HomeMy WebLinkAboutAGENDA REPORT 2013 0619 CCSA REG ITEM 09D ITEM 9_ .D.
City Council Meeting
-/9- v 43 ,
MOORPARK CITY COUNCIL- -- - - ---
AGENDA REPORT
TO: Honorable City Council
FROM: Dave Klotzle, City Engineer/Public Works Director
Prepared by: Al Gali, Assistant Engineer XC-�
DATE: June 7, 2013 (CC Meeting of 06/19/13)
SUBJECT: Consider Seven-Year Capital Improvement Program (CIP) for the
Department of Public Works for FY 2012/13 — FY 2018/19
BACKGROUND
The City's seven-year Capital Improvement Program (CIP) for the Department of Public
Works is updated annually. Staff has prepared the final draft of the updated CIP for FY
2012/13 — FY 2018/19 and has distributed that document to the City Council under
separate cover. This staff report summarizes the recommended changes from the
previous CIP.
DISCUSSION
A. General Description / Purpose
The CIP is a list of planned municipal improvement projects for the City's
Department of Public Works. Proposed improvements for parks, buildings and
facilities are not included. Also, costs for general public works maintenance
programs (i.e. pavement marking, striping, regulatory signs, tree trimming, etc.) are
not included in this program as this type of Public Works Operations and
Maintenance expense is set forth in the annual Departmental Operating Budget.
The purpose and focus of the CIP is to provide the City Council with a tool for
planning and programming major public works capital improvement projects
related to streets and roads, over the next several years.
29
Honorable City Council
June 19, 2013
Page 2
B. Changes from Last Report
1. Project 8087 — Moorpark Avenue Left-Turn Lane (page B-30) was updated to
describe that the project will be incorporated into Metrolink's Sealed Corridor
Railroad Crossing Improvement Project.
2. No new projects were added to the updated CIP.
3. Section 'N' of this report lists the completed projects which have been added to
Appendix `I' of the CIP.
4. The updated CIP includes a new list of Potential Objectives as identified in
Appendix `III'.
C. Committee Review and Input
The Transportation and Public Works Committee (TPWC), (Councilmembers
Millhouse and Van Dam), was not able to meet and review the draft CIP update so
the document was taken directly to the Planning Commission for review and
comment.
D. Planninq Commission Review
Section 65401 of the Government Code of the State of California requires the
Planning Commission to review the City's Capital Improvement Program each
year, for the purpose of reporting to the City Council on the conformity of said
document with the City's General Plan. On June 4, 2013, the final draft of the
subject document was presented to the Moorpark Planning Commission for such
action. The Planning Commission found the subject CIP to be in conformance
with the Circulation Element of the Moorpark General Plan with the exception of
the Moorpark Avenue Widening project. The project includes a second
southbound lane from Casey Road to Third Street that is not identified in the
General Plan and the Circulation Element.
E. Seven Year Program / Congestion Management Program
The subject CIP provides for the planning and programming of projects over a
seven year period. In this way the CIP is compatible with the Ventura County
Transportation Commission's (VCTC) Congestion Management Program (CMP).
The CMP requires a seven-year projection of projects which might enhance the
traffic capacity on any street on the CMP Roadway Network. A map of the CMP
network and a chart listing the projects on that network, are listed in Section 'D' of
the CIP.
SAPublic Works\Everyone\Reports\Staff Reports\2013\June\6-19-2013(7 Year CIP).doc 30
Honorable City Council
June 19, 2013
Page 3
F. Priorities and Planninq
The funding year shown for each project listed in the CIP is an indication of its
relative priority. Should the Council wish to recommend project priorities different
from those set forth in the draft document prepared by staff, it may do so.
G. Fiscal Year 2012/13: Budget Consistency
The first year of the subject CIP is Fiscal Year 2012/13. The funding amounts and
sources cited in the CIP for FY 2012/13 are consistent with the current FY 2012/13
Budget.
H. GASB-34
City staff monitors and maintains an Infrastructure Valuation Program consistent
with the requirements of the Government Accounting Standards Board Statement
No. 34 (GASB-34). The initial analysis which established the valuation of the
City's infrastructure, inventoried, quantified, categorized and valued (replacement
cost estimate) all of the City's capital assets. The valuation amount for the City's
infrastructure assets is over $225 million, with "street-related" improvements
valued at over $70 million.
I. Program Content
In addition to known projects planned to be constructed by either the City or
private developers, a number of projects have been included in the CIP in order to
fully address the needs described in certain infrastructure planning documents,
noted as follows:
1. Circulation Element All of the "future" arterial and collector streets identified
in the Circulation Element of the Moorpark General Plan, have been included
in the program.
2. Master Drainage Study. All of the "future" drains identified in the 1995 Master
drainage Study, have also been included in the program.
J. Program Format
The projects listed in the CIP are organized into five categories listed as follows:
• Streets (including underground utility projects);
• Trails and Walkways;
• Traffic Signals;
• Medians and Parkways; and
• Storm Drains.
SAPublic Works\Everyone\Reports\Staff Reports\2013\June\6-19-2013(7 Year CIP).doc 31
Honorable City Council
June 19, 2013
Page 4
K. Program Cost Estimate
Section 'A' of the CIP provides a general introduction to the program and includes
a listing of the total program cost estimate (exceeding $48 million), summarized as
follows:
Estimated
Section Program Cost($)
100 Streets 29,582,924
200 Trails/Walkways 864,000
300 Traffic Signals 550,000
400 Medians & Parkways 1,310,549
500 Storm Drains 16,400,000
Total 48,707,473
L. Project Descriptions
Section 'B' of the CIP sets forth a "Project Description" page for each project. The
information provided on each Project Description page includes estimated project
costs, recommended funding year and recommended funding sources.
It should be noted that no detailed preliminary engineering was proposed for the
projects listed. The cost estimates are, therefore, very preliminary and will be
subject to change as the full scope and requirements of each project are
developed.
M. Program Expenditure Summary
Section 'C' of the CIP sets forth a table listing all projects in the CIP along with
total estimated project costs for each fiscal year of the program.
N. Completed Projects
In order to document completed projects, Appendix `I' of the CIP lists all known
major Capital Improvement projects (for the Public Works Department)
constructed since the City's incorporation in 1983. The following projects were
added to Appendix `I':
2009
Streets & Trails
• High Street Rehabilitation
Storm Drains
• Walnut Canyon Drain Improvement
SAPublic Works\Everyone\Reports\Staff Reports\2013\June\6-19-2013(7 Year CIP).doc 32
Honorable City Council
June 19, 2013
Page 5
2012
Streets & Trails
• Alderbrook Street Asphalt Overlay
• 2012 Pavement Rehabilitation
• 2012 Sidewalk Reconstruction
• Spring Road Overlay
Storm Drains
• Spring Road Storm Drain
O. Funding Sources: Definitions
Appendix `II' of the CIP is a listing of the major funding sources for the program,
along with a description for each.
P Conclusion
The subject CIP is designed to serve many purposes.
• It is a budget planning document.
• It is a funding source reference.
• It is a plan for future improvements.
• It is a list of infrastructure needs.
• It sets forth the scope and estimated cost of specific projects.
• It is a tool for prioritizing and scheduling capital improvement projects.
• It provides a list of projects already completed.
• It provides a list of potential projects.
• It documents compliance with requirements of the Congestion Management
Program.
• Additionally, it is a "hands-on" working reference document to identify, define
and describe future planned capital improvement projects.
FISCAL IMPACT
None.
STAFF RECOMMENDATION
Approve the updated CIP for FY 2012/13 — FY 2018/19.
SAPublic Works\Everyone\Reports\Staff Reports\2013\June\6-19-2013(7 Year CIP).doc 33
ITEM 9.1).
m
AaRq TFo �uL-c
CITY OF MOORPARK
DEPARTMENT OF PUBLIC WORKS
Seven Year
Capital Improvement Program
FY 2012/2013 - FY 2018/2019
JANICE PARVIN,MAYOR
ROSEANN MIKOS,COUNCILMEMBER
KEITH MILLHOUSE, COUNCILMEMBER
DAVID POLLOCK, COUNCILMEMBER
MARK VAN DAM, COUNCILMEMBER
STEVEN KUENY
-CITY MANAGER-
DAVID KLOTZLE,P.E.
-CITY ENGINEER/PUBLIC WORKS DIRECTOR-
Adopted June 19,2013
Cl P 2012!2013 6/19/2013
A. Introduction
B. Project Descriptions
CIP 2012/2013
Table of Contents
Page
A-1
100 Streets
101 8002: Slurry Seal Program B-4
102 8076: SR-118/Collins Drive Westbound Off-Ramp Improvements and Signals B-5
Modification.
103
Walnut Canyon Road Sidewalk Improvements
B-6
104
8026:
Spring Road Widening
B-7
105
8012:
Princeton Avenue Widening
B-8
106
8013:
Los Angeles Avenue Widening: Spring Road to Moorpark Avenue
B-9
107
8069:
Spring Road/Charles Street Bus Turn-Out.
B-10
108
8058:
Los Angeles Avenue Widening at Shasta Avenue
B-11
109
Underground Utility Projects
B-12
110
8051:
Underground District No.2: L.A. Avenue Transmission Lines
B-13
111
8066:
Underground Utilities: L.A.Avenue at the Arroyo Simi Bridge
B-14
112
8039:
Rail Crossing Improvements at Spring Road
B-15
113
8084:
Arroyo Drive Overlay
B-16
114
8071:
Bus Shelter Improvements and Other Bus Stop Amenities
B-17
115
8061:
North Hills Parkway
B-18
116
5056:
High Street Streetscape/Parking Improvements
B-19
117
8045:
23 FWY North Alignment
B-20
118
8079:
SR-23 FWY Soundwalls at Tierra Rejada Road
B-21
119
8056:
Metrolink South Parking Lot South Entry
B-22
120
Gabbert Road Rail Crossing
B-23
121
High Street[West] Reconstruction
B-24
122
8080:
Railroad Crossing Improvements at Arroyo Drive
B-25
123
8040:
Moorpark Avenue Widening Project
B-26
124
Lengthen Curb Radii at Designated Intersections
B-27
125
Los Angeles Avenue Widening West of Tierra Rejada Road
B-28
126
Casey Road Extension
B-29
127
8087:
Moorpark Left Turn Lane
B-30
128
8093:
Asphalt Overlay on Spring Road, Princeton Avenue,and Poindexter Avenue
B-31
200
Trails and Walkways
201
8001:
Sidewalk Reconstruction Project
B-34
202
Pedestrian/Bicycle Projects
B-35
203
8035:
Arroyo Trail Bridge Ramp Project
B-36
204
8059:
Drain No.2 Trail
B-37
205
8086:
Sidewalk&Bicycle Lane at AVRC
B-38
206
Walnut Canyon Road Westside Championship Drive to Peter's Driveway
B-39
207
Civic Center Pedestrian Access and Bus Stop Improvements
B-40
6/19/2013
Table of Contents (Cont.)
Page
300 Traffic Signals
301 Not Assigned B-42
302 8058: Los Angeles Avenue and Shasta Avenue B-43
303 8077: SR-118/Collins Drive Eastbound On/Off Ramps B-44
304 Not Assigned B-45
305 8013: Los Angeles Avenue and Millard Street B-46
306 8061: Los Angeles Avenue West of Butter Creek Road B-47
400 Medians and Parkways
401 8047: Medians:Los Angeles Avenue B-50
402 8026: Medians: Spring Road B-51
403 Not Assigned B-52
404 8048: Parkway: Poindexter Avenue B-53
405 SR-23 /Tierra Rejada Road Interchange Landscaping B-54
406 Not Assigned B-55
407 Not Assigned B-56
408 Peach Hill Parkways B-57
500 Storm Drains
501 8088: Master Plan of Drainage B-60
502 Gabbert Canyon/Walnut Canyon System Improvements B-61
503 Shasta Drain B-62
504 8065: Millard Drain B-63
505 Villa Del Arroyo Drain B-64
506 Miscellaneous Drainage Improvements B-65
507 Arroyo Simi Channel Improvements B-66
C. Program Expenditure Summary C-1
• Total Program Project Costs: Spread to Funding Year
• FY2012/13 Total: Spread to Funding Sources
• Total Program: Spread to Funding Sources
D. Projects on the Congestion Management Plan [CMP] Road Network D-1
Appendix `I': List of Completed Projects 1-1
Appendix `II': Description of Funding Sources I1-1
Appendix `III': List of Potential Projects 111-1
UP P 2012/2013 6/19/2)0 13
City of Moorpark
Capital Improvement Program
A. Introduction
This is the updated Seven Year Capital Improvement Program (CIP) for the City of Moorpark,
Department of Public Works for the period covering FY 2012/13 through FY 2018/19. The primary
purpose of this CIP is to provide the City Council with a framework for identifying, planning and
prioritizing needed municipal capital improvements. The year each project is recommended to be
funded, is an indication of the priority given to each project. The figures cited in the FY 12/13 column,
should be identical to the appropriations approved in the FY 2012/13 Budget for capital improvement
projects for(8000 series).
Projects have been organized into the five (5) Sections noted below. The projects identified in this CIP
include both City funded projects as well as major projects which are likely to be constructed by land
developers. The projects listed in Section 100 include future streets which are identified in the
Circulation Element of the Moorpark General Plan. The projects listed in Section 500 include future
needed storm drains identified in the Moorpark Master Drainage Study. Also included in Section 500
are certain projects of importance to the City which are planned to be constructed by the Ventura
County Watershed Protection District.
A brief description of the contents of this CIP is as follows:
• A: this Introduction;
• B: a project description page for each project;
• C: a summary of total program expenses by fiscal year;
• D: a list of the projects on the Network Congestion Management Program (CMP);
• Appendix `I': a list of completed projects through 2012.
• Appendix `II': a description of the funding sources referenced herein.
• Appendix `III': a list of potential projects.
A summary of the total estimated program expenditures is as follows:
Section FY12/13 FY13/14 FY14/15 FY15/16
100 Streets 14,118,466 3,034,458 1,385,000 895,000
200 Trails &Walkways 299,000 290,000 115,000 40,000
300 Traffic Signals 0 0 550,000 0
400 Medians/Parkways 92,549 850,000 316,000 52,000
500 Storm Drains 150,000 0 450,000 800,000
Total 14,660,015 4,174,458 2,816,000 1,787,000
Section FY16/17 FY17/18 FY18/19 Total
100 Streets 150,000 5,000,000 5,000,000 29,582,924
200 Trails & Walkways 40,000 40,000 40,000 864,000
300 Traffic Signals 0 0 0 550,000
400 Medians/Parkways 0 0 0 1,310,549
500 Storm Drains 0 7,500,000 7,500,000 16,400,000
Total 190,000 12,540,000 12,540,000 48,707,473
CI P 2012/2013 A-1 61/191/20 13
Cl P 2012/20 l 3 A-2 6/1 1 3
City of Moorpark
Capital Improvement Program
B. Project Descriptions
Individual project descriptions are set forth in this section. Each project description
includes a location map, a project cost estimate, a proposed schedule, and recommended
funding sources.
It should be noted that there has been no preliminary engineering performed for most of
the projects programmed in future years. The cost estimates provided for those projects
are a rough estimate only and should not be relied upon to predict actual costs. These
estimates were included in the project descriptions in order to provide a general idea of
the total estimated program costs. Individual project cost estimates will be revised as
engineering for each project is developed.
0 P 2012/2013 B-1 6/19/20 1
MIJ
CI P 2012/2013 B-2 61/191/210 13
Streets
CIP 2012/2013 B-3 6/19!2013
City of Moorpark
Capital Improvement Program
Project Name: Slurry Seal Program Code No. 101
Account No. 8002
Location Map
Various Streets (to be determined)
Project Description
Bi-annual Slurry Seal/ARAM project. Resurfacing of one-third of the City's streets every other year. Past
Slurry Seal Projects are listed in Appendix `I'. The scope of work often includes the removal and
replacement of pavement in poor condition, and the application of crack sealer where needed. The next
slurry seal project is scheduled for Summer 2014.
