Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0421 CC REG ITEM 11G-)ORPARK, CALIFORNIA city Cou rime 199 A TION: til ey M ,ITEM He G. a,, F. 44, &� � E M O R A N D U l+M TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works DATE: April 13, 1993 (Meeting 4- 21 -93) SUBJECT: Consider Contribution Toward Certain Capital Coats to Establish a Community Garden at the Presbyterian Church at the Southeast Corner of Spring Road and Peach Hill Road �. !! Last June the City Council considered a request for City contribution toward the cost of establishing a Community Garden. The site proposed at that time was a vacant lot located at the northeast corner of Peach Hill Road and Rolling Knoll Drive owned by the Moorpark Unified School District. The applicant was unable to comply with the requirements of the district and the proposal was shelved. The applicant, Pat Kemper, has received approval from the Presbyterian Church at the southeast corner of Spring Road and Peach Hill Road, to use a portion of the church property (see Exhibit 1) for this use. Again, the applicant has requested that the City assist in some of the cost and effort required to establish this use. Staff has been in contact with both the applicant and Reverend David Wilkinson of the Presbyterian Church to confirm the scope and requirements of this proposal. A breakdown of the elements and costs associated with this proposal is as follows: Item 1. hater: Construction of a point of connection for water supply from existing irrigation system lines located near northeast corner of the garden site. To include placement of a sub - meter. Cost Rance Remarks Higb(S) Low (S) This amount is an estimate 200.00 200.00 for materials only. It is suggested that, if approved, the work be done by City field personnel. Community Garden April 21, 1993 Page 2 Cost Range Item ReNarks High (S) Low (S1 2. Discing: Provide initial discing Consistent with last 200.00 0 of the field to prepare the site year's discussion, the for subdividing and planting. discing of the field may be provided by donation from a fourth party. If this donated effort is not realized, this service may be provided by the City. 3. Fencing: Construct approximately It is the recommendation 6501 of fencing (if required). of staff that, if 5,400. 0 approved, this elewnt be deferred and installed only if the need for saxe arises. Total 5,800.00 200.00 Last year the major cost item was the construction of a water connection. Total costs were estimated to be approximately $2,700. Staff recommends that the City's contribution not to exceed $500, plus staff time, for the effort required to establish the subject use. The Public Works, Facilities & Solid Waste Committee is scheduled to discuss this matter at their meeting of April 19, 1993. If the Committee has anything to add to the staff recommendation, the matter may be pulled from the consent calendar. . 1 - �� •_� Direct staff as deemed appropriate (pending Committee discussion). vp \rpt \coigtdn2 Modification # 5 Phasing of Landscape PEACH HILL ROAD Complete landscaping as planned along public way -C-11 T C* —A U-4 T �Iil(�I �1� ;f11 _� I 14111 4 J, Complete landscaping In phase 1 parking ILQ Hydroseed with natural grasses until phase 3 construction Plant all trees In this area %.I � I i 1, Complete landscaping around fellowship hall FELLOWSHIP HALL PLAN (See Sheet C•1 F . . t�$S 00-S 'I Hydroseec I until ph Plant all t A A D C3 ❑ ❑ landscaping as planned along public way N — =a ss