MOORPARK CITY COUNCIL -- --� -- --� ----
AGENDA REPORT
TO: Honorable City Council
FROM: Hugh R. Riley, Assistant City Manna a
BY: Ky Spangler, Special Projects Consulta
DATE: May 23, 2012 (CC Meeting of 6/6/12)
SUBJECT: Consider Additional Funding for Structural Steel and
Miscellaneous Metals Additions and Revisions and Amendment
No. 3 to the Agreement with Steelcon, Inc. for the Ruben Castro
Human Services Center
BACKGROUND & DISCUSSION
The Ruben Castro Human Services Center (RCHSC) is being constructed as a multiple-
prime contract project with construction management provided by Barnhart Balfour-
Beatty Construction (Balfour-Beatty). Bids were solicited from trades in September,
2010, opened on October 21, 2010 and bids were awarded by the Moorpark City
Council on January 19, 2011. Steelcon, Inc., (Steelcon) was selected as the lowest
responsive and responsible bidder for the Structural Steel and Miscellaneous Metals bid
package and a construction agreement was executed on March 25, 2011.
Concurrently with the bidding process, the County of Ventura and the City of Moorpark
entered into negotiations for the purchase of Building A for use as a County medical
facility. A Ground Lease between the City of Moorpark and County of Ventura was
approved on January 11, 2011. The Ground Lease also includes a Bill of Sale for
purchase and of transfer of Building A to the County upon completion of construction
with a purchase price of $5,600,000.
The Ventura County Health Care Agency medical clinic includes a procedure room with
a suspended light fixture. An Instructional Bulletin issued by the structural engineer in
response to a Request for Information included a detail for the above-ceiling light
attachment which requires structural steel support to comply with safety and seismic
requirements. The total amount of the structural angle iron and seismic angle beams
required for the Ventura County Health Care Agency procedure room light is $7,294.34
312
Honorable City Council
June 6, 2012
Page 2
(Attachment 1). All changes requested by the County are being tracked and any
construction costs which exceed the $5,600,000 building purchase price will be billed to
and paid for by the County.
At the time of storefront door installation at the main entries to the buildings, an error in
the location of the concrete-embedded structural tube posts was discovered. Steelcon
corrected the installation at the direction of Balfour-Beatty at a cost of $2,009.33. This
amount will be backcharged to the concrete trade.
Lastly, a request was made by the City to reduce the height of the block wall at the
north end of the site and replace the top two feet of masonry with galvanized
ornamental fencing. This change will permit improved sightline visibility along the
railroad right-of-way for vehicles traveling northbound on Spring Road. The cost for the
450 feet of fencing is $45,445.75. A credit for the reduction in block wall height will be
received from the masonry contractor.
A recap of the contract revisions to date is below:
Original Contract $1,101,575.00
Amendment No. 1 $ 34,024.40
Amendment No. 2 $ 41,051.61
Current Agreement Amount $1,176,651.01
Amendment No. 3
Procedure Room light structural supports $ 7,294.34
Relocation of main entry structural posts (backcharge to trade) $ 2,009.33
Ornamental fence on north boundary wall $ 45,445.75
Total Amendment No. 3 Amount $ 54,749.42
Revised Agreement Amount $1,231,400.43
Currently the remaining contingency available under Steelcon's contract is $35,081.49.
The cost for the additional structural steel and miscellaneous metals work is $54,749.42
which is $19,667.93 above the available contingency. Therefore staff is seeking the
approval of this additional amount.
FISCAL IMPACT
The Fiscal Year 2011/2012 Capital Improvement budget for the Ruben Castro Human
Services Center (Fund 5020) is $11,038,064. To date $6,512,302 has been expended
with $3,465,038 left in encumbrances and $1,060,724 available project balance.
313
Honorable City Council
June 6, 2012
Page 3
Therefore, no additional funds need to be budgeted for the proposed work at this time.
Sufficient funds exist in the budget to cover this work.
STAFF RECOMMENDATION (ROLL CALL VOTE)
Approve additional funding in the amount of $19,667.93 for additional structural steel
and miscellaneous metals work for the Ruben Castro Human Services Center and
authorize the City Manager to execute Amendment No. 3 in the amount of $54,749.42
to Steelcon, Inc., subject to final language approval of the City Manager and City
Attorney.
