HomeMy WebLinkAboutAGENDA REPORT 2013 0605 CCSA REG ITEM 10H ITEM 10.H.
city Council Meeting
MOORPARK CITY COUNCIL
AGENDA REPORT ACTIOW
Zu'd F_ .3
- 1
'i--if
TO: Honorable City Council
FROM: Hugh R. Riley, Assistant City ManAae4-'11,�
.0
DATE: May 15, 2013 {CC Meeting of 6/512013)
SUBJECT: Consider Amendment No. 3 to the Agreement with Southwest
Testing, dba Vertical-V Testing Engineer at the Ruben Castro Human
Services Center; and Consider Resolution Amending the Fiscal Year
2012/13 Budget to Appropriate $16,100 from the RDA-SA 2006 TAB
Proceeds Fund 9104 to Cover the Cost of Amendment No. 3 to the
Southwest Testing Agreement
BACKGROUND & DISCUSSION
The Ruben Castro Human Services Center (RCHSC) was being constructed as a
multiple-prime contract project with construction management provided by Barnhart
Balfour Beatty Construction (Balfour-Beatty). Requests for Proposals were received to
provide Materials Testing, Special Inspection Services and Geotechnical Services for
the project. The City entered into a Professional Services Agreement with Southwest
Testing Engineers, dba Vertical—V Engineer on February 25, 2011, to provide said
services.
During the course of construction, direction was provided by the City to modify and
extend storm drain collection systems to the project site. Said changes resulted in
modifications to the previously designed onsite grading elevations and underground
utilities, referenced as HMC Architects Instruction Bulletin # 9. In order to complete the
modifications to work already in place, additional observation and oversight was
required to provide re-inspection, soils re-testing and geotechnical services to confirm
compliance of work.
There have been two (2) amendments issued for changes, modifications, and
construction alterations requested or required during the course of construction. A
recap of the original contract and amendments issued to date is provided on the
following page.
467
Honorable City Council
June 5, 2013
Page 2
Original Contract $ 156,151.50
Amendment No. 1 $ 13,795.00
Amendment No. 2 $ 5,486.00
Current Agreement Amount $ 175,432.50
Amendment No. 3
Modifications to onsite grading and utilities $ 16,080.40
Revised Agreement Amount $ 191,512.90
Currently there is no contingency remaining within the Professional Services Agreement
with Southwest Testing Engineers, Inc, dba Vertical -- V Engineering. The cost for the
additions, revisions, and associated labor and materials is $16,080.40, which exceeds
the available contingency; therefore, staff is seeking the approval of this additional
amount.
FISCAL IMPACT
The construction of the Ruben Castro Human Services Center (CIP 5020) and the
Southwest Testing, dba Vertical—V Testing Engineer contracts are included in the
approved Recognized Obligation Payment Schedule III (ROPS III) for the period
January 1, 2013, to June 30, 2013. However, there are no available appropriations to
cover the cost of Amendment No. 3. A budget amendment of $16,100 is required from
the RDA-SA 2006 TAB Proceeds Fund (Fund 9104). This fund is estimated to have
$2,986,343 fund balance at year-end with the proceeds from the sale of Building A to
the County of Ventura.
STAFF RECOMMENDATION ROLL CALL VOTE
1. Approve Amendment No. 3 to Southwest Testing Engineers, Inc, dba Vertical—V
Engineering.
2. Adopt Resolution No. 2013 amending the FY 2012/13 Budget to appropriate
$16,100 from the RDA-SA 2006 Tab Proceeds Fund (9104) to cover the cost of
Amendment No. 3 to the Southwest Testing Engineers, Inc, dba Vertical—V
Engineering.
Attachments:
1. Amendment No. 3 to Southwest Testing Engineers, Inc, dba Vertical—V
Engineering
2. Resolution No. 2013-
468
THIRD AMENDMENT TO AGREEMENT 2011-415
FOR MATERIALS TESTING & SPECIAL INSPECTION SERVICES
AT THE RUBEN CASTRO HUMAN SERVICES CENTER
THIS THIRD AMENDMENT TO THE AGREEMENT FOR MATERIALS TESTING,
SPECIAL INSPECTION AND GEOTECHNICAL SERVICES ("Third Amendment"), is
made and entered into this day of , 2013, ("the Effective
Date") between the City of Moorpark, a municipal corporation, hereinafter referred to as
"CITY", and Testing Engineers Southwest, Inc., dba Vertical-V Testing Engineers, Inc.,
a California corporation, hereinafter referred to as "CONSULTANT".
