MOORPARK CITY COUNCIL
AGENDA REPORT AC MO W�
TO: The Honorable City Council
FROM: Jeremy Laurentowski, Parks and Recreation Director z�v
DATE: July 1, 2013 (CC Meeting July 17, 2013)
SUBJECT: Consider Amendment No. 1 to the Agreement with Sterndahl
Enterprises, Inc.; and Resolution Amending the Fiscal Year 2013/14
Budget by Appropriating $16,088 from the General Fund Reserve
BACKGROUND
On May 15, 2013, the City Council authorized the City Manager to execute an
Agreement with Sterndahl Enterprises, Inc. to re-stripe roadway markings at various
City locations. This project was initiated by the Public Works Department, as the
roadway markings have faded over time and are in need of replacement.
The Parks, Recreation and Community Services Department is currently preparing the
contract documents and bid specifications for a project to repair the asphalt parking lots
at the Civic Center and several City parks. This project will be scheduled later in 2013.
However, a portion of this work includes roadway and parking lot striping at Arroyo Vista
Community Park. Staff feels that the low striping costs recently obtained by the Public
Works Department, would result in cost savings to the City by completing this work
under the current contract. Typically, asphalt contractors do not perform striping and
will sub-contract this portion of a project. Staff anticipates a cost savings of
approximately 20%, due to the fact that the City can bypass overhead fees and contract
for this work directly with a striping contractor at this time.
DISCUSSION
The parking lots at Arroyo Vista Community Park are in need of re-striping, as the
striping, arrows and other miscellaneous markings in parking lots B, C and D have
faded over time. In addition, staff feels that stop signs should be added at the exit
locations of parking lots B and D, and a center line added along the length of the
access road from the median island adjacent to parking lot A, to the entrance of parking
lot C. Traffic along the access road can be very high during large events and staff feels
that a double yellow centerline would help slow down and direct traffic, as well as
179
Honorable City Council
July 17, 2013
Page 2
alleviate some congestion. Parking lot A is not included at this time, as the repairs
required at this location are extensive and will need to be included in the repaving work
planned for later this year.
FISCAL IMPACT
The total cost to complete this work is $16,088, which includes a 10% contingency in
the amount of $1,463. Funding for this work was not included in the Fiscal Year
2013/14 spending plan. Staff is requesting an additional appropriation from the General
Fund reserve in the amount $16,088 to the Parks Division (7800) to complete this work.
STAFF RECOMMENDATION (ROLL CALL VOTE)
1. Approve Amendment No. 1 to the Agreement with Sterndahl Enterprises, Inc. for
striping at Arroyo Vista Community Park, and authorize the City Manager to
execute the Amendment in the amount of $16,088: and
2. Adopt Resolution No. 2013 - amending the FY 2013/14 budget to
appropriate $16,088 from the General Fund (1000) to fund this project.
Attachments:
1. Resolution 2013 -
2. Amendment No. 1 to Agreement with Sterndahl Enterprises, Inc.
180
Honorable City Council
July 17, 2013
Page 3
RESOLUTION NO. 2013 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR
2013/14 BUDGET TO ALLOCATE $16,088 FROM THE
GENERAL FUND (1000) TO THE PARKS DIVISION (7800),
FOR ROADWAY AND PARKING LOT STRIPING AT
ARROYO VISTA COMMUNITY PARK
WHEREAS, on May 15, 2013, the City Council approved staff's recommendation
to award the construction contract for the 2013 Pavement Markings Project to Sterndahl
Enterprises, Incorporated (Sterndahl); and
WHEREAS, on June 19, 2013, the City Council adopted the Operating and
Capital Improvement Budget for Fiscal Year 2013/14; and
WHEREAS, a staff report has been presented to City Council discussing the
need to re-stripe parking lots B, C and D, and stripe the access road at Arroyo Vista
Community Park and the potential cost savings of completing this work under
Sterndahl's current agreement, and
WHEREAS, an additional appropriation of $16,088 is requested from the
General Fund (1000) to the Parks Division (7800) to fund this work; and
WHEREAS, Exhibit "A" hereof describes said budget amendment and its
resultant impact to the budget line items.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment allocating $16,088 from the General Fund
(1000) for roadway and parking lot striping at Arroyo Vista Community Park, as more
particularly described in Exhibit "A" attached hereto is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and
shall cause a certified resolution to be filed in the book of original resolutions.
181
Honorable City Council
July 17, 2013
Page 4
PASSED AND ADOPTED this 17th day of July, 2013.