Attachment 1: Steelcon, Inc. Change Order Request dated March 26, 2012
Attachment 2: Steelcon, Inc. Change Order Request dated February 14, 2012
Attachment 3: Steelcon Inc. Change Order Request dated May 8, 2012
Attachment 4: Amendment No. 4 to Steelcon, Inc.
314
I
ATTACHMENT 1
STEELCON, Inc.
2677 South Chestnut Avenue
Fresno CA 93725.2113
ph.(559)266-3823
fax(559)266-3019
email Steelcon81 nnaoi.com
ITEM Change Order Request DESCRIPTION: RFI#287 Contractor STEELCON,Inc.Bid Package#6
#19rev1 BLDG A
added steel framing In room 546 Project Ruben Castro Human Services Center
for procedure light support
_ DATE February 13,2012
REV DATE March 26,2012
FORM FOR EXTRA WORK AND/OR DEDUCTIVE WORK
SHOP COSTS list each if more than one ADDITIVE DEDUCTIVE.
1 5.0 @ 43.48 DETAILING LABOR TOTAL $ 217.40 $ 0.00
2 11.0 @ 50.00 SHOP LABOR TOTAL $ 548.50 $ 0.00
3 MATERIALS TOTAL $ 243.00 $ 0.00
4 SUBTOTAL#1(LINES 1,2&3) $ 1,008.90 $ 0.00
5 CONTRACTOR'S OVERHEAD AND
PROFIT FOR SUBTOTAL#1(LINE 4) is$ 151.34 $ 0.00
6 SUBTOTAL#2(LINES 4&5) $ 1,160.24 $ 0.00
FIELD COSTS ADDITIVE DEDUCTIVE
7 13.4 @ 84.03 FIELD LABOR TOTAL $ 1,121.80 $ 0.00
7.1 8.0 @ 100.00 SUPERVISION $ 800.00 $ 0.00
8 FIELD MATERIAL TOTAL $ 0.00 $ 0.00
9 FIELD EQUIPMENT TOTAL $ 85.00 $100
10 SUBTOTAL#3(LINES 7,8&9) $ 2,006.80 $ 0.00
11 CONTRACTOR'S OVERHEAD AND
PROFIT FOR SUBTOTAL#3(LINE 10) 15$ 301.02 $ 0.00
12 SUBTOTAL#4(LINES 10&11) $ 2,307.82 $ 0.00
ADDITIONAL COST ADDITIVE DEDUCTIVE
13 TAXES 8$ 30.77 $ 0.00
14 Drops,remoblllzation,freight OTHER $ 3,795.52 $ 0.00
15 GRAND TOTALS $ 7,294.34 $ 0.00 _
16 NET TOTAL FOR C.O.R. $ 7,294.34
17 TIME EXTENSION REQUESTED 4 DAYS
NOTE:cost is more than Steelcon COR 09 as there are more pieces to Install
315
b
ATTACHMENT 2
STEELCON, Inc.
2677 South Chestnut Avenue
Fresno CA 93725-2113
ph.(559)266-3823
fax(559)266-3019
email$S.gelcon81 @aol.com
ITEM Change Order Request DESCRIPTION: BLDG B&Bldg A Contractor STEELCON,Inc.Bid Package#6
#22 relocate steel posts at
main entrances Project Ruben Castro Human Services Center
Bldg B doors 002,004
Bldg A door 501 DATE February 14,2012
REV DATE
FORM FOR EXTRA WORK AND/OR DEDUCTIVE WORK
SHOP COSTS list each If more than one ADDITIVE DEDUCTIVE
1 0.0 @ 0.00 DETAILING LABOR TOTAL $ 0.00 $ 0.00
2 0.0 @ 50.00 SHOP LABOR TOTAL $ 0.00
3 MATERIALS TOTAL $ 0.00 $ 0.00
4 SUBTOTAL#1 (LINES 1,2&3) $ 0.00 $ 0.00
5 CONTRACTOR'S OVERHEAD AND
PROFIT FOR SUBTOTAL#1(LINE 4) 1s$ $ 0.00
6 SUBTOTAL#2(LINES 4&5) $ 0.00 $ 0.00
FIELD COSTS ADDITIVE DEDUCTIVE
7 8.0 @ 84.03 FIELD LABOR TOTAL $ 672.24 $ 0.00
7.1 8.0 @ 100.00 SUPERVISION $ 800.00 $ 0.00
8 FIELD MATERIAL TOTAL $ 60.00 $ 0.00
9 FIELD EQUIPMENT TOTAL $ 215.00 $ 0.00
10 SUBTOTAL#3(LINES 7,8&9) $ 1,747.24 $ 0.00
11 CONTRACTOR'S OVERHEAD AND
PROFIT FOR SUBTOTAL#3(LINE 10) 1s $ 262.09 $ 0.00
12 SUBTOTAL#4(LINES 10&11) $ 2,009.33 $ 0.00
ADDITIONAL COST ADDITIVE DEDUCTIVE
13 TAXES e$ 0.00 $ 0.00
14 OTHER $ 0.00 $ 0.00
15 GRAND TOTALS �$ 2,009.33 $ 0.00
16 NET TOTAL FOR C.O.R. I$ 2,009.3
17 TIME EXTENSION REQUESTED 1 DAYS
NOTE:
316
1
ATTACHMENT 3
STEELCON, Inc.
