Loading...
HomeMy WebLinkAboutAGENDA REPORT 1991 1016 CC REG ITEM 11CCON l k•Y ITEM //. MOORPARK 799 Moorpark Avenue Moorpark, California 93021 (805) X52 1�01-^,t, c.y council Meetng c,r ACTION: The Honorable City Council Dirk Lovett, Assistant City Engineer Ken Gilbert, Director caf Public Works DATE: October 11, 1991 (Count -il Meeting 10- 16 -91) SUBJECT: Review of Conceptual Design for High Street Improvements OVERVIEW This presents for approval a , onceptual design for the construction of curb, gutter, sidewalk and storm drain improvements to certain designated segments of High Street between Moorpark Avenue and SprirTq Road DISCUSSION A. Background As you know, High Street does not yet have the benefit of full street improvements along its entire length. This year's budget provides for a project to address some of those deficiencies. A portion of the funding for this project is a State Grant for pedestrian /bicycle facilities. B. Project Elements The focus of this project is to provide curb, gutter and sidewalk in those areas where it presently missing or very substandard. The area to k)e improved are generally described as follows: the north side of High Street between Bard Street and Magnolia Street; the south side of High Street in the vicinity of Walnut Street; the south side of High "refit -lust east of Magnolia Street; and, the south side of High ;greet. just west of Spring Road. The project also includes the -y construction of a storm drain westerly of Magnolia � -;t Est PAU_ N LAWRASON JR BERNARDO M PEREZ SCOTT MCNT kM,1tR Pp E TAL_E-Y JR JOHN E WOZNIAK Mayor Mayor Pro Tem Counc, memr, sx nc,+me^�D r Councdmember C. High Street Conceptual Design October 16, 1991 Page 2 C. Downtown Streetscape As stated above, the work to be done is for the purpose of addressing present deficiencies. It is recognized that it is the intent of the City to develop a design theme for the High Street streetscape, which would be consistent with the Downtown Study; and to undertake a project for the substantial reconstruction of the street in accordance with that design. It is possible, or even likely, that the improvements proposed herein will have to be removed and reconstructed when that project is finally implemented. The Public Works and Facilities Committee has reviewed the conceptual design with this fact in mind and recommends approval. D. Design Plans Attached for your review is a set of preliminary conceptual improvement plans. Further corrections are being made to the plans at this time. A revised set of plans will be provided t:] the City Council prior to Tuesday, October 15. Various technical aspect treatment of trees, etc.) oral presentation at your RECOMMENDED ACTION Approve conceptual design. o the design (width of street, will be discussed by staff in an ieeting.