HomeMy WebLinkAboutAGENDA REPORT 2012 0418 CC REG ITEM 10I ITEM 10.1. =ev 'ourcii ��e�5= MOORPARK CITY COUNCIL AGENDA REPORT -- -�� - -- TO: Honorable City Council FROM: Hugh R. Riley, Assistant City Mana Dave Klotzle, City Engineer/Public Works ' ector BY: Ky Spangler, Special Projects Consultant' v�, DATE: April 9, 2012 (CC Meeting of 4/18/12) SUBJECT: Consider Additional Funding for Materials Testing, Special Inspection and Geotechnical Services Associated with Construction of an Asphalt Overlay of the Northbound Lanes of Spring Road from Flinn Avenue and Amendment No. 2 to the Professional Services Agreement with Southwest Testing Engineers, dba Vertical-V Testing Engineer for the Ruben Castro Human Services Center BACKGROUND & DISCUSSION During the course of the construction of the Ruben Castro Human Services Center (RCHSC) the decision was made to install an offsite storm drain connection in Spring Road to alleviate drainage coming from the railroad right of way to the north of the project site. On November 2, 2011 the City Council approved the preliminary estimate for the storm drain construction and on April 4, 2012 authorized additional funding necessary to move forward with the project. Construction of the storm drain began on April 9, 2012. An asphalt overlay of the northbound lanes of Spring Road between Flinn Avenue and the Union Pacific Railroad tracks was proposed conjunction with the storm drain construction to improve drainage conditions in this location. The City Council approved the preliminary estimate for this work at their November 2, 2011 meeting and is considering an additional allocation of funding to perform the work as a separate agenda item. In the event that the City Council approves the additional funding to move forward with the asphalt overlay, some minor additional costs will be necessary for asphalt materials testing. 154 Honorable City Council April 18, 2012 Page 2 Southwest Testing Engineers, Inc., dba Vertical-V Testing Engineers/BTC Labs (Vertical-V) is the professional services consultant performing materials testing, special inspection, and geotechnical services for the construction of the RCHSC. Their original contract in the amount of $156,151.50 plus a ten percent contingency ($15,615.15) was approved by the City Council at their meeting on January 19, 2011. An amendment in the amount of $13,795.00 was issued for materials testing and special inspection associated with the Spring Road offsite storm drain construction, leaving a contingency balance of$1,820.15 remaining. Vertical-V has submitted a proposal (Attachment 1) in the amount of $5,486.00 for materials testing, special inspection and geotechnical services required for the asphalt overlay project which is $3,665.85 above the available contingency. Therefore staff is seeking the approval of this additional amount in conjunction with the overlay project. FISCAL IMPACT The Capital Improvement budget for the Ruben Castro Human Services Center (Fund 5020) is $11,038,064. To date $5,363,356 has been encumbered with an available balance of $1,105,213. Therefore, no additional funds need to be budgeted for the proposed work at this time. Sufficient funds exist in the budget to cover this work. STAFF RECOMMENDATION (ROLL CALL VOTE) Approve additional funding in the amount of $3,665.85 materials testing, special inspection and geotechnical services associated with the asphalt overlay of the northbound lanes of Spring Road for the Ruben Castro Human Services Center and authorize the City Manager