HomeMy WebLinkAboutAGENDA 2012 0613 CC SPC 7:00 PM ITEM 05A ITEM 5.A.
+::ity Council Meeting
X__ 6-.3
ACTION:
MOORPARK CITY COUNCIL -- -- - - -
AGENDA REPORT
TO: Honorable City Council
FROM: Dave Klotzle, City Engineer/Public Works Director
Prepared by: Teri Davis, Senior Management Analyst:6)
DATE: June 6, 2012 (CC Special Meeting of 06/13/12)
SUBJECT: Consider Water Rate Increase Presentations by General Managers from
Calleguas Municipal Water District and Metropolitan Water District of
Southern California
BACKGROUND
The City of Moorpark (City) incurred unprecedented water rate increases over the past
several years and water rates are expected to continue to rise in the foreseeable future.
The City purchases water from the Ventura County Waterworks District No. 1 (District)
which in turn purchases water from Calleguas Municipal Water District (Calleguas) which
purchases imported water from Metropolitan Water District of Southern California
(Metropolitan).
The District's service area encompasses approximately 21,500 acres, including about
7,900 acres of the City (approximately 65 acres within the City boundaries is not serviced
by the District). The District services approximately 10,950 customers, 96% of which are
inside the City boundaries while the remaining 4% are outside the City boundaries. The
volume of water sold inside the City is 75% of the total water sold by the District.
Approximately 20% of the District's water is a blend of well water and imported water
supplied by Calleguas and 95% of the blended water is delivered to customers outside of
the City boundaries. Also of note, the District rates for water designated to be used for
agricultural purposes rather than municipal and industrial purposes is approximately 15%
lower than the municipal and industrial water rates.
On December 1, 2010, City Council directed staff to submit to the Ventura County Board of
Supervisors (Board) a letter protesting a proposed 10% water rate increase scheduled to
take effect January 1, 2011. The Board postponed consideration of the water rate increase
and later adopted a 12% water rate increase to take effect May 1, 2011. In January 2012,
staff brought before City Council a subsequent proposed water rate increase scheduled to
take effect March 1, 2012. This 2012 increase ranged between 6.5% and 8%and the City
Council did not direct staff to submit a letter of protest but rather directed staff to submit to
the Board a letter of concern. Additionally, the City Council directed staff to request
1
Honorable City Council
June 13, 2012 Special Meeting
Page 2
presentations from the General Managers of Calleguas and Metropolitan at a future City
Council meeting to explain and discuss the need for seemingly excessive water rate
increases and why water rates are projected to steadily increase for a minimum of ten
years.
DISCUSSION
Historically, the District has generally imposed rate increases when Calleguas increases
water rates and Calleguas has generally imposed increases when Metropolitan increases
water rates. The table below summarizes the agencies' increases over the past five years.
Water Rate Increases for 5 Year Period
Effective Date Metropolitan Calleguas District
2008 6% 10% 9.5%
....................................................................................._..........._........................_..........................................._.........._._.._...._...._........_.................._...._.................._._..........._.....;................_................................_.......
2009 14% 17% 15%
......................._....__....._........................................_............._....._.............__....................................._................_...................._..............__.._................................_............._._...._.._....._..._.............................. .__..._..............
2010 20% 22% 16%
.....................................
:..............._............................................._................................................................_................................................................................................................;...................................................._......
2011 7.5% 10% 12%
.. .._
2012 7.5% 8% 6.5-8%
The cost to the City resulting from the 5 year period of water rate increases is estimated to
exceed$245,000. This$245,000 only relates to parks and landscaping subsidies from the
general fund and self-funded landscape assessment district zones, which represents the
vast majority of water costs to the City. Costs for interior water use at City Hall, Active
Adult Center, Library, Moorpark Public Services Facility, and other City facilities are not
included in this estimated cost to the City.
Cost to City Incurred by 5 Year Period of Water Rate Increases
Landscape
Fiscal Parks/Landscaping Assessment Districts
Effective Increase Year General Fund Subsidies Self-funded
2008 9.5% 2007/08 $ 6,744.61 $ 5,248.34
............._......................._.........._....._...._...................._..._.............._.........._...._......._........._._...._.............._...._..........._.._........_............_.........._......_._....._.__.............._.........._.._._..._......_........_...............................__......_.................
2009 15% 2008/09 : .. $ 14,918.75. $ ._._ 19,264 46 .
