Loading...
HomeMy WebLinkAboutAGENDA REPORT 2013 0717 CCSA REG ITEM 10L ITEM 10.L. ;ity Council N."ap inn, MOORPARK CITY COUNCIL �' - AGENDA REPORT TO: Honorable City Council FROM: Dave Klotzle, City Engineer/Public Works Director DATE: July 1, 2013 (CC Meeting of 07/17/13) SUBJECT: Consider Third Amendment to Agreement with Penfield & Smith for Additional Services for the Princeton Avenue Widening Project (Project 8012) BACKGROUND On March 19, 2008, the City Council awarded an Agreement to Penfield & Smith to prepare conceptual design, construction plans, specifications and a cost estimate for Project 8012: the widening and realignment of Princeton Avenue west of Condor Drive. The scope of services set forth in the Agreement with Penfield & Smith, directed them to proceed with initial re-design efforts using the information developed by a prior design effort, and to evaluate what additional efforts, such as hydrology, geotechnical and topographic surveys, might be required. The original scope of services anticipates the possible need to revise and increase the scope and related fees necessary to complete the design. On February 3, 2010, the City Council approved the First Amendment to Penfield & Smith's agreement in the amount of $74,692.25 for additional design services required of the project including property surveys and a geotechnical report. As the project design and right-of-way acquisition progressed, it was determined that additional tasks were required to complete the project. On November 3, 2010, the City Council approved the Second Amendment to Penfield & Smith's agreement in the amount of $130,000 for additional design services including an updated drainage study, redesign of the storm drain system as determined by the drainage study, extension of the project limits to Condor Drive and right-of-way acquisition support. 168 Honorable City Council July 17, 2013 Page 2 DISCUSSION It has been determined that the additional engineering services described below, and in more detail in the attached amendment, are required to complete the project design: 1. Ground penetrating radar to determine the size and location of existing underground utilities and storm drains to properly complete the storm drain design. 2. Revisions to the drainage report to incorporate additional information about existing storm drain pipes and outlet locations. 3. Drainage design modifications to address the routing of storm water on the Conejo Ready Mixed property. 4. Completion of plans specifications and construction cost estimate. 5. Retaining walls structural design. 6. Coordination of utility relocations. 7. Obtaining Caltrans encroachment permit. 8. Bidding and construction phase services. The additional design fees associated with the above tasks are summarized below: Task Amount 1. Ground Penetrating Radar $ 6,600.00 2. Revisions to Drainage Report $ 10,240.00 3. Drainage Design Modifications $ 41,000.00 4. Completion of Plans, Specifications and Cost Estimate $ 43,660.00 5. Retaining Walls Design $ 19,650.00 6. Utility Coordination $ 32,000.00 7. Caltrans Permit $ 12,000.00 8. Bidding and Construction Phase $ 46,640.00 Total $ 211,790.00 FISCAL IMPACT The proposed Third Amendment would increase Penfield & Smith's Agreement by $211,790.00 from a not-to-exceed amount of $483,840.25 to a not-to-exceed amount of $695,630.25. A budget amendment is not necessary to fund the additional design S:\Public Works\Everyone\Reports\Staff Reports\2013\July\7-17-2013(Penfield Amend No.3 Princeton Widening).doc 169 Honorable City Council July 17, 2013 Page 3 services under the Third Amendment. The approved FY 2013/14 project budget has sufficient funding to allow a line item transfer from the construction budget to the design budget. A future adjustment to the construction budget at the time of contract award may be necessary depending on the actual cost for construction. STAFF RECOMMENDATION Approve the Third Amendment to Agreement with Penfield & Smith to increase the Scope of Services for the Princeton Avenue Widening Project in an amount not to exceed $211,790.00 and authorize the City Manager to execute said amendment, subject to final language approval by the City Manager and City Attorney. Attachment: Amendment No. 3 S:\Public Works\Everyone\Reports\Staff Reports\2013\July\7-17-2013(Penfield Amend No.3 Princeton Widening).doc 170 THIRD AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF MOORPARK AND PENFIELD & SMITH THIS THIRD AMENDMENT TO THE AGREEMENT FOR SERVICES is made and entered into this day of , 2013, between the City of Moorpark, a municipal corporation, hereinafter referred to as "City" and Penfield & Smith, a corporation, hereinafter referred to as "Consultant". WITNESSETH WHEREAS, on May 15, 2008, the City and Consultant entered into an Agreement for providing civil engineering design services for the re-design of the Princeton Avenue Widening Project, hereto referred to as Agreement; and WHEREAS, on February 20, 2009, a no cost Change Order was executed specifying the amount set aside for reimbursable expenses; and WHEREAS, on February 16, 2010, the City and Consultant amended the Agreement for the first time to include a boundary