to execute Amendment No. 2 in the amount of $5,486.00 to Southwest Testing Engineers, Inc., dba Vertical-V Testing Engineers, subject to final language approval of the City Manager and City Attorney. Attachment 1: Vertical-V/BTC Labs, Inc. Proposal dated March 29, 2012 155 ATTACHMENT 1 NIV15 BTC LASS VERTICALFIVE March 16,2012 (Revised ltlarch 29, 2012) Proposal No: 4502.12.059 City of Moorpark c/o Balfour Beatty Construction 300 East Esplanade, Suite 1120 Oxnard, CA 93036 ATTENTION: Dennis Kuykendall SUBJECT: Proposal for Materials Testing and Inspection for the Ruben Castro Asphalt Overlay BTC LABS - Vertical Five is pleased to submit this proposal for the referenced project. Our estimated scope of services and costs are summarized below. Scope of Work and Cost Estimate Rate Units Total Asphalt: Asphalt Paving Technician (trench patch) $ 81.00 hr 24 $ 1,944.00 Asphalt Paving Technician (ARHM) $ 81.00 hr 16 $ 1,296.00 Asphalt Paving Batch Plant $ 81.00 hr 16 $ 1,296.00 AC Max Density(LTMD) $ 210.00 ea 2 $ 420.00 Extraction &Gradation $ 145.00 ea 2 $ 290.00 Engineering review $ 120.00 hr 2 $ 240.00 TOTAL: $ 5,486.00 Notes: 1 Travel time and mileage will be waived to project job site for inspectors. 2 Travel by Field Technicians and inspectors to offsite locations will be charged portal-to-portal and mileage. 3 Special Inspectors 4 hrs.daily minimum,actual hours thereafter. 4 Technicians 2 hr.daily minimum,actual hours thereafter at hourly rate. Assumptions: 1 Proposal is based on information provided by client's representative. 2 This estimate is provided for budgetary purposes only and is not a lump sum/not to exceed cost. Billing will be for actual service provided. 3 Additional services will be charged in accordance with the attached 2012 Fee Schedule. 4 Our cost estimate is based upon California Prevailing Wage rates. 5 Services will be performed in accordance with the accompanying"Terms and Conditions"made a part of this agreement. BTC Labs appreciates the opportunity to be of service. If you have any questions, please do not hesitate to contact us. Respectfid1y Submitted,, BTCLABS VERTICALFIVE Reviewed By, "41 Carol Harrison Sco oors, qEG 1901 Marketing Manager President Attachments: Agreement w/Terms and Conditions 2012 Fee Schedule BTC LABS - VERTICAL FIVE An NV5, Inc. Company 1868 Palma Drive, Suite A,Ventura, CA 93003 www.NV5.com 156 Phone: (805)656-6074 Fax(805)650-6264 Offices Nationwide f BTCLABS - VERTICALFiVE Geotechnkal Construction Inspection &Materials Testing Consultants 2012 FEE SCHEDULE GENL RA1,CONDI'flOin Should a holiday fall on Saturday or Sunday, the closest previous or "Testis;; Samples - An hourly preparation charge will be added to all following regular workday will be observed for the holiday. saulpleS submitted to the laboratory that are not ready for testing.There Travel-Itourly travel is charged portal-to-portal for technicians. Travel krill be it 50%o premium charge for "RINHlPRIORIT7"'testing. charges are normally waived for inspectors within 40 miles of our Scheduling - A minimum of 24-hour notice is required to schedule laboratory. Mileage will be charged at $0.65 per mile for all projects personnel(48-hour notice is required for DSA projects). For same-day with a$30 minimunn charge per trip. scheduling. a 50%, premium applies. If'less than 24 hour notice is Per Diem-Per diets will be charged at 1.1 times the Federal(GSA)rate provided on a cancellation.a charge of 2 hours will be assessed. for all out-of-town assignments unless other arrangements are