Project Funding Schedule Total Cost: $4,574,588
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 34,741
R-O-W
Construction 3,536,843 804,736
Inspection 146,209 51,795
Total 3,717,793 856,531 0 0 1 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2603:LTF 2,508,292
2606:HUTA 94,347 495,966
2609:Grant 54,000
2610: Grant 479,323 304,770
2611:Grant 582,628 1,795
2400:Parks 53,203
Total 3,717,793 856,531 0 0 1 0 0 0 0
CI P 2012/2013 B-4 6/19/20 13
City of Moorpark
Capital Improvement Program
Project Name: SR-118/Collins Drive Westbound Off-Ramp Improvements and Signal Code No. 102 .
Modification. Account No. 8076 .
Location Map
1 �
1 '
J _.
CON"DINO
ca
PROJECT '
Project Description
This project involves the modification of the westbound SR-118 off-ramp and signal to provide an un-
signalized right turn lane from the westbound SR-118 off-ramp to Collins Drive. This project is partially funded
by Moorpark Community College.
Project Funding Schedule Total Cost: $550,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 75,000
R-O-W
Construction 475,000
Inspection
Total 0 0 0 75,000 475,000 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2603:LTF
1000 General
Other Sources 75,000 475,000
Total 0 0 0 75,000 475,000 0 0 0
C I P 2012/2013 B-5 611/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Walnut Canyon Road Sidewalk Improvements Code No. 103.
Account No. ----
Location Map
/
T 5130
PROJECT
Case d
st
Project Description
Construction of additional pavement and a sidewalk on the west side of Walnut Canyon Road, north of
Casey Road. This project is to be constructed by the developer of Tract 5130.
Project Funding Schedule Total Cost: $500,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 500,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 500,000
Developer
Total 0 0 500,000 0 0 0 0 0
C1P 2012/2013 B-6 6'19/2013
City of Moorpark
Capital Improvement Program
Project Name: Spring Road Widening: Los Angeles Avenue to Flinn Avenue Code No. 104
Account No. 8026
tt
'' ttI � (( Location Ma
ijc� ltd Sr- �J
li
a
MITT m
PROJECT
i
Los Angeles Ave(SR 118)
Project Description
Construction of improvements and modifications to Spring Road, from a point south of Los Angeles
Avenue northerly to Flinn Avenue. This project requires the acquisition of additional street right-of-way,
widening, new curb, gutter and sidewalk along the east side of the street. Ultimate improvements will
include four (4) travel lanes, six foot (6') wide bike lanes, a fourteen foot (14') wide landscaped median
and double left-turn lanes southbound on Spring Road. The project extends south of Los Angeles Avenue
to accommodate a shift of the centerline to the east. The project also includes new signal poles at the
northeast and southeast corners of Los Angeles Avenue and Spring Road.
Project Funding Schedule Total Cost: 1,250,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 77,778 42,222
R-O-W 272,178 87,822
Construction 44,380 655,620
Inspection 1 1 70,000
Total 1 394,336 855,664 0 1 0 1 0 1 0 1 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501:L A AOC 394,336 855,664
Total 394,336 855,664 0 0 0 0 0 0
CIP 2012/2013 B-7 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Princeton Avenue Widening Realignment and Reconstruction Code No. 105 .
Account No. 8012
Location Map
23 F'WY
nc um
P�
PROJECT V
kvwws
1Z I
6 -
3
Project Description
Widening, realignment and reconstruction of Princeton Avenue from a point east of Spring Road to South
Condor Drive. Additional street right-of-way is being acquired to provide an eighty-eight feet (88') wide
corridor — sufficient to allow for future widening of the road to four lanes. The current project design
provides for only one lane in each direction with a paved median and paved shoulders. The project plans
call for the realignment and reconstruction of the street pavement, the construction of storm drains and the
construction of retaining walls as required.
Project Funding Schedule Total Cost: $4,827,698.
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 769,247
R-O-W 2,061,649 17,547
Construction 29,410 1,849,845
Inspection 100,000
Total 2,860,306 1,967,392 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501: LAOC 2,841,550 880,148
2609:Grant 18,756 1,087,244
Total 2,860,306 1,967,392 0 0 0 0 0 0
C I P 2012/2013 B-8 6/1911,11"/2013
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Widening: Spring Road to Moorpark Avenue Code No. 106 .
Account No. 8013
Location Map
111111111111111111 000
r ve
9 ° o
3
D
� a
IIIIIIII Los 1 Ave
2.
is
ct
PROJECT,
w
Project Description
Widening of Los Angeles Avenue to provide for six (6) travel lanes of traffic. At Spring Road the
centerline will be shifted to the south to avoid acquiring right-of-way from the residential properties along
the north side of the street. The additional right-of-way in this area will be acquired from the south side of
the street. At Moorpark Avenue the additional street right-of-way will be acquired from the north side of
the street. The project includes westbound right-turn lanes at Spring Road and at Moorpark Avenue, and a
new traffic signal at Millard Street.
Project Funding Schedule Total Cost: $4,020,129 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 721,821 57,051
R-O-W 583,144 1,079,414
Construction 354,876 1,126,270
Inspection 4,019 93,534
Total 1,663,860 2,356,269 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501:LA AOC 1,663,860 1,559,499
2604:Grant 796,770
Total 1,663,860 2,356,269 0 0 0 0 0 0
C I P 2012/2013 B-9 6'19/2013
City of Moorpark
Capital Improvement Program
Project Name: Spring Road/Charles Street: Bus Turn-Out Project Code No. 107
Account No. 8069
Location Map
�J T
v �
g
m �
X 1°
h
R
Charles St Ch
n 7777 R EC
Prin
High St
s
e2
M
CL
Project Description
The construction of a bus turn-out on the east side of Spring Road just south of Charles Street. Additional
street right-of-way will have to be acquired in order to implement this proje ct.
Project Funding Schedule Total Cost: $164,216
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 13,968
R-O-W 248 39,000
Construction 106,000
Inspection 5,000
Total 14,216 0 0 150,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM 14,216 150,000
Total 14,216 0 0 150,000 0 0 0 0
CIP 2012%2013 B-10 6119/2()13
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Widening at Shasta Avenue Code No. 108 .
Account No. 8058 .
Location Map
m e
rest Ave -FIE
I Q% Ain riolake Ava
m7m
w
c
PROJECT
Project Description
The construction of widening the south side of Los Angeles Avenue between Maureen Lane and Leta
Yancy Road, along the frontage of the vacant property of Tentative Tract 5882 [Pacific Communities]. A
traffic signal will be constructed at the intersection of Los Angeles Avenue and Shasta Avenue during the
development of Tract 5882 [Pacific Communities]. It is the intent of the City to seek reimbursement from
the developer of Tract 5882 for City costs incurred to implement this project.
Project Funding Schedule Total Cost: $1,200,000.
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 68,876 131,124
R-O-W
Construction 900,000
Inspection 100,000
Total 68,876 1,131,124 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501:L A AOC 68,876 1,131,124
Total 68,876 1,131,124 0 0 0 0 0 0
CIP 2012/2013 B-11 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Underground Utility Projects Code No. 109
Account No. ----
Location Map
Locations to be determined
Project Description
City costs related to the development and implementation of various underground utility projects and/or
formation of Underground Utility Districts for such purpose. Project Codes 110 and 111 describe
immediate future efforts in this regard. This project (#109) has been included in order to program future
"undergrounding" projects, the location and scope of which are to be determined. As projects are
identified,they will be added to the CIP as separate projects.
Project Funding Schedule Total Cost: 10,000,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 5,000,000 5,000,000
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 5,000,000 5,000,000
Total 0 0 0 0 0 0 5,000,000 5,000,000
C I P 2012/2013 B-12 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Underground Utility District No 2 Code No. 110.
Account No. 8051 .
Location Map
P JECT ILI °
90
Eerenst
r
17� Los An ales Ave
m
n
Project Description
Establishment and implementation of an underground utility district along Los Angeles Avenue between
Shasta Avenue and Millard Street to underground the high voltage transmission lines and remove all poles
and overhead wires. SCE Rule 20A monies in the approximate amount of$400,000 are not included in the
budget figures shown below.
Project Funding Schedule Total Cost: $ 726,448 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction 240 726,208
Inspection
Total 240 0 726,208 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2330:AD 92-1 426,447
2501:LA AOC 240 299,761
Rule 20A
Total 240 0 726,208 0 0 0 0 0
CI 20 12/201 3 B-13 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Underground Utilities at the Los Angeles Avenue Bridge Code No. 111.
Account No. 8066
Location Map
e�5 pve
VOS pn9
3
A
PROJECT
Project Description
This is a project to "underground" the overhead utility wires on the north side of Los Angeles Avenue east
and west of the Arroyo Simi Bridge. Currently, project funding via the LA AOC is proposed to be
reimbursed from unexpended funds from the Community Facilities District for the Moorpark Marketplace
project.
Project Funding Schedule Total Cost: $429,928
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 17,504 104,424
R-O-W
Construction 305,000
Inspection 3,000
Total 17,504 0 412,424 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501:LA AOC 5,500 412,138
2001:TSM 12,004 286
Total 17,504 0 412,424 0 0 0 0 0
C I P 2012/2013 B-14 6/191/2 0 1
City of Moorpark
Capital Improvement Program
Project Name: Rail Road Crossing Improvements at Spring Road . Code No. 112 .
Account No. 8039
Location Map
o
m
a
Princeton Ave
High St
ITT
m�uonauamunununuuuonuunununnnm ununuu uuuuunnnu�
PROJECT
N
V
7
Dorothy Ave
CL
Project Description
This project provides for street widening and improvements to the rail crossing by adding a center median
and four(4) crossing gates. The project also includes acquisition of additional street right-of-way and street
widening on the east side of the street between the rail crossing and Princeton Avenue to provide an
additional right-turn lane and bike lanes on both sides of the street. SCRRA (Metrolink) is managing the
construction of the project which is estimated at a total cost of $3.3 million. Metrolink is contributing
$1.1 million towards the project which is not included in the funding schedule below since Metrolink is
paying their contractor directly and their funds will not flow through the City's budget.
Project Funding Schedule Total Cost: $2,235,564
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 132,918 56,241
R-O-W 116,848
Construction 1,889,557
Inspection 40,000
Total 249,766 1,985,798 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2603:LTF 127,339
2902:MRA 122,427 162,881
2501:LA AOC 1,822,917
Total 249,766 1,985,798 0 0 0 0 0 0
CI 2012/2013 B-15 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Arroyo Drive Overlay . Code No. 113
Account No. 8084
Location Map
Cai mpuS Park UDr
q - rwc I
! A fte s PROJECT
_ 118
5' gram
Irv., 41 . .` �•
Project Description
Pavement rehabilitation on Arroyo Drive from Collins Drive to entrance of Villa del Arroyo Mobile Home
Park.
Project Funding Schedule Total Cost: $536,344
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 9,344
R-O-W
Construction 517,000
Inspection 10,000
Total 0 1 0 1 536,344 0 1 0 1 0 0 1 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2611:Prob 1 B 536,334
Total 0 0 536,344 0 0 0 0 0
CI P 2 012/2 01 3 B-16 6/19/201 3)
City of Moorpark
Capital Improvement Program
Project Name: Bus Shelters and Other Bus Stop Improvements Code No. 114 .
Account No. 8071
Location Map
Various Locations (to be determined)
Project Description
The construction of Bus Stop improvements at various locations. Current year costs are for the relocation
of the bus stop at the Community Center and the installation of five (5) new bus stop shelters at various
locations. Future funding is for other Bus Stop improvements which may be required in the next few years.
Project Funding Schedule Total Cost: $234,044 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction 144,562 89,482
Inspection
Total 144,562 0 89,482 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
5000 Transit 141,369 89,482
2601 STA 3,193
undetermined
Total 144,562 0 89,482 0 0 0 0 0
CI 2012/2013 B-17 6/19,/2013
City of Moorpark
Capital Improvement Program
Project Name: —_North Hills Parkway Code No. 115 .
Account No. 8061 .
Location Map
x
PROJECT meow
was rye
w Orr
r
iru w � rry � rr
rr
r
l
rm �r
i la J®a �� 1b �� _r � � � � ��•
- n r � .
Project Description
The construction of a new east-west arterial street north of Casey Road. The westerly end of the street is
proposed to connect to Los Angeles Avenue, via a future railroad undercrossing, at a point west of Butter
Creek Road. Currently, the easterly terminus of this new street will be Spring Road. Segments of this
project will be constructed by developers (Tract 5147, Tract 5130, Tract 5045, Hitch Ranch, Centex and
the studio project) and other segments funded by the Citywide Traffic Mitigation Fund.
Project Funding Schedule Total Cost: $2,512,051 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 922,598 1,044,453
R-O-W 242,109 2,891
Construction 300,000
Inspection
Total 1,164,707 1,347,344 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2002:Traf Mit 1,164,707 1,347,344
Total 1,164,707 1,347,344 0 0 0 0 0 0
CI P 2012/2013 B-18 6!19!2013
City of Moorpark
Capital Improvement Program
Project Name: High Street Streetscape Code No. 116
Account No. 5056
Location Map
Charles St Charles St
01 m m
3 C 0
o
w to
s
a m
HIGH ST a
IIIINIII 111111 1111111 IIIIIIIIIHIIIIIIIIIIIIIIIIIIIIHilllllllllllls I�III�IIJ�IIIIIIIIIIIIIIIIIIIHIIIIHIIIIHIHNIINIIIIIIIIIIIIIIIIHIIIIIIIIIIIIIIIIIIIUIIIIiII IIHIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIHIIIIIHIIIIHIHIIIIIIIIIII 1111111 II
Project Description
Development of a project to make possible modifications and improvements to the streetscape and parking
along High Street. When and if a project is deemed feasible, further design and construction expenditures
will be budgeted.
Project Funding Schedule Total Cost: $12,525
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 12,525
R-O-W
Construction
Inspection
Total 12,525 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2902:MRA 12,525
2905:MRA
Undetermined.
Total 12,525 0 0 0 0 0 0 0
('I P 2012/2013 B-19 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: 23 FWY North Alignment Code No. 117 .
Account No. 8045.
Location Map
AWAAWAY
I
1
PRO ECT
� Q
o �
i i t a
OD
d e 6 $�sr r
C
Project Description
Construction of a roadway from the SR-118 Freeway to Broadway with a connection to North Hills
Parkway at Spring Road. Initial costs are for the development of design concepts.
Project Funding Schedule Total Cost: $214,489
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 214,489
R-O-W
Construction
Inspection
Total 1 214,489 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2002:Trf.Mit. 214,489
Undetermined
Total 214,489 0 0 0 0 0 0 0
C I P 2012/2013 B-20 6/19/21013
City of Moorpark
Capital Improvement Program
Project Name: SR-23 FWY Soundwalls at Tierra Rejada Road Code No. 118 .
Account No. 8079
Location Map
Ct TY OF MOORPARK
TR 497-3 o
7 6' AMR g -PROPOSEO NORTHERN WALL
- - _ Ex @5T NG
OR
_,c
�SOUTHERN�PROPO SEO ALL
Project Description
Construction of freeway sound walls adjacent to the homes on Crab Apple Court at the eastern boundary of
Tract 4975 (Toscana at Serenata) within the Carlsberg Specific Plan area, bordering the west side of the
SR-23 Freeway
Project Funding Schedule Total Cost: $2,282,063
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 363,519 65,624
R-O-W
Construction 1,632,250
Inspection 220,670
Total 363,519 1,918,544 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Carlsberg Mit 363,519 1,918,544
Fund
Total 363,519 1,918,544 0 0 0 0 0 0
CIP 2012/2013 B-21 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Metrolink South Parking Lot South Entry Code No. 119
Account No. 8056 .