2010 16% 2009/10 $ 30,470.39 $ 38,835.49
....... _. _....... . ... ....... .. ...._.... .. ............_ ...
2011 12% 2010/11 $ 25,119.09 $ 56,688.16
......... . ............... .. ............... ...._ .. ..
2012 8% 2011/12 $ 14,377.75 $ 34,212.94
......... ... ................... .. ......;. ......__ ............. ._........ ._.... ....
Subtotal $ ....... ... ....... . ....._.... . .......
Total $ 245,879.98
2
Honorable City Council
June 13, 2012 Special Meeting
Page 3
Jeffrey Kightlinger, General Manager of Metropolitan, will give the first presentation at the
Special Meeting followed by Susan Mulligan, General Manager of Calleguas. Reddy
Pakala, Director of the Water & Sanitation Department of the County of Ventura will be
available to answer questions. The City Council will receive, under separate cover, a
comparison of recent water rate increases (comparing water rate increases in the cities of
Moorpark, Simi Valley,Thousand Oaks, and Camarillo), and copies of presentation slides
from both Metropolitan and Calleguas.
FISCAL IMPACT
None.
STAFF RECOMMENDATION
Hear presentations and direct staff as deemed appropriate.
3
ATTACHMENT 1
Comparison of Recent Base Water Rate Increases in Four Cities
Tier 1 Rates per Acre Foot
Year Moorpark Camarillo Simi Valley Thousand Oaks
2012 $ 1,122.98 $ 723.10 $ 1,067.22 $ 1,572.52
2011 $ 1,054.59 $ 675.18 $ 1,067.22 $ 1,324.22
2010 $ 941.77 $ 622.91 $ 1,067.22 $ 1,324.22
Tier 1 Rates per Hundred Cubic Foot
Year Moorpark Camarillo Simi Valley Thousand Oaks
2012 $ 2.58 $ 1.66 $ 2.45 $ 3.61
2011 $ 2.42 $ 1.55 $ 2.45 $ 3.04
2010 $ 2.16 $ 1.43 $ 2.45 $ 2.70
Source: Ventura County Water&Sanitation Department
Note: Camarillo is low because imported water is blended with a high quantity
of well water and Thousand Oaks is high because it is 100% imported water.
6/12/2012
cz
V)
(1)
bu !
i
ZA fm doZ� 4-j c
tj -
J
1113 (ill
U
.- N
4-j U �
� O
1
QM
O �
O �
z
: 600Z pueuaap Hela�] .
u011P} Z $ :Auaouo:)a Ieuoi2a�]
sIuapisaa uoiIPua 6t� .
sai:)ua2y aaquaaW gZ
saijunoD 9 0l aalesaloq/N aaleM jeuoi2a�j .
eiujoj! IeD uj@qlnoS jo
1:)ijlsi (] j@IeN\ uel! lodojl@N
Sources of Water for Southern California
Sierra Mtns
LA Aqueduct
Delta �
� Colorado River
Aqueduct
State Water Supplies
Project
Supplies
Conservation
Local
Groundwater and
Recycling
6uipu3 aeaA Ie:)si:l
Z60Z
ti�OZ £ 60Z Z40Z 196pn8 6602 O �OZ
•doad •doad •toad pasinab den;oV den;oV
loealuoo 0$
aaleM alelg ■ - OOZ$
6uioueuij - OOti$
lelideo �
swea6oad 009$ o.