made. Mininnnn Charges - Special lrupeclions: A minfinu n charge of 4 Review & Distribution of Reports - All assignments are under the hour; applies to inspection call-out between 0 and 4 hours. fight (8) supervision of Registered Professional Engineer. Engineering time of' hours will be charged for work performed over 4 hours up to eight 0.1 hour per inspection day or'/n-hour/week(min)will be included for hours. A 4-11our minimum charge shall apply to all Cancellations after scheduling,report review,an(]data evaluation. Up to hard 2 copies and inspector has been dispatched. Travel time is not normally charged for 6 electronic copies of reports are provided at no additional charge, inspections within 25 miles of the laboratory. Additional hard copies will be billed at S2 per report. Tt!clmic'icros: A minimum charge of 2 hours applies to technician call- Outside Services/Subcontractors- Cost plus 15%will be charged for out behveen 0 and 2 hours. Additional time will be charged in 2-hour outside services and for any materials procured. increments. Technician time is portal-to-portal from lab-to-site-to-lab. Prevailing Wage-Client agrees to notify the Laboratory, in writing,of A 2-hour minimum charge shall apply to all cancellations after any requirement for payment of California Prevailing Wages or other technician has[veil dispatched. predetermined contract wage condition. Client agrees to indemnify Overtime Rates - Rates are based on an 8-hour workday between the BTC Labs- Vertical Five against all costs related Client's finilure to hours of' 7:00 a.m. and 4:00 p.m.. Monday through Friday. Work notify Lab of predetermined wage requirements. outside of these hours or in excess of 8 hours in one day or over 40 Certified Payroll - A S45 per week, per project processing tee for hours in one week will he charged at 1.5 times the listed rates. Work Certified Payroll will be assessed on Prevailing Wage Projects. over 12 hours in one day or over 8 hours on the 7th consecutive day,or work on holidays will be charged at 2.0 times quoted rates. Escalation-[,fisted rafts,ire subject to annual escalation consistent with the Consumer Price Index(tvww.bls.gov). Prevailing Wage labor rates holidays - The following holidays are observed: New Years Day, will be adjusted in accordance with DIR inundated increases plus 30%. Memorial Day. independence Day, Labor Day, Veteran's Day, (}nttp:/h%wa.die.ca.govtdlsr/DPre\VageDctermination.httn) Thanksgiving Day and the following Friday, and Christmas Day. 1. 11110I ESSIONAI,,TECiIiViCAL.d SUPPORT STUFF ill.....If sue"un! �,thenrr"t rndreuh•d C'hto1e,ore Irural-to portal(men to BR'Labe) E. �noOrt eclinic$peCrfll SClV1CCS P�t'ailing Nate Standard Laboratory'fechnician $35 A. IYntc+sion:tl Staff Standard File Search,Reissue of Report S45(min.) Principal I_ngineu/Geologist/Consultant $170 Certified Payroll Admin.(0.5 hrmin.Avk) $80 Scmor Engineer/GeologistlCnnsultant(PE,CEG) $145 Court Appearance and Depositions(4 hr min) $280 Prt,t Cell:ngln'el'JCiel7IGgISf/COnSUltantl�lanagcr $125 DraftingJCADD $70 Stall,Eng,ineer/Geologist/ConsulWill $95 Clerical S60 It. Field S unplin,.Inspection&Testing Prevailing Maize Standard ft. MATERiALS AND EQIJIPNIENT Special(Deputy)Inspector $86 S78 A. Equipment Rate I(wwrele. 