HomeMy WebLinkAboutAGENDA REPORT 2012 0404 CC REG ITEM 10E ITEM 10.E.
.:;f- r:-"ooE VAh'CAL;,
�_;ity cpunciilrhApeetino
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: Hugh R. Riley, Assistant City Mana
Dave Klotzle, City Engineer/Pu is Works recto
BY: Ky Spangler, Special Projects Consultantt,
DATE: March 27, 2012 (CC Meeting of 4/4/12)
SUBJECT: Consider Additional Funding to Install an Offsite Storm Drain
Connection in Spring Road and Amendment No. 4 to the
Agreement with John S. Bascom, Inc., dba Precision Plumbing-
Mechanical for the Ruben Castro Human Services Center
BACKGROUND & DISCUSSION
Construction of the Ruben Castro Human Services Center (RCHSC) began in February,
2011. During the course of construction it was determined that an offsite storm drain
connection within Spring Road was necessary to adequately drain the RCHSC site due
to drainage coming from the adjacent railroad right of way. The City Council approved
an amendment in an amount not-to-exceed $232,946 to the construction Agreement
with John S. Bascom, Inc. dba Precision Plumbing-Mechanical (Precision Plumbing)
which included: potholing to confirm the feasibility of an offsite storm drain connection;
storm drain construction based on a preliminary alignment; an asphalt overlay for the
northbound lanes of Spring Road; and a contingency to cover unknown costs potentially
resulting from the final design. The initial estimate for storm drain construction
approved by the City Council was $143,946, with a $39,000 contingency to cover both
the storm drain and asphalt overlay costs based on final design.
RJR Engineering prepared construction drawings based upon the results of the
potholing investigations and under the direction of the City Engineer/Public Works
Director. In order to connect the new construction to the existing storm drain facilities, a
specially- designed connection was required. The engineered design was provided to
Precision Plumbing and a revised cost estimate was prepared using the final plans and
specifications. The new cost estimate is $190,357 which is $46,411 above the original
base estimate. By utilizing $20,000 of the $39,000 contingency amount approved in
191
Honorable City Council
April 4, 2012
Page 2
November, the estimate exceeds the original Council approval by $26,411. In order to
move forward with the offsite storm drain construction, staff is requesting approval of
this additional amount. The remaining $18,000 in approved contingency is being
maintained for the asphalt overlay component of the plans.
FISCAL IMPACT
The Capital Improvement budget for the Ruben Castro Human Services Center is
$11,038,064. To date $5,172,999 has been encumbered with an available balance of
$1,295,570. Therefore, no additional funds need to be budgeted for the proposed work
at this time. Sufficient funds exist in the budget to cover this work.
STAFF RECOMMENDATION (ROLL CALL VOTE)
Approve additional funding in the amount of$26,411 for offsite storm drain installation in
Spring Road associated with the construction of the Ruben Castro Human Services
Center and authorize the City Manager to execute Amendment No. 4 in the amount of
$190,357 to John S. Bascom, Inc., dba Precision Plumbing-Mechanical, subject to final
language approval of the City Manager and City Attorney.
Attachment 1: John S. Bascom, Inc. dba Precision Plumbing-Mechanical Proposal
dated March 21, 2012
192
n A
ATTACHMENT 1
License#533836
0
#10349A
Mechanical
PR9CISION Plumbing
l.. 5350 Gabbert Road • Moorpark, CA 93021 • (805)529-4748 • fax(805)529-5433
Proposal
Page No. of Pages
PROPOSAL 51190ITTEG TO PHOfiF: BATE —�
)Balfour Beatty Construction Dennis Kuykendall (805)5 .3-0015 iO3-21-2012
1 STREET 100 NAME
300 E.Esplanade I)r #350 _ _ Storm Drain Installation Sprinn Rd.
t6lY STATE ANO IP LODE �- _ jOb tOCAtION
h0knard,CA 9303.6 _____ 612 Spring Rd. Moorpark, CA 93021
4AkC,W}TE�T BATE Or PLANS t JOB PHONE .
�RdR:En ink tiers Y _ __J� N[A f duykendall @abalfourbeattyus.�1Q.S)523-001.5
we hereby propose to furnish in accordanee with specifications below,or on attached pages,all labor and materials necessary to complete the following:
We propose to provide the labor and materials needed to install items# 1-11, 16& 17 on the, "Proposed Schedule
of Work and Prices" for the, "Spring Road Storm Drain and Asphalt Overlay". Installation will be per plan sheets
# 1-6 of plans drawn by RJR Engineering of plans distributed on March 05,2012 labeled preliminary only,not for
construction. This revised proposal includes some breakdowns and value engineering as requested by Balfour
Beatty.
