, EIT 4 BSCE Cadd
Designer
M. Burleigh 10 Sr. Designer
D. Garner 30 Sr. Designer
D. Holmquist, EIT 1 BSCE Engineer
A. Tse, EIT 1 BSCE Engineer
+ • 1
November 8, 1990
APPENDIX D
FEE
The estimated fee to complete the task identified in the scope of
work is as follows:
TASK 1 SURVEY $ 520. 00
TASK 2 CALTRANS COORDINATION 780. 00
TASK 3 INITIAL UTILITY COORDINATION 910. 00
TASK 4 IMPACT OF SIX LANE 1, 040. 00
TASK 5 PREPARE CONSTRUCTION PLANS 4, 320. 00
TASK 6 PREPARE TRAFFIC CONTROL PLANS 2,080. 00
TASK 7 REVIEW WITH CITY STAFF 260. 00
TASK 8 FINAL UTILITY COORDINATION 325. 00
TASK 9 QUANTITIES, ESTIMATED
SPECIFICATION 788 . 00
TASK 10 FINAL CALTRANS AND CITY REVIEW 650. 00
TASK 11 CONSTRUCTION ASSISTANCE NO ESTIMATE
TOTAL $11,673.00
This assumes that survey data provided by Berner and Carpenter is
adequate.