MOORPARK CITY COUNCIL
1J4i11C19 Meeting
REPORT ;f4
TO: Honorable City Council "'°"'"e'
_-_V_LV_. 7
FROM: Hugh R. Riley, Assistant City Manager
DATE: June 26, 2013 (CC Meeting of 7/17113)
SUBJECT: Consider Amendment No. 6 to the Agreement with Standard Drywall,
Inc., for Additional Painting Required at the Ruben Castro Human
Services Center; and Consider the Resolution Amending the Fiscal
Year 2012/13 Budget to Appropriate $13,741 from the RDA-SA 2006
TAB Proceeds Fund 9104 to Cover the Cost of Amendment No. 6 to
the Standard Drywall, Inc. Agreement
BACKGROUND & DISCUSSION
The Ruben Castro Human Services Center (RCHSC) was constructed as a multiple-
prime contract project with construction management provided by Barnhart Balfour
Beatty Construction (Balfour-Beatty). Bids were solicited from trades in September
2010, opened on October 21, 2010, and bids were awarded by the Moorpark City
Council on January 19, 2011. Standard Drywall, Inc., (SDI) was selected as the lowest
responsive and responsible bidder for the Finishes bid package and a construction
agreement was executed on April 12, 2011. The original contract amount was for
$2,175,000 with a contingency amount of $217,500.
Amendment No. 6 is to include the following items:
1. Prior to painting, the exterior plaster finish on Building A, primarily the west facing
wall adjacent to Spring Road, experienced excessive cracking. The cause for the
cracking was most likely due to the warm and dry weather conditions during the
plaster installation in 2012, and the premature drying of the plaster finish. The
cracking was repaired by the plaster contractor at no additional cost to the City. In
addition, Balfour Beatty Construction and HMC Architects, recommended that
Building A should be painted with an elastomeric paint, as this paint type has water
repelling qualities and superior weather protection. This was also completed with no
additional contract cost. However, in order to maintain consistency with the exterior
paint type for both buildings, it was determined that the finish of Building B should
match the same finish applied to Building A. This work was authorized by the City,
but a contract amendment was not completed. Although, elastomeric paint has a
209
Honorable City Council
July 17, 2013
Page 2
higher initial cost, the finish reduces long term maintenance costs and provides an
added level of weather protection to the plaster finish. Elastomeric paint has a life
span of approximately fifteen to twenty years, as compared to ten to fifteen years for
the exterior latex paint that was originally specified for this project. The additional
cost for this work is $8,276.
2. As directed by Balfour Beatty Construction on a verified time and material basis,
provide various wall repairs and paint touch up to correct incidental damage caused
by other trades and furnishing installations. Time and material costs have been
negotiated and resolved with responsible trade contractors. This work was
authorized by the City but a contract amendment was not completed. The additional
cost for this work is $5,465.
There have been five amendments issued for changes, modifications, and construction
alterations requested or required during the course of construction. A recap of the
original contract and amendments issued to date is provided below..
Original Contract $2,175,000.00
Amendment No. 1 $ 26,203.05
Amendment No. 2 $ 10,737.41
Amendment No. 3 $ 42,725.43
Amendment No. 4 $ 32,966.96
Amendment No. 5 $ 160,772.00
Current Agreement Amount $2,448,404.85
Amendment No. 6
Various final paint items (with 3% contingency) $ 13,741.00
Revised Agreement Amount $2,462,145.85
FISCAL IMPACT
The construction of the Ruben Castro Human Services Center (CIP 5020) and the
Standard Drywall, Inc. agreement are included in the approved Recognized Obligation
Payment Schedule III (ROPS III) for the period January 1, 2013, to June 30, 2013.
However, there are no available appropriations to cover the cost of Amendment No. 6.
A budget amendment of $13,741 is required from the RDA-SA 2006 TAB Proceeds
Fund (Fund 9104). This fund is estimated to have $2,109,840 fund balance at year-end
with the proceeds from the sale of Building A to the County of Ventura.
210
Honorable City Council
July 17, 2013
Page 3
STAFF RECOMMENDATION (ROLL CALL VOTE)
1. Authorize the City Manager to execute Amendment No. 6, subject to final
language approval by the City Manager and the City Attorney; and
2. Adopt Resolution No. 2013- amending the FY 2012/13 Budget to appropriate
$13,741 from the RDA-SA 2006 Tab Proceeds Fund (9104) to cover the cost of
Amendment No. 6 to the Standard Drywall, Inc. agreement.