establishment survey and legal description preparation, a geotechnical update report, and an additional topographic survey; and WHEREAS, on November 16, 2010, the City and Consultant amended the Agreement for the second time to include a drainage study preparation, extension of the project limits, storm drain plan and profile design, reimbursement for previous out of scope of services work requested conducted prior to Amendment No. 2 and future anticipated engineering services required in support of ongoing right-of-way acquisition efforts; and WHEREAS, the City desires to increase the Consultant's Scope of Services to include ground penetrating radar for storm drain design, drainage report revisions, drainage design modifications, completion of plans specifications and cost estimates, structural wall design, utility coordination, Caltrans permitting, and bidding and construction phase services; and WHEREAS, the City also desires to identify optional drainage design alternatives that may be added to the Consultant's Scope of Services in the future by separate amendment; and WHEREAS, the City wishes to amend the Agreement for the third time to reflect these additional services and the resultant fee increases; and SAPublic Works\CIPs\Projects\8012 Princeton Widening0esigMAmendment No.3(Penfield&Smith).doc 171 Agreement for Re-Design of Princeton Avenue Widening Project Amendment No. 3 Page 2 WHEREAS, a recap of the total design fee, including the changes requested herein, is set forth as follows: A. Original Fee: $279,148.00 B. Change Order (Reimbursables) $ 0.00 C. Amendment No. 1 $ 74,692.25 D. Amendment No. 2 $130,000.00 Sub-total $483,840.25 E. This Change $211,790.00 Total $695,630.25 NOW, THEREFORE, in consideration of the mutual covenants, benefits and premises herein stated, the parties hereto agree to amend the aforesaid Agreement as follows: City does hereby retain Consultant in a contractual capacity to provide certain civil engineering design services in accordance with the terms and conditions hereinafter set forth in Exhibit "A", for a not to exceed amount of$211,790.00. All other terms and conditions of the original agreement shall remain in full force and effect. CITY OF MOORPARK CONSULTANT Penfield & Smith Steven Kueny, City Manager Hady Izadpanah, President Date Date ATTEST: Maureen Benson, City Clerk Exhibit A— Consultant's Proposal SAPublic Works\CIPs\Projects\8012 Princeton Widening0esignWmendment No.3(Penfield&Smith).doc 172 Exhibit A td ps r- ie Smith 1327 Del Norte Road,Ste 200 Camarillo,CA 93010 2013 tel 805-981-0706 July 3, W.O. 18305.04 fax 805-981-0251 www,penfieldsmith.com Mr. David Klotzle, P.E. City of Moorpark Public Works Director 799 Moorpark Avenue Santa Barbara Moorpark, CA 93021 Camarillo Santa Maria Lancaster --- ---! SUBJECT: PRINCETON AVENUE WIDENING PROJECT REVISED PROPOSED FEE FOR ADDITIONAL SERVICES Civil Engineering Land surveying Dear Mr. Klotzle, Land Use Planning In response to our meeting and conversations in January 2013, and email and Construction Management&Inspection discussions the last few weeks, please find this proposal for additional services related to the completion of the Princeton Avenue widening civil design. The Traffic&Transportation additional scope of services proposed includes: Engineering Transportation Planning Ground Penetrating Radar (GPR) investigation to attempt to identify type, size and location of existing utilities that cross proposed storm Structural Engineering drain alignments; Water Resources Design and permit storm drain line to the VCWPD box culvert; Engineering Completion of the demolition, grading, striping, signage and street plans GIS and specifications through unforeseen conditions; • Completion of structural wall design and plans; • Utility coordination; • Caltrans permitting; • Bidding and construction phase services by the design engineer. Optional scope of service items that may be added at a later date include: • Modifications to the Drainage Study to address a newly proposed storm drain line through the Ready Mix Site to a private basin; • Design and permit storm drain line through the Ready Mix Site The total cost for the additional scope of services is $211,790.00 and will be billed on a time and materials (T&M) basis, in accordance with our current billing rates (attached). The detailed scope and estimated fee for each scope item is outlined below and a schedule showing each item has been attached. 