1"T Coecrere.,Masonry..Structural Steet Firepraaf+ng,Pile Driving) I. Air Meter(Concrete) $45/day Mechanicallldectrical inspector 595 $90 2. Calibrated Ram(Pull test) S75/day RtwtingJ\Vatcrprunling Inspector S95 $85 3. Ceiling Wire Dead-Weight Equip. $110/day Concrete/Asphalt Batch Plant Inspection S86 $78 4. Concrete Relative Humidity Meter $265/day \CI C oncFere Technician S88 $74 5. Concrete Slab Moisture Emission Kit S55/ea Scow,"Icchnician*(Soil.'Asphafl,SpecialTesting) 590 S76 6. FlcxrFlatness(pluslabor-Ormin) $550/day N'onde5uucme Examffestm (t!l7Mrg Part/Dyc Pen.) 592 $84 7. Generator $65/day TripC'htrger,.nr,,!�r,da­fU i125,„ lx'ufl=rdlr:,_rr $30 8. Ground Penetrating Radar(GPR)- (plus labor-4 hr min) $385/dy Inn..-b". dor,nhrnu..Aar,�,ui,,'AOrnniih/G,run.r'runlhiy l dam,rrsrnrrttron)n.r:;n 9. ,Magnetic Particle Equipment&Consumables $50/day' .,,,.rr,0/".,,.,,t•,t,;r, di,r cerrn"fir I........... 10. Nuclear Gauge $251day ('. DS A'OSP)I D hrspection&*Testis, Prevailing lf'aee%Standard it. Pachometer(Rebar)Survey Equipment $85/day Project Ins sector/10R.DSA Class 1 $110 12. Schmidt hammer $35/day 111niect Inspector/IOR.DSA Class If/ill $95 13. Skidmore Wilhelm,per day $75/clay I)S,\Masonry/shoterete Inspection $90 14. Torque Wrench(Large),per day S50/day DSA Form 5{Inspector Qualifications) $45 ca. 15. Torque Wrench(Small),per day $T5/day Spccicl Inspection Verified Report(S1VR/VR) S185(min.)ea. 16. Ultrasonic Equipment&Consunnables S60/day I ohoraton•/Gcotechnical Verified Report $385(min.)ca. 17. Vehicle-Field Truck S55/day B Diamond Coring (min chnrae=field time%v/travel+I hr.mob./demob.) D. Sample Pickup R Deliver.'.Mileage Prevoiline ff'aee Standard 1. Machine,trunk&1 operator(accessible flatwork only) S190Air S I i0/hr. S:unple Pickup(-2sn, radius,ft-.b)-plus applicable unit price $55/hr 2. Machine,truck,operator and helper S275/hr 21 incli I I-:quipment t\ Supply Delivery(I hr min) S55/hr 3. Coring Bit Charge $2/inch saturdac Pickup(hourly.4 hr mininurm.plus mileage) $75/hr 4. Coring truck mileage(portal to portal) $0.70/mi \lilcage-Field Vehicle($30/day minimum charge) 50.60/mi 5, Traffic Control Per Quote \[[Cage-Coring Truck $0.70/rni �cc I)m/'vices jar pickup charges of cylinders,primm paneh.etc. s UY 1 I 5 e 1 of 3 fi72fiTC Fee S: Page� �� - f4i „o' J11C Luhs is terrified or approved hr D.U.CC RL.AHRL.AAS1110.rf Colrrons. 157 I BTCLABS - VERTICALFIVE J11111111, 1 V 15 2012 FEE SCHEDULE Ill. I.,AB'1'1,SI'S::IGGREGATE&SOIL IV. LAB TESTS: CFNIEiNT,CO',\CIZE'I'E,&NIASONRN' A (.icotechnical A Cement I ;\nctlicru Limits(I-Land PL)--AST IM D4318,CTIM 204 S 142 1. Alkali content of Portland Cement Per Quote Consolidation(incremental Loading)-ASTM D2435 $ 315 2. Grab sample(CCR Title 24)includes I year storage S 43 Direct Shear,remolded sample-ASTIM D3080 S 285 3. Testing individual samples ofccinern,ASTM CISO Per Quote 4 Direct Shear.undisturbed(ring)sample-ASTM D3080 $ 235 3 Fxpartmon Index-ASTM D4829 S 158 B Concrete 6 If\dronieter analvsis(without specific gravity)-ASTIM D422 S 132 1. Cement content of hardened concrete-ASTM im S 550 7 Permeability.Constant If cad remolded -ASINID2434,C]'220 S 360 2, Concrete compression:6x12 cylinders-ASTM C39, $ 2, N pi I(soil)-ASTM D4972 $ 35 3. Concrete compression:4x8 cylinders-ASTIM C39: S 20 1) Resistivity-ASTM G57 S 60 4. Concrete cylinder pickup:6xI2(>25,ou.radius of Lab addhoudypJq, SP it) ReSiNtivity(Mininnuu),includes pf I-CTNI 643 S 155 5, Concrete cylinder pickup:4x8(>25n radius of Lab add hourly r;ckur,t­ I I Soil Cenit tit-.Nloist,-Dens.or Simple Prep set of 3 -ASTM D558 S 240 6. Concrete cylinder mold(w/lid-spare) 12 Soil Cement-We(-Dry Durability-ASTM D559 S 1100 7, Concrete core compression test-ASTM C42 I'I Soil Cement-Compressive Strength-A STNT D 16:33 S 60 S. Concrete Trial