Attachment 1: Amendment No. 6 to Standard Drywall, Inc.
Attachment 2: Resolution No. 2013-
211
Attachment 1
SIXTH AMENDMENT TO AGREEMENT 2011-107
FOR BID PACKAGE #12 — FINISHES
AT THE RUBEN CASTRO HUMAN SERVICES CENTER
THIS SIXTH AMENDMENT TO THE AGREEMENT FOR BID PACKAGE #12 —
FINISHES ("Sixth Amendment"), is made and entered into this day of
2013, ("the Effective Date") between the City of Moorpark, a
municipal corporation, hereinafter referred to as "CITY", and Standard Drywall, Inc., a
California corporation, hereinafter referred to as "CONTRACTOR".
WITNESSETH:
WHEREAS, on April 12, 2011, the CITY and the CONTRACTOR entered into an
Agreement for finishes for the Ruben Castro Human Services Center; and
WHEREAS the CONTRACTOR has executed five previous Amendments to the
Agreement totaling an amount not-to-exceed two hundred seventy three thousand, four
hundred four dollars and eighty-five cents ($273,404.85) increasing the total not-to-exceed
amount to two million four hundred forty-eight thousand four hundred four dollars and
eighty-five cents ($2,448,404.85) for finishes for the Ruben Castro Human Services
Center, and
WHEREAS, the CITY wishes to acknowledge and correct the typographical error in
Amendment No. 5 Section 11 to now indicate "the CITY hereby increases the not-to-
exceed amount of $2,287,632.96 under this Agreement by $160,772.00 to $2,448,404.85".
WHEREAS, the CITY wishes to further amend the Agreement to include additional
work to complete various painting items as Amendment No. 6 to the Agreement with
Standard Drywall, Inc., for the Ruben Castro Human Services Center at a cost not-to-
exceed thirteen thousand seven hundred forty-one dollars ($13,741.00) as described in
the CONTRACTOR'S Change Order Requests dated July 11, 2012, August 22, 2012, and
September 26, 2012, and incorporated herein as Exhibit RR to the Agreement by this
Sixth Amendment; and
WHEREAS, on July 17, 2013, the City Council of the City of Moorpark approved
additional funding for these additional services, and
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto AMEND the aforesaid Agreement follows:
Construction Agreement Page 1 of 2
Sixth Amendment Between City of Moorpark and Standard Drywall, Inc. 212
1. Section 2 of the Agreement is amended to read:
Contractor's Scope of Services is amended to include the labor and materials
required to complete various additional scope painting items at the Ruben Castro Human
Services Center.
11. . Section 7 of the Agreement is amended to read:
CITY hereby increases the not-to-exceed amount of $2,448,404.85 under this
Agreement by $13,741.00 to $2,462,145.85.
111. Remaining Provisions
All other terms and conditions of the original Agreement shall remain in full force
and effect.
CITY OF MOORPARK STANDARD DRYWALL, INC.
By: By:
Steven Kueny David J. Dearborn
City Manager Project Manager
ATTEST:
Maureen Benson, City Clerk
Construction Agreement Page 2 of 2
Sixth Amendment Between City of Moorpark and Standard Drywall, Inc. 213
Balfour Beatty
Construction
EXHIBIT RR
Ruben Castro Human Service Center
Recommendation for Agreement Amendment# 12.42
Standard Drywall, Inc, Bid Package# 12, Finishes
TO: Hugh R. Riley, Assistant City Manager
FROM: Dennis Kuykendall, Sr. Project Manager
DATE: June 21, 2013
SUBJECT: Various Final Paint items
Summary-
1. Per direction by the City of Moorpark as recommended by Balfour Beatty Construction and
HMC Architects, apply elastomeric water repelling paint to Building B to match the same
finish applied to Building A (Building A elastomeric paint applied at no charge to the project).