2677 South Chestnut Avenue
Fresno CA 93725-2113
ph.(559)266-3823
fax(559)266-3019
email,,Steelcon8l @aoLcom
ITEM Change Order Request DESCRIPTION: 0#16 Contractor STEELCON,Inc.Bid Package#6
#23rev#1 added cost to add
fencing to top of Project Ruben Castro Human Services Center
Nodh perimeter CMU wall
DATE March 23,2012
REV DATE May 8,2012
FORM FOR EXTRA WORK AND/OR DEDUCTIVE WORK
SHOP COSTS list each if more than one ADDITIVE DEDUCTIVE
1 34.0 @ 50.00 DETAILING LABOR TOTAL $ 1,700.00 $ 0.00
2 231.3 @ 50.00 SHOP LABOR TOTAL $ 11,566.50 $ 0.00
3 MATERIALS TOTAL $ 3,085.29 $ 0.00
4 SUBTOTAL#1(LINES 1,2&3) $ 16,351.79 $ 0.00
5 CONTRACTOR'S OVERHEAD AND
PROFIT FOR SUBTOTAL#1(LINE 4) 15$ 2,452.77 $ 0.00
6 SUBTOTAL#2(LINES 4&5) $ 18,804.56 $ 0.00
FIELD COSTS ADDITIVE DEDUCTIVE
7 91.2 @ 84.03 FIELD LABOR TOTAL $ 7,664.38 $ 0.00
7.1 32.0 @ 100.00 SUPERVISION $ 3,200.00 $ 0.00
8 FIELD MATERIAL TOTAL $ 690.04 $ 0.00
9 FIELD EQUIPMENT TOTAL $ 145.00 $ 0.00
10 SUBTOTAL#3(LINES 7,8&9) $ 11,699.42 $ 0.00
11 CONTRACTOR'S OVERHEAD AND
PROFIT FOR SUBTOTAL#3(LINE 10) 15$ 1,754.91 $ 0.00
12 SUBTOTAL#4(LINES 10&11) $ 13,454.33 $ 0.00
ADDITIONAL COST ADDITIVE DEDUCTIVE
13 TAXES a$ 293.38 $ 0.00
14 Travel,Subsistence,Freight,Re-moblllzatlon OTHER $ 5,489.61 $ 0.00
15 GRAND TOTALS $ 38,041 87 $ 0.00
16 NET TOTAL FOR C.O.R. $ 38,041.67
17 TIME EXTENSION REQUESTED 16 DAYS
NOTE:fence quoted with prime coat finish
Tuesday,May 08,2012
see page 93 for alternate pricing for hot dipped galvanize finish
317
a
i
3
t
z
ST E E L C O N, Inc. Proposal Form Break Use in conjunction with Steelcon
Down
Change Order Request #23rev#1 03123/12
Bid Package 16 Structural Steel and Miscellaneous Metals
PROJECT: City of Moorpark Ruben Castro Human Services Center
TRADE: Structural Steel
Provided quantities,unit cost and totals for each of the following applicable Items of work:
If Item is not applicable to this project operation N/A In the Quantity column
ITEM QUANTITY UNIT COST QTY UNIT TOTAL
Field Supervision 32 hrs $115.00 32/ hr $3,680.00
Erection 91.21 hrs $96.63 91.21 I hr $8,814.03
Fabrication 231.33 hrs $57.50 231.33! hr $13,301.48
Structural Steel
Joist NIA $0.00 /ton $0.00
Joist Girders N/A $0.00 ! ton $0.00
Roof Deck- N/A $0.00 / sq It $0.00
Floor Deck- N/A $0.00 / sq ft $0.00
Columns N/A $0.00 / ea $0.00
WF Beams N/A $0.00 /lb $0.00
Channels NIA $0.00 / lb $0.00
Tubing 2288 LF $1.531 2288/ LF $3,511.34
X Bracing N/A $0.00 / lb $0.00