Batch(includes 6 compression tests) $765 14 Soil ClaNsitication-ASTM D2488-Visual-Manual S 24 9• Concrete Nfix Design Review(excludes testing&revisions) 5230 15. Soluhle Chloride(soils) S 75 10. Concrete mix proportion revision -150 It, solublc sull"Itc(Soils) S 75 11. Density of concrete cylinder(unit weight) $64 17 1 hiconfined compression on prepared specimens $ 95 12. Drying shrinkage-ASTM C157(set of 3,S ages) 5495 11 End preparation of cores,diamond sawing,per cut SI 5 If I"lakfe"Yze j�nal sis -up(>2.snu radius of tab add hourly pi,;Lup rate) ------ 14. Flexural beam pick M Sand equivalent(ASTNI 2419-CTM 217) S 110 15, Flexural strength,6"\6"beam-ASTM C78&C293 11) Sieve#200 wash otjJN1(AS'I-i\,l 1)1140.CTM-202) S 65 16. Sbotcrete/Gunite core compression test(not including coring) r35 SieN c(coarse or fine only.no%Dmsh-ASTj%'J C 136,CTM 202) S 85 IT Coring of Shoterete/Gunite panel in laboratory,each core 21 Sieve(Coarse&fine w/wash-ASTM C 136,c*ri\,l 202) S 105 18, Shotcrete/Gunite panel pick-up(>25mi.radius of Lab add hourly pickup 2 Sievc wi I lydrometcr(ASTM D-122.CTM 203,no specific grav-) S 165 M Lab.trial batch,not including specimen tests-ASTM C192 Per Quote 20. Lightweight.insulating concrete compress,4 req.-ASTM C Moisture Density Relationft 21. Lighmvight insulating concrete-unit weight(oven dry) 2,1, Max Density-Opt.Moisture(4 in mold)-ASTM 1)1557,D699 S 175 22- Modulus of elasticity,6x 12"cylinder-ASTM 0469 13 24. Max Density-Opt,Moisture(6 in mold)--ASTM D 1557,D698 S 195 21 Petrographic analysis of hardened concrete-ASTM C856 2' Maximum Densit),Checkpoint S 65 24. Poisson's Ratio on 6"x 12"cylinders-ASTM C469 If, N lotsuife&Dry Density(ring samples) S 20 25. Splitting tensile-ASTM C496 $75 27 Moisture determination(aggregate samples) S 35 26. Statistical Analysis($1105 minimum) 7- )uote 'S Callrons Relative Compaction(Wet Density) -CTNI 216 S 225 27. Non-Shrink(Dry-Pack)Grout-2"x2"x2";set of 3 $96 zere�g tic�Soif -�Jzo'k Abrasion Resistance by LA Rattler-ASTM C 131,CTNI 211 $ 165 1. Absorption-brick,5 required-ASTM C67 75 3,O AbNoiplioji.sand or gravel--ASTM C127,C128 S 60 2, Absorption-masonry unit,3 required-ASTM C 140 45 31, Arid SOILIN1(1)'(includes Flaz Mat Fee) S 225 3. Compressive strength,brick,5 required-ASTM C67 ;4i 32 Calilorruit hearing ratio(CBR)with expansion-AS IM D 1883 S 365 4. Compression-masonry core 35 33. California bearing ratio(CBR)at95%(3 points)--ASTM D 188 S 585 5, Compression-masonry prisms 8"x 8"-As'rM E447 31. Cement Treated Base(C'I-B).compact,cure&test S 225 (other sizes by quote-may require cutting charge) 145 33, Cenicin't'reated Base-compression(make,cure.test-3 spec) S 565 6. Compression-masonry unit,3 required-ASTM C 140 S 65 16 ('ementTreated Base-stability S 525 (requires absorption/unit weight tests for Net Area) 7, Clay lumps and firiabic particles.per primary size--,As,rh.f C 142 S 115 T Dimensions-masonry unit,3 required -40 i. CleminessTest-C-FiNt 227 $ 128 8, Masonry Prism Pickup articles,per primar\ Crushed 13, Y size S 165 9, Masonry Unit Acceptance Test-ASTM 0140 40, DOrIbllitV 111dCN($120 Per size fraction)-CTM 229 S 215 (includes absorption,compression,dimensions,unit wci.olu) I I 1:111C 4arctiatc Angularity-AASIITO T304 $ 175 M Compression test,grout specimens 30 4;?. 