Ajddng 008$ �
v
Wso � — - 000` �$
o0z, Ls
aannod b'?AO
juauaafeuew .Siam OOti` L$
pueuaaa ,. "� 009` 4$
/\/\@IAJ@Ao ajnl! Pu@ax3
• / • 1 1
MWD Service Area
Treatment Piwits
Colorad River Aqueduct
Jose h Jensen Filtration Plant State Water Project
Treated Water
Untreated Water
` p tV"F.E.Weymouth Filtratio Plant
obert B.Diemer Filtration Plant nry J. Filtration Plant
4
I � �
9 n ert .Skinner Filtration Plant--,
t
� M
10 5 0 10 20 30 40
Miles
3R L u rrOOR27TI5
Capital Investment Plan FY 12/13 — 13/14
20 - Year Period: 1995/96 — 2014/15
700,000
600,000
500,000
400,000
300,000
200,000
100,000 i
p --
10 'l boo h 6 1 O O O '� �, "� N h
�� 6� 'l� O,O O,O 0,0 �,O �,O ,�,0 �,O �,O O,O ,1,0 00 O,h 0,� N'� � �'� �'�
1100 1,00 "00 1100 N00 1p X00 100 ,000 l00 X00 X00 1p X00 ,�0o 104 �,0N �0� IpN �0N
Infrastructure Regulatory ■ Cost Efficiency & Productivity Water Quality Supply Reliability
2uipu3 aePA Ie:)siJ
ZZOZ
17ZOZ £ZOZ ZZOZ IaSpn8 TTOZ OZOZ
•doad •doad •foad pasinaM lenpV lenpV
saes aalem 0$
aaj u011exauud OOZ$
#g saxel - OOtp$
anaas 009$
-01-ssauipead
008$
:)siw '8 _ 000`1$ o
awo3ul Isaialul —
OOZ`1$
00 '1$
a�aey� /t�i�ede� ■
uoijeaaua! 009`1$
aamOd 008`1$
nE) nU@A@lj
i
V) %0'£ <el
i I i I • w
V) %0 £ �g
s
ro
%0'£
s
s
V � � p s
p o
p o
%L'6 � OZ
oe
� p �
'b� 6 c'
%£'
O
Q� %8.5 Oc'
ca
O
00
V
• —� %9' L 9p V
%0'Z A Oe
O
' O
O
' O
' O
0 66
+-�
6,
o 0 0 0 o
N � �
OSeGJOUI GjeN OBeJOAd
Off' Off' 0�' 0 �o�' 10�' 0�' 0�' 1o�' 10 �o�' 10 1o�'
�O 00 ��° O�° �4' 04 Gib' Off' �°� 00 �� O� GiO O'0 y4' O4'
saxel %OZ
Ajaadoad
%OZ
%OE
sasaey:) %Ob
aa4}O %OS
%09
%OL
saleS
aaleM %08
%06
%001
sa:)jnoS anU@A@� Ie3I.JOISI, H
o�
suoilipuoo juaaano uo paseq pal:)afoad
ZTOZ TTOZ OTOZ 6002 8002 I-OOZ 9002
0
001
LOT
b'Z g0t Z'Z Z D
*CZ �
a:)uele8 a9eaols aOeaoIs A:)uaSaaua3
P@Aoidwl DAeH S@AJ@S@� @�ejojS C] N\ A
fti•
c/1
N
C�
N
UNICIPAL WAT
D1STiR1CT
The Cost of Reliability
Moorpark City Council
June 13, 2 012
D
D
n
2
m
z
w
i
What you will learn tonight
Which costs have been increasing and why?
How much will rates increase over the next ten
years?
Calleguas Service Area
�NiU RA COUiyr
v r
33 Sespe
Creek Lake
Ojai
Piru
150 Piru
Fillmore 126
150
101 Lake Santa
Paula 23
Casitas 33 126 Moorpark Simi
' Ventura Camarillo 23 118
118 Lake
Oxnard 232 34 Thousand Bard
Port Hueneme 34 Oaks Westlake
Point Mugu Newbury ,o,
Park
El Calleguas Service Area
u
Calleguas' mission . . .
. . .to provide the service area with a reliable
supply of regional and locally developed
water in an environmentally and
economically responsible manner.
IJ,
Calleguas Water Rate Facts
Increases have been and will be driven by the critical
need to fund costly capital improvement programs to
improve su-Dply reliability.
Development of new local resources to reduce reliance on
Sacramento Delta supplies.
Rehabilitation and replacement of aging infrastructure.
• Operations and maintenance costs have been held in
check over past five years.
Five-year annual O&M rate increase < i%.
No O&M rate increases in 2011, 2012, or 2013.