Location Map
i
a High St
n
`o
0
MetrollnWAmtrak Station
PROJECT IT
ftlnde�ter Ave
First St
m
Project Description
Relocation of the entry to the south Metrolink parking lot to a point on First Street east of Moorpark
Avenue.
Project Funding Schedule Total Cost: $1,489,095
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 35,050
R-O-W 625,000 410,000
Construction 404,045
Inspection 15,000
Total 660,050 829,045 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM 321,067 166,250
2603: LTF 33,983
2604:CMAQ 120,000 462,795
4004: Special 185,000
5000:TDA 1 1 200,000
Total 1 660,050 829,045 0 0 0 0 0 0
C I P 2012/2013 B-22 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Gabbert Road Rail Crossing Improvements Code No. 120
Account No. ----
Location Map
PROJECT
mummm�nnuum
Poit
xf�t pre
nnllnlllillll IIII IMI IIIIIIIIIII
nnu,nlllpjp11llllalp11rnnunnnnnmm�n
n
IIItlnIIIIIII11Mllnlllllilll11111111111111111111111111 �
m
IIIIIIIIIIIIIIpI11111111111Nn � �
Q m
� m
a
Project Description
The construction of the street widening and related improvements on Gabbert Road at the rail crossing will
be undertaken by AB Properties (Tract 5147) per the conditions of their Tract Map and Development
Agreement requirements. There will be no City funds used for the construction of these improvements. The
project is shown here in order to identify projects which are implementing components of the Circulation
Element of the General Plan.
Project Funding Schedule Total Cost: Develoaer
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Developer
Total 0 0 0 0 0 0 0 0
C1 P 2012/2013 B-23 6/19,201
City of Moorpark
Capital Improvement Program
Project Name: High Street West Code No. 121 .
Account No. ----
Location Map
PROJEC o
o ;
D
m
HIGH ST
IIIIIIUINIIIIIIIIIaI111HIUIIIIIIIIIIIAlII111111111�II1111111111111111111uilllltlllll @IIIIINIIIUIIIIIIIII IIIUIIIII IIImNIIIII InIIBInII1WIIlI111pi11enplltluul11111111111111111AlINllil111111111111111111
S.P.R.R.
Project Description
Widening, realignment, and reconstruction of High Street west of Moorpark Avenue. The scope of work
would include a study to determine the precise alignment of this roadway project, as well as the westerly
extension of the project to serve the properties in this area(Hitch Ranch).
Project Funding Schedule Total Cost: $430,000
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 30,000
R-O-W 80,000
Construction 300,000
Inspection 20,000
Total 0 0 0 110,000 320,000 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 110,000 320,000
Total 0 0 0 110,000 320,000 0 0 0
C 1 P 2012/2013 B-24 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Railroad Crossing Improvements at Arroyo Drive . Code No., 122
Account No. ----
Location Map
arra
Campus Park Dr
o "
" we !
U Wil►" t ""' PROJECT
.
y . »e
SY-
PM
Project Description
The construction of street widening and other improvements on Arroyo Drive at the railroad crossing east
of Collins Drive. PUC and Caltrans has proposed funding through Section 130 for this project.
Project Funding Schedule Total Cost: 1,000,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 1,000,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 1,000,000
Total 0 0 0 1,000,000 0 0 0 0
CI P 2012/2013 B-25 6!19/2013
City of Moorpark
Capital Improvement Program
Project Name: Moorpark Avenue Widening Project Code No. 123
Account No. 8040 .
Location Map
PROJECT SITE
Y
Project Description
Widening of Moorpark Avenue to add a southbound lane along the west side from Casey Road to Third
Street. Includes street realignment at First Street and Poindexter Avenue (Prior Project 8057) and rail
crossing improvements (Prior Project 8038). Prior year appropriations for those projects have been returned
to funding sources. Prior to commencing work on this project, the General Plan and Circulation Element
must be updated to identify the second southbound lane. Therefore, funding will be moved to Future Years
in the FY 13/14 CIP budget.
Project Funding Schedule Total Cost: $1,745,620.
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 262,920 370,755
R-O-W 655,237 300,000
Construction 156,708
Inspection
Total 1,074,865 670,755 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2002:TM Fund 134,245 670,755
2501:LAOC 156,708
2902: MRA 783,912
Total 1,074,865 670,755 0 0 0 0 0 0
CI P 2012/2013 B-26 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Lengthen Curb Radii at Designated Intersections on L. A. Avenue Code No. 124 .
Account No. ----
Location Map
Locations to be Determined
Project Description
This project constructs modifications to existing improvements on major arterials, including the State
Highways,to lengthen the curb radii at certain corners to facilitate turning movements and ease congestion.
Project Funding Schedule Total Cost: $300,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 50,000
R-O-W 100,000
Construction 150,000
Inspection
Total 0 0 0 50,000 100,000 150,000 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 50,000 100,000 150,000
Total 0 0 0 50,000 100,000 150,000 0 0
CI 2012/2013 B-27 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Widening West of Tierra Rejada Road—. Code No. 125
Account No. ----
Location Map
Los Anaeles Ave 'SRI III)
m
�o
PROJECT
rT-
Project Description
The construction of street widening on Los Angeles Avenue west of Tierra Rejada Road, as a function of
the development of property in this area. This project is proposed to be funded by development. It is
shown here to reflect implementation of the Circulation Element of the Moorpark General Plan.
Project Funding Schedule Total Cost: Developer .
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Total 0 0 0 0 0 0 0 0
CIP 2012/2013 B-28 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Casey Road Westerly Extension Code No. 126 .
Account No. ----
Location Map
e
PROJECT
LLILLU
Project Description
The Circulation Element of the Moorpark General Plan calls for the westerly extension of Casey Road to
connect to Gabbert Road. This future project is to be constructed by developers.
Project Funding Schedule Total Cost: Developer
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Developer
Funded
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-29 6/19/201 3
City of Moorpark
Capital Improvement Program
Project Name: Moorpark Avenue Left Turn Lane Code No. 127
Account No. 8087
Location Map
- CHARLES STREET
M 0 R ARK
A E
1
HIGH STREET
PROJECT
i - AIL w
NORTH
Project Description
This project will be incorporated into Metrolink's Sealed Corridor railroad crossing improvement project.
The improvements include revisions to the traffic signal to provide a protected left-turn phase for the
shared left and through northbound lane. Both sides of Moorpark Avenue will be widened to
accommodate a raised center median and will improve the intersection turning movements.
Project Funding Schedule Total Cost: $200,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 25,000
R-O-W 150,000
Construction 25,000
Inspection
Total 0 200,000 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501:LA AOC 200,000
Total 0 200,000 0 0 0 0 0 0
C I P 2012/2013 B-30 6!19%20 13
LM
City of Moorpark
Capital Improvement Program
Project Name: Asphalt Overlay on Spring Road, Princeton Avenue, Poindexter Avenue Code No. 128 .
Account No. 8093
Location Map
r_— G)
ers
Project
Limits
Project
Limits 'L
Project - —4 ,.-a
Limts
-
�_ _ --
E fam..,orcoAve - Con or r -
�-7 �
Project Description
Pavement rehabilitation on Spring Road (Tierra Rejada Road to Monte Vista Nature Park); Princeton
Avenue (Condor Drive to Campus Park Drive); Poindexter Avenue (N. Commerce Avenue to Gabbert
Road); and Gabbert Road (Poindexter Avenue to a point approximately 200-ft south of Poindexter
Avenue.)
Project Funding Schedule Total Cost: $ 770,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15116 FY 16/17 FY 17/18 FY 18/19
Design 50,000
R-O-W
Construction 670,000
Inspection 50,000
Total 0 0 770,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2604: Grant 637,416
Undetermined 132,584
Total 0 0 770,000 0 0 0 0 0
CI P 2012/2013 B-31 6/19/2 0 13
CI P 2012/2013 B-32 6,/19!2013
Trails & Walkways
C I P 2012/2013 B-33 6/19/22 013
City of Moorpark
Capital Improvement Program
Project Name: Sidewalk Reconstruction Project Code No. 201
Account No. 8001
Location Map
Various Locations (to be determined)
Project Description
Replacement of sidewalks, curbs, and gutter at various locations. Recurring project each fiscal year with an
estimated cost of$50,000/Year.
Project Funding Schedule Total Cost: $455,084
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction 280,084 125,000 50,000
Inspection
Total 280,084 125,000 50,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2605:Gas Tax 280,084 125,000 50,000
2603:TDA
Art.8
Total 280,084 125,000 50,000 0 0 0 0 0
CIP 2012/2013 B-34 6/19/201
City of Moorpark
Capital Improvement Program
Project Name: Bicycle/Pedestrian Facility Improvement Project Code No. 202
Account No. ----
Location Map
The Location of Future Projects
To Be Determined
Project Description
The construction of bicycle and/or pedestrian facility improvements, partially funded by a TDA Article 3
State grant [SB-821]. As projects are approved and added to the Budget, a new project will be added to the
CIP.
Project Funding Schedule Total Cost: $280,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction 40,000 40,000 40,000 40,000 40,000 40,000 40,000
Inspection
Total 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2603:LTF 20,000 20,000 20,000 20,000 20,000 20,000 20,000
2602:TDA-3 20,000 20,000 20,000 20,000 20,000 20,000 20,000
Total 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000
C 1 P 2012/2013 B-35 6,�'19/2013
City of Moorpark
Capital Improvement Program
Project Name: Arroyo Trail Bridge Ramp Project Code No. 203
Account No. 8035
Location Ma
MOORP RK j'`` aj
1 MOORPA .11 ' 1`
�. °.
�t
A LEY
Y d I J 4 � '•� •
`®" ARK � 's ! --- •-----•
9 021 9302
d f �
Project Description
Prior Year costs are for the Arroyo Simi Trail Study. That study evaluated options for the possible future
development of a trail system, generally along the levee road of the Arroyo Simi, from the westerly City
Limit easterly to Madera Road in the City of Simi Valley. Future expenses are for projects to implement
segments of that system. Ramps at the Spring Road bridge are included in the design for the channel
improvements planned by the Ventura County Watershed Protection District.
Project Funding Schedule Total Cost: $150,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 150,000
R-O-W
Construction
Inspection
Total 150,000 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM 0
2603:LTF 30,000
2604:CMAQ 120,000
Undetermined.
Total 150,000 0 0 0 0 0 0 0
C I P 2012/2013 B-36 6/1 13
City of Moorpark
Capital Improvement Program
Project Name: Drain No. 2 Trail Code No. 204
Account No. 8059
Location Map
Campus Park Dr
ri.
WE
PROJECT.
118
M OdAMP
VdIb Mew ft*
Project Description
This project is to provide for the construction of a trail extending from the east end of Campus Park Drive,
across the watercourse referred to Drain No. 2, then south under the freeway through an existing access
tunnel to Los Angeles Avenue. Prior year costs were for the development of a feasibility study to determine
access and design requirements. Review and finalization of the study has been placed on hold. Future costs
are for the acquisition of those access rights, preparation of the design and construction of the project. Cost
estimates for this project have not yet been developed and the funding for future year projects has not yet
been determined.
Project Funding Schedule Total Cost: $28,554
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 28,554
R-O-W
Construction
Inspection
Total 28,554 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM 28,554
Undetermined
Total 28,554 0 0 0 0 0 0 0
CI 2012/2013 B-37 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Sidewalk& Bicycle Lane at AVRC Code No. 205
Account No. 8086 .
Location Map
Cj M1
-r Arroyo
Simi
Project Site
ARROYO VISTA-
COMMUNITY
PARK
North
Project Description
Build a 1,200 foot sidewalk and bicycle path connecting Arroyo Vista Recreation Center's existing sidewalk
to the Pedestrian Bridge.
Project Funding Schedule Total Cost: $134,000
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 6,000
R-O-W
Construction 122,000
Inspection 6,000
Total 0 134,000 0 0 0 1 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM 68,000
2602:TDA 66,000
Total 0 134,000 0 0 0 0 0 0
("I P 2012/2013 B-38 61/19/ 0 1 1)
City of Moorpark
Capital Improvement Program
Project Name: Walnut Canyon Road Westside Championship Drive to Peter's Driveway-. Code No. 206
Account No. ----
Location Map
CHAMPIONSHIP DR11fE � �,
� Project Site
y SPRING
ROAD
5
Project Description
Construct a five (5) foot P.C.C. sidewalk from Championship Drive to Peters' driveway along the existing
multi-purpose trail.
Project Funding Schedule Total Cost: $75,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction 75,000
Inspection
Total 0 0 0 75,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM 75,000
Total 0 0 0 75,000 0 0 0 0
Cl P 2012/2013 B-39 61/191/2013
City of Moorpark
Capital Improvement Program
Project Name: Civic Center Pedestrian Access and Bus Stop Improvement Code No. 207
Account No. ----
Location Map
Case oa icks Roa
Moorpark Ave Everett Street
—
Civic Center
Charles Street
Walnut Street
PROJECT
Project Description
Construct sidewalk, bus turn-out with shelter, and ADA ramps connecting the library to the Active Adult and
Community Center.
Project Funding Schedule Total Cost: 200,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 15,000
R-O-W 0
Construction 178,000
Inspection 7,000
Total 0 0 200,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2602: Art 3 100,000
5000:Art 8C 20,000
2001:TSM 80,000
Total 0 0 200,000 0 0 0 0 0
CIP 2012/2013 B-40 6/1911,220 13
Traffic Signals
CI P 2012/2013 B-41 6/19!20 13
City of Moorpark
Capital Improvement Program
Project Name: Code No. 301
Account No. ----
Location Map
Not Assigned
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermine
Total 0 0 0 0 0 0 0 0
C 1 P 2012/2013 B-42 6,119/20 1
City of Moorpark
Capital Improvement Program
Project Name: Traffic Signal: Los Angeles Avenue and Shasta Avenue Code No. 302
Account No. 8058
Location Map
o
410A
a ve
Los Angeles Ave (SRI 18)
r
m
PROJECT
K
X
a
Project Description
Developer for Pacific Communities (TR5053) to construct the traffic signal at the intersection of Los
Angeles Avenue and Shasta Avenue.
Project Funding Schedule Total Cost: Developer
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 1 0 0 1 0 0 0 1 0 0 1 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Developer
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-43 6/19/20 13
City of Moorpark
Capital Improvement Program
Project Name: SR-118/Collins Drive Eastbound On/Off-Ramp Signalization and Striping Code No. 303 .
Modification. Account No. 8077 .
Location Map
U'Z) '
_
PR6JECT
. rri
J
Project Description
This project involves signalizing the eastbound SR-118 on/off-ramps intersection and converting the
westbound through lane to a westbound through lane and a right turn lane, modifying the striping to provide
two left turn lanes from the off ramp to northbound Collins Drive if feasible. This project is partially funded
by Moorpark Community College
Project Funding Schedule Total Cost: $550,000
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 25,000
R-O-W
Construction 500,000
Inspection 25,000
Total 0 0 0 550,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2001:TSM
2501:LA AOC
2604:CMAQ
Other Sources 550,000
Total 0 0 0 550,000 0 1 0 0 0
C I P 2012/2013 B-44 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Code No. 304 .
Account No. -----
Not Assigned
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Fund 4000
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-45 61/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Traffic Signal: Los Angeles Avenue and Millard Street Code No. 305
Account No. 8013
Location Map
3
y Moonson Ct Shs
Los Angeles Ave (SRI 18)
PROJ C Millard& o
3
@S O
Project Description
The Los Angeles Avenue Widening Project between Moorpark Avenue and Spring Road [Project 106]
includes the construction of a traffic signal at the intersection of Los Angeles Avenue and Millard Street.