1:1;11& Pi'micles,(per bin size)-ASTM D4791 S 190 11, Compression test,mortar specimens s 25 1.3, LiolriweiLlit pieces,per size fraction-ASTM 0123 S 400 12. Diamond sawing of masonry specimens,it'required(minimum) $24 44. Lime content of treated materials(1)),titration) 13. Efflorescence,first unit @$125,each additional((il IS 511 a I.lane content curve determination,liar each material S 395 14. Linear shrinkage,masonry unit,3 required-ASTM C426 '98 11 1-mic content.including untreated control sample S 145 15. Modulus of rupture.brick,5 required-ASTM C67 i 42 15 Mortar making properties of Sand ASTM C87 S 360 16. Moisture content-masonry unit(as received).3 req*d-ASTM 01 40 S 42 At, Nlomir Propenics-CTNI 515 S 410 IT Shear test on masonry core 47 Organic Impurities-ASTM C40 S 75 18, Tensile test on masonry block 48 Petrographic Analysis ol'Gravel-ASTM 0295(single grading) S 450 19. Unit weight,masonry unit,3 required-ASTM C140 $''i J -11) Petrographic Analysis ol'WC Sand-ASTM 0295(pre-graded) S 850 5a Potential Reactivity Test ASTM('M'9 Chemical Method S 495 V. LAB TESTS:REINFORCING&STRUCTURAL STEEL 31 Potential Reactivity AS*I M C227 Mortar Bar Method(3 month) S 785 A General Testing I''iwh additional month S Its 1, Processing mill certification(each size&beat) $18 en i? Now ntial Reactiv ray"lest ASTNI CII-60 Rapid Method 589 1 Rockwell or Brinell Hardness,average of three readings $24 ca Potential Reactivit) AS I'M C1293 Mortar Bar\%/Pozz(12 month) S 1600 3. Zinc coating,each item(includes Ilaz Mat Fee) $187 Fxwnd it)'4-moiuhs add ..­r­viw w,.Nhft S 800 B Reinforcing Steel Potential Reacttvii\Test ASTM C 1567 Rapid-Cenient Combo S 760 -1Z,Value 0 IVFJ�- 1. Derbrinition,reinforcing steel 5.'JO �-M)(Treated material by quote) S 270 2. Pre-stress,strand or wire,tensile&elongation Per Quote 56 Rip Rap.Slope Protection.Quart),Stone Acceptance Per Quote e 7 Siectl*ict!ra\,it\,\vt'aL,.ioiptioji -coiirsc(ASTM('I27.CTM 206)_ S too 3, Proof test on post-tension assembly Per 011(l1c , Spec ific cravity\\,/absorption -line(AST iM Cl 28,CT 4 Bend Test(rebir) NI 207) S 125 5. Tensile test(tebar),Lip to&,including#8 >9 Sttlfiit(�Soundness.5 cycle test per primary size-ASTM C88 325 N I I hictimpav(ci]Void Content of-Fine Aggregate-AASITFO T304 S 145 6. Tensile test(rebisr)#9,#10,411 M Unit feel uht-ASTM C29 S 72 7. Tensile test(rebar)#14,#18 8. Rebar Mechanical Coupler(Tension)Test(tip to#I I bar) 12 Page 2 of 3 158 BTCLASS - VERTICALFIVE 2012 FEE SCHEDULE C Structural Steel N'll. ASPHALT&ASPHALTIC CONCRETE I Cutting&machining charges S72Air A.Asphalt Pavement Engincerine 2 Bend test,structural,III Sizes $55 1. CALTRANS Third Party Resolution Documentation Fee 5350 -1 CrIsilC test,btruChn"ill.</4*'CrOSS-SMi011(cutting R machining extra)" $75 Tensile test.structural.>1/4"cross-scction(cutting machining extra)* $95 2. Pavement Evaluations $425(minimum) Flauctlim"test of pipe $42 B.Asphaltic Cements And Liquid Asphalts .1elisile and yield by percent qflset add$85 1, Absolute viscosity(q)]40'F-ASTM D-2171,AASI ITO T-202 $l5i Other temperature $185 1) 1 ltplys'lretlg(�t LIS 1 Conc penetration-ASTM D-217 $125 t I)SA-Certified High Strength Bolt Set ca.(Bolt.Nut,&Washer) $325 3. Flash point Cleveland Open Cup-ASTM D-92,AASHTO T-48 5125 2 Bolts-proof load(jion•OSA) $ 45 4. Kinematic viscosity @ 140 or 2757-D-2170,T-201 $1'25 Bolts-ultimate load S 65 Other temperature $155 Botts hardness S 35 5� Penetration-ASTM D-5,AASI ITO T-49(at 77"F) $115 I Other temperature ,i Nots-proof load S 45 $135 Nuts-hardness S 35 6. Softening point-ASTM D-36 5125 .1 Washers-hardness S 35 7. Solubility in trichloroethylene-ASTM D2042, AASHTO T-44 $185 Li Welding Procedure and Welder Owdification'fests & Specific gravity-ASTM D-70,AASHTO T-228 $125 CotifIrin thickness(tivild