Misc.iron
Stairs N/A $0.00 l if $0.00
Bollards N/A $0.00 I ea $0.00
Angles N/A $0.00 / lb $0.00
Bike Racks N/A $0.00 1 ea $0.00
Ladders N/A $0.00 /If $0.00
Roof openings N/A $0.00 / Ib $0.00
Site Cast Embeds N/A $0.00 / lb $0.00
Flat Bar&Plate 16.25 Ib $0.591 16.25/ lb $9.64
Other-Bolts lot $27.11 1 / ea $27.11
Other Costs
Safety Cable N/A $0.00 1 if $0.00
Second Mobilization lot $2,300.00 1 / ea $2,300.001
Lifts&Fork N/A $0.00 1 ea $0.00
Field Hand Tools lot $166.75 1 / ea $166.75
Welding Machine N/A $0.00 1 hr $0.00
Touch Up Paint Field Welds NIA $0.00 / hr $0.00
Material Drops lot $130.61 1 / ea $130.61
Consumables lot $793.55 1 / ea $793.55
Shop Drawing Drafting 34 hrs $57.50 34 / hr $1,955.00
Subouts- N/A $0.00 / ea $0.00
Other-Field Measure lot $460.00 1 1 ea $460.00
Other-Travel&Subsistence lot $1,794.00 1 / ea $1,794.00
Freii ht lot $805.00 1 / ea $805.00
Crane N/A $000 /ea $0.00
Taxes 1 7.98% $293.38
(Pricing includes labor(prevailing wage rates),material,equipment,and applicable taxes)
TOTAL: $38,041.87
318
Proposal Form Break
S T E E L C O N r Inc. Down Use in conjunction with Sleelcon
Bid Package 06 Structural steel and Miscellaneous Metals Change Order Request #23nini l 03!23112
i!
Alternates
add for hot dipped galvanized finish shop 52 hrs $51.18 52 1 hr $2,661.10
galvanize $4167.78 1 / ea $4,167.78
freight $575.00 1 / ea $575.00
$0.00 / ea $0.00
$0.00 / ea $0.00
$0.00 ! ea $0.00
$0.00 / ea $0.00
$0.00 / ea $0.00
$0.00 / ea $0.00
$0.00 / ea $0.00
$0.00 / ea $0.00
Total of Alternates $4,793.96 $7,403.88
Total Including Alternates: $45,445.75
added duration if aitenate is accepted 8 days
Total duration in work days) 16
Start Date: TBD
Exclusions: test and inspections
Special Requirements:
Weekend/Holiday Work:
Company: STEELCON,Inc.
Phone: 559-266-3823
E-mail: JimmvFranco STEELCONQ-live.com
Print Name:Jimmy Franco
Title: Proiect Manager
Signature:
Date: 03123112
319
ATTACHMENT 4
THIRD AMENDMENT TO AGREEMENT 2011-073
FOR BID PACKAGE #6 — STRUCTURAL STEEL AND MISCELLANEOUS METALS
AT THE RUBEN CASTRO HUMAN SERVICES CENTER
THIS THIRD AMENDMENT TO THE AGREEMENT FOR BID PACKAGE #6 —
STRUCTURAL STEEL AND MISCELLANEOUS METALS ("Third Amendment"), is
made and entered into this day of , 2012, ("the Effective
Date") between the City of Moorpark, a municipal corporation, hereinafter referred to as
"CITY", and Steelcon, Inc., a California corporation, hereinafter referred to as
"CONTRACTOR".