This project will be partially funded by the developer of property south of the intersection [Shea Homes —
Tentative Tract 5133].
Project Funding Schedule Total Cost: See# 106
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Fund 2501
Fund 2604
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-46 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Traffic Signal: Los Angeles Avenue West of Butter Creek Road Code No. 306
Account No. 8061
Location Map
Ick
s wo
-• � arr. Z
PROJECT
how&A
.r.■ �7►rrrrrw
..�
--J
_ €use ! �,� �� +� � 1 � � •1
Project Description
This project is for the construction of a traffic signal at the future intersection of Los Angeles Avenue and
the westerly terminus of the North Hills Parkway [see Project 115].
Project Funding Schedule Total Cost: See#115
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Total 0 0 0 0 0 0 0 0
Cl P 2012/2013 B-47 6//l 9/22 0 1
Cl P 2012/2013 B-48 6/19/2 0 l 3
Medians & Parkways
C I P 2012/2013 B-49 61/19/2-0 13
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Medians Code No. 401
Account No. 8047
Location Map
Ri.r
C , IIIIR rrr
R R r ,,
LOS ANGELES ' """ J ' !
to
R.
1 ad' 1 PROJECT ' �' � r .�. �•• n
Project Description
The construction of raised landscaped medians on Los Angeles Avenue (SR-118), from the SR-23 freeway
westerly to Tierra Rejada Road. Phase 1 will include that area east of Spring Road to the SR-23.
Project Funding Schedule Total Cost: $1,103,490
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 210,894 92,549
R-O-W
Construction 750,000
Inspection 50,000
Total 210,941 92,549 800,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2501:L A AOC 210,941 92,549 800,000
Total 210,941 92,549 800,000 0 0 0 0 0
C I P 2012/2013 B-50 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Medians: Spring Road Code No. 402
Account No. 8026
Location Map
1 11 IN I
nnn
're LAIII
w
c
.0 91
A
a o,
ro
PROJECT
'lLl.Y'_I
Los Angeles Ave(SR718)
Project Description
The Spring Road Widening Project [Project 104] includes the construction of raised, landscaped medians
between Los Angeles Avenue and Flinn Avenue.
Project Funding Schedule Total Cost: See No. 104
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Fund 2501
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-51 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Code No. 403
Account No.
Location Map
Not Assigned.
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15116 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2502: STR AOC
Total 0 0 0 0 0 0 0 0
CI P 2012/2013 B-52 6/191/2)0 13
City of Moorpark
Capital Improvement Program
Project Name: Poindexter Avenue parkways Code No. 404
Account No. 8048
Location Map
�a
r
PROJECT U ilon Pacif c SCRRA
�mnm noun nunmmnm�punmpnon nnnnnnnnnnm nnuununnnunnuunnunu uu nnnnnm uunnnuuuuu mumnw
n�unnnuu1°�umimn"ununnnnunuu� �
er Ave
Idil 0%
4
Project Description
The installation of trees and shrubs, with irrigation, along the north side of the street east of Gabbert Road,
on railroad property. This project will require the approval by the Southern California Regional Rail
Authority [SCRRA] for the easterly portion, and the Union Pacific Railroad [UP] for the westerly portion.
A funding source for future maintenance costs has not yet been determined.
Project Funding Schedule Total Cost: $115,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15116 FY 16/17 FY 17/18 FY 18/19
Design 10,000
R-O-W
Construction 100,000
Inspection 5,000
Total 0 0 0 115,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2150:Trees 115,000
Total 0 0 0 115,000 0 0 0 0
CI P 2012/2013 B-53 61/19/2 0 11
City of Moorpark
Capital Improvement Program
Project Name: Freeway Landscaping at the Tierra Rejada Road Interchange Code No. 405
Account No. ----
Location Map
■
+ 4 �
•'°� a
*.. PROJECT
m
F
v
Project Description
This project calls for the installation of irrigation and landscaping within the on/off ramp areas at the Tierra
Rejada Road / State Route 23 Freeway interchange. This project will require a Cooperative Agreement
with Caltrans related to City funding of both construction and future maintenance of this landscaping. A
project cost estimate has not yet been developed and the funding source has not yet been determined. In
2008, the City funded the planting of over 100 oak trees in the ramp areas during the SR-23 Freeway
Widening project.
Project Funding Schedule Total Cost: $296,281
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W 50,000
Construction 46,281 200,000
Inspection
Total 46,281 0 50,000 200,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 50,000 200,000
2150 trees 46,281
Total 46,281 0 50,000 200,000 0 0 0 0
C I P 2012/2013 B-54 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Code No. 406
Account No. ----
Location Map
Not Assigned.
Project Description
Project Funding Schedule Total Cost: $
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 1 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undet.
Undetermined
Total 0 0 0 0 0 0 0 0
CIP 2012/2013 B-55 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Code No. 407
Account No. ----
Location Map
Not Assigned
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-56 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Peach Hill Parkways Code No. 408 .
Account No. ----
Location Map
m
01WACT qa
L< m Silver Oak Ln
� C
v d �
Peach Hill Rd G m
3
O
Q
7 7 7 771711
7, 7�
Laurelhurst Rd
Project Description
Installation of Parkway Landscaping on both sides of the "east-west" segment of Peach Hill Road between
Mesa Verde Drive and Rolling Knoll Road.
Project Funding Schedule Total Cost: $53,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 1,000
R-O-W
Construction 50,000
Inspection 2,000
Total 0 0 0 1,000 52,000 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 1,000 52,000
Total 0 0 0 1,000 52,000 0 0 0
CI P 2012/2013 B-57 6/191/20 1 1
CI P 2012/2013 B-58 6/19/20 13
Storm Drains
C 1 P 2012/2013 B-59 6/19/20 13
City of Moorpark
Capital Improvement Program
Project Name: Master Plan of Drainage Update Code No. 501
Account No. 8088
Location Map
Entire City
Project Description
This project is to prepare an update to the 1995 Citywide Master Plan of Drainage. This project will be
undertaken upon completion of the Letter of Map Revisions to the Digital Flood Insurance Rate Maps.
Project Funding Schedule Total Cost: $150,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 150,000
R-O-W
Construction
Inspection
Total 0 150,000 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
2800: 150,000
Endowment
Total 0 150,000 0 0 0 0 0 0
('I P 2012/2013 B-60 6/1 9/20 1 3
City of Moorpark
Capital Improvement Program
Project Name: Gabbert Canyon/Walnut Canyon Improvements Code No. 502
Account No. ----
Location Map
Walnut
Canyon ■
Drain �..
o■■■■■06R■M O M
• �, _.
• Gabbart
•• Canyon
Drain _ .,...
Project Description
The existing Ventura County Watershed Protection District [VCWPD] facilities within the Gabbert Canyon
and Walnut Creek watersheds are inadequate. This project calls for the construction of new detention,
diversion and capacity enhancement improvements to those existing facilities. The 2006 cost estimate for
those improvements was estimated to be $12,000,000 plus financing costs. No implementation or
financing plan has yet been developed. Some of the required improvements have been, or are planned to
be, constructed by land development projects within this watershed.
Project Funding Schedule Total Cost: $15,000,000
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 7,500,000 7,500,000
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 7,500,000 7,500,000
Total 0 0 0 0 0 0 7,500,000 7,500,000
CIP 2012/2013 B-61 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Shasta Drain Code No. 503
Account No. ----
Location Map
�J
ar Ava
EP
FFFFFV
Q
a
t
■ (q
■
■
■
■
■
■
■
■
■
■ EvOng ran • •••
■
■
Project.■ ■■ ■
■ rest
! A
•
Los Angeles Ave(SRI 18)
Project Description
Construction of a storm drain to serve the residential area north of the intersection of Los Angeles Avenue
and Shasta Avenue, as identified in the City's Master Plan of Drainage. No funding source has been
identified for this project. The 1995 cost estimate for this project was $188,000. However, the full scope
and cost of this project has never been determined.
Project Funding Schedule Total Cost: $800,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 1 0 800,000 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 800,000
Total 0 0 0 0 800,000 0 0 0
CI P 2012/2013 B-62 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Millard Drain Code No. 504
Account No. 8065
Location Map
■
■
■
aExisting Drain: • • • • .� Esther Ave
c Project:■ ■ ■ ■ _
U.
■
■
■
■
Moonsong Ct ■ Sherman Ave
■
■
■
•■ ■ ■■
Los Angeles Ave(SR118) •
Project Description
Construction of a storm drain similar in function to that identified in the City's Master Plan of Drainage as
the "Freemont Drain", located north of the intersection of Los Angeles Avenue and Millard Street. The
current design concept for this project anticipates a storm drain running easterly along the north side of Los
Angeles Avenue from the existing Los Angeles Avenue culvert to Millard Street, and then northerly along
the east side of Millard Street for a short distance.
Project Funding Schedule Total Cost: $250,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design 25,000
R-O-W
Construction 200,000
Inspection 25,000
Total 0 0 0 250,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 250,000
Total 0 0 0 250,000 0 0 0 0
C I P 2012/2013 B-63 6/1911,2013
City of Moorpark
Capital Improvement Program
Project Name: Villa Del Arroyo Drain Code No. 505
Account No. ----
Location Map
rad E i
�YIE�1
L
RUft
„s
Scope of,p-00 yet ,` P
To 6e detsrtnined)
d— w
. "+alp u ^�_•w+.{1�� _��e.:�i.�.�ti-�,..r.ilf�n��� .
Project Description
There is a culvert under Arroyo Drive at the entrance to the Villa Del Arroyo Mobile Home Park, which
connects to a storm drain pipe owned by the Mobile Home Park. This "private" drain line extends southerly
to the arroyo. It has been determined that the function of that storm drain is impaired and that remedial
action must be taken in order to provide adequate drainage for both the City street and the Mobile Home
Park. Consistent with the provisions of a Settlement Agreement between the City and the Mobile Home
Park,the property owner is required to take corrective action to remedy this problem.
Project Funding Schedule Total Cost: By Property Owner
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Total 0 0 0 0 0 0 0 0
CI P 2012/2013 B-64 61/19/20 13
City of Moorpark
Capital Improvement Program
Project Name: Miscellaneous Drainage Improvements Code No. 506
Account No. ----
Location Map
Location of Improvements To Be Determined
Project Description
This project is for the construction of miscellaneous drainage improvements, throughout the City, as
required.
Project Funding Schedule Total Cost: $200,000 .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 200,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Undetermined 200,000
Total 0 0 0 200,000 0 0 0 0
C 1 P 2012/2013 B-65 6/19/2013
City of Moorpark
Capital Improvement Program
Project Name: Arroyo Simi Channel Improvements Code No. 507
Account No. ----
Location Map
Arro o Simi Pro'ect
W
Project Description
A number of projects, to be undertaken by the Ventura County Watershed Protection Agency, to construct
improvements to the Arroyo Simi to render it capable of containing flows from a 100 year storm event, in a
manner satisfactory to the Federal Emergency Management Agency [FEMA]. When those projects are
completed, revisions to the FEMA flood zone maps will be processed to remove as many areas as possible
from flood zones.
Project Funding Schedule Total Cost: by VCWPD .
Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19
Total 0 0 0 0 0 0 0 0
C I P 2012/2013 B-66 6/19/120 13
City of Moorpark
Capital Improvement Program
C. Program Expenditure Summaries
• Total Program Project Costs: Listed By Fiscal Year C-3
• FY 2012/13 Total: Spread to Funding Source C-7
• Total Program [All Seven Years}: Spread to Funding Sources C-11
CIP 2012/2013 C-1 6/19/2013
C 1 P 2012/2013 C-2 6/1 9!20 1 3
Total Program Project Costs
Listed by Fiscal Year
CI P 2012/2013 C-3 6/19/2013
CI P 2012/2013 C-4 6/19112013
C.Program Summary
Page C-5
Account Prior FY 12/13-FY 18/19
Code Project Name Number Years FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18 FY 18/19 Total
Street Improwments
101 Slurry Seal 8002 3,717,793 856,531 0 0 0 0 0 0 856,531
102 SRI18/Coas Dr Ramp/Sig Mod 8076 0 0 0 75,000 475,000 0 0 0 550,000
103 Walnut Canyon Rd S/W Imp - 0 0 500,000 0 0 0 0 0 500,000
104 Spring Rd Widening 8026 394,336 855,664 0 0 0 0 0 0 855,664
105 Princeton Ave.Widening 8012 2,860,306 1,967,392 0 0 0 0 0 0 1,967,392
106 LA Ave: Spg to Mpk 8013 1,663,860 2,356,269 0 0 0 0 0 0 2,356269
107 Sprg/Charles Bus Turnout 8069 14,216 0 0 150,000 0 0 0 0 150,000
108 LA Ave:Shasta 8058 68,876 1,131,124 0 0 0 0 0 0 1,131,124
109 Underground Utilities - 0 0 0 0 0 0 5,000,000 5,000,000 10,000,000
110 LA Ave Transmission Lines 8051 240 0 726,208 0 0 0 0 0 726208
111 Undrgmd @ N L A Brg 8066 17,504 0 412,424 0 0 0 0 0 412,424
112 Rail Xing:Spring Rd 8039 249,766 1,985,798 0 0 0 0 0 0 1,985,798
113 Arroyo Drive Overlay 8084 0 0 536,344 0 0 0 0 0 536,344
114 Bus Shelter Improvements 8071 144,562 0 89,482 0 0 0 0 0 89,482
115 North Hills Parkway 8061 1,164,707 1,347,344 0 0 0 0 0 0 1,347,344
116 High Street Streetscape 5056 12,525 0 0 0 0 0 0 0 0
117 North Extension of SR23 8045 214,489 0 0 0 0 0 0 0 0
118 SR23 FWY Sound Walls TRRd 8079 363,519 1,918,544 0 0 0 0 0 0 1,918,544
119 Metrolink S.Parking Lot S.Entry 8056 660,050 829,045 0 0 0 0 0 0 829,045
120 t abbert Rd.Rail Xing - 0 0 0 0 0 0 0 0 0
121 High Street West Reconstrcution - 0 0 0 110,000 320,000 0 0 0 430,000
122 Rail Road Xing hnp at Arroyo Dr. 0 0 0 1,000,000 0 0 0 0 1,000,000
123 Moorpark Ave Widening Project 8040 1,074,865 670,755 0 0 0 0 0 0 670,755
124 Lengthen Curb Radii - 0 0 0 50,000 100,000 150,000 0 0 300,000
125 L A Ave Widening W/O T.R.Rd - 0 0 0 0 0 0 0 0 0
126 Casey Rd Extension - 0 0 0 0 0 0 0 0 0
127 Moorpark Avenue Left Tom Lane 8087 0 200,000 0 0 0 0 0 0 200,000
128 Overlay Spring,Princeton,&Poindext 8092 0 0 770,000 0 0 0 0 0 770,000
Sub-Total 12,621,614 14,118,466 3,034,458 1,385,000 895,000 150,000 5,000,000 5,000,000 29,582,924
Trails&Walkways
201 Sidewalks 8001 280,084 125,000 50,000 0 0 0 0 0 175,000
202 Ped/Bicycle Project - 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000 280,000
203 Arroyo Trail 8035 150,000 0 0 0 0 0 0 0 0
204 Drain#2 Trail 8059 28,544 0 0 0 0 0 0 0 0
205 Sidewalk&Bicycle Lane at AVRC 8086 0 134,000 0 0 0 0 0 0 134,000
206 Peter's Driveway 8086 0 0 0 75,000 0 0 0 0 75,000
207 Civic Center Ped Access&Bus hnp 0 0 200,000 0 0 0 0 0 200,000
Sub-Total 458,628 299,000 290,000 115,000 40,000 40,000 40,000 40,000 864,000
Page Total 13,080,242 14,417,466 3,324,458 1,500,000 935,000 190,000 5,040,000 5,040,000 30,446,924
L IP 2012/2013 C-5 6/19/2013
C.Program Summary
Page C-6
Account Prior FY 12/13-FY 18/19
Code Project Name Number Years FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 Total
Traffic Signals
301 Not Assigned ---- 0 0 0 0 0 0 0 0 0
302 L A Ave/Shasta 8058 0 0 0 0 0 0 0 0 0
303 SR118/Collins Dr EB Ramps 8077 0 0 0 550,000 0 0 0 0 550,000
304 Not Assigned ---- 0 0 0 0 0 0 0 0 0
305 L A/Millard 8013 see 106 0 0 0 0 0 0 0 0
306 L A/Near ButterCreek 8061 see 115 0 0 0 0 0 0 0 0
0
0
Sub-Total 0 0 0 550,000 0 0 0 0 550,000
Medians and Parkways
401 L A Ave Medains 8047 210,941 92,549 800,000 0 0 0 0 0 892,549
402 Spring Median 8026 See 104 0 0 0 0 0 0 0 0
403 Not Assigned ---- 0 0 0 0 0 0 0 0 0
404 Poindexter Pkwy 8048 0 0 0 115,000 0 0 0 0 115,000
405 SR23/T.R.Rd.Inter Landscaping ---- 46,281 0 50,000 200,000 0 0 0 0 250,000
406 Not Assigned ---- 0 0 0 0 0 0 0 0 0
407 Not Assigned ---- 0 0 0 0 0 0 0 0 0
408 Peach Hill Parkways ---- 0 0 0 1,000 52,000 0 0 0 53,000
Sub-Total 2579222 92,549 850,000 316,000 52,000 0 0 0 1,310,549
Storm Drains
501 Master Plan of Drainage Update ---- 0 150,000 0 0 0 0 0 0 150,000
502 Gabbert/Walnut ---- 0 0 0 0 0 0 7,500,000 7,500,000 15,000,000
503 Shasta Drain ---- 0 0 0 0 800,000 0 0 0 800,000
504 Millard Drain 8065 0 0 0 250,000 0 0 0 0 250,000
505 Villa Del Arroyo Drain ---- 0 0 0 0 0 0 0 0 0
506 Misc.Drainage Impr. ---- 0 0 0 200,000 0 0 0 0 200,000
507 Arroyo Simi Channel ---- 0 0 0 0 0 0 0 0 0
Sub-Total 0 150,000 0 450,000 800,000 0 7,500,000 7,500,000 16,400,000
Prior Year Costs
Not Included
Page Total 257,222 242,549 850,000 1,316,000 852,000 0 7,500,000 7,500,000 18,260,549
Grand Total 13,337,464 14,660,015 49174,458 2,816,000 1,787,000 190,000 12,540,000 12,540,000 48,707,473
C I P 2012/2013 C-6 6/19/201 3)
FY 2012/13 Total Project Costs
Spread to Funding Sources
CIP 2012/2013 C-7 6/19;2013
CI P 2012/2013 C-8 6/19/2013
2012/13 to 2018/19 Capital Improvement Program
FY2012/13 Funding Sources
Account 1000 2000 2001 2002 2150 2501 2502 2602
Code Project Name Number General Fund Traf Safety TSM Traf Mitigiation Trees L A AOC STR AOC TDA Art 3
Streets&Trails
101 Slurry Seal 8002
102 SR118/Collins Dr Ramp/Sig Mod 8076
103 Walnut Canyon Rd S/W Imp ----
104 Spring Rd Widening 8026 855,664
105 Princeton Ave.Widening 8012 880,148
106 L A Ave: Spg to Mpk 8013 1,559,499
107 Spring/Charles Bus Tum-Out 8069
108 L A Ave:Shasta 8058 1,131,124
109 Underground Utility Projects ----
110 L A Ave Undergrounding 8051
111 Undrgrnd:New L A Ave 8066
112 Rail Xing:Spring Rd 8039 1,822,917
113 Arroyo Drive Overlay 8084
114 Bus Shelter Improvements 8071
115 North Hills Parkway 8061 1,347,344
116 High St.Streetscape/Parking 5056
117 North Extension of SR 23 8045
118 SR 23 FWY Soundwalls at TR Rd 8079
119 Metrolink South Parking Lot Entry 8056 166,250
120 Gabbert Rd Rail Xing ----
121 High Street West ----
122 Arroyo Drive ----
123 Moorpark Ave Widening Proj 8040 670,755
124 Lengthen Curb Radii ----
125 L.A.Ave West of T.R.Rd. ---
126 Casey Rd Ext. ----
127 Moorpark Ave Left Turn Lane 8087 200,000
128 Overlay Spring,Princeton,Poindexter 8092
Sub-Total 0 0 166,250 2,018,099 0 7449,352 0 0
Trails&Walkways
201 Sidewalks 8001
202 Ped/Bicycle Project ---- 20,000
203 Arroyo Trail Study 8035
204 Drain#2 Trail 8059
205 Sidewalk&Bicycle Lane at AVRC 8086 68,000 66,000
206 Peter's Driveway ----
207 Civic Center Ped&Bus Stop Imp ----
Sub-Total 0 0 68,000 0 0 0 0 86,000
Traffic Signals
301 Not Assigned ----
302 L A Ave/Shasta 8058 see 108
303 SR118/Collins Dr E/B Ramps 8077
304 Not Assigned ----
305 L A/Millard 8013 see 106
306 L A/Near ButterCreek 8061 see 115
Sub-Total 0 0 0 0 0 0 0 0
Medians and Parkways
401 L A Ave Medain 8047 92,549
402 Spring Median 8026 see 104
403 Not Assigned ----
404 Poindexter Pkwy 8048
405 T R at Freeway ----
406 Not Assigned ----
407 City Entry Signs ----
408 Peach Hill Pkwy ----
Sub-Total 0 0 0 0 0 92,549 0 0
Storm Drains
501 Master Drainage Study 8088
502 Gabert/Walnut ----
503 Shasta Drain ----
504 Millard Drain 8065
505 Villa Del Arroyo Drain ----
506 Misc.Improvements ----
507 Arroyo Sim Channel Impr. ----
Sub-Total 0 0 0 0 0 0 0 0
Total 0 234,250 2,018,099 0 6,541,901 0 86,000
C IP 2012/2013 C-9 6/19/2013
2012/13 to 2018119 Capital Improvement Program
FY2012/13 Funding Sources
Account 2603 2604 260512606 2609/2610 2902/2904
Code Project Name Number LTF Fed Grant Gas Tax State Grants Other Undetermined MRA Total
Streets&Trails
101 Slurry Seal 8002 495,966 358,770 1,795 856,531
102 SR118/Collins Dr Ramp/Sig Mod 8076 0
103 Walnut Canyon Rd S/W Imp - 0
104 Spring Rd Widening 8026 855,664
105 Princeton Ave.Widening 8012 1,087,244 1,967,392
106 L A Ave: Spg to Mpk 8013 796,770 2,356,269
107 Spring/Charles Bus Tum-Out 8069 0
108 LA Ave:Shasta 8058 1,131,124
109 Underground Utility Projects -- 0
110 L A Ave Undergrounding 8051 0
111 Undrgmd:New L A Ave 8066 0
112 Rail Xing:Spring Rd 8039 162,881 1,985,798
113 Arroyo Drive Overlay 8084 0
114 Bus Shelter Improvements 8071 0
115 North Hills Parkway 8061 1,347,344
116 High St.Streetscape/Parking 5056 0
117 North Extension of SR 23 8045 0
118 SR 23 FWY Soundwalls at TR Rd 8079 1,918,544 1,918,544
119 Metrolink South Parking Lot Entry 8056 462,795 200,000 829,045
120 Gabbert Rd Rail Xing - 0
121 High Street West - 0
122 Railroad Crossing at Arroyo Drive - 0
123 Moorpark Ave Widening Proj 8040 670,755
124 Lengthen Curb Radii - 0
125 L.A.Ave West of T.R.Rd. - 0
126 Casey Rd Westerly Ext. - 0
127 Moorpark Ave Left Turn Lane 8087 200,000
128 Overlay Spring,Princeton,Poindexter 8092 0
Sub-Total 0 1,259,565 495,966 1,446,014 2,120,339 0 162,881 14,118,466
Trails&Walkways
201 Sidewalks 8001 125,000 125,000
202 Ped/Bicycle Project -- 20,000 40,000
203 Arroyo Trail Study 8035 0
204 Drain#2 Trail 8059 0
205 Sidewalk&Bicycle Lane at AVRC 8086 134,000
206 Peter's Driveway -- 0
207 Civic Center Ped&Bus Stop Imp 0
Sub-Total 20,000 0 125,000 0 0 0 0 299,000
Traffic Signals
301 Not Assigned 0
302 L A Ave/Shasta 8058 0
303 SR118/Collins Dr E/B Ramps 8077 0
304 Not Assigned - 0
305 L A/Millard 8013 0
306 L A/Near ButterCreek 8061 0
Sub-Total 0 0 0 0 0 0 0 0
Medians and Parkways
401 L A Ave Medain 8047 92,549
402 Spring Median 8026 0
403 Not Assigned -- 0
404 Poindexter Pkwy 8048 0
405 T R at Freeway - 0
406 Not Assigned - 0
407 City Entry Signs - 0
408 Peach Hill Pkwy - 0
Sub-Total 0 0 0 0 0 0 0 92,549
Storm Drains
501 Master Drainage Study 8088 150,000 150,000
502 Gabert/Walnut -- 0
503 Shasta Drain -- 0
504 Millard Drain 8065 0
505 Villa Del Arroyo Drain -- 0
506 Misc.Improvements - 0
507 Arroyo Sim Channel Impr. - 0
Sub-Total 0 0 0 0 150,000 0 0 150,000
Total 20,000 1,259,565 620,966 1,446,014 2,270,339 0 162,881 14,660,015
CIP 2012/2013 C-10 6/19/2013
Total Program
FY 2012/13 Thru FY 2018/19
Spread to Funding Sources
CIP 2012/2013 C-11 6/19/2013
CIP 2012/2013 C-12 6/19/2013
2012113 to 2018/19 Capital Improvement Program
Funding Sources Totals:FY 2012113 thru FY 2018/19
Account 1000 2000 2001 2002 2150 2501 2502 2602
Code Project Name Number General Fund Traf Safety TSM Traf Mitigiation Trees L A AOC STR AOC TDA Art 3
Streets&Trails
101 Slurry Seal 8002
102 SRI 18/Collins Dr Ramp/Sig Mod 8076
103 Walnut Canyon Rd S/W Imp —
104 Spring Rd Widening 8026 855,664
105 Princeton Ave.Widening 8012 880,148
106 L A Ave: Spg to Mpk 8013 1,559,499
107 Spring/Charles Bus Tum-Out 8069 150,000
108 LA Ave:Shasta 8058 1,131,124
109 Underground Utility Projects --
110 L A Ave Undergrounding 8051 299,761
111 Undrgmd:New L A Ave 8066 286 412,138
112 Rail Xing:Spring Rd 8039 1,822,917
113 Arroyo Drive Overlay 8084
114 Bus Shelter Improvements 8071
115 North Hills Parkway 8061 1,347,344
116 High St.Streetscape/Parking 5056
117 North Extension of SR 23 8045
118 SR 23 FWY Soundwalls at TR Rd 8079
119 Metrolink South Parking Lot Entry 8056 166,250
120 Gabbert Rd Rail Xing --
121 High Street West —
122 Arroyo Drive —
123 Moorpark Ave Widening Proj 8040 670,755
124 Lengthen Curb Radii
125 L.A Ave West of T.R.Rd. --
126 Casey Rd Ext. —
127 Moorpark Ave Left Turn Lane 8087 200,000
128 Overlay Spring,Princeton,Poindexte 8092
Sub-Total 0 0 316,536 2,018,099 0 7,161,251 0 0
Trails&Walkways
201 Sidewalks 8001
202 Ped/Bicycle Project — 140,000
203 Arroyo Trail Study 8035
204 Drain#2 Trail 8059
205 Sidewalk&Bicycle Lane at AVRC 8086 68,000 66,000
206 Peter's Driveway — 75,000
207 Civic Center Ped&Bus Stop Imp — 80,000 100,000
Sub-Total 0 0 223,000 0 0 0 0 306,000
Traffic Signals
301 Not Assigned —
302 L A Ave/Shasta 8058 see 108
303 SR118/Collins Dr E/B Ramps 8077
304 Not Assigned —
305 L A/Millard 8013 see 106
306 L A/Near ButterCreek 8061 see 115
Sub-Total 0 0 0 0 0 0 0 0
Medians and Parkways
401 L A Ave Medain 8047 892,549
402 Spring Median 8026 see 104
403 Not Assigned —
404 Poindexter Pkwy 8048 115,000
405 T R at Freeway —
406 Not Assigned —
407 City Entry Signs —
408 Peach Hill Pkwy —
Sub-Total 0 0 0 0 115,000 892,549 0 0
Storrs Drains
501 Master Drainage Study 8088
502 Gabert/Walnut —
503 Shasta Drain —
504 Millard Drain 8065
505 Villa Del Arroyo Drain —
506 Misc.Improvements —
507 Arroyo Sim Channel Impr. —
Sub-Total 0 0 0 0 0 0 0 0
Total 0 0 539,536 2,018,099 115,000 8,053,800 0 306,000
C I P 2012/2013 C-13 6/19/2013
2012/13 to 2018/19 Capital Improvement Program
Funding Sources Totals:FY 2012/13 thru FY 2018/19
Account 2603 2604 2605/2606 2609/2610 2902/2904
Code Project Name Number LTF Fed Grant Gas Tax State Grants Other Undetermined MRA Total
Streets&Trails
101 Slurry Seal 8002 495,966 358,770 1,795 856,531
102 SR118/Collins Dr Ramp/Sig Mod 8076 550,000 550,000
103 Walnut Canyon Rd S/W Imp - 500,000 500,000
104 Spring Rd Widening 8026 855,664
105 Princeton Ave.Widening 8012 1,087,244 1,967,392
106 L A Ave: Spg to Mpk 8013 796,770 2,356,269
107 Spring/Charles Bus Tum-Out 8069 150,000
108 LAAve:Shasta 8058 1,131,124
109 Underground Utility Projects - 10,000,000 10,000,000
110 L A Ave Undergrounding 8051 426,447 726,208
111 Undrgmd:New L A Ave 8066 412,424
112 Rail Xing:Spring Rd 8039 162,881 1,985,798
113 Arroyo Drive Overlay 8084 536,344 536,344
114 Bus Shelter Improvements 8071 89,482 89,482
115 North Hills Parkway 8061 1,347,344
116 High St.Streetscape/Parking 5056 0
117 North Extension of SR 23 8045 0
118 SR 23 FWY Soundwalls at TR Rd 8079 1,918,544 1,918,544
119 Metrolink South Parking Lot Entry 8056 462,795 200,000 829,045
120 Gabbert Rd Rail Xing - 0
121 High Street West - 430,000 430,000
122 Railroad Crossing at Arroyo Drive - 1,000,000 1,000,000
123 Moorpark Ave Widening Proj 8040 670,755
124 Lengthen Curb Radii - 300,000 300,000
125 L.A.Ave West of T.R.Rd. - 0
126 Casey Rd Westerly Ext. - 0
127 Moorpark Ave Left Turn Lane 8087 200,000
128 Overlay Spring,Princeton,Poindexte - 637,416 132,584 770,000
Sub-Total 0 1,896,981 495,966 1,446,014 3,722,612 12,362,584 162,881 29,582,924
Trails&Walkways
201 Sidewalks 8001 175,000 175,000
202 Ped/Bicycle Project - 140,000 280,000
203 Arroyo Trail Study 8035 0
204 Drain#2 Trail 8059 0
205 Sidewalk&Bicycle Lane at AVRC 8086 134,000
206 Walnut Canyon Rd Peters Drwy -- 75,000
207 Civic Center Ped&Bus Stop Imp - 20,000 200,000
Sub-Total 140,000 0 175,000 0 20,000 0 0 864,000
Traffic Signals
301 Not Assigned - o
302 L A Ave/Shasta 8058 0
303 SR118/Collins Dr E/B Ramps 8077 550,000 550,000
304 Not Assigned - 0
305 L A/Millard 8013 0
306 L A/Near ButterCreek 8061 0
Sub-Total 0 0 0 0 550,000 0 0 550,000
Medians and Parkways
401 L A Ave Medain 8047 892,549
402 Spring Median 8026 0
403 Not Assigned - 0
404 Poindexter Pkwy 8048 115,000
405 T R at Freeway - 250,000 250,000
406 Not Assigned - 0
407 City Entry Signs - 0
408 Peach Hill Pkwy - 53,000 53,000
Sub-Total 0 0 0 0 0 303,000 0 1,310,549
Storrs Drains
501 Master Drainage Study 8088 150,000 150,000
502 Gabert/Walnut - 15,000,000 15,000,000
503 Shasta Drain - 800,000 800,000
504 Millard Drain 8065 250,000 250,000
505 Villa Del Arroyo Drain -
506 Misc.Improvements - 200,000 200,000
507 Arroyo Sim Channel Impr. -
Sub-Total 0 0 0 0 0 16,400,000 0 16,400,000
Total 140,000 1,896,981 670,966 1 1,446,014 1 4,292,612 1 29,065,584 1 162,881 48,707,473
C I P 2012/2013 C-14 6/19/2013
City of Moorpark
Capital Improvement Program
D. Congestion Management Program
The purpose of the Ventura County Transportation Commission's (VCTC) Congestion
Management Program (CMP) is to monitor certain street segments and/or intersections
on the CMP Road Network (see Map), to confirm that the Level of Service (LOS) [a
measurement of the level of congestion] on those segments, or at those intersections,
does not deteriorate below certain stipulated levels. Increased traffic generated by
development is one of the major causes of increased traffic congestion and, therefore,
the deterioration of the LOS. The CMP requires each Agency to identify projects
designed to increase capacity and/or otherwise improve the efficient and effective
movement of traffic. The projects set forth in this seven year program, which are on the
CMP Road Network and which could reduce congestion, are listed on the following
page.