steel onlill to 318 over 318 C.Emulsions And Slurry Scats I Fraclure bend(fillet) $42 I. Cement mixing-ASTM D-244,AASI ITO T-59 slos 2 Macloctch S49 ca. 2. Consistency test-ASTM D-3910 $95 Fr cc bend $60 3, Demulsibility-ASTM D-244,AASHTO T-59 5115 4, 'Nick bleak $41 ea. $33 4. Miscibility-ASTM D•244 5115 Side.lice or root bend $22 ca, $27 5, Particle charge-ASTM D•244,AASHTO T-59 575 6 Tensile $31 ea. $43 6. pH determination S75 7 Welder Qualification Records $115 7, Oven cook ofT(%residue) Wo hichfdea evaluation(!fiesi.ipechnens anel preparation of Stamped S. Set time-ASTM D-3910 S85 It Procedure Qualificrition Records per applicable cride. 9. Settlement,5 or 7 day-ASTM D-244,AASIIT0 T-59 $155 *11"'ififfer extrillimations aregiven in off),laboratory orriffabricatol's 10. Slurry seal mix proportion $1,750 %hop irith 7-hour iniWinum iritnessing charge. 11. Solids content by evaporation and extraction(slurry) S205 t eea lixre,i ru r jut rests awls. krrrrple prelrar atiarx,corrpar+rrraclririfug.etc.,will 12. Storage stability,I day-ASTM D-244 S150 he t haired ar aphlii able horn 1}!ab rates reed cost pkis I S°la far Orarsirle Uir ect 13, Torsional Recovery $125 14, Wet Track Abrasion -ASTM D-3910(prep.not included) $270 VL 1iiS(',I-.LLAN'EOtIS(,*ONS`i'llt;("1'101 jNIA*I*EIZIALSI'El")FS I Calibration Certificates Per Quote D.Asphaltic Concrele.Aggregate And,.NIixe 8,AASHTOT166 2 Density ot'Sprayed Fireproofing $70 1, Bulk Specific Gravity(max density,bulk AC)CTM 30 $210 $38 3 pt.LTMD $325 4 Roof file Strength $54 5 pt.UFMD m� Rii(it"rile Absorption $38 2, Coring of asphaltic concrete- See Section E Diamond Curing 6 Roofcut'l'ests(total weight only) $57 3. Extraction,%bitumen and sieve analysis 7 III\ comnty separotion,bituininous content,etc Per Quote Solvent Extraction Method-ASTNI D2172,0137 $325 S Jill)Nitc"-railer or klobile Lattoratory Per Quote Ignition Oven Method CTNI 382,202 $225 1) ( fit\crSA Testing Machine(hourly) 5150 4. Extraction,%bitumen only S265 141 61­0011d Rod Icst(plus travel) $]so Solvent Extraction Method-ASTM 2172 Ignition Oven Method-CTM 382 S145 5, Film stripping-cm 302 $165 6. Ignition Oven Correction Factor-CTM 382 $650 A DDITIONAL TE'US: BTC LABS and NVi perform abroad spectrum of field 7. Marshall -Stability and flow{core)-ASTM D-1559 $125 and ljbtn­aq(iry testing, This Fee Schedule list only the most $325 I common tests 8. Marshall -Stability and flow(bulk)-ASTM D-l5i9 performed. For w1brination regarding additional testing services,pIcasc 9. Marshall-Specific Gravity $225 coinact our laboratory- 10. Mix proportion-Marshall Method $2,900 with R.A.P. $3,700 11. Mix proportion-FIVEEM Method $2.700 with R.A.P. $3,500 12, Theoretical Maximum Specific Gravity(RICE)-ASTIM D-2041 5200 13, Moisture content-ASTM D-1461 $115 14. Recovery of Extracted Asphalt(extraction only)-ASTM D-5404 $250 15. Recovery of rubber from ARHM extraction $115 16. Specific gravity of core-ASTM D-2726 $60 17, FIVEEM Stabilorneter test on premixed simple-C'rM 366 S 18 Stabilorneter test and mixing or sample S400 18. Surface abrasion CTM 360 $445 19, Swell test in conjunction with stabiloineter-C'I M 305 $115 20, Resistance to Moisture Induced CT 371 $1,700 21. Resistance to Moisture Induced Damage(lime)-T-283,CT 371 $I.850 22, Viscosity curve ror ARHM(%rubber)binder blend-6 hr. $870 -8 lit. 51,200 NOTE: Where prices are listed for inix proportions.the necessary specific gruvitV tests and sieve analyses are included, however, aggregate and asphoh qualification tests are not. Page 3 of 3 159