7x 1�
2012 Ca I l e u a s Water Rate Components
Calleguas O&M
5%
,Ol
MWD
76%
A few ways Calleguas has held operations
and maintenance costs flat...
t 1 \\ \
gg
Historical investment in reservoirs to
allow for pumping during less expensive,
off-peak k SCE periods
p
:r
�t4
,�T��
?i
r
a
f�jrl�
09/10 '2009
N Nj K'I\P
Rotating the fleet to smallest vehicles
suitable for needs
36 Month Average Retail Price Chart
Regular Gas Regular Gas
Price(US $/G) USA Average Price (US $fG)
3.96 3.96
3.81 3.81
3.66 3.66
3.51 3.51
3.36 3.36
3.21 3.21
3.05 3.05
2.90 2.90
2.75 2.75
2.60 I 2.60
2.45 2.45
3 3 i�3 C' �3 �3 iB M13 i Z CD SD �B A3 CD
Z, w " il LN tIj CD w C5 �3 C� M -j C1
cr) M tj W CO
2009 2010 2011 2012
Date(Monthffiay) I.-L"12012 udsBuddyxom
4Hd\\\bJ
d
Automating processes to reduce staff
requirements
ASRSYSTEM
rmunr oK
s
& --
metering billing _--
GN..
1 WtlAY] Y
smart labor
a.w r - a] ♦ n..�.
,� avr roGF AKOSr
epae]cm scheduling & tracking
G O
r.anraFanr.latpe '=� arm=
RAG
water quality & --
opera1.
tional Ca-teO N i cccm nt to fa.,l t,-i �... Document TytM
Faculty/Component type:_AIJ .. Document Name:
Facplty: !AIII Document Descrlptlon:
monitoring & control $ed
A00 New DOCVmem
12:±552 B 410 11222711191A 121E 1329...
Q95pBt6[LC7l6019 lyft Deatftollen 54Btt4 ChW E k Sire
J CI.--Yedve Se."'.fcrm General 55.82 KS O X
J Behef V.We SetbnGe Genw.l 28.5 K8 O x
J [IS VNve Ser -e Fo.m General 55.82 KS O X
J gctrvbWan Annual Msinten.nce[omeon.M[h.ckl rt G.nerpl 47.5 KB ViOaw X
J Gatr.buncn Annual Ha...nen__ en,Checkj.l Ganer V.l 47.5 KB X
.,11 QpValve Service Fwm n General 55.82 KB O X
General 55.82 KB ViOew X
.Y.��' D,etnb�:.Gn Annual Nelntenence Cemm.?!!M Chr_klitt General 47.5 KB O X
J 4 C—I ch-khg 47.5 KB O X
Oevalve S.M.Form General SS.B2 K6 O X
12l3id 722 to 111212 L+1314121$1329,.,
Calleguas Ten-Year Capital
Improvement Program 2012-2021
W9 — --.,A Total Cost:
$342 million
■ Local Supply - Wellfield
■ Local Supply - Salinity Mange ment Pipeline
Efficiency & Security Improvements
■ Rehabilitation & Replacement
Las Posas Basin ASR Project
Provides a reliable local supply when imported supplies
are curtailed for planned maintenance or emergencies.
I_
� y Seasonal
R Supply of
Simi Valley Imported Water
borpark
Camarillo
` 1 - ■ Water
Dad t Thousand Oaks Treatment #
■ ■ Plant et t
a �
\' ASR WQIIMid
Las Posas Basin ASR Project
Valv• Yard and
Disinfection
Facility Grimes Canyon
We11flold
No.2(47 cfs) Reservoir
Welifield No. 1
v�•
(23 cfs) r`
Los
t
60" Grimes
Canyon Feeder
72" Las Posas Fonder No.3 tolfrom Distribution System
-- X' Moorpark Pump..
Station & Pressure
Regulating Station
a �
l
Purpose of the
Salinity Management Pipeline
Improve the , of . ter sup-Dlies by
developing sVentura County
Remove salt which is building up in the watershed
Y�
_
{ 1
mmgmm,m�mmnM,�mm'mrv,mmmmmmR,mm�ammmm .ex�a�ymmwm�mH,wwry. p,www�,womw, _.. .,..
.............
Status as of
June 2012 Simi Valley
-,
Moorpark
Complete to
Design Moorpark Desalter
,► in 2016
Camarillo
Cunard Thousand
i Oaks
Construction
Port i
Hueneme
Compl e
Cal leg uas Regional Salinity
Management Pipeline
Calleguas has been ver successf u y
obtaining funding for theSMP
g
Phase I & ocean outfall
Construction Celt $97 ) 464) 000
State & Federal Grants ($33) 615) 000)
Net Cost $63, 849, 000
Phase
Construction Cost $61 ) 181 ) 882
State & Federal Grants ($3, 750, 000) to date
Net Cost $57 ) 431 ) 882
.� � ..� ��� ..���\,`- \\ `.\'.. .\C ,r..p�.\\ \;\�40\l �\"� l hi�'�.\�n �l lr.,\\..�\��\''\ 0.3u\\.�� ���\. `.t Y\�.�1•,\: �\\C.�\1.�:�\..,� l�\�\\"<\c. S;
f
_
Pipe Construction
pill,
:- ,tee_ d _ `:,c�, �,��t� :fix ,-�:e�, r� �f� ,�..�.�. �.:z, � '� $'"�a�S'�`t,�"` r a
� s •
� ��� �� � �
� .: � ��
�� � ���' ri � .� � �
_ ,�. ,.,•r� -,
s�
n
=��
�.