WITNESSETH:
WHEREAS, on February 25, 2011, the CITY and the CONSULTANT entered into
an Agreement for material testing, special inspection and geotechnical services for the
Ruben Castro Human Services Center, and
WHEREAS, on April 6, 2012, the CITY and the CONSULTANT executed a First
Amendment for material testing, special inspection and geotechnical services for the
Ruben Castro Human Services Center; and
WHEREAS, on April 18, 2012, the City Council of the City of Moorpark provided
approval for additional funding for material testing, special inspection and geotechnical
services for the Ruben Castro Human Services Center; and
WHEREAS, on May 21, 2012, the CITY and the CONSULTANT executed a
Second Amendment for material testing, special inspection and geotechnical services
for the Ruben Castro Human Services Center; and
WHEREAS, the CITY wishes to amend the Agreement to include additional
materials testing and special inspection services associated with various onsite grading
and underground utility modifications which were affected by the offsite storm drain
modifications and additional scope associated with the Ruben Castro Human Services
Center at a cost not-to-exceed sixteen thousand eighty dollars and forty cents
($16,080.40) as described in the revised Proposal dated April 30, 2013, and
incorporated herein as Exhibit E to the Agreement by this Third Amendment; and
WHEREAS, this amount is above the ten percent (10%) contingency amount
approved with the original Agreement.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto AMEND the aforesaid Agreement follows:
Professional Services Agreement Page I of 2
Third Amendment Between City of Moorpark and Testing Engineers Southwest, Inc. dba Vertical-V 469
I. Section 2 of the Agreement is amended to include:
Consultant's Scope of Services is amended to provide additional materials
testing and special inspection services associated with the onsite grading and
underground utility modifications provided in HMC Architects Instruction Bulletin #9.
Instruction Bulletin #9 resolves coordination and modification of final on site grading
elevations and underground utilities resulting from the modifications and additional
scope of storm drain located within Spring Road.
The Scope of Services for the additional testing and inspection services is described in
the Consultant's Proposal dated April 30, 2013, attached hereto and incorporated herein
as Exhibit E to the Agreement by this Third Amendment.
II. Section 5 of the Agreement is amended to include:
CITY hereby increases the not-to-exceed amount of $175,432.50 under this
Agreement by $16,080.40 to $191,512.90.
III. Remaining Provisions
All other terms and conditions of the original Agreement shall remain in full force
and effect.
CITY OF MOORPARK VERTICAL V TESTING ENGINEERS, INC.
By: By:
Steven Kueny Scott Moors, CEG 1901
City Manager President
ATTEST:
Maureen Benson, City Clerk
Exhibit E — Consultant's Proposal dated April 30, 2013
Professional Services Agreement Page 2 of 2
Third Amendment Between City of Moorpark and Testing Engineers Southwest, Inc. dba Vertical-V 470
EXHIBIT E
NIV15
STCLASS-VERTICALFIVE
April 30,2013 Project No. : 45011-001037.00
Barnhart Balfour Beatty,Inc.
300 E. Esplanade Sr., Ste. 350
Oxnard, CA 93036
ATTENTION: Dennis Kuykendall, Sr. Project Manager
SUBJECT: Proposal for Materials Testing and Inspection for the Ruben Castro Human Services Center
and SnrinLy Road Storm Drain,Moorpark
BTC LABS-Vertical V is pleased to submit this change order request for the referenced project.
The following is a summary of variances from your original project estimate. As indicated,there was a large variance
in the soils hours versus what was estimated and smaller variances in the shop welding and masonry inspection hours.
Hourly Proposal Est. Actual Reg. Actual Variance Variance Cost*
Rate (Hrs) (Hrs) O.T. Hrs*
Concrete Inspection/Tech/Non-Shrink Grout $ 76 336 258.5 9.75 -62.9 $ (4,779)
Field Welding Inspection $ 76 852 591 9 -247.5 $ (18,810)
Shop Welding Inspection $ 69 320 296.5 55.5 59.75 $ 4,123
Non-Destructive Testing(NDT) $ 80 20 43.5 23.5 $ 1,880
Masonry Inspection $ 76 164 210 4 52 $ 3,952
Soils/Asphalt Inspection&Testing $ 78 232 596 11 380.5 $ 29,679
Epoxy Inspection $ 76 20 8.5 -11.5 $ (874)
Anchor Pull Testing $ 76 32 8.5 -23.5 $ (1,786)
Project Management/Engineering $ 120 14 40.25 26.25 $ 3.150
Totals: 1990 2052.75 89.25 196.625 $ 16,535
* Hours a normalized to regular time hours,i.e.OT hrs are multiplied by 1.5. Negative means actual hours were less than our estimate.