Elastomeric paint finish reduces future City maintenance and provides an added level of
weather protection to the exterior plaster finish. Cost $ 8,276.00
2 As directed by Balfour Beatty Construction on a verified time and material basis, provide
various wall repairs and paint touch up to correct incidental damage caused by other trades
and furnishing installations. T&M costs have been negotiated and resolved with responsible
trade contractors. Cost $ $5,465.00
Impact to Bid Package #12 is for material and labor to upgrade exterior paint at Building B and
provide incidental touch up to building interior walls. Pricing was received and subsequently
reviewed and found acceptable by the CM.
Financial Summary
Agreement Amount $ 2,175,000.00
Contingency Amount $ 217,500.00
Previously Approved Amended Agreement thru Amend#5 $ 2,448,404.85
Current requested Amendment ISDI $ 13,741.00
Proposed Revised Agreement Amount $ 2,462,145.85
Schedule Impact
No impact to Project Scheduling responsible to Bid Package#12.
Recommendation.
Authorize issuance of Amendment to the Agreement between the City and Standard Drywall,
Inc. formally authorizing the additional scope of work.
214
u( STREAMLINEPAINTING #0312 Y. 0111
i
�■v�r��rAN A,&& SJMAM
AV,I""AWM&111,C
Phone: (951) 581-2242 Fax. (951) 928 -1719
9726 Sunnybrook Dr. Moreno Valley Ca, 92557
streamlinepaintinginc @hotmail.com Lic: 799584
7/11/2012 -
Standard Drywall, Inc.
3100 Palisades Drive
Corona, Ca. 92880
Attm David Dearborn
Ref: Ruben Castro Human Services Center Moorpark
Dear Mr. Dearborn
The following is a quote for applying 1 coat of primer and 1 coat of elastomeric in lieu
specified finish per the Architects request.
astmeric Portion of South Elevation-'°'^ "w�
Please Add La $62.00 per hour $ 992.00
Material Elastomeric 28.00 per gal $ 700.00
Lift 2 days @ $200.00 per day $ 400.00
Ada Not charged to the
Project
A Elastomeric Balance of Building
Please abor 80 hours @ $62.00 per hour $ 4,950.00
Ma 0 gallons @ $28.00 per gallon $ 3,080.00
Lifts 2 weeks 0.00 per week $ 1,000.00
Please Credit finish coats on portions o
Labor 6 hours @ $62.00 per hou ($ 372.00)
Material 4 gallons @ $28.00 per gallon ($ 112.00)
Lifts 1 day @ 200.00 per day 00.00) Not Charged to the
Add $ 8, Project
Building B Elastomeric
Please Add Labor 148 hours @ $62.00 per hour $ 9,176,.00
Material 200 gallons @ $28.00 per gallon $ 5,600.00
Lifts 3 weeks @ $500.00 per week $ 1,500.00
Please Credit unfinished portions of building
Labor 70 hours @ $62.00 per hour ($ 4,340.00)
Material 95 gallons @ $ 28.00 per gallon ($ 2,660.00)
Lifts 2 weeks @ $500.00 per week ($ 1,000.00)
Add $ 8,276.00
SDI 6%OH/P 413.80
Page 1 Total Add $8,689.80
115
1,
STANDARD DRYV=INC.
August 22,2012
Mr. Dennis Kuykendall
Balfour Beatty
300 E. Esplanade Drive
Suite 350
Oxnard, CA 93036
RE: Ruben Castro Human Services Center
C.O.R. No. 40
Dear Dennis,
Enclosed please find our charge of $3,015 for additional work as
described in our Change Order Request No. 40 on the above referenced
project. Attached is a breakdown associated with the above change.
Qualifications:
This price excludes acceleration, overtime costs and time extensions
to the contract.
This price reflects the current-material pricing. Material order
pending approval of this change order.
The above price is valid for thirty(30)days.
If you have any questions or require clarification of any kind, please do not
hesitate to call.
Sincerely,
STANDARD DRYWALL, INC.
David J. Dearborn
Project Manager
3100 Fa vadea Drive-Carona,Califomio-97880
TEL(951)2564656-Fax:(951)256-M7-W W W.STANDARDDRYWALI.COM-OFFICES LOCATED IN CORONA,CA SAN DIEGO,CA-SALT LAKE CIZy,
UT.JACKSON.WY-LAS VEGAS,NV
CA#444328-NM#85263-HI#24487.OR#111655-AZ#1276444-UT#5732716-5501-M#13666-AAA4(1,26,17)
216
Standard Drywall,Inc.