CiP 2012/2013 D-1 6/19/201
C I P 2012/2013 D-2 6/19/2013
��
r� ',��`,i't �
`� ',�
��
.,,
�� � �`�+
I� � �=.._
�ts_�
awl ���F�.■'f�
� .� °� �
D
' � ��
�.� � r� � _ of ®�� _ �
��� �
�� � � ��:
!� �c+ti i� � � ,� V ww
�. - � i
�`
`���, -
D. Projects on the Congestion Management Program [CMP]Road Network
Account Prior FY 12/13-FYI 8/19
Code Project Name Number Years FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 Total
Street Improvements
106 L A Ave: Spg to Mpk 8013 1,663,860 2,356,269 0 0 0 0 0 0 2,356,269
108 LAAve:Shasta 8058 68,876 1,131,124 0 0 0 0 0 0 1,131,124
117 North Extension of SR 23 8045 214,489 0 0 0 0 0 0 0 0
124 Moorpark Ave Widening Proj 8040 1,074,865 670,755 0 0 0 0 0 0 670,755
126 L A Ave W/O T R Rd ---- 0 0 0 0 0 0 0 0 0
Sub-Total 3,022,090 4,158,148 0 0 0 0 0 0 4,158,148
Traffic Signals
302 L A Ave/Shasta 8058 0 0 0 0 0 0 0 0 0
305 L A Ave/Millard --- See#106 0 0 0 0 0 0 0 0
306 L A Ave/West of ButterC reek --- See#115 0 0 0 0 0 0 0 0
Sub-Total 0 0 0 0 0 0 0 0 0
Page Total 3,022,090 4,158,148 0 0 0 0 0 0 4,158,148
C I P 2012/2013 D-4 6/19/2 01 3
City of Moorpark
Capital Improvement Program
Appendix `I'
Completed Projects
The following is a list of known Streets and Roads Projects constructed subsequent to the incorporation
of the City in 1983.
Project Name Descri tion
1985
Streets& Trails
Sidewalk Construction East Side of Moorpark Avenue, Third Street to Los Angeles Avenue
Sidewalk Construction West side of Moorpark Avenue from Community Center to High Street
Sidewalk Construction West side of Moorpark Avenue from North of Poindexter Avenue to Third Street
Asphalt Overlay Various Streets including High Street,Gabbert Road,Third Street,Bard Street,
Sherman Avenue, Second Street and Sarah Avenue
1987
Streets& Trails
Asphalt Overlay Spring Road South of Williams Ranch Road(by Developer)
Sidewalk Construction South side of Williams Ranch Road(by Developer)
Slurry Seal Project Various Streets throughout the City
Railroad Crossing Construction of rubberized railroad crossing on Old Los Angeles Avenue(east of
College View Avenue)
Tragic Signals
Los Angeles Avenue& Construction of a traffic signal at Los Angeles Avenue&Tierra Rejada Road/
Tierra Rejada Road Gabbert Road
Los Angeles Avenue& Construction of a traffic signal at this intersection
Condor Drive
Parkways and Medians
Campus Park Drive Construction of landscape improvements to medians on Campus Park Drive(two
Developers)
Tree Replacement Removal and replacement of parkway trees on a number of streets in the
downtown area
Spring Road&Peach Construction of landscape improvements at the southwest corner
Hill Road
CIP 2012/2013 I-1 6/19/2013
Project Name Description
Spring Road Drainage Construction of a box culvert on the west side of Spring Road south of Los
Improvement Angeles Avenue
1988
Streets&Trails
Tierra Rejada Bridge Construction of a four lane(with median)bridge across the Arroyo Simi
Traffic Signals
Traffic Signal:Los Construction of a traffic signal at this intersection
Angeles Avenue&
Princeton Avenue
1989
Streets& Trails
Spring Road Railroad Construction of rubberized railroad crossing on Spring Road
Crossing
Moorpark Avenue Construction of rubberized railroad crossing on Moorpark Avenue
Railroad Crossing
Curb/Gutter/Sidewalk North side of High Street, east of Magnolia Street
Construction
Asphalt Reconstruction Various streets including Millard Street,Harry Street, Dorothy, Esther,Roberts
&Overlay Avenues, Laurelhurst Road, Campus Park Drive&Maureen Lane
Traffic Signals
Los Angeles Avenue& Construction of a traffic signal at this intersection
Science Drive
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)
Peach Hill Road
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)
Walnut Creek Road
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)
Mt. Meadows Drive
Storm Drains
Moorpark Avenue Construction of storm drain improvements north of High Street(by Caltrans)
1990
Streets&Trails
Slurry Seal Project Various streets throughout the City
Sidewalk Construction East side of Spring Road,Los Angeles Avenue to Roberts Avenue(by Developer)
Sidewalk Reconstruction Replacement of damaged sidewalks(including tree limb and root pruning)
throughout the City.
Cl P 2012/2013 I-2 6//l 9/210 13
Project Name Descri tion
Traffic Signals
Los Angeles Avenue& Major reconstruction of the traffic signal at this intersection(by Developer)
Spring Road
Traffic Signal: Campus Construction of a traffic signal at this intersection
Park Drive&Delfen
Street
Parkways and Medians
Tierra Rejada Road Construction of landscape improvements to Tierra Rejada Road medians from the
Median Edison Easement easterly to a point east of Southhampton Road
Tierra Rejada Road Construction of landscape improvements to the parkway on the north side of
Parkway Tierra Rejada Road east of Peach Hill Road(Developer)
1991
Streets& Trails
High Street& Spring Reconstruction of curb,gutter& sidewalk at southeast corner(by Caltrans)
Road
Avenida Colonia& Reconstruction of these two streets including the construction of new curbs,
Nogales Street gutters and sidewalks and the construction of a portion of the Happy Camp
Canyon covered box culvert to allow for the connection of these two streets
Los Angeles Avenue North side street improvements from Liberty Bell Road to Maureen Lane,
Widening including an additional westbound travel lane, curb,gutter and sidewalk
Sidewalk Construction West side of Spring Road,Los Angeles Avenue to Roberts Avenue
Sidewalk Construction North side of Los Angeles Avenue between Spring Road and Millard Street
Sidewalk Construction West side of Spring Road between Roberts Avenue and the railroad tracks
Handicap Access Ramps Construction of handicap access ramps at various locations throughout the City
Traffic Signals
First St./Poindexter Construction of a traffic signal at this intersection to fulfill the City's portion of a
Avenue @ Moorpark City/State Agreement to signalize both this intersection and Moorpark Avenue/
Avenue High Street
Storm Drains
Happy Camp Box Construction of a covered box culvert for the Happy Camp drain at Los Angeles
Culvert Avenue crossing(Unit I1I)and at the intersection of Nogales Street and Avenida
Colonia
C I P 201 2/2013 1-3 6/19/2013
Project Name Descri tion
1992
Streets& Trails
Sidewalk Reconstruction The reconstruction of the sidewalk on the east side of Tierra Rejada Road south of
Los Angeles Avenue, including the replacement of street trees
High Street Storm Drain Construction of a storm drain from Walnut Street to Magnolia Street and a
and Sidewalks sidewalk on the north side of the street between Bard Street and Magnolia Street
Charles Street Reconstruction of the street from Moorpark Avenue to Bard Street, including the
Reconstruction(Ph. I) construction of a storm drain and new curbs,gutters and sidewalks
Traffic Sianals
Spring Road&Peach Construction of a traffic signal at this intersection
Hill Road
Collins Dr. &Campus Construction of a traffic signal at this intersection by Caltrans as a part of the
Park Dr. freeway construction project
High St. &Moorpark Construction of a traffic signal at this intersection by Caltrans to fulfill Caltrans'
Avenue portion of a City/State Agreement to signalize this intersection and Poindexter
Avenue/First Street/Moorpark Avenue
Peach Hill Rd& Spring Construction of a traffic signal at this intersection
Rd
Parkways and Medians
Williams Ranch Road Construction of a landscaped barrier across Williams Ranch Road near the Edison
Landscape Barrier Easement
East side Tierra Rejada Replacement of the street trees on the east side of the street south of Los Angeles
Road @ Los Angeles Avenue in conjunction with the reconstruction of sidewalks in that area
Avenue
1993
Streets&Trails
Asphalt Overlay Project Construction of an asphalt overlay on the following streets: 1)Tierra Rejada Road
at the Route 23 Freeway; 2)Peach Hill Road; &3)Campus Park Drive
Slurry Seal Project Construction of Slurry Seal on various streets throughout the City
Los Angeles Avenue @ Construction of street improvements, storm drains,traffic signals, landscaping and
Park Lane, etc. related improvements on Los Angeles Avenue,Park Lane,Lassen Avenue and
Liberty Bell Road required for the construction of the Mission Bell Plaza, funded
by Assessment District 92-1 [**CMP].
Peach Hill Road East of Extension of Peach Hill Road east of Spring Road to the future Science Drive
Spring Road (constructed by the developer of the Carlsberg Specific Plan to serve the Mesa
Verde Middle School)
C I P 2012/2013 I-4 6/19/2013
Project Name Description
Traffic Sienals
Tierra Rejada Rd& Street widening project included the construction of a"permanent"traffic signal to
Spring Rd replace the temporary traffic signal at this location [**CMP]
Los Angeles Ave&Park Construction of a traffic signal at this intersection as a part of the street and storm
Lane drain improvements funded by Assessment District 92-1 [**CMP]
Los Angeles Avenue& Construction of a traffic signal at this intersection as a part of the off-site and
Liberty Bell Road storm drain improvements funded by Assessment District 92-1 [**CMP]
Parkways& Medians
Sherman Avenue Replacement of the rear property walls for the properties on the south side of
Property Wall Sherman Avenue(north side of Los Angeles Avenue between Spring Road and
Millard Street)
Los Angeles Avenue: Construction of parkway landscaping on the north side of Los Angeles Avenue
Spring Road to Millard between Spring Road and Millard Street
Street
Tierra Rejada Road/ Repair of a slope failure on the south side of Tierra Rejada Road east of Peach Hill
Peach Hill Road Slope Road
Repair
Storm Drains
Sunnyslope Place Debris Construction of an access road to facilitate the maintenance of a storm water
Basin Access Road debris basin north of Sunnyslope Place
1994
Streets& Trails
Lassen Alley Construction of pavement improvements to complete the drainage improvements
Improvements at the south end of McFadden Avenue and Cornett Avenue
Charles Street Reconstruction of the street from Bard Street to Spring Road, including the
Reconstruction(Ph. 11) construction of a storm drain and new curbs,gutters and sidewalks
Spring Road Berm Construction of an asphalt berm on the east side of the street north of Peach Hill
Road in order to prevent erosion of the slope supporting the street
Flory Area Sidewalks Construction of sidewalks on certain streets in the vicinity of Flory Elementary
School,partially funded by an SB-821 pedestrian facility grant, including Second
Street, Bard Street, Third Street,Flory Avenue,Millard Street,Roberts Avenue,
and Harry Street
Tierra Rejada Road Realignment and reconstruction of Tierra Rejada Road east of Spring Road,
Realignment and increasing the roadway to four lanes and adding a center raised median [**CMP]
Reconstruction
Grimes Canyon Road Street improvements(including widening)near the entrance(Turfway Road)to
Tract 4081 (constructed by the developer)
Park Lane and Lassen Improvements to Park Lane north of Los Angeles Avenue and Lassen Avenue,to
Avenue serve the Mission Bell Plaza Shopping Center(AD 92-1)
C I P 2012/2013 I-5 6//l 9/21 0 13
Project Name Descri tion
Traffic Signals
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer) [**CMP]
Mountain Trail Street
Tierra Rejada Rd& Construction of a traffic signal at this intersection(Developer) [**CMP]
Arroyo Vista Access Rd
/Countrywood Drive
Tierra Rejada Road @ Construction of a traffic signal at this intersection(Developer) CMP]
Shopping Center Entry
Parkways& Medians
Installation of landscaping in the extension of the center median in Tierra Rejada
Tierra Rejada Rd Road just west of Spring Road
Median at Spring Rd
Construction of a block wall and landscaping at the northeast corner of Los
Shasta Avenue/Los Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements
Angeles Avenue Wall
[NE Corner]
East Side Spring Road Construction of parkway landscaping on the east side of Spring Road south of
South of Peach Hill Road Peach Hill Road
Los Angeles Avenue @ Construction of parkway landscaping on the north side of Los Angeles Avenue at
Shasta Avenue Shasta Avenue
Storm Drains
AD 92-1 Construction of storm drains along the north side of Los Angeles Avenue, Park
Lane,and within easements on the Mission Bell Plaza property
1995
Streets& Trails
High Street Decorative Installation of underground conduits for electrical,telephone,cable television,
Street Lights street lights and a decorative lighting system,plus the installation of nostalgic
decorative street lights on High Street
Freeway Connector Construction of bridges and related improvements required to connect the Route
Project 23 Freeway to the Route 118 Freeway(Caltrans) [**CMP]
City Maintenance Yard Conversion of property at 675 Moorpark Avenue to a City Maintenance facility
Metro Link Parking Lot/ Construction of the south Metro Link parking lot and access driveway(SCRRA)
Driveway [**CMP]
Lassen Avenue @ Modifications to Lassen Avenue to provide entrances to the north end of the
Mission Bell Plaza Mission Bell Plaza Shopping Center parking lot from Sierra Avenue and from
Park Lane
C111 2012/2013 1-6 6/19/2013
Project Name Descri tion
Slurry Seal Project Application of slurry seal and related work to approximately one-third of the
residential streets in the City
Tecolote,Canario,Etc. Construction of an asphalt overlay on Tecolote Court, Canario Court,and a
portion of North Granadilla Drive
Walnut Canyon Road @ Widening of Route 23 by Caltrans to provide a center turning lane at Wicks Road
Casey Road and Casey Road
First Street/Bard Street Reconstruction of First Street and Bard Street including reconstruction of
pavement, curb,gutter and sidewalks
Parkways& Medians
Moorpark Estates Entry Installation of entry signs at Shasta Avenue and Los Angeles Avenue and at
Poindexter Avenue and Sierra Avenue
Shasta Avenue/Los Construction of a block wall and landscaping at the northwest corner of Los
Angeles Avenue Wall Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements
[NW Corner]
Poindexter Avenue @ Construction of parkway landscaping on the south side of Poindexter Avenue at
Sierra Avenue Sierra Avenue
Princeton Avenue Construction of parkway and median landscaping on Princeton Avenue
Campus Park Drive Construction of parkway landscaping on the south side of Campus Park Drive east
and west of Princeton Avenue
Tierra Rejada Road Restoration of slope slippage on the south side of Tierra Rejada Road near Peach
Slope Restoration Hill Road
Bard Wall Construction of a wall at the north end of Bard Street,just north of First Street
Virginia Colony Planter Construction of a landscaped planter at the corner of Virginia Colony Place and
Los Angeles Avenue
Irrigation Crossover Construction of conduits for future irrigation water lines and valve control wires at
Conduits a number of locations including: Tierra Rejada Road at Courtney Lane;Courtney
Lane on the west side of Tierra Rejada Road and Southhampton Road at Tierra
Rejada Road
Spring Road Parkway Removal and replacement of damaged sidewalks and the installation of tree well
Trees grates along the west side of Spring Road south of Peach Hill Road,to preserve
existing parkway trees.
