Loading...
HomeMy WebLinkAboutAGENDA REPORT 1991 0918 CC REG ITEM 11Dt-, foq -7, a 1(e) ITE MOORPARK 799 Moorpark Avenue Moorpark, California 93021 @6CA1IF0RNIA City Co nctl Meeting of 199 / ACTION: MEMORANDUM Bye- TO: The Honorable City Council FROM: Philip E. Newhouse, Director of Community Services DATE: September 13, 1991 SUBJECT: Consider Award of Bid for Picnic Shelters and Restrooms This item is presented for Council's consideration to award a bid to Jevon Construction Co., Inc., for the construction of three public restrooms and four picnic shelters as follows: Campus Campus Canyon Glenwood Griffin North Meadows BACKGROUND: FACILITY: Picnic Shelter Restroom X X X X X X X Bids for the construction of three restrooms and four picnic shelters were received and opened on July 30, 1991, at 2:00 p.m. at City Hall. Please refer to Exhibit "A" for bid details. After receipt of the bids, staff was made aware of additional information related to the work to be done at North Meadows Park. Staff was informed about stub outs for sewer and water installed at the park by Urban West Communities not shown on the park's final as -built plans. Staff contacted the apparent low bidder, Jevon Construction Company, to inform them of the stub outs to discuss the bid price change for the work to be performed. Staff also requested a quote on upgrading the block wall construction bid from precision block to slumpstone block to match the picnic shelter; prices for exchanging the restroom partitions from metal to high density polyethylene; paint the interior and exterior of the block wall PAUL W. LAWRASON JR. BERNARDO M. PEREZ SCOTT MONTGOMERY ROY E. TALLEY JR. JOHN E. WOZNIAK Mayor Mayor Pro Tem Councilmember Councilmember Councilmember 1. The Honorable City Council Page 2 9/13/91 restroom facility with "ultra shield" graffiti paint; and eliminate six soap dispensers. Jevon's prices for the items requested were as follows: 1. Upgrade block restroom buildings from precision block to slumpstone $ 81000 2. Credit for six soap dispensers $( 300) 3. Credit for sewer lateral (stub) and eliminate 20' of pipe and street excavation (No. Meadows Park) $(1,475) 4. Credit for 300' of water line to connect to stub (No. Meadows Park) $( 700) 5. Exchange metal toilet partitions for high density polyethylene $ 1,495 6. Application of Ultra Shield to both sides of restroom block walls $ 1,945 Subtotal of extra charges: $ 8,965 Staff recommends elimination of the Ultra Shield (staff can apply) $(1,945) TOTAL EXTRA CHARGES: $ 7,020 As modified, the extra charges requested by staff adjust Jevon's initial bid to $248,498.26. PROJECT FUNDS: The total funds appropriated in the FY 91/92 budget to construct the restrooms and picnic shelters are $165,000.00. The low bid for each picnic shelter came in at $7,707.01 above the budget appropriation. The low bid for the restroom buildings at Campus Canyon and North Meadows Parks came in $2,923.44 under the budget appropriation. The low bid for the restroom at Griffin Park came in $5,456.70 above the budget appropriation. This is because a storage room is being added to the Griffin Park restroom. Additionally, utility costs to connect electricity, water and sewer to the restrooms were appropriated in the FY 91/92 budget as the costs were unknown at that time. Utility costs for the