Ruben Castro human Services Center
Date: August 22,2012 SDI COR# 40
Change Description:
Patch,Sand,Prime and Paint Walls due to damage by cabinet Install.
Material
Description Quantity Unit Unit$ Total
LF X $0.000 $0.00
LF X $0.000 $0.00
SF X $0.000 $0.00
EA X $0.000 $0.00
LF X $0.000 $0.00
LF X $0.000 $0.00
BX X $0.000 $0.00
EA X $0.000 $0.00
BX X $0.000 $0.00
BX X $0.000 $0.00
EA X $0.000 $0.00
Material Sub-total $0.00
Tax @ 9.25% $0.00
Total Material $0.00
Miscellaneous
Streamline Painting 1 LS X $ 2,871.00 $2,871
1 LS $ - $0
1 LS $ - $0
Miscellaneous Subtotal $2,871
O.+P@ 5.00% $144
Total Miscellaneous $3,015
Labor:
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $0.00 $0.00
Total Labor $0.00
Sub-total $0.00
O.+P @ 15.00% $0.00
Sub-total $0.00
Total Miscellaneous - $3,014.55
Total Request $3,015
Qualifications:
1.The price indicated is for this change only and does not include any compensation for costs which may
be incurred as a result of delays or accelerations.
2.The work quoted above will proceed only upon receipt of a written change order.
3. The price Indicated Is valid for thirty(30)days.
4.The work quoted above will add 0 Days to contract schedule.
S or P
217
d9lWAMAWAII1117,AV
Phone: (951) 581-2242 Fax: (951) 780-5350
9726 Sunnybrook Dr. Moreno Valley Ca, 92557
streamlinepaintinginc @hotmail.com Lic: 799584
TIME & MATERIAL INVOICE
Date: 812212012
To: Standard Drywall, Inc.
Job: Ruben Castro Human Services Center
Invoice # 135-11
Description of work: Patch, sand, prime and paint walls due to damage by cabinet
Installation. B/C K&Z Cabinets.
Labor Hours:
39 hours @ $62.00 per hour $ 2418.00
Total Labor $ 2,418.00
Materials:
1 qt. spackle @ $5.06 per qt. $ 5.00
16 gallons @ $28.00 per gallon $ 448.00
Total Material $ 453.00
Total All Costs $ 2,871.00
Respectfully:
i. ;
f f - lf�r
r•
John Scheurer
218
STANDABD DRYWALL INC.
August 22,2012
Mr. Dennis Kuykendall
Balfour Beatty
300 E. Esplanade Drive
Suite 350
Oxnard, CA 93036
RE: Ruben Castro Human Services Center
C.O.R. No. 42
Dear Dennis,
Enclosed please find our charge of $1,089 for additional work as
described in our Change Order Request No. 42 on the above referenced
project. Attached is a breakdown associated with the above change.
Qualifications:
This price excludes acceleration,overtime costs and time extensions
to the contract.
This price reflects the current material pricing. Material order
pending approval of this change order.
The above price is valid for thirty(30) days.
If you have any questions or require clarification of any kind,please do not
hesitate to call.
Sincerely,
STANDARD DRYWALL, INC.
David J. Dearborn
Project Manager
3100 PaUsadea Drive•Carona,California•92888
TEL.•(951)256-8656•Pax:(951)256.8657•W W W.SI'ANDARDDRYWALL.CObt•OFFICES LOCATED IN CORONA,CA SAN DIEGO,CA•SALT LAKE CiTy,
UT•JACKSON,WY•LAS VEGAS.NV
CA#454328•NM#85263•H1#24497-OR#111655•AZ#IZ7644-8•UT#5732716.5501•ID#L%66-AAAA(1,26,47)
219
Standard Drywall,Inc.
Ruben Castro Human Services Center
Date: August 22,2012 SDI CDR# 42
Change Description:
Patch,Sand,Prime and Paint Walls due to trade damage.