1996
Streets& Trails
Millard Street Area Construction of sidewalks on Sherman Avenue,Esther Avenue,Roberts Avenue
Sidewalks and other streets
Poindexter Avenue Complete reconstruction of this street west of Chaparral Middle School
Everett Street Complete reconstruction of this street, including curb,gutter and sidewalk
C I P 2012/2013 I-7 6/19/21 013
Project Name Description
Walnut Street Complete reconstruction of this street, including curb,gutter and sidewalk
Bard Street Complete reconstruction of this street between Charles Street and High Street
Magnolia Street Complete reconstruction of this street north of Charles Street
Tierra Rejada Road Construction of an asphalt overlay on this street east of Spring Road
Spring Road Construction of an asphalt overlay on this street south of Peach Hill Road
Old Los Angeles Avenue Construction of an asphalt overlay on this street east of the rail crossing located
east of Collins Drive
Flory Avenue Construction of an asphalt overlay on this street
Magnolia Street Construction of an asphalt overlay on this street south of Charles Street
Goldman Avenue Construction of an asphalt overlay on this street
Spring Road Median/ Construction of modifications to the south leg of the intersection of Spring Road
Double Left Turn Lane and Los Angeles Avenue to provide for a double left turn lane and a raised center
median
Painted Sky Street Repair of street improvements damaged by a street subsidence
Subsidence Repair
Public Works Yard Construction of additional improvements to expand the City Maintenance Yard at
Expansion 675 Moorpark Avenue
Traffic Signals
Collins Drive&Campus Construction of a traffic signal at this intersection by Caltrans, as a apart of the
Park Drive Freeway Connector construction project
Moorpark Road&Tierra Construction of a traffic signal at this intersection by the City,with partial funding
Rejada Road from the County of Ventura
Parkways& Medians
Home Acres Buffer Area Construction of a landscaped buffer area, including an emergency access road and
a flood control maintenance road,at the west end of Shadyridge Drive in Tract
4021 (funded by Zone 8 of AD 84-2)
Storm Drains
Tierra Rejada Road Sub- Construction of a sub-drain system along Tierra Rejada Road between Walnut
Drain System Canyon Road and Mountain Trail Street to convey subsurface water to storm drain
inlets
Tierra Rejada Road Inlet Installation of a catch basin on the north side of the center median on Tierra
East of Spring Road Rejada Road east of Spring Road
1997
Streets&Trails
Flinn Avenue Reconstruction of Flinn Avenue east of Spring Road,constructed in conjunction
Reconstruction with the Spring Road storm drain project
CI P 2012/2013 I-8 6/191/2013
Project Name Descri tion
Moorpark Avenue Construction of an asphalt overlay on this street, constructed in conjunction with
[South]A/C Overlay the construction of the Moorpark Avenue storm drain project
AVCP Access Bridge Construction of a pedestrian,equestrian,emergency access bridge across the
Arroyo Simi,to connect Arroyo Vista Community Park to Liberty Bell Road
Arroyo Vista Construction of a paved surface between the end of the park access road and the
Community Park Bike Arroyo Vista Park Access Bridge,partially funded by an SB-821 bicycle facilities
Path grant
Storm Drains
Moorpark Avenue Storm Construction of a storm drain system extending from the south side of Los
Drain System Angeles Avenue northerly to a point north of First Street,with storm drain laterals
serving Flory Avenue and the Metro Link parking lot
Spring Road Storm Drain Construction of a storm drain system extending from the south side of Los
System Angeles Avenue northerly to Flinn Avenue, and then extending easterly on Flinn
Avenue
1998
Streets&Trails
Downtown Alley Reconstruction of the alleys south of First Street
Reconstruction
Valley Road Reconstruction of the street
Construction of retaining walls and related improvements required to provide
Wicks Road Slope slope stabilization to support Wicks Road
Stabilization
Wicks Road A/C Construction of an asphalt overlay on the westerly portion of this street
Overlay
Bonnie View Street A/C Construction of an asphalt overlay on this street
Overlay
Maureen Lane Reconstruction of Maureen Lane south of Los Angeles Avenue
Reconstruction
Storm Drains
Science Drive Storm Construction of two storm drain systems serving the Carlsberg Specific Plan(by
Drain System Developer),one serving the streets and a separate system conveying run-off from
common areas to vernal ponds
1999
Streets& Trails
Peach Hill Road Widening to the south side of the street east of Spring Road, in order to provide a
westbound left-turn lane.
Poindexter Avenue Widening to the north side of the street east of Gabbert Road, including new curb,
gutter and sidewalk,and the re-striping of the street to provide a painted median
and Bike Lanes.
C1P 2012/2013 1-9 6/19/2013
Project Name Descri tion
New Los Angeles Avenue Widening to the south side of the street to provide six (6) lanes of traffic(by
Widening Developer). [**CMP]
Spring Road Widening Construction of widening to the east side of Spring Road from Tierra Rejada Road
northerly to the Arroyo Simi Bridge(by developer).
Casey Road Widening Widening to the south side of the street west of Walnut Canyon Road.
Old L.A.Avenue Surface crossing improvements to the rail crossing(by SCRRA).
Rail Crossing
Gabbert Road Surface crossing improvements to the rail crossing(by Union Pacific)
Miller Parkway Construction of a new collector street between Tierra Rejada Road and New Los
Angeles Avenue(by developer).
Tierra Rejada Road Improvements to the north side of the street,just west of the freeway(by
developer).
Traffic Sisnals
Casey Road/Walnut Construction of a traffic signal, funded by the City,Caltrans and the Moorpark
Canyon Road Unified School District. [**CMP]
Peach Hill Road and Installation of a new traffic signal at this new intersection(by developer).
Miller Parkway
Tierra Rejada Road and Installation of a new traffic signal at this new intersection(by developer).
Miller Parkway [**CMP]
Commercial Entry and Installation of new traffic signal at this new intersection(by developer). This
Miller Parkway signal is to be made operational when the center is opened.
New Los Angeles Modifications to the traffic signal at the intersection of New Los Angeles Avenue
Avenue&Miller and Science Drive,to accommodate the addition of Miller Parkway as the south
Parkway leg of the intersection. (by developer) [**CMP].
New Los Angeles Installation of traffic signals at the on and off-ramps to the freeway, in order to
Avenue at the Route 23 allow ingress and egress traffic to and from White Sage Road(private) [by
Freeway Caltrans and the developer].
Parkways&Medians
Spring Road Medians Construction of new landscaped medians and parkways(east side)from Tierra
and Parkways Rejada Road northerly to the Arroyo Simi Bridge(by developer).
2000
Streets&Trails
Spring Road Bridge Reconstruction of the Spring Road Bridge at the Arroyo Simi,to provide
sidewalks,bike lanes and a raised median.
CIP 2012/2013 1-10 6/19/2013
Project Name Descri tion
Asphalt Overlay The construction of an asphalt overlay and related improvements to the following
streets: Talmadge Rd.; Marquette St.; Gabbert Rd. (north of Poindexter Ave.);
Spring Road(north of High St.);Fitch Ave.;Minor St.; Robert St.;Harry St.;Ruth
Ave.;Dorothy Ave.; Mt. Trail(east of Walnut Creek Rd.);Collins Dr.; Campus
Park Dr.;Princeton Ave.; High Street; Spring Road(New L.A Ave.to Bridge);
and Christian Barrett Drive.
Spring Road Rehabilitation of Spring Road between New Los Angeles Avenue and High Street.
Rehabilitation The cost of this project was reimbursed by Caltrans as required by a Highway
Relinquishment Agreement.
Los Angeles Avenue Rehabilitation of Los Angeles Avenue between High Street and Princeton Avenue.
Rehabilitation The cost of this project was reimbursed by Caltrans as required by a Highway
Relinquishment Agreement. Upgrades to the middle portion of this street segment
are being deferred until the Los Angeles Avenue East project is constructed.
Parkways& Medians
Freeway Landscaping Installation of freeway landscaping from Collins Drive to a point west of
Princeton Avenue(by Caltrans).
Storm Drains
Tierra Rejada Road Construction of additional storm drain inlets to better handle peak storm flows.
Inlets
L. A.Ave.Drain Installation of new inlets east of Spring Road to eliminate flooding.
2001
Streets& Trails
New Los Angeles Widening to the south side of the New Los Angeles Avenue [SR-118] bridge over
Avenue Bridge the Arroyo Simi to provide six(6)lanes of traffic. [**CMP]
Widening
Los Angeles Avenue: Widening to the south side of the street to provide three(3)eastbound lanes(by
Moorpark Avenue to Developer). [**CMP]
Park Lane
Los Angeles Avenue: Construction of street widening to the south side of the street at the old Caltrans
East of Leta Yancy Rd Maintenance Yard, in order to provide three(3)eastbound lanes,curb,gutter and
sidewalk. [**CMP]
Traffic Signals
Los Angeles Avenue& Modifications to the striping to provide a double left-turn lane at the east leg of the
Tierra Rejada Road intersection. [**CMP]
Parkways& Medians
Los Angeles Avenue Installation of median landscaping and irrigation in the new raised median on Los
Angeles Avenue south of the Princeton Avenue freeway ramps.
Tierra Rejada Road Installation of parkway landscaping on the north side of Tierra Rejada Road east
and west of Southhampton Road, funded by the Zone 2 improvement assessment
[AD84-2].
CIP 2012/2013 I-ll 6/19/2013
Project Name Descri tion
2002
Streets&Trails
Underground Utility The undergrounding of all overheard utilities, other than high voltage electrical
District No. 2000-1 lines, on Los Angeles Avenue between Gabbert Road and Millard Street. Project
was constructed by SCE and funded by SCE pole replacement monies and Rule
20A undergrounding accruals.
Miller Parkway/Peach Construction of widening at the northeast corner to allow south-to-north U-Turn
Hill Road U-Turn movements.
2003
Streets& Trails
Arroyo Trail Study Feasibility Study and Implementation Plan for an arroyo levee trail from the
westerly City limit to Madera Road in the City of Simi Valley.
Moorpark Road City costs related to a County of Ventura Road Department Project to construct a
Realignment new,realigned Moorpark Road intersecting Tierra Rejada Road at Miller
Parkway.
Curb Ramp Project Construction of curb ramps at a number of locations(mainly"T-intersections")
throughout the City.
2003 Slurry Seal Project Application of Slurry Seal to approximately one-third of the streets in the City.
2003 AC Overlay Construction of an asphalt overlay on a number of streets throughout the City.
Project
GASB-34 Infrastructure Preparation of a study to inventory,quantify, categorize and determine the value
Inventory Report of the City's infrastructure improvements. Depreciation rates and replacement cost
estimates were also derived from that effort.
Curb/Gutter Repair Replacement of damaged curb and gutter at numerous locations throughout the
Proj ect City.
Parkways& Medians
Peach Hill Road Construction of parkway landscaping on Peach Hill Road between Mesa Verde
Parkway Drive and Peach Hill Park. This project was constructed by the Peach Hill HOA.
Traffic Signals
L.A. Avenue at the Installation of a new traffic signal by the developer of the shopping center.
Marketplace Shopping
Center
Miller Parkway& Installation of a new traffic signal by the developer of the shopping center.
Patriot Drive
CIP 2012/2013 I-12 6/19/2013
Project Name Descri tion
2004
Streets& Trails
Flinn Avenue The realignment of Flinn Avenue to align with Second Street. The project
Realignment included the widening of Spring Road north of Flinn Avenue,the construction of a
raised median on Spring north of Flinn Avenue and the construction of a traffic
signal at the intersection of Spring Road and Second Street.
Civic Center Driveway The widening of the driveway into City Hall.
Modification
Street Light A CDBG funded project to relocate and add street lights in the neighborhood
Modification—Millard southeast of Moorpark Avenue and First Street.
Tract
Traffic Sianals
Double Left-Turn Lane Construction of improvements to provide a double left-turn lane for southbound
on Spring Road at Tierra traffic.
Rejada Road
Spring Rd and Second Construction of a traffic signal at the intersection of Spring Road and Second
Street Street/Flinn Avenue.
Parkways& Medians
Spring Road Parkway Removal of existing eucalyptus trees and the construction of new tree wells,with
West side deep root irrigation,between Peach Hill Rd. and Christian Barrett Drive.
Tierra Rejada Rd Removal of existing trees and installation of new tree wells,with deep root
Parkway, East side irrigation,between Harvester and Courtney.
Spring Road Median Installation of median landscaping north of Second Street.
Storm Drains
Loraine Drain Construction of storm drainage facilities northwest of the Spring Road Bridge(by
a developer)to meet needs identified in the Master Drainage Study as the"Loraine
Drain"or the"No Name Drain".
2005
Streets&Trails
Grimes Canyon Road at Construction of roadway improvements by a Developer. City costs related to the
Championship Drive acquisition of needed rights-of-way were reimbursed by the Developer.
Traffic Sianals
Casey Signal The modification of the traffic signal at Casey Road and Walnut Canyon Road
Modification [State Route 23]to provide a left-turn arrow for northbound traffic [funded by
developer(Pardee Homes)].
Storm Drains
Little Hollow SubDrain Construction of a sub-drain to intercept subsurface water and convey same to a
storm drain in an effort to prevent future damage to the asphalt pavement.
CIP 2012/2013 I-13 6/19/2013
Project Name Descri tion
2006
Streets& Trails
Los Angels Avenue Construction of roadway widening to the south side of the street,including
Widening at Maureen addition pavement,curb,gutter,sidewalk and property walls,and the construction
Lane of a traffic signal at the intersection of Los Angeles Avenue and Maureen Lane.
[**CMP]
Traffic Sianals
Los Angeles Avenue at Construction of a traffic signal at this intersection. CMP]
Maureen Lane
Parkways& Medians
Tierra Rejada Road Construction of median landscaping on Tierra Rejada Road between Spring Road
Medians and the Route 23 freeway.