173 Princeton Avenue Widening Proposed Fee For Additional Services Page 12 July 3, 2013 GPR Storm Drain Lines We propose to have a GPR investigation of existing utilities to identify their type, size, alignment. We feel that this information is necessary to properly design the final storm drain plans and safeguard conflicts between existing conditions and proposed. Conducting the GPR investigation will likely expedite construction and has the possibility of reducing construction change orders by further clarifying existing conditions. Fee: $6,600.00 Revisions to Drainage Report In early 2012 after substantial completion of the storm drain design and Final Drainage Report, City staff provided an as-built plan for the "Performance Nursery" which our office had not previously seen. The plan depicts a recently built storm drain line which the Princeton Avenue improvements are now proposed to connect to. This has substantially changed the previously proposed storm drainage layout and hydrologic boundaries and impacts the grading and drainage plans as well. As a result, we propose to revise the Final Drainage Report as needed to address these design changes. Fee: $10,240.00 Modifications to the Drainage Design The current drainage design for the project maintains existing drainage patterns at the Ready Mix site, which is to convey storm water from the north side of Princeton Avenue via a culvert to a surface discharge south of the proposed retaining wall on the Ready Mix Site. Stormwater continues via surface sheet flow across the Ready Mix and eventually reaches Arroyo Simi. City Staff has requested that we include the following alternative design in our proposal. The scope and fee includes topographic surveying, engineering design, preparation of plans, specifications and estimates and all necessary permitting. Review the feasibility of redirecting the Princeton Avenue culvert to the west to connect to an existing Ventura County Watershed Protection District (VCWPD) box culvert and determine if VCWPD will allow the connection. Fee: $6,000.00 If feasible, Penfield & Smith would then prepare plans and specifications and permit a storm drain from the Ready Mix site frontage to the west within the Princeton Avenue right-of-way to the existing box culvert. It is anticipated that this alternative will require permitting through VCWPD. Fee: 35,000.00 Structural Wall Design Penfield & Smith will conduct structural and value engineering analysis to identify a cost- effective retaining wall system for the proposed alignments. Plans for the identified retaining wall system will then be prepared for bidding and construction. Fee: $19,650.00 174 Princeton Avenue Widening Proposed Fee For Additional Services Page 13 July 3, 2013 100% Completion of Plans, Specifications and Estimates Penfield & Smith initiated work on the Princeton Avenue design project over five years ago in 2008. During that time period, multiple unforeseen conditions and changes in the project have caused increases of the design cost. Examples of cost increases include: 1) Multiple start and stop directives and lack of timely review of our plans which have slowed work progress, led to inefficiencies and caused inflation erosion of agreed upon billing rates; 2) Dealing with two City Engineers and an interim project manager with different visions of the project; and, 3) Addressing various alignments, right-of-way issues and retaining wall configurations. Given the above, Penfield & Smith respectfully requests an increase for the design fee to complete the project by building upon the currently accepted 80% plans. The completed plans will include the 100% plans, specifications and estimates needed for bidding and construction of this important project. Fee: $43,660.00 Utility Coordination Penfield & Smith will provide management and coordination of wet and dry utility relocations, including posting notices to all affected utilities, identifying conflicts, and organizing and verifying relocation. Fee: $32,000.00 Caltrans Permitting Penfield & Smith will provide management, coordination and permitting with Caltrans which owns various parcels along the alignment, and controls right-of-way through the portion of the project located beneath the Highway 23 overhead bridge. It is anticipated that this permitting will follow a typical Caltrans Encroachment Permit Application process and timeline. Fee: $12,000.00 Bidding and Construction Phase Services As the design engineer, Penfield & Smith will provide assistance with bidding and construction services. Proposed services will include addressing requests for information (RFIs) during bidding, attending pre-bid and bid meetings, addressing RFIs during construction from the contractor or City Staff, conducting periodic site visits during construction, and preparing as- built drawings based on feedback from the City's Construction Management and inspection team. Fee: $46,640.00 Total proposed fee for additional services $211,790.00 PSi 175 Princeton Avenue Widening Proposed Fee For Additional Services Page 14 July 3, 2013 Optional Drainage Design Alternatives The following drainage design alternatives may be added in the future upon separate approval by the City: Optional Design Alternative 1 Extend the proposed Princeton Avenue culvert across the Ready Mix site to discharge into an existing basin at the southerly edge of the property. It is assumed that the, basin is already constructed so that it can overflow and safely spill into the Arroyo. Penfield & Smith proposes to initially perform a field survey and engineering investigation of the existing facilities to determine the feasibility of this option. Fee: $9,000.00 If proved feasible, we will complete the design, modify the drainage report and prepare PS&E's for approximately 425 LF of storm drain line and associated improvements. It is assumed that no additional permitting is required for this alternative. Fee: $18,000.00 Optional Design