Material
Description Quantity Unit Unit$ Total
LF X $0.000 $0.00
LF X $0.000 $0.00
SF X $0.000 $0.00
EA X $0.000 $0.00
LF X $0.000 $0.00
LF X $0.000 $0.00
BX X $0.000 $0.00
EA X $0.000 $0.00
BX X $0.000 $0.00
BX x $0.000 $0.00
EA X $0.000 $0.00
Material Sub-total $0.00
Tax @ 9.25% $0.00
Total Material $0.00
Miscellaneous
Streamline Painting 1 LS X $ 1,037.00 $1,037
1 LS $ - $0
1 LS $ - $0
Miscellaneous Subtotal $1,037
O.+P @ 5.00% $52
Total Miscellaneous $1,089
Labor:
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $0.00 $0.00
Total Labor $0.00
Sub-total $0.00
0.+P @ 15.00% $0.00
Sub-total $0.00
Total Miscellaneous $1,088.85
Total Request $1,089
Qualifications:
1.The price Indicated Is for this change only and does not include any compensation for costs which may
be incurred as a result of delays or accelerations.
2.The work quoted above will proceed only upon recelpt of a written change order.
3. The price indicated is valid for thirty(30)days.
4.The work quoted above will add 0 Days to contract schedule.
S or P
220
p�r�rrn� lac
Phone: (951) 581-2242 Fax: (951) 780-6350
9726 Sunnybrook Dr. Moreno Valley Ca, 92557
streamlinepaintinginc@hotmait.cam Lic: 799584
TIME & MATERIAL INVOICE
Date: 8/22!2012
To: Standard Drywall, Inc.
Job: Ruben Castro Human Services Center
Invoice # 135-13
Description of work: Prime and repaint walls in lobby due to damage by
the Installation. SIC Reliable Flooring b Pedite.
Labor Hours:
13 hours @ $62.00 per hour $ 806.00
Total Labor $ 806.00
Materials:
1 roll tin, blue tape @ $5.00 per roll $ 5.00
2 4X15 drops @ $15.00 per ea. $ 30.00
7 gallons @ $28.00 per gallon $ 196.00
Total Material $ 231.00
Total All Costs S 1,037.00
7tfully;'
Joph Scheurer
221
14
STANDARD DRYWALL INC.
September 26, 2012
Mr. Dennis Kuykendall
Balfour Beatty
300 E. Esplanade Drive
Suite 350 —
Oxnard,CA 93036
RE: Ruben Castro Human Services Center
C.O.R. No. 54
Dear Dennis,
Enclosed please find our charge of $357 for additional work as
described in our Change Order Request No. 54 on the above referenced
project. Attached is a breakdown associated with the above change.
Qualifications:
This price excludes acceleration, overtime costs and time extensions
to the contract.
This price reflects the current material pricing. Material order
pending approval of this change order.
The above price is valid for thirty(30) days.
If you have any questions or require clarification of any kind, please do not
hesitate to call.
Sincerely,
STANDARD DRYWALL,INC.
David J.Dearborn
Project Manager
3100 Palisades D&c•Comm,CdWarnls•93880
TEE-•(951)25"06•Faa(951)256.8657•W W W.SPANIDARDDRYWALL_COM•OFFICES LOCATED IN CORONA,CA SAN DIEGO,CA•SALT LAKE Cny,UT
JACKSON,WY•LAS VEGAS.NV
CA#444338•NM#85263•H1#24497.OR#111655•AZ#127644-8•UT#5732716-5301•ID#L1666-AAA4(1,%,47)
222
Standard Drywall,Inc.
Ruben Castro Human Services Center
Date: September 26,2012 SDI COR# 54
Change Description:
Prime and Repaint
Material
Description Quantity Unit Unit$ Total
EA X $12-000 $0.00
LF X $7.000 $0.00
SF X $0.000 $0.00
EA X $0.000
LF X $0.000 $0.00
LF X $0.000 $0.00
BX X $0.000 $0.00
EA X $0.000 $0.00
BX X $0.000 $0.00
BX X $0.000 $0.00
EA X $0.000 $0.00
Material Sub-total $0.00
Tax @ 9.25% $0.00
Total Material $0.00
Miscellaneous
Streamline 1 LS X $ 340.00 $340
SDI TRUCK 0 LS $ 300.00 $0
LS $ - $0
Miscellaneous Subtotal $340
O.+P @ 5.00% $17
Total Miscellaneous $357
Labor:
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $0.00 $0.00
Total Labor $0.00
Sub-total $0.00
O.+P @ 15.00% $0.00
Sub-total $0.00
Total Miscellaneous $357.00
Total Request $357
Qualifications:
1.The price indicated is for this change only and does not Include any compensation for costs which may
be incurred as a result of delays or accelerations.