2007
Streets&Trails
Freeway Sign Replacement of freeway off-ramp signs required by street name changes for New
Replacement Los Angeles Avenue and Princeton Avenue.
Downtown Trail Study The Downtown Trail Study was completed.Future implementation will be
considered when and if funding sources are identified.
Spring Road Extension Construction of the extension of Spring Road northerly from Charles Street to
connect to Walnut Canyon Road.
`C' Street(Ridgecrest Construction of the east-west local collector street(Ridgecrest Drive)along the
Drive) northerly boundary of the City(Pardee Homes), from Spring Road easterly to the
proposed realigned Route 23.
Traffic Sianals
Campus Park Drive and Signal and striping changes were funded and constructed by the developer of the
Collins Drive property at the southwest corner.
Spring Road and Charles New traffic signal installed by developer.
Street
Spring Road and Elk New traffic signal installed by developer.
Run Drive
Spring Road and New traffic signal installed by developer.
Ridgecrest Drive
Spring Road and Walnut New traffic signal installed by developer.
Canyon Road(SR-23)
Traffic Controller and Construction of controller and other hardware, improvements,and/or for the
Operations upgrading of traffic signal operations through improved software,at designated
Improvements intersections.
Parkways& Medians
Los Angeles Avenue Construction of parkway landscaping on the south side of Los Angeles Avenue
and Tierra Rejada Rd from Butter Creek Road to Maureen Lane,and the construction of parkway and
Parkways median landscaping on Tierra Rejada Road south of Los Angeles Avenue.
CIP 2012/2013 I-14 6/19/2013
Project Name Descri tion
Princeton Avenue Modification of the median and median landscaping on Princeton Avenue at
Median Modification Campus Park Drive.
2008
Streets&Trails
Lighted Crosswalk on Replacement of freeway off-ramp signs required by street name changes for New
Moorpark Avenue at Los Angeles Avenue and Princeton Avenue.
Second Street
Asphalt Overlay Construction of an asphalt overlay,and related work,along the entire length of
Projects Tierra Rejada Road and on Second Street.
Slurry/ARAM Project Pavement rehabilitation of various City streets completed in FY 08/09.
Traffic Signals
Traffic Signal Construction of a hardwire traffic signal interconnect system to allow for the
Interconnect: Los coordination of all of the traffic signals along the Los Angeles Avenue corridor
Angeles Avenue (SR-118).
Traffic Signal Construction of a hardwire traffic signal interconnect system to allow for the
Interconnect: Tierra coordination of all of the traffic signals along Tierra Rejada Road between
Rejada Road Countrywood Drive and the Route 23 freeway.
2009
Streets& Trails
Moorpark Road Dual Perform intersection modifications to provide dual left turn lanes on Moorpark
Left Turn Lanes Road to Tierra Rejada Road.
Lassen Avenue Construction of a Bikeway/Walkway path extending westerly from Moorpark
Bikeway/Walkway Avenue near Third Street,within the Lassen Avenue street right-of-way.
High Street Widening and extension of High Street west of Moorpark Avenue and
Rehabilitation construction of Post Office parking lot.
Parkways& Medians
Tierra Rejada Road Construction of median landscaping on Tierra Rejada Road between Brennan
Medians Road and the Route 23 freeway.
Storm Drains
Walnut Canyon Drain Replacement of open channel drain with covered reinforced concrete pipe from
Improvement the west end of the High Street extension to approximately 350 feet north of High
Street
2010
Streets&Trails
Mountain Trail Street/ Pavement rehabilitation and construction of a landscaped median in Mountain
Spring Road Pavement Trail Street from Tierra Rejada Road to Country Hill Road,and pavement
Rehabilitation rehabilitation on Spring Road from Peach Hill Road to a point approximately 2000
feet to the south.
Julliard Avenue and Asphalt overlay of Julliard Avenue from Campus Park Drive to Loyola Street and
Reedley Street Overlay Reedley Street from Julliard Avenue west to the end due to damage caused by a
ruptured waterline.
CIP 2012/2013 I-15 6/19/2013
Project Name Descri tion
Parkways& Medians
City Entry Signs Installation of City Entry Signs on Princeton Avenue on each side of the 118
Freeway; and on Tierra Rejada west of the 23 Freeway.
Mountain Trail Street/ Construction of a landscaped median in Mountain Trail Street from Tierra Rejada
Spring Road Pavement Road to Country Hill Road.
Rehabilitation
2011
Streets& Trails
Metrolink Security Wall Extension of the security wall along the Metrolink south parking lot property line.
&Camera System Metrolink security camera system completed in FY 07/08.
Traffic Sienal
Collins Drive and Construction of a traffic signal at the intersection of Collins Drive and University
University Drive Drive.
Los Angeles Avenue Modification of the traffic signal to provide protected phases(Left Green Arrows)
and Tierra Rejada Drive for the north and south legs of the intersection,as well as a right green arrow for
northbound Tierra Rejada Road [**CMP]
2012
Streets&Trails
Alderbrook Street Asphalt overlay on Alderbrook Street from Honeybrook Court to Rivergrove
Asphalt Overlay Court and on Walnut Creek Road from Tierra Rejada to Misty Grove Street.
2012 Pavement ARAM and slurry seal of various City Streets.
Rehabilitation
2012 Sidewalk Replacement of sidewalks,curbs, and gutter at various locations.
Reconstruction
Spring Road Overlay Asphalt overlay on northbound Spring Road from Flinn Avenue to the railroad
crossing.
Storm Drains
Spring Road Storm Installation of a catch basin on northbound Spring Road at the Police Services
Drain Center driveway with a connection to the existing storm drain on the west side of
Spring Road. The project included a storm drain connection to the Ruben Castro
Human Services Center site.
"Note: CMP denotes that the project was on the Congestion Management Program roadway network and
was related to congestion management.
CIP 2012/2013 I-16 6/19/2013
City of Moorpark
Capital Improvement Program
APPENDIX II: Description of Funds
Fund Remarks
1000 — General Fund: Revenues derived It should be noted that State law requires the City to
from property tax, sales tax, motor vehicle in maintain an established level of effort of General Fund
lieu fees and other non-restricted sources. expenditures for streets [called a Maintenance of Effort
(MOE)], in order to continue to receive certain State
grant funds. The current MOE amount is$342.
2000 — Traffic Safety Fund: Revenues Revenue to this Fund is only about$125,000 per year. In
derived from vehicle code fines, which are recent years this fund has been used primarily to fund the
restricted to construction / maintenance of Crossing Guard program.
traffic control devices, streets, equipment, and
supplies for traffic enforcement, accident
prevention and crossing guards.
2001 — Traffic Systems Management: The purpose of this Fund is finance system
Revenues derived from fees based on the air improvements that improve circulation and reduce
quality impacts of land development projects. emissions.
Said funds are to be used on projects or
programs designed to mitigate those air
quality impacts.
2002 — Citywide Traffic Mitigation: The purpose of this fund is to improve circulation by
Revenues derived from development fees to constructing major capacity enhancement projects.
fund mitigation measures to better
accommodate the increased traffic flow
generated by those development projects.
2150 — Trees and Landscaaina: Revenues
derived from development fees to fund
various landscape improvements.
23xx — Assessment Districts: Revenues Project 111, the Los Angeles Avenue Undergrounding
derived from maintenance & improvement Project, is partially funded by Fund 2330 [AD92-1:
district assessments, which have been Mission Bell Plaza].
earmarked for improvement projects. A
separate Fund has been established for each
District and/or Zone within a District.
Also included in this category are Community
Facility District Funds.
CIP 2012/2013 II-1 6/19/2013
Fund Remarks
2501—Los Angeles Avenue AOC: Revenues Various projects to be financed by this Fund include: 1) a
derived from fees paid by land development number of projects required in order to provide six (6)
projects located within a designated area, for lanes of traffic along the New Los Angeles Avenue /Los
the purpose of constructing roadway Angeles Avenue corridor, and 2) the reconstruction and
improvements within that area. The properties realignment of Princeton Avenue east of High Street.
subject to this fee consist of all of the areas of
the City located north of the Arroyo Simi,
plus the property south of the Arroyo and east
of the freeway [S.D.I. Property].
2502 — Snring Road / Tierra Reiada Road Projects funded or partially funded by this source include
AOC: Revenues derived from fees paid by the Tierra Rejada Traffic Signal Interconnect System and
land development projects located within a the Tierra Rejada Road median landscaping project.
designated area, for the purpose of
constructing roadway improvements within
that area. The properties subject to this fee
consist of all of the area of the City located
south of the Arroyo Simi.
2503 — Casey Rd / Gabbert Rd AOC: No appropriations have yet been made to projects from
Revenues derived from fees paid by land this Fund.
development projects located in that area
generally located northwest of Walnut
Canyon Road(Moorpark Avenue)and the rail
corridor, for the purpose of constructing
roadway improvements within that area.
2602 — TDA Article 3: A portion of State These funds are allocated to the cities in the County by
sales tax revenues which is restricted to the the Ventura County Transportation Commission (VCTC)
construction or improvement of pedestrian via a competitive grant process.
and/or bicycle facilities.
2603 — TDA Article 8A: TDA Article 8 Historically, these monies have been used to fund major
monies are derived from a portion of State street improvement and maintenance projects, such as
sales tax revenue, which is apportioned to slurry seal application and asphalt overlay projects.
each city based on population. The City
allocates these monies between TDA Article
8C funds, which become revenues to the
City's Transit Fund (Fund 5000), and TDA
Article 8A funds, which become revenues to
the Local Transportation Fund [LTF] (Fund
2603) to fund street improvement and
maintenance.
2604 — Federal Grants: Revenues received
via various federal grant programs, including:
CIP 2012/2013 11-2 6/19/2013
Fund Remarks
the Surface Transportation Program (STP)
and Congestion Mitigation Air Quality
(CMAQ)•
2605 — Gas Tax: Revenues derived from a
tax on motor vehicle fuel sales, apportioned to
local agencies based on a formula using
population, road miles and other factors.
These revenues are restricted to expenditures
for street maintenance and related costs.
2606 — HUT 2103: Revenues derived from a
tax on motor vehicle fuel excise tax.
2609 / 2610 — Other State Grants:
Revenues derived from various State grant
programs.
2902 — MRA Operations: Revenues from
tax increment derived from property taxes
levied upon properties within the
Redevelopment Project Area.
Cl P 2012/2013 11-3 6/19/2 01
CIP 2012/2013 II-4 6/19/2013
City of Moorpark
Capital Improvement Program
Appendix `III'
Potential Projects
1 Consider feasibility of pedestrian bridge over Poindexter Avenue and Union Pacific
Railroad(UPRR)from Specific Plan No. 1.
2 Modify traffic signals to include upgraded controllers and other equipment as necessary
including pedestrian crossing devices for use by vision impaired and physically disabled
persons as well as upgrading to include countdown time display.
3 Install parkway landscaping and enhanced pavement on collector and arterial streets that
lack such improvements, including the south side of Peach Hill Road west of Rolling
Knoll Road, and north side of Peach Hill Road west of Bella Vista Drive,and consider
possible use of Xeriscape landscaping.
4 Evaluate options for bus turnouts on Los Angeles Avenue and other locations.
5 Evaluate options for second location for vehicular access at Arroyo Vista Community
Park.
6 Install parkway trees on the west side of Spring Road north of Peach Hill Road and the
west side of Tierra Rejada Road south of Harvester Street.
7 Evaluate options for providing a continuous Class 1 bike lane on Campus Park Drive,
including a reduction of the number of travel lanes and attendant increase in landscaping
and use of Caltrans/SCE right-of-way between Princeton Avenue and Collins Drive.
8 Construct raised landscaped median on Collins Drive from Campus Park Drive to
University Drive.
9 Modify the intersection of Condor Drive(south),Princeton Avenue,and Virginia Colony
Place.
10 Plant parkway trees on both sides of Princeton Avenue,east of Spring Road
11 Construct enhanced entry statements at Spring Road and Roberts Street, and Spring Road
and Second Street.
12 Evaluate feasibility of installing raised median on Poindexter Avenue and on Gabbert
Road south of Poindexter Avenue.
13 Evaluate construction of Lassen Avenue from Park Lane to Moorpark Avenue to create a
four-way intersection at Third Street.
14 Evaluate need for traffic signal at Campus Canyon Drive and Collins Drive.
15 Construct sidewalks on one side of certain streets in industrial zoned areas to provide a
safe path for pedestrians and to encourage walking.
16 Evaluate feasibility of modifying certain existing streets to increase landscaping and
reduce the amount of asphalt to be maintained.
17 Extend the Fremont Avenue drain north of SR-118
CIP 2012/2013 III-1 6/19/2013
18 Widen Science Drive at Los Angeles Avenue(SR-118)to provide a dedicated right-turn
lane.
19 Remove hump on Poindexter Avenue at former railroad crossing to improve drainage.
20 Evaluate feasibility of relocating the storm drain system on Poindexter Avenue just west
of Endeavor Court.
21 Install raised median landscaping on Princeton Avenue from Spring Road to
approximately 1,500 feet east of Spring Road.
22 Evaluate feasibility and cost of installation of"Blue Lights"(also known as Tattletale
Lights")on selected traffic signals to enhance traffic enforcement of red light violations.
23 Evaluate feasibility of constructing a sidewalk on Arroyo Drive from Collins Drive to east
City limits,and in conjunction with City of Simi Valley and County of Ventura,
investigate pedestrian and bike connections between Collins Drive and Madera Road.
24 Evaluate feasibility of pedestrian bridge on Los Angeles Avenue(SR-118)in vicinity of
Moorpark Avenue.
25 Evaluate feasibility of relocating the Metrolink layover facility.
26 Develop design plan to refurbish median landscaping and hardscape on Tierra Rejada
Road from Spring Road to Los Angeles Avenue and Campus Park Drive from Princeton
Avenue to Collins Drive including cost estimates,financing,phasing and water
conservation measures.
27 Evaluate need for traffic signal at Arroyo Drive and the entrance to Villa Del Arroyo
Mobile Home Park.
28 Construct a permanent truck scale facility west of the City limits.
29 Storm drain on Poindexter Avenue and Gabbert Road.
30 Develop new design for City street name signs and a standard design for street
identification signs in medians.
31 Work with the US Postal Service and homeowners' associations to relocate group mail
boxes to maximize on-street parking
32 Construct a dedicated right and shared left/through lanes for westbound Charles Street at
Moorpark Avenue(SR-23).
33 Construct a dedicated right and left-turn lanes for westbound Second Street at Moorpark
Avenue(SR-23).
34 Asphalt overlay on Wicks Road.
35 Consider constructing a West loop trail
36 Construct a trail from Valley Road to VCWWD#1 offices
37 Install Lassen pathway lighting.
38 Install AVRC Pedestrian Bridge security lighting
39 Evaluate the feasibility of constructing a bridge over the Arroyo and under the railroad.
40 Construct a trail that connects the Moorpark Highlands to the Happy Camp Regional Park
CIP 2012/2013 III-2 6/19/2013
41 Add protected/permissive left-turn at various intersections.
42 Evaluate need for a traffic signal at Nogales Street and Princeton Avenue.
43 Reduce the pavement of Park Crest Lane and Moorpark Avenue south of SR-118.
44 Update the pavement management system
45 Coordinate with Caltrans to improve traffic signal synchronization for Princeton
Avenue/SR-118 ramps and Condor Drive.
46 Evaluate benefits of revising current street standards to narrow the street width but not the
right-of-way to encourage more landscaping and reduce greenhouse gas generation and
pavement maintenance costs.
47 Work with Caltrans to permit installation of City identification sign on Collins Drive
overpass bridge and City entry statements in Caltrans right-of-way at selected locations.
C1P 2012/2013 III-3 6/19/2013
END OF DOCUMENT
CIP 2012/2013 6/19/2013