Alternative 2 As an alternative to using the Ready Mix basin and outlet, Penfield & Smith can prepare plans and specifications and permit an extension of the Princeton Avenue culvert though the Ready Mix site and provide a new outlet in the Arroyo. The new Arroyo outlet, at a minimum will require permitting through California Fish and Wildlife, Army Corp of Engineers and Ventura County Watershed and may delay the project as a result of these permitting requirements. Fee: $90,000.00 We have estimated the cost of our services based on our understanding at this time of the scope and complexity of the work. However, please note that our services will be performed on a time and materials basis, and it is possible that our actual charges could exceed the amount we have estimated. During the performance of our services, the need for additional or expanded services may be determined. We will make every reasonable effort to keep you informed of our progress and costs incurred. If you have questions regarding this fee estimate for additional services, please contact me at (805) 981-0706 x 221 or via email at sdmOpenfieldsmith.com. Sincerely, PENFIELD & SMITH Scott D. Meckstroth, R.C.E. 63337 Geremy Salts Project Engineer Principal Engineer 18305 01 CO-3 REV 2013 07 01.doc 176 Name Duration Start Finish Predecessors 1 GPR Services&Mapping 30 days 7/8/13 8:00 AM 8/16/13 5:00 PM 2 Revise Drainage Report 40 days 7/8/13 8:00 AM 8/30/13 5:00 PM 3 VCWPD Connection Feasib... 30 days 7/8/13 8:00 AM 8/16/13 5:00 PM 4 VCWPD Connection PS&E... 40 days 8/19/13 8:00 AM 10/11/13 5:00 PM 3 5 Structural Wall Design 40 days 7/8/13 8:00 AM 8/30/13 5:00 PM 6 100%Completion of PS&E 70 days 7/8/13 8:00 AM 10/11/13 5:00 PM 7 Utility Coordination 110 days 7/8/13 8:00 AM 12/6/13 5:00 PM 8 Caltrans Permitting 80 days 8/19/13 8:00 AM 12/6/13 5:00 PM 3 9 Bidding&Construction Ph... 260 days 12/9/13 8:00 AM 12/5/14 5:00 PM 8 Princeton Avenue 177 PENFIELD & SMITH BILLING RATES EFFECTIVE JANUARY 1, 2013 Engineering Construction Management Engineering Technician ...............................$80 Construction Technician..............................$90 Associate Technician.....................................90 Assistant Construction Manager..................120 Senior Technician........................................100 Associate Construction Manager.................140 Designer......................................................120 Senior I Construction Manager....................155 Senior Designer...........................................135 Senior II Construction Manager...................165 Junior Engineer............................................100 Principal Construction Manager ..................185 Assistant Engineer.......................................120 Associate Engineer......................................140 Construction Inspector..................................$95 Senior I Engineer.........................................155 Prevailing Wage......................................120 Senior 11 Engineer........................................165 Senior Construction Inspector......................105 Principal Engineer........................................185 Prevailing Wage......................................125 Chief Inspector/Owner's Representative......115 Geomatics (Surveying & Mapping) Prevailing Wage......................................130 Survey Technician .......................................$80 General Junior Surveyor............................................100 Assistant Surveyor.......................................120 Technical/Clerical Support............................$70 Dry Utility Coordinator.............................120 Associate Surveyor......................................140 Special Consultant........................................200 Senior I Surveyor.................................:.......155 (Principal with specialized skills in engineering, Senior II Surveyor........................................165 geomatics or planning) Principal Surveyor........................................185 Expert Witness/Deposition Rates One-Man Survey Crew..............................$170 Court appearance—flat fee$3,300/day Prevailing Wage.....................................190 Depositions-$400/hour including travel time Two-Man Survey Crew................................230 Supplementary work— 1.5 times the regular Prevailing Wage.....................................265 rate Planning Rapid Response= Minimum charge of four(4) Assistant Planner..........................................105 hours at 1.5 times the regular rate Associate Planner.........................................125 Out-of-town Survey CreWTravel = 1/2 times Senior I Planner............................................150 regular rate Senior 11 Planner...........................................160 Outside Consultant..........................Cost+ 15% Principal Planner...........................................175 Reimbursable Expenses..................Cost+ 15% In-house reimbursable expense rates available upon request. Note:Adjustments to rates are normally made on January 1St however, Penfield& Smith reserves the right to make adjustments at any time. &snort 178