WITNESSETH:
WHEREAS, on March 25, 2011, the CITY and the CONTRACTOR entered into
an Agreement for structural steel and miscellaneous metals work for the Ruben Castro
Human Services Center; and
WHEREAS, on November 8, 2011, the CITY and the CONTRACTOR entered
into a First Agreement in an amount not-to-exceed thirty-four thousand twenty-four
dollars and forty cents ($34,024.40) for structural steel and miscellaneous metals work
for the Ruben Castro Human Services Center increasing the total not-to-exceed amount
to one million one hundred thirty-five thousand five hundred ninety-nine dollars and forty
cents ($1,135,599.40); and
WHEREAS, on May 22, 2012, the CITY and the CONTRACTOR entered into a
Second Agreement in an amount not-to-exceed forty-one thousand fifty-one dollars and
sixty-one cents ($41,051.61) for structural steel and miscellaneous metals work for the
Ruben Castro Human Services Center increasing the total not-to-exceed amount to one
million one hundred seventy-six thousand six hundred fifty-one dollars and one cent
($1,176,651.01); and
WHEREAS, the CITY wishes to further amend the Agreement to provide and
install additional structural support for a procedure light in Room 546 in Building A per
the recommendation of the structural engineer of record at a cost not-to-exceed seven
thousand two hundred ninety-four dollars and thirty-four cents ($7,294.34) as described
in the CONTRACTOR'S Change Order Request #19R1 (6.17) dated March 26, 2012,
and incorporated herein as Exhibit T to the Agreement by this Third Amendment; and
WHEREAS, the CITY wishes to further amend the Agreement to provide for
relocation of structural steel posts for the main entrance aluminum storefront frames for
Buildings A and B at a cost not-to-exceed two thousand eight hundred seventy-two
dollars and thirty-three cents ($2,009.33) as described in the CONTRACTOR'S Change
Order Request #22 (6.18) dated February 14, 2012, and incorporated herein as Exhibit
U to the Agreement by this Third Amendment; and
Construction Agreement Page 1 of 3
Third Amendment Between City of Moorpark and Steelcon, Inc.
320
WHEREAS, the CITY wishes to further amend the Agreement to include the
installation of a two (2) foot high galvanized ornamental fence on the north property line
concrete masonry unit (CMU) wall at a cost not-to-exceed forty-five thousand four
hundred forty-five dollars and seventy-five cents ($45,445.75) as described in the
CONTRACTOR'S Change Order Request #23R1 (6.19) dated May 8, 2012, and
incorporated herein as Exhibit V to the Agreement by this Third Amendment; and
WHEREAS, the total dollar amount of $54,749.42 exceeds the ten percent (10%)
contingency amount approved with the original Agreement; and
WHEREAS, on June 6, 2012 the City Council of the City of Moorpark approved
additional funding for these structural steel and miscellaneous metals additions,
revisions and changes.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto AMEND the aforesaid Agreement as follows:
I. Section 2 of the Agreement is amended to include:
Contractor's Scope of Services is amended to include the materials and labor
needed to:
• install additional angle iron, all thread rods and seismic angles for the mounting
of the future procedure light in Room 546 in Building A according to the structural
engineer's response to RFI 287 and per Change Order#19R1 (6.17); and
• relocate structural steel tube posts to correct the layout to properly fit the main
entrance aluminum storefront frame for Buildings A and B per Change Order #22
(6.18), and
• provide a two (2) foot high galvanized ornamental fence along the north property
line CMU block wall per the request of the City of Moorpark and according to
Instructional Bulletin #16 issued by the architect of record, and per Change Order
#23R1 (6.19).
The Scope of Services for the additional structural steel work is described in the
Change Orders dated March 26, February 14, and May 8, 2012, attached hereto and
incorporated herein as Exhibits T, U and V to the Agreement by this Third Amendment.
II. Section 7 of the Agreement is amended to include:
CITY hereby increases the not-to-exceed amount of $1,176,651.01 under this
Agreement by $54,749.42 to $1,231,400.43.
Construction Agreement Page 2 of 3
Third Amendment Between City of Moorpark and Steelcon, Inc.
321
III. Remaining Provisions
All other terms and conditions of the original Agreement shall remain in full force
and effect.
CITY OF MOORPARK STEELCON, INC.
By: By:
Steven Kueny Dossie Norris
City Manager President
ATTEST:
Maureen Benson, City Clerk
Exhibit T — Change Order Request #19R1 dated March 26, 2012 (6.17)
Exhibit U — Change Order Request #22 dated February 14, 2012 (6.18)
Exhibit V — Change Order Request #23R1 dated May 8, 2012 (6.19)
Construction Agreement Page 3 of 3
Third Amendment Between City of Moorpark and Steelcon, Inc.