HomeMy WebLinkAboutAGENDA REPORT 1993 0421 CC REG ITEM 08GITEM 8_G 05 AGENDA REPORT C 2 TY O F MOORPARK TO: The Honorable City Council i '1 FROM: Kenneth C. Gilbert, Director of Public Works y - .V•s� DATE: February 24, 1993 (Council Meeting 2•Q-9,i) SUBJECT: Consider Authorization to Advertise for Receipt of Bids for the Construction of Sidewalks on Streets in the Vicinity of Flory Elementary School Approximately one year ago the City received a State grant under the SB -821 pedestrian / bicycle facilities improvement program, for the construction of sidewalks on certain streets in the vicinity of Flory Elementary School. The amount of the grant was $34,000, with a like amount to be provided by the City as a local match. Staff then attempted to have a design prepared for the project. It soon became apparent that the cost of having a design prepared by a consultant would require the expenditure of a majority of the funds available. It was decided, therefore, to prepare the design in house. That design is now completed. Recently the City Council approved the submittal of a grant application for an additional $31,000 in SB -821 funds for phase 2 funding of the subject project. That application is now being reviewed by the CTAC /SSTAC Committee of VCTC. The Committee will make its recommendation to VCTC in May with action by VCTC expected in June. Under separate cover the plans and specifications have been made available to the City Council for review and comment. flry_ad ' 00PPARK, CALIFORNIA City Cou I Moeting of 2 Tpq� ACTION: BY Flory Sidewalks April 21, 1993 Page 2 B. Schedule It is suggested that the construction of this project occur during the Summer when conflict with school traffic is at its lowest. For that reason, it is recommended that every attempt be made to the following projects schedule: • Authorization to Advertise April 21 • Bid Opening May 20 • Award Contract June 2 • Commence Construction June 21 C. Bid Alternates In that the a determination regarding SB -821 grant funding will not be known until June, the bidding documents provide two bid schedules to allow for the flexibility in determining the Scope of Work. Schedule I includes only the work called for on Flory Street, Third Street and Bard Street. Schedule II includes all of the above plus the remainder of the work called for on Second Street and on Millard Street. D. Fiscal Impact 1. Project Cost Estimate: Attached as Exhibit 1 are two project cost estimates for Schedule I and Schedule II. A summary of those costs are as follows: 2. Ineligible Work: That portion of the work related to the construction of curb & gutter at the corner of Third Street and Bard Street is not directly related to pedestrian facilities (sidewalks) and is, therefore, not grant funded. One hundred per cent of these cost will be funded by Gas Tax. With the addition of the local share matching funds, a re -cap of grant and non -grant funded costs (as depicted at the bottom of Exhibit 1) is summarized as follows: ilry_ed Contr ldiain 5 Description Design construction Ins2gction Toth Schedule I: Flory St, Third 200 91,997 8,000 100,197 St & Bard St Second St, Millard St 0 47,964 2,000 53,164 Schedule II: Total Project 200 139,961 10,000 150,161 2. Ineligible Work: That portion of the work related to the construction of curb & gutter at the corner of Third Street and Bard Street is not directly related to pedestrian facilities (sidewalks) and is, therefore, not grant funded. One hundred per cent of these cost will be funded by Gas Tax. With the addition of the local share matching funds, a re -cap of grant and non -grant funded costs (as depicted at the bottom of Exhibit 1) is summarized as follows: ilry_ed Flory Sidewalks April 21, 1993 Page 3 Description Schedule I: Flory St, Third St & Bard St Schedule II: Total Project SB-821 Funds Gas Tax Funds 34,000 66,197 65,500 84,661 Total 100,197 150,161 3. Budget Amendment: The current budget shows the subject project funded at $72,000, $38,000 by the State Grant and $38,000 form Gas Tax. It is suggested that any reappropriation or budget amendment be deferred until the actual bids are considered. Approve the plans and specifications for the subject projects and authorize staff to advertise for receipt of bids. Plry_ad EXkA1F,,"i 1 ( i 2) Flory Sidewalks Flory Area Sidewalk Construction 15- Apr -93 Project Cost Estimate Schedule I: Flory, Bard & 3rd --------------------------- ------------------------------------------------------ ------------------ ------- ITEM DESCRIPTION Qty Units Unit Price TOTAL 1 Traffic Control 1 LS 1000.00 1,000.00 2 Public Motice 1 LS 1000.00 1,000.00 3 PCC Sidewalks 11,708 SF 4.00 46,832.00 I 4 PCC Walkways 596 SF 4.00 2,384.00 5 PCC Driveway Aprons 928 SF 10.00 9,280.00 6 PCC Handicap Ramp (Case Cj 1 EA 800.00 800.00 7 A/C Sidewalk Transitions 2 EA 100.00 200.00 8 A/C Sidewalk 0 SF 3.00 0.00 9 A/C Pavement R 4 R 3,000 SF 5.00 15,000.00 I 10 PCC Curb & Gutter 220 LF 12.00 2,640.00 11 Cross Drain Cover 0 EA 2000.00 0.00 12 Tree Removal 10 EA 600.00 6,000.00 13 Root Barrier 228 LF 30.00 6,840.00 14 Retaining Wall 0 LF 50.00 0.00 15 Release 1 EA 1.00 1.00 Total ; 91,977.00 Less Ineligible Costs (17,640.00) -------- - - - - -- Sub -Total 74,337.00 Less FY 1992/93 SB -821 Grant Amount (34,000.00) Sub -Total 40,337.00 Plus kelated Costs 8,200.00 Total Local Match (Gas Tax) 48,537.00 Plus Ineligible Costs 17,640.00 Total City Cost (Gas Tax) 66,177.00 Flory Sidewalks Flory Area Sidewalk Construction 15- Apr-93 Project Cost Estimate Schedule II: Entire Project ------------------------------------------------------------------------------------------------------------- ITEM DESCRIPTION Qty Units Unit Price TOTAL 1 Traffic Control I LS 1500.00 1,500.00 2 Public Notice 1 LS 2000.00 2,000.00 3 PCC Sidewalks 19,650 SF 4.00 78,600.00 4 PCC Walkways 630 SF 4.00 2,520.00 5 PCC Driveway Aprons 1,500 SF 10.00 15,000.00 6 PCC Handicap Ramp (Case Cj 1 EA 800.00 800.00 7 A/C Sidewalk Transitions 7 EA 100.00 700.00 8 A/C Sidewalk 200 SF 3.00 600.00 9 A/C Pavement R & R 3,000 SF 5.00 15,000.00 10 PCC Curb & Gutter 220 LF 12.00 2,640.00 11 Cross Drain Cover I 1 EA 2000.00 2,000.00 12 Tree Removal 13 EA 600.00 7,800.00 13 Root Barrier 270 LF 30.00 8,100.00 14 Retaining Wall 54 LF 50.00 2,700.00 15 Release 1 EA 1.00 1.00 Total 139, %1.00 Less Ineligible Costs (17,640.00; Sub -Total 122,321.00 Less FY 1992/93 SB-821 Grant Amount (65,500.00' Sub -Total 56,821.00 Plus Related Costs 10,000.00 Total Local Match (Gas Tax) 66,821.00 Plus Ineligible Costs 17,640.00 Total City Cost (Gas Tax) 841461.00