2.The work quoted above will proceed only upon receipt of a written change order.
3. The price indicated is valid for thirty(30)days.
4.The work quoted above will add 0 Days to contract schedule.
S or P
223
T- ®!dMY0. ®IYr.
Phone: (951) 581-2242 Fax: (951) 780-6350
9726 Sunnybrook Dr. Moreno Valley Ca, 92557
streamlinepaintinginc @hotmail.com Lic: 799584
TIME & MATERIAL INVOICE
Date: 9/26/2012
To: Standard Drywall, Inc,
Job: Ruben Castro Human Services Center
Invoice # 135-15
Description of work: Repaint. walls in room 101, 110 and 505 due to damage by
glass installers. B/C Center Glass.
Labor Hours:
4 hours @ $62.00 per hour $ 256.00
Total Labor $ 256.00
Materials:
3 gallons @ $28.00 per gallon $ 84.00
Total Material $ 84.00
Total AIR Costs $ 340.00
R€sp ctfully:
f? -
r �' } f �
John Scheurer
224
FUI '
sTlIm MR DBYWAL INC.
JUPFA
September 26,2012
Mr. Dennis Kuykendall
Balfour Beatty
300 E.Esplanade Drive
Suite 350
Oxnard,CA 93036
RE: Ruben Castro Human Services Center
C.O.R. No. 55
Dear Dennis,
Enclosed please find our charge of $502 for additional work as
described in our Change Order Request No. 55 on the above referenced
project. Attached is a breakdown associated with the above change.
Qualifications:
This price excludes acceleration,overtime costs and time extensions
to the contract.
This price reflects the current material pricing. Material order
pending approval of this change order.
The above price is valid for thirty(30)days.
If you have any questions or require clarification of any kind,please do not
hesitate to call.
Sincerely,
STANDARD DRYWALL, INC.
David J.Dearborn
Project Manager
3100 Pnlisndes D$ve•Camns,Cafitomia•92980
TEL(951)236-8656•Fog(951)2564657•W W W.STANDARDORYWALT—COM•OFFICES LOCATED IN CORONA,CA SAN DIEGO,CA•SALT LAKE CITY,UT
JACKSON,Wy•LIDS VEGAS,NV
CA#414328•NM#85263•M#24487.OR#111655•AZ#127644-8•UT#5732716-5501•ID#13666-AAA4(1,26,47)
225
Standard Drywall,Inc.
Ruben Castro Human Services Center
Date: September 26,2012 SDI COR# 55
Change Description:
Prime and Repaint
Material
Description Quantity Unit Unit$ Total
EA X $12.000 $0.00
LF X $7.000 $0.00
SF X $0.000 $0.00
EA X $0.000 $0.00
LF X $0.000 $0.00
LF X $0.000 $0.00
BX X $0.000 $0:00
EA X $0.000 $0.00
BX X $0.000 $0.00
BX X $0.000 $0.00
EA X $0.000 $0.00
Material Sub-total $0.00
Tax @ 9.25°/a $0.00
Total Material $0.00
Miscellaneous
Streamline 1 LS X $ 478.00 $478
SDI TRUCK 0 LS $ - $0
LS $ - $0
Miscellaneous Subtotal $476
O.+P @ 5.00% $24
Total Miscellaneous $502
Labor:
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0lirs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $60.04 $0.00
0 Hrs. X $0.00 $0.00
Total Labor $0.00
Sub-total $0.00
O.+P @ 15.00% $0.00
Sub-total $0.00
Total Miscellaneous $501.90
Total Request $502
Qualifications:
1.The price Indicated is for this change only and does not include any compensation for costs which may
be incurred as a result of delays or accelerations.
2.The work quoted above will proceed only upon receipt of a written change Order.
3. The price indicated Is valid for thirty(30)days.
4.The work quoted above will add 0 Days to contract schedule.
S or P
226
®TAW AN All�ff® NAMAMW
AV I ®®
PAI 1175, 1/lb.