restrooms total $32,514.50 A summary of the project funds compared to the low bid are as follows: 0 The Honorable City Council Page 3 9/13/91 BID COMPARISONS LOW BID FUNDS ELECTRICAL PARK APPROP. STRUCTURE SERVICE SUBTOTAL BALANCE Campus $15,000 $22,707.01 $ 2,160.00 $ 22,707.01 ($ 7,707.01) Glenwood *$ -0- $22,707.01 $ 3,577.50 $ 22,707.01 ($22,707.01) Griffin $15,000 $22,707.01 $ 4,000.00 $ 22,707.01 ($ 7,707.01) N Meadows $15,000 $22,707.01 $ 3,000.00 $ 22,707.01 ($ 7,707.01) Total: $45,000 $90,828.04 **$12,737.50 $ 90,828.04 ($45,828.04) * Funds in the amount of $15,000 were appropriated in the FY 90/91 City budget for a Picnic Shelter at Glenwood Park. Through an oversight in preparing and adopting the FY 91/92 City budget, the funds were not re -appropriated. Staff will be recommending the Council appropriate funds in the amount of $22,707.01 from the neighborhood portion of the Northwest Park Improvement Fund to construct a picnic shelter at Glenwood Park. ** Jevon Construction has agreed to eliminate this cost if the City will pay Jevon the full cost of the labor and performance bond with the first progress payment and schedule award of the picnic shelters and restrooms at September 18, 1991, Council meeting. The Contractor will install and stub out electrical conduit and lights at each picnic shelter at no additional cost. The City would be responsible to extend the electrical service from the shelters to the power source to make the security lights and receptacles operational. RESTROOMS: RESTROOM UTILITY HOOKUP W/O STORAGE ELEC./SEWER ROOM BID WATER SUBTOTAL BALANCE Park/ Frame/ Concrete Appropr. Stucco Block Campus Canyon: $40,000 $33,076.56 $ 5,467.50 $38,544.06 $ 1,455.94 $35,076.56 $ 5,467.50 $40,544.06 ($ 544.06) Griffin: $40,000 $33,076.56 $12,902.00 $45,978.56 ($ 5,987.56) $35,076.56 $12,902.00 $47,978.56 ($ 7,987.56) N. Meadows: $40,000 $33,076.56 $14,145.00 $47,221.56 ($ 7,221.56) $35,076.56 $14,145.00 $49,221.56 ($ 9,221.56) The Honorable City Council Page 4 9/13/91 RESTROOM WITH STORAGE ROOM Griffin: BID $40,000 $39,245.10 N. Meadows: $40,000 $39,245.10 ADJUSTED RESTROOM W/O STOR- SLUMP - AGE ROOM: STONE Park/ Appropr. Campus Cyn. $40,000 $37,076.56 Griffin: $40,000 $37,076.56 N Meadows: $37,076.56 RESTROOM WITH STORAGE ROOM: Griffin: UTILITY HOOKUP ELEC./SEWER WATER SUBTOTAL BALANCE $12,902.00 $52,147.10 $42,790.04 $12,902.00 $55,692.04 ($15,692.04) $14,145.00 $53,390.01 ($13,390.01) $42,790.04 $14,145.00 $56,935.04 ($16,935.04) ADJ. CHRG. SUBTOTAL UTIL. SUBTOTAL TOTAL $980 $38,056.56 $ 5,467.50 $43,524.06 ($ 3,524.06) $980 $38,056.56 $12,902.00 $50,958.56 ($10,958.56) $980 $38,056.56 $14,145.00 $52,201.56 ($12,201.56) $40,000 $45,278.16 $980 $46,258.16 $12,902.00 $59,160.16 ($19,160.16) N Meadows: $40,000 $45,278.16 $980 $46,258.16 $14,145.00 $60,403.16 ($20,403.16) When funds were appropriated for the picnic shelters and restrooms, utility hookup costs were not included as the extent of work to be done was unknown at that time. When this project was bid, the bid documents identified the utility work needed to be installed with the facilities and the bids received identified those costs as previously mentioned in this report. This project is to be funded from the Park Improvement Fund. The appropriate park zone fund trial balances as of 6/30/91 are as follows: The