Janice S. Parvin, Mayor
ATTEST:
Maureen Benson, City Clerk
Attachment: Exhibit A— Budget Amendment
182
Honorable City Council
July 17, 2013
Page 5
EXHIBIT A
BUDGET AMENDMENT FOR THE GENERAL FUND
FOR ROADWAY AND PARKING LOT STRIPING
AT ARROYO VISTA COMMUNITY PARK
FY 2013/14
FUND ALLOCATION FROM:
FUND TITLE FUND ACCOUNT NUMBER AMOUNT
General Fund 1000-5500 $16,088
Total $16,088
DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS:
BUDGET NUMBER CURRENT BUDGET REVISION ADJUSTED BUDGET
1000-7800-7803-9252 $73,100 $16,088 $89,188
Total $73,100 $16,088 $89,188
Finance approval:
l
183
AMENDMENT NO. 1
TO AGREEMENT BETWEEN THE CITY OF MOORPARK
AND STERNDAHL ENTERPRISES, INC., FOR STRIPING SERVICES
AT ARROYO VISTA COMMUNITY PARK
This Amendment to Agreement, made and entered into this day of
2013, between the City of Moorpark, a California municipal
corporation, hereinafter referred to as "City" and Sterndahl Enterprises, Inc., a
corporation, hereinafter referred to as "Contractor."
Whereas, on June 7, 2013, the City and Contractor entered into an Agreement
for certain roadway striping services to be provided to City by Contractor; and
Whereas, the City now desires to amend the Agreement to include additional
striping services at Arroyo Vista Community Park.
Now, therefore, in consideration of the mutual covenants, benefits, and premises
herein stated, the parties hereto agree to amend the aforesaid Agreement as follows:
I. Section 2, Scope of Services, of the Agreement is amended to read, in its
entirety, as follows:
"City does hereby retain Contractor in a contractual capacity to provide
construction services related to striping services, as set forth in Exhibits B and C:
Contractor's Bid Proposal(s), dated May 1, 2013 and June 2, 2013, which exhibits are
attached hereto and incorporated herein by this reference as though set forth in full and
hereinafter referred to as the "Proposal" and as set forth in Exhibits B and C, which
include (i) Standard Specifications; (ii) Special Provisions; (iii) Workers' Compensation
Insurance Certificate (Labor Code 1860 and 1861); (iv) Payment and Performance
Bonds; and (v) Insurance Certificate for General Liability and Automobile Liability,
attached hereto and incorporated herein by this reference as though set forth in full and
hereinafter referred to as Exhibits B and C. Where said Scope of Services is modified
by this Agreement, or in the event there is a conflict between the provisions of said
Scope of Services and this Agreement, the language contained in this Agreement shall
take precedence.
Contractor shall perform the tasks described and set forth in Exhibits B and C,
both of which are attached hereto and incorporated herein by this reference as though
set forth in full. Contractor shall complete the tasks according to the schedule of
performance which is also set forth in Exhibits B and C.
Compensation for the services to be performed by Contractor shall be in
accordance with Exhibits B and C, attached hereto and incorporated herein by this
reference as though set forth in full. Compensation shall not exceed the rates or total
value of one hundred eleven thousand three hundred nineteen dollars and ninety cents
184
($111,319.90) as stated in Exhibits B and C, including a ten percent (10%) contingency
for the striping at Arroyo Vista Community Park in the amount of one thousand four
hundred sixty-three dollars ($1,463.00) for a total amount of one hundred twelve
thousand seven hundred eighty-two dollars and ninety cents ($112,782.90) without the
written authorization of the City Manager. Payment by City to Contractor shall be as
referred to in this Agreement."
City and Contractor acknowledge that this project is a public work to which
prevailing wages apply. Contractor agrees to comply with and be bound by all the
terms, rules and regulations described in (a) Division 2, Part 7, Chapter 1 (commencing
with Section 1720) of the California Labor Code, including without limitation Labor Code
Section 1771 and (b) the rules and regulations established by the Director of industrial
Relations implementing such statutes, as though set forth in full herein, including any
applicable amendments made thereto during the term of this Agreement. For every
subcontractor who will perform work on this project, Contractor shall be responsible for
subcontractor's compliance with (a) and (b), and Contractor shall take all necessary
actions to ensure subcontractor's compliance.
11. Paragraph 1 of Section 5, Payment, of the Agreement is amended to read as
follows:
"The City agrees to pay Contractor monthly, in accordance with the terms and
the schedule of payment as set forth in Exhibits B and C, attached hereto and
incorporated herein by this reference as though set forth in full, based upon actual time
spent on the above tasks. This amount shall not exceed one hundred eleven thousand
three hundred nineteen dollars and ninety cents ($111,319.90), including a contingency
in the amount of one thousand four hundred sixty-three dollars ($1,463.00) for a total
amount of one hundred twelve thousand seven hundred eighty-two dollars and ninety
cents ($112,782.90) for the total term of the Agreement unless additional payment is
approved as provided in this Agreement."
III. Remaining Provisions
All other provisions of the aforesaid Agreement shall remain in full force and
effect.
In witness whereof, the parties hereto have executed this Amendment on the
date and year first above written.
CITY OF MOORPARK STERNDAHL ENTERPRISES, INC.