Phone: (951) 581-2242 Fax: (951) 780-6350
9726 Sunnybrook Dr. Moreno Valley Ca, 92557
streamlinepaintinginc @hotmaii.com Lic: 799584
TIME & MATERIAL INVOICE
Date: 9/26/2012
To: Standard Drywall, Inc.
Job: Ruben Castro Human Services Center
Invoice # 135-16
Description of work: Prime and paint eyebrow brackets that should have been
Prefinished.
Labor Hours:
6 hours @ $62.00 per hour $ 372.00
Total Labor $ 372.00
Materials:
1/2 gallon epoxy @ $61.00 per gallon $ 30.50
112 gallon polyurethane @ $120.00 per gallon $. 60.00
112 gallon .thinner @ $30.00 per gallon $ 15.00
Total Material $ 105.50
Total All Costs $ 477:50
�r esp ity:
John Scheurer
227
RESOLUTION NO. 2013-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR
2012/13 BUDGET TO APPROPRIATE $13,741 FROM THE
RDA-SA 2006 TAB PROCEEDS FUND (9104) TO COVER
THE COST OF AMENDMENT NO. 6 TO STANDARD
DRYWALL, INC. AGREEMENT
WHEREAS, on June 20, 2012, the City Council adopted the Operating and
Capital Improvement Budget for Fiscal Year 2012/13; and
WHEREAS, on October 14, 2012, the State of California Department of Finance
approved the Recognized Obligation Payment Schedule III (ROPS III) for the period
January 1, 2013, through June 30, 2013; which included the Ruben Castro Human
Services Center Project (CIP 5020) and the obligation to Standard Drywall, Inc. for
finishing and painting services; and
WHEREAS, a staff report has been presented to City Council discussing the
changes requested or required during the construction CIP 5020 and the need to
execute Amendment No. 6 to the Agreement with Standard Drywall; and
WHEREAS, an additional appropriation of $13,741 is requested from the RDA-
SA 2006 TAB Proceeds Fund (9104) to cover the cost of Amendment No. 6; and
WHEREAS, Exhibit "A" hereof describes said budget amendment and its
resultant impacts to the budget line item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment allocating $13,741 from the RDA-SA 2006
TAB Proceeds Fund (9104) for the modifications covered in Amendment No. 6 to the
Agreement with Standard Drywall, Inc., as more particularly described in Exhibit "A"
attached hereto is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and
shall cause a certified resolution to be filed in the book of original resolutions.
228
Resolution 2013-
Page 2
PASSED AND ADOPTED this 17th day of July, 2013.
Janice S. Parvin, Mayor
ATTEST:
Maureen Benson, City Clerk
Attachment: Exhibit A — Budget Amendment
229
Resolution 2013-
Page 3
EXHIBIT A
BUDGET AMENDMENT FOR RDA-SA 2006 TAB PROCEEDS FUND 9104
TO COVER THE MODIFICATIONS IN AMENDMENT NO. 6 OF THE AGREEMENT
WITH STANDARD DRYWALL, INC., FOR THE CONSTRUCTION OF THE RUBEN
CASTRO HUMAN SERVICES CENTER PROJECT 5020
FY 2012/13
FUND ALLOCATION FROM:
FUND TITLE FUND ACCOUNT NUMBER AMOUNT
RDA-SA 2006 TAB Proceeds 9104-5500 $13,741
Total i $13,741
DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS:
BUDGET NUMBER CURRENT BUDGET REVISION ADJUSTED BUDGET
2701-2100-5020-9601 $17,625.26 $0.00 $17,625.26
9101-2411-5020-9603 $3,020.00 $0.00 $3,020.00)
9101-2411-5020-9620 ($1,278,992.55) $0.00 ($1,278,992.55
9104-2411-5020-9601 $34,999.65 $0.00 $34,999.65
9104-2411-5020-9603 $3,000.67 $0.00 $3,000.67
9104-2411-5020-9620 $2,579,200.54 $13,741.00 $2,592,941.54
9104-2411-5020-9625 $55,000.50 $0.00 $55,000.50
9104-2411-5020-9632 $25,000.16 $0.00 $25,000.16
9104-2411-5020-9650 $0.00 $0.00 $0.00
Total $1,432,814.23 $13,741.00 $1,446,555.23