Honorable City Council Page 5 9/13/91 6/30/91 ZONE TRIAL BALANCE Campus Zone: Campus/Campus Cyn. Griffin Parks $586,318 Mtn. Meadows Zone: ANTIC. (1)ANTIC. REVENUE EXPEND. EXCEPT EXCLUDING INTEREST SHELTERS & EST. INCOME RESTROOMS BAL. FY 91/92 SUBTOTAL FY 91/92 6/30/92 -0- $586,318 *$254,380 $331,938 N. Meadows Park $ 62,775 $ 13,430 $ 76,205 **$ 12,000 (Fedelety) Northwest Zone: Glenwood Park $ 74,185 $ 8,954 $ 83,139 ***S 52,125 (Boething) (1) Summary of Anticipated Park Zone Expenditures FY 91/92 *Campus Park Zone Campus Park 1. Capital Improvements awarded to J & H Engineering $128,900 2. Restroom sky lights $ 5,000 3. Upgrade irrigation system $ 20,000 Campus Canyon Park 1. Light for picnic pavilion $ 750 2. Additional play equipment for tot lot $ 1,000 Griffin Park 1. Capital improvements awarded to J & H Engineering $ 72,879 2. Horseshoe pits (2) $ 500 3. Two picnic tables $ 11800 4. Trash receptacles $ 800 **Mountain Meadows Zone North Meadows Park 1. Play equipment $ 7,500 2. Security lighting $ 4,500 ***Northwest Zone Glenwood Park 1. Capital improvements awarded to J & H Engineering $ 30,625 2. Irrigation upgrade $ 20,000 3. Relocate volleyball courts w/sand $ 1,500 $ 64,205 $ 31,014 The Honorable City Council Page 6 9/13/91 FUNDING SUMMARY BY ZONE FOR CONSTRUCTION OF P7 SHELTERS: EST. ZONE BAL. 6/30/92 Campus Zone $331, 938 Mtn. Meadows Zone $ 64,205 Northwest Zone $ 31,014 COST PICNIC SHELTER (2) $45,414.02 $22,707.01 $22,707.01 7% CON/INSP..SUBTOTAL $3,178.98 $48,593.00 $1,589.49 $24,296.50 $1,589.49 $24,296.50 BALA $283, $ 39,_-_--- $ 6,717.50 FUNDING SUMMARY BY ZONE FOR CONSTRUCTION OF SLUMPSTONE BLOCK RESTROOMS: Campus Zone total funds available $283,345.00 STRUCTURE 7% CONT/INSP. Campus Canyon Park $ 43,524.06 $3,046.68 Griffin Park w/storage $ 59,.160.16 $4,141.21 Total $102,684.22 $7,187.89 $109,872.11 Zone Balance $173,422.89 Mtn Meadows Zone total funds available $ 39,908.50 North Meadows Park $ 52,201.56 $3,654.11 $ 55,855.66 Zone Balance ($ 15,947.17) If currently budgeted capital improvement projects at North Meadows Park of security lights of $7,500 and play equipment of $4,500 plus the restroom building and picnic structures are built, this zone will have a deficit of $16,605.00. Staff recommends deletion of the North Meadows capital project totaling $12,000 and proceed with construction of the picnic shelter and restroom which would result in a zone deficit of $3,947.17. As you know, City Council terminated the Fedelety Lease so revenue projections for the Mountain Meadows Zone are only through 12/31/91. Staff will be recommending the undeveloped balance of the Arroyo Vista Community Park continue to be leased. If this is done, staff estimates additional revenue of $9,000 annually to the neighborhood portion of the Mountain Meadows Park Improvement Fund. The Honorable City Council Page 7 9/13/91 If Council approves staff's recommendations, the estimated 6/l/92 park zone balances would be as follows: ZONE EST, BALANCE Campus $188,892.00 Mountain Meadows $ 520.00 Northwest $ 18,671.00 STAFF RECOMMENDATION: 1. Award bid to Jevon Construction in the amount of $245,713.82 to: A. Construct four picnic shelters, one each at Campus, Glenwood, Griffin and North Meadows Parks. Appropriate a 7% contingency/inspection fund of $6,357.96 for a total project cost of $97,186.00 funded from the Neighborhood portion of the Park Improvement Fund as follows: Campus Zone $48,593.00* *2 shelters (Campus & Griffin Parks) Mountain Meadows Zone $24,296.50 Northwest Zone $24,296.50 $97,186.00 B. Construct three slumpstone restroom buildings, one each at Campus Canyon, Griffin and North Meadows Parks at a cost not to exceed $154,885.78. Griffin Park w/storage room $59,160.16 Campus Canyon Park $43,524.06 North Meadows Park $52,201.56 Appropriate a 7% contingency/inspection fund of $10,842.00 for a total project cost of $165,727.78. 2. Authorize payment of labor and performance bond (approximately $12,000) with first progress payment with credit of $12,737.50 for electrical service to picnic shelters. 3. Defer capital improvements approved in the FY 91/92 budget for North Meadows Park and authorize a loan to the neighborhood portion of the Mountain Meadows Zone of $3,947.17 from the Campus Park Zone with understanding it shall be repaid when funds are received. PEN:db Attachment ") * �-3 CTJ l7 n W N �' O * p hi y o 0 G ct m W C]rt :4z m0 mr+$0 rt Zn Ci]n cn L=] G O N O a 0 F F, FJ O w ri 0 w w �-j a a C rt w �l c t rfi m rt ri m m m rt F• (t m x 0 H o 0 hi r n n hi m rt 0�$ 0 hi m h-h hi m c3 n Cs ri G m rt (D ri rt i rt (D hi M (D Fi G rt G `• a n Fi Fi cn ` Fl O hi Cl) ` F'- Co ` (A hi cn x tl cQ Fi c-r N- rr F- O F'- rt rt Fl- N n TJ w n m m P- rr 0 ri (n m o Q. 0 hi (n Fi cn n 0 ro 0 0 hi ¢ 0 Fi cn 0 0 0 m a O m ro 0 cD w w w¢ �j a n rt rt 0 E 0. (tro rt 0 i w O$�j rt hi 0 0 hi cn o 5 m 0 0 w 0 m Fi �l m 'C 0 ;Nl C] Fi m M hi m 0 0 (D Fi E Fi h K Fi 0 (D 0 m— 0 CD IJ 7r C3 u, rt cn ri rt cn a" ; �3' m rt m rt H O ro 0 () ro 0 m G (n G rh Imo- m a ::3 m m w H bJ 0 rt W n w P- cn Fl- F✓ hi F'- F'- F, H " F'- rt F-' 0 0 0 0 m 7c n n m (D 7i 0 m 0 0 Fi 0 0 F n .. 0 a .. hi 0 w 0 FJ �l (D co rt (n Cl) rt rt u, n' cQ 7c F - o cn Gr hi �r G' m rt rt rr m Fl- m m r- F • (D �c m Fi 0 0 0 O r rt rt rFt rt $ rt ri Fi hi hi O H n �¢ z (D H (n rr r* 0 to to -cn to to In to to -cn to {n {n to in n n C a n hi N F O 0 m O A N F N W W l0 .l C 0 cn F✓ A W A N (n cn W m (n 0 x �l I I. --1 N . O O I N rt �:l H Fi C� r4 n] .PCD F- n (n -.t O to o 0 .P m F- rn o F rn J N G r 0 p¢ wco C, cn O -_7 w co of Ol of Ci rt F3 r OD F'• N O U7 O O cn o O .A Ul U'i it N P- F: 7l1 H b O O O O O O N OD .A Ol Ol 61 O F hi G W � ro �� z w tzi 0 z ~ H 0 t-�N- toZZ z zz z z � iD� mto 4D CN;O o z rt 0 N O O O O O 0 -- -- N rt w m H� 4) ¢ m .A .A W I--� F-' W �P W .A ¢ 0 (n • to a7 al a1 U7 p7 a7 O F- l0 W to to F'• rt N:UO rn w N(p w ON P-0 O N F �o n o n v, OD 0 o o rt 0 oo �Docn P-�l rt * * m o (D ron (Dca m � � V> m �� z� V> n n n o w 0 rt N O O w z W (n .A •A w rt F- J �l `, l Fi !n w N FJ F-� N N to N F- N m of (n to N W ) N- H] H N- I rt cQ ¢ Ol O F-I Ln F-' N Ol Ui m co OD Ol ,'J rt O 4. Ul CD CD O —1 CD O to N W cn () 4< to n -.7 O O O F- O O l0 N Ol to I--' H Ol m G 1-7 rt H 0 m m m Cl (n o �j z P- 10 rt 0 h-h to to to cn -n -(a to In in to z U N N rt O F- N F-� .A W O m .A U co 01 C O W W Cn FJ (.n 1 -1 N 1 1 (n Ut 1H O w m N O FJ O 1-' .iA O OD N .P al of U7 0- l0 .A O O C. C. Ol O Ul W y CA 10 {n {n (n {R {n in 4n {/? {n {n L1 {n to {n H fYi ro w W m ¢ OD N F N W (n (n n C N ' c0 o mW F--' F✓ J N 110 co O -_] .A m F✓ to O w m Cn F,- m O Ul OD J OD O m N FS O co co .r, cn F- to —1 O