Steven Kueny, City Manager Dennis Sterndahl, Vice President
Sterndahl Enterprises, Inc. Amendment No. 1 18;
Attest:
Maureen Benson, City Clerk
Sterndahl Enterprises, Inc. Amendment No. 1 18�
Exhibit B
CITY OF MOORPARK
DEPARTMENT OF PUBLIC WORKS
PROPOSAL
FOR
2.013 Pavement Makings
-- REVISED April 29, 2013 --
Specification No. MPK 12-00, including 1 sheet of plans
Revised Bids (pages 1 and 2) must be received by 5:00 a.m. on May 3. 2013
Completion Time: ISConsecutive Working Daysafter Receipt of
Notice to Proceed
Liquidated Damages:$500 per Calendar Day
Working Hours: 7:00 a.m. to 4:00 p.m.
r c.
Contractor Name Street Address Ci b1 .�[ f�tZ`� 5T ,
city " State CA Zip Code it
Telephone No.k f pq —`t;lit J Email: kPA-!
Licensed in accordance with a act providing for the registration of Contractor's License
No. LA-A-0-3 Class r c 3! Expiration Date 9-3L�-tj
Federal Tax Identification Number: 37;E-7 3S
The undersigned declares that he/she has carefully examined the location of the proposed
work, that he/she has examined the Plans and Specification's and read the accompanying
instructions to bidders, and hereby proposes to furnish all materials and to do all the work
required to complete such work in accordance with such.Plans and Specifications for the prices
set forth in this Proposal.
The undersigned has carefully checked all the figures in this Proposal:and understands that City
will not be responsible for any error or omission on the part of the undersigned in preparing this
bid nor will City release the undersigned on account of such error or omission.
The undersigned swears or affirms under ty of perjury that the information regarding the
Contractor's License is true and correct.
Signature.of Bidder l�� �
Title
Signature of Bidder
Date of Submittal: Title
2013 Pavement Markings
187
PROPOSED SCHEDULE OF WORK AND PRICES
2013 Pavement Markings
-- REVISED April 29, 2013 —
Item Payment QTY Unit
No. Reference Description Unit Price Cost
1 703-7 Edge Line (solid) Detail No. 39 34,000 LF
Thermoplastic
2 703-7 Edge Line(broken) Detail No. 39A 14,600 LF v�� L� �.CO.
Thermoplastic
Turn and Channelizing Line Detail 5,400 LF
3 703-7 No. 38 Thermoplastic
4 703-7 12" Crosswalk Line 3,209 LF
(yellow or white) Thermoplastic
5 703-7 Edge line Detail 24 Thermoplastic 15,100 LF
6 703-7 Edge line Detail 24 Paint2 coats 11,600 LF , 3`�r 4
Centerline Detail 21 (paint 3' black _
7 703-7 separation line 2 coats) 5,550 LF I.OD S/5�-O, CO,
Thermoplastic
Centerline Detail 22 (paint 3" black
8 703-7 separation line 2 coats) 16,000 LF
Thermoplastic
Median Island on Pavement
9 703-7 Detail 29(paint 3" black separation 2,200 LF 3o) ��J,c-D
line,2 coats) Thermoplastic
10 703-7 "KEEP CLEAR"Legend 2 OD O03,Including Limit Lines Thermoplastic �����
"SIGNAL AHEAD'Legend 2 EA 35D(1) 7LO.cz
11 703-7 Thermoplastic
"STOP AHEAD" Legend
12 703-7 3 Thermoplastic 36D,`� 0D.cz3
13 703-7 "STOP" Legend 17 EA (4r?.v> a�376,cD
Including Limit LineThermoplastic
Arrow Type 1, IV and V 50 EA
14 703-7 Thermoplastic '
15 704-2 Release on Contract 1 LS $1 $1
Total Amount of Bid $
Contractor's Name pqjW ckj�,
2013 Pavement Markings 188
Exhibit C
June 2, 2013
PROPOSED SCHEDULE OF WORK AND PRICES
2013 Pavement Marking Spec No. MPK 13-02
Striping for AVRC Parking lots B, C and D
Item Description QTY Unit Unit Price Cost
Stalls (Paint) 500 EA $ 11.00 $5,500
HC Stalls (Paint) 25 EA $ 85.00 $2,125
Base Line (Paint) 500 LF $ 1.00 $500
STOP Legend including limit line (Paint) 2 EA $ 100.00 $200
EXIT Legend (Paint) 3 EA $ 100.00 $300
NO EXIT Legend (Paint) 2 EA $ 150.00 $300
Center Line - Detail 21 (Paint) 2200 LF $ 1.00 $2,200
Roadway edge -4" white (Paint) 4400 LF $ 0.50 $2,200
Painted Island 4" white line (Paint) 200 LF $ 1.00 $200
Arrows Type I, IV, and V (Paint) 20 EA $ 55.00 $1,100
TOTAL COST $14,625