PLEASE SEE ATTACIIMENT"A"FOR ITEMS INCLUDED AND EXCLUDED
ALTERNATE: ADD: $9,930.00
Provide and install one(1)2" blow off valve for relocated 6"ACP water main on East side of Spring Rd.
No blow off valve was indicated on plans but will be required if water main is offset below new storm
drain line.
PPM FOREMAN:
Provide foreman at all times on site while work is being performed $755,00 per day. This cost isn't included in
the total cost below.
WE PROPOSE hereby to furnish material and labor—complete in accordance with above specifications,for the sum of:
One Hundred Ninety Thousand Dollars Three Hundred Fifty Seven & NO 1100 dollars(s 190,357.00 1
Payrnp-t to he made as fnflnws:
All material is guaranteed to be as specified. All work to be campletad in a sub•
stantial workmanlike manner according to specifications submitted, per standard Authorized ( U8I11C11;8iiCOHt
practices: Any alteration or deviation from above specifications Involving extra Signature
costs will De execUted only upon written orders,and will become an extra charge
over and above the estimate.All agreements contingent upon strikes,accidents or Mote.This proposal may be
delays peyond our control.Owner to carry fire, tornado and other necessary in-
surance .Our workers are fully covered oy Workmen's Compensation insurance. withdrawn by us d not accepted within 3 days.
ACCEPTANCE OF PROPOSAL.The aouve prices, specifications and condi-
tions are satisfactory and are hereby accepted. You are authorized to do the work
as fgecif ied_Payment will be made as outline above. Signature
Date of Acceptance Signature
193
,
--' _
Attachment"A"
PROPOSAL#10349A -
Thefollowing -
items are included in this
�
Provide and install items# l-ll, 16& l7ofattached cost breakdown per plans and specifications.
�
Performance and payment bond.
� Prices are based on one mobilization charge for each division ofwork.
0 Item# D was changed to install u manhole per attached standard# 323-2 this doesn't include u pressure manhole
shaft and plate pccSPPWC a1uodand 328'2 as stated on plan sheet storm drain construction note # 5^
* All work will be performed during the normal business hours of 8:30 AM to 4:30 PM Monday through Friday.
Th e follo wing items are excludedfrom this
*
Off hours work.
�
Precision Plumbing Mechanical foreman on site during all work.
�
Permits mcfees,related to project including required NPDFS permit.
�
Removal of excess dirt. (Balfour Beatty has approved dumping and spreading of any excess dirt on Ruben
Castro Human Service Center site)
�
Item# l8 remove and replace PCCspandrel. We believe this io unnecessary and that tunneling the two 101'
storm drain lines under the curb and gutter will beacceptable.
�
Furnish and install water for project ut contractors own expense including metering,water from RC}fSC project
can beused.
_
^
194
`
Page 2 of 2
SPRING ROAD STORM DRAIN AND ASPHALT OVERLAY
PROPOSED SCHEDULE OF WORK AND PRICES
Item Unit
No. Description Qty Unit Price Total
1 Traffic Control 1 LS %
2 Stormwater Pollution Control Plan 1 LS
I
Furnish and install 18" RCP per the plans and
3 specifications including excavation, backfill and 53 LF ?
pavement repair.
Furnish and install 4 ft. x 1 ft. RCB per the plans
4 and specifications including excavation, backfill 10 LF
and pavement repair.
Furnish and install 10" HDPE pipe per the plans
5 and specifications including excavation, backfill 202 LF 6q_
and pavement repair.
Join 18" RCP to existing RCB per the plans and
6 specifications including excavation, backfill and 1 LS' t �
pavement repair.
RCP to RCB transition structure per the plans and
7 specifications including excavation, backfill and 1 LS
pavement repair.
8 Furnish and install manhole, frame and cover. 1 LS
9 Curb opening catch basin and local depression 1 LS 'r
including excavation, backfill and pavement repair. 1�,i v��.
Lower existing 2"AT&T cable and place 2—4"
10 Sch. 80 conduits, each 20 ft. long with all ends 1 LS
capped.
11 Relocate existing 6"ACP water main per VCVVWD 1 LS `-
Standards including excavation and backfill
12 Crack sealing and weed spraying 1 LS
13 Pavement Milling 8,300 SF
14 Furnish and Install Asphalt Rubber Hot Mix 205 TON
(ARHM-GG-C)
15 Remove and replace 6" asphalt concrete 2,500 SF
Remove arid replace existing median
16 improvements including median curb, stamped 1 L_S
concrete, landscaping and irrigation
17 Remove and replace PCC sidewalk 200 SF (1-�7-18 Remove Remove and replace PCC spandrel 1 LS
19 Install striping per the plans and specifications 1 LS
TOTAL
195