�, " ,
' _:. = _ :n
..�, � ri
-�
�� �rr� _ ..�.
,�.. �� °,
` �
��
• - -
. . - .
r •�.
xr .
waxy
nW x
� r
Ron
s
Desalters are being p & built
Simi Valley
Moorpark
—♦� Anil Vagay YMalar
r Moorpark % Quality Cflnlral Plant
,,D�»e�sager 1 -
phases ,21E,21F `+r'�'� Phase3 West Simi
_.. "
DesaFler
'��—. .��` �i� ♦♦ Moorpark Wastewater
8wniu+Camuwlla Agdcalttrrel
OaaalNr Well Desa16ef1 Treatment Plant
Camrosa
Camarillo Phase ZC Desatker
101
■Mill Canyon Wastewater
Thousand Oaks
Treatment Plant
w Phase 28
+� ■Camarillo 14a1er
�� ♦♦ Reclamation taunt
Agricultural IN
WGN00"Iters Phase 2A of
at Round Mountain Deealler
Port we Recycleal�faker D-fta ter Legend
Hueneme
PhasesiA.B.C,D Camrosa Water Hueneme Outfall Complete
Reclamation Facility Phases IA, 8,C, D Complete
61 PHWA Phase i E Construction (2009-2011)
Dasaltar Phase 2A
rlaxiadng� i .' Design
---- Phase 2B Design
Phase 2C Design
-- Phases 2D, E. F Preliminary Design
Phase 3 Future
It
V d,e.l� ��,��, \„\,� a v,hi 1� \„ \,�M \4�,?,.V ��F, ��„�..,,
Rehabilitation & are re air p projects
required as the system ages
Facilities date back to early 196os
Vulnerable to corrosion, wear, and general degradation
Calleguas routinely inspects, monitors, and performs
structural analyses to confirm system integrity
v _
I ry M�� ryol �x r
i�
I
■
l�k
Reservoirs are inspected and analyzed for
compliance with current seismic standards
Some must be strengthened or replaced
Coatings must be replaced to prevent corrosion
are Pipes proactively rehabilitated based
on inspection results
I A
a
b
q�w
e . .
a,, r
r
1
An inventory of spare pipe is currently
being put in place for rapid repairs
A recent for the im rovement p project
sole benefit of VCWWD 1
Emergency generator at
Fairview Pump Station k -
t
i
Completed in2007 _
Provides water if SCE is out
o w
e.g. when power poles
burned down in the fires
t •i
i
Fairview PS & Generator
Rate Projectionsfrom Calleguas Long Range Finance Plan
$2,200 ------------------------------------------------------------------------------------
$2,000 , Rates to increase by 6% or less each year. _______________
$1,800 -----------------------------------------------------------
■ MWD Total ■CMWD Total
$1,600 --------------------------------------------------
$1,400 ------------------------------
---- -- --- --- --- --- -- -
$1,20+0 - --- --- ---
$1,000 --28&--11 --- --- -- -
$800 - --- --- --- --
cc
$600 - --- . --- --- -- -- - - -- --- -- -
__ 933 98
$400 --- -- -- ---
$200 - --- --- ---
$0
2012 2013 2014 2015 2016 2017 2018 2019 2+020 2021 2022
Chart shows all rates & charges divided by sales. Sales assumed constant.
Actual MW D rates through 2014, est. 5 to 6% per year thereafter.
In summary, Calleguas will ...
Continue to focus on implementing innovative
solutions to ensure future water reliability.
Incur significant costs, largely related to
pursuing these regional programs.
Annually update its long range financial plan to
continue to provide greater certainty with
respect to future rate increases.
Minimize rate increases by pursuing grant
funding, improving efficiency, and deferring
projects to the extent possible.