Loading...
HomeMy WebLinkAboutAGENDA REPORT 2012 0606 CC REG ITEM 09C ITEM 9.C. City Council Meeting ACTION:T MOORPARK CITY COUNCIL AGENDA REPORT -- TO: Honorable City Council FROM: Dave Klotzle, City Engineer/Public Works Director Prepared by: Al Gali, Assistant Engineer DATE: May 22, 2010 (CC Meeting of 06/06/12) SUBJECT: Consider Plans and Specifications and Authorization to Advertise for Construction Bids for Alderbrook Street Asphalt Overlay (Project 8091) BACKGROUND The City has conducted testing of the deteriorated pavement on Alderbrook Street between Honeybrook Court and Rivergrove Court. The testing results indicate the need to remove and replace the severely cracked portions of asphalt pavement and overlay the entire street with rubberized asphalt. The project will also construct a new concrete gutter across Honeybrook Court on the west side of Alderbrook Street. Construction of the asphalt pavement repair, rubberized asphalt overlay and concrete cross gutter has been added to the updated Capital Improvement Program and will be funded by the City's Highway Users Tax Account (HUTA) funds. The interior neighborhood streets connecting to Alderbrook Street will also be improved with an Asphalt Rubber Aggregate Membrane (ARAM) and Slurry Seal treatment as part of the 2012 Pavement Rehabilitation Project. This project is expected to occur in the Summer of 2012 after the Alderbrook Street overlay is completed. DISCUSSION A. Scope of Work The subject project will construct a rubberized asphalt overlay at the location described above. The work includes asphalt grinding, remove and replace severely cracked asphalt pavement, rubberized asphalt paving, utility cover adjustments, and pavement striping. The project plans and specifications have been completed and a copy has been placed on top of the file cabinet in the City Council Conference Room. S:\Public Works\Everyone\Reports\Staff Reports\2012\June\6-6-2012(Alderbrook Overlay Authority to Bid).docx 150 Honorable City Council June 6, 2012 Page 2 B. Project Schedule The anticipated project schedule is as follows: Advertise for Bids 06/12/2012 Bid Opening 07/10/2012 Award of Construction Contract 07/18/2012 Notice to Proceed 08/13/2012 Project Completion 10/31/2012 FISCAL IMPACT The estimated project costs are summarized as follows: Design (In-House) $0 Construction $240,000 Inspection & Testing $35,000 Total $275,000 The project will be funded by the Highway Users Tax Account — HUTA (Fund 2606). Funding appropriations are included in the proposed FY 2012/13 Capital Improvements Budget. STAFF RECOMMENDATION Approve the plans and specifications for the subject project and authorize staff to advertise for construction bids. Attachment: Project Location Map S:\Public Works\Everyone\Reports\Staff Reports\2012\June\6-6-2012(Alderbrook Overlay Authority to Bid).docx 151 Alderbrook Street Asphalt Overlay Project 8091 HIGH ST O O 23 D �7 ;)) z D �0 < p m LOS ANGELES AVE 118 118 118 LOS ANGELES AVE m x D v � o SAM / D � P 9 PROJECT SITE PEACH HILL RD h � � � r �p\N O o CHRISTIAN M601 BARRETT RD WILLIAMS RANCH RD m O o � o r Z BROOK N�T cRfFk R� TIERRA REJADA RD N NOT TO SCALE Location Map 152