Our currently authorized budget and the currently anticipated change order amount are summarized below.
Summary of Budget Status
Current Authorized Budget: $ 175,432.50
Total Accumulated Charges: $ 191,512.90
This Change Order Request: $ 16,080.40
BTC Labs appreciates the opportunity to be of service. If you have any questions, please do not hesitate to contact us.
Respectfully Submitted,
BTC LABS-Vertical Fiv Reviewed By,
Scott Moors,CEG 1901 Carol Harrison
Pres' ent / Marketing Manager
BTC LABS-Vertical Five An NV5,Inc.Company
1868 Palma Drive,Suite A,Ventura,CA 93010 www.NV5.com
Phone: (805) 656-6074 Fax(805) 650-6264 Offices Nationwide
471
RESOLUTION NO. 2013-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR
2012/13 BUDGET TO APPROPRIATE $16,100 FROM THE
RDA-SA 2006 TAB PROCEEDS FUND (9104) TO COVER
THE COST OF AMENDMENT NO. 3 TO SOUTHWEST
TESTING, DBA VERTICAL-V TESTING ENGINEER
AGREEMENT
WHEREAS, on June 20, 2012, the City Council adopted the Operating and
Capital Improvement Budget for Fiscal Year 2012/13; and
WHEREAS, on October 14, 2012, the State of California Department of Finance
approved the Recognized Obligation Payment Schedule III (ROPS III) for the period
January 1, 2013, through June 30, 2013; which included the Ruben Castro Human
Services Center Project (CIP 5020) and the obligation to Southwest Testing, dba
Vertical-V Testing Engineer for materials testing, special inspection services, and
geotechnical services; and
WHEREAS, a staff report has been presented to City Council discussing the
changes requested or required during the construction CIP 5020 and the need to
execute Amendment No. 3 to the Agreement with Southwest Testing; and
WHEREAS, an additional appropriation of $16,100 is requested from the RDA-
SA 2006 TAB Proceeds Fund (Fund 9104) to cover the cost of Amendment No. 3; and
WHEREAS, Exhibit "A" hereof describes said budget amendment and its
resultant impacts to the budget line item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment allocating $16,100 from the RDA-SA 2006
TAB Proceeds Fund (Fund 9104) for the modifications covered in Amendment No. 3 to
the Agreement with Southwest Testing, as more particularly described in Exhibit "A"
attached hereto is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and
shall cause a certified resolution to be filed in the book of original resolutions.
472
Resolution No. 2013-
Page 2
PASSED AND ADOPTED this Stn day of June, 2013.
Janice S. Parvin, Mayor
ATTEST:
Maureen Benson, City Clerk
Attachment: Exhibit A— Budget Amendment
473
Resolution No. 2013-
Page 3
EXHIBIT A
BUDGET AMENDMENT FOR RDA-SA 2006 TAB PROCEEDS FUND 9104
TO COVER THE MODIFICATIONS IN AMENDMENT NO. 3 OF THE AGREEMENT
WITH SOUTHWEST TESTING, DBA VERTICAL-V TESTING ENGINEER FOR THE
CONSTRUCTION OF THE RUBEN CASTRO HUMAN SERVICES CENTER
PROJECT 5020
FY 2012/13
FUND ALLOCATION FROM:
FUND TITLE FUND ACCOUNT NUMBER AMOUNT
RDA-SA 2006 TAB Proceeds 9104-5500 $16,100
Total $16,100
DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS:
9101-2411-5020-96-03 $3,020.00 $0.00 $3,020.00
9101-2411-5020-9620 ($1,278,992.55) $0.00 ($1,278,992.55
9104-2411-5020-9601 $58,980.35 $0.00 $58,980.35
9104-2411-5020-9603 $18,152.67 $0.00 $18,152,67
9104-2411-5020-9620 $188,558.54 $16,100.00 $204,658.54
9104-2411-5020-9625 $58,372.50 $0.00 $58,372.50
9104-2411-5020-9632 $10,451.16 $0.00 $10,451.16
9104-2411-5020-9650 $427,000.00 $0.00 $427,000.00
Total $2,069,996.73 $16,100.00 $2,086,096.73
Finance approval:
474