HomeMy WebLinkAboutAGENDA REPORT 2012 0718 CC REG ITEM 09A ITEM 9.A.
C:Ity OF 1100 ORPARK,CALIFORNIA
City Council Meeting
of_ ? / 01
AcMN.- .
ua
FAY:
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: David Klotzle, City Engineer/Public Works Director
Prepared by: Linda Williams, Administrative Assista t
DATE: July 5, 2012 (CC Meeting of 07/18/12)
SUBJECT: Consider Seven-Year Capital Improvement Program (CIP) for the
Department of Public Works for FY 2011/12 — FY 2017/18
BACKGROUND
The City's seven-year Capital Improvement Program (CIP) for the Department of Public
Works is typically updated annually, however, the CIP was not updated for FY 2010/11.
Staff has prepared the final draft of the updated CIP for FY 2011/12 — FY 2017/18 and
has distributed that document to the City Council under separate cover. This staff
report summarizes the recommended changes from the previous CIP. This item was
continued from the June 20, 2102 City Council meeting since the CIP document had
not been distributed to the City Council prior to that meeting.
DISCUSSION
A. General Description / Purpose
The CIP sets forth a list of planned municipal improvement projects for the"City's
Department of Public Works. Proposed improvements for parks, buildings and
facilities are not included. Also, costs for general public works maintenance
programs (i.e. pavement marking, striping, regulatory signs, tree trimming, etc.) are
not included in this program as this type of Public Works Operations and
Maintenance expense is set forth in the annual Departmental Operating Budget.
The purpose and focus of the CIP is to provide the City Council with a tool for
planning and programming major public works capital improvement projects
SAPublic Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(7 Year CIP).doc 1
Honorable City Council
July 18, 2012
Page 2
related to streets and roads, over the next several years.
B. Changes from Last Report
1. The updated CIP includes a new list of Potential Objectives as identified in
Appendix 'D'.
2. New Projects added are as follows: 122 (Alderbrook Street Asphalt Overlay
[8091]); 129 (Asphalt Overlay on Spring Road, Princeton Avenue, and
Poindexter Avenue [TBD]); and 207 (Civic Center Pedestrian Access and Bus
Stop Improvements [TBD]). Section 'N' of this report lists the completed
projects which have been added to Appendix 'I' of the CIP.
C. Committee Review and Input
On January 23, 2012, the Transportation and Public Works Committee (TPWC),
(Councilmembers Millhouse and Van Dam), reviewed a draft copy of the subject
document. It was recommended that the final draft be forwarded to the Planning
Commission for review and comment.
D. Planning Commission Review
Section 65401 of the Government Code of the State of California requires the
Planning Commission to review the City's Capital Improvement Program each
year, for the purpose of reporting to the City Council on the conformity of said
document with the City's General Plan. On May 22, 2012, the final draft of the
subject document was presented to the Moorpark Planning Commission for such
action. The Planning Commission found the subject CIP to be in conformance
with the Circulation Element of the Moorpark General Plan.
E. Seven Year Program / Congestion Management Program
The subject CIP provides for the planning and programming of projects over a
seven year period. In this way the CIP is compatible with the Ventura County
Transportation Commission's (VCTC) Congestion Management Program (CMP).
The CMP requires a seven-year projection of projects which might enhance the
traffic capacity on any street on the CMP Roadway Network. A map of the CMP
network and a chart listing the projects on that network, are listed in Section 'D' of
the CIP.
F. Priorities and Planninq
The funding year shown for each project listed in the CIP is an indication of its
relative priority. Should the Council wish to recommend project priorities different
S:\Public Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(7 Year CIP).doc 2
Honorable City Council
July 18, 2012
Page 3
from those set forth in the draft document prepared by staff, it may do so.
G. Fiscal Year 2011/12: Budget Consistency
The first year of the subject CIP is Fiscal Year 2011/12. The funding amounts and
sources cited in the CIP for FY 2011/12 are consistent with the FY 2011/12
Budget.
H. GASB-34
City staff monitors and maintains an Infrastructure Valuation Program consistent
with the requirements of the Government Accounting Standards Board Statement
No. 34 (GASB-34). The initial analysis which established the valuation of the
City's infrastructure, inventoried, quantified, categorized and valued (replacement
cost estimate) all of the City's capital assets. The valuation.amount for the City's
infrastructure assets is over $225 million, with "street-related" improvements
valued at over $70 million.
I. Program Content
In addition to known projects planned to be constructed by either the City or
private developers, a number of projects have been included in the CIP in order to
fully address the needs described in certain infrastructure planning documents,
noted as follows:
1. Circulation Element. All of the "future" arterial and collector streets identified
in the Circulation Element of the Moorpark General Plan, have been included
in the program.
2. Master Drainage Study. All of the "future" drains identified in the 1995 Master
drainage Study, have also been included in the program.
J. Program Format
The projects listed in the CIP are organized into five categories listed as follows:
• Streets (including underground utility projects);
• Trails and Walkways;
• Traffic Signals;
• Medians and Parkways, and
• Storm Drains.
S:\Public Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(7 Year CIP).doc 3
Honorable City Council
July 18, 2012
Page 4
K. Program Cost Estimate
Section 'A' of the CIP provides a general introduction to the program and includes
a listing of the total program cost estimate (exceeding $50 million), summarized as
follows:
Estimated
Section Program Cost(
100 Streets 31,785,215
200 Trails/Walkways 712,000
300 Traffic Signals 550,000
400 Medians & Parkways 1,309,599
500 Storm Drains 16,400,000
Total 50,756,814
L. Project Descriptions
Section 'B' of the CIP sets forth a "Project Description" page for each project. The
information provided on each Project Description page includes estimated project
costs, recommended funding year and recommended funding sources.
It should be noted that no detailed preliminary engineering was proposed for the
projects listed. The cost estimates are, therefore, very preliminary and will be
subject to change as the full scope and requirements of each project are
developed.
M. Program Expenditure Summary
Section 'C' of the CIP sets forth a table listing all projects in the CIP along with
total estimated project costs for each fiscal year of the program.
N. Completed Projects
In order to document completed projects, Appendix 'I' of the CIP lists all known
major Capital Improvement projects (for the Public Works Department)
constructed since the City's incorporation in 1983. The following projects were
added to Appendix 'I':
2010
Streets & Trails
• Mountain Tail Street/Spring Road Pavement Rehabilitation
• Julliard Avenue/Reedley Street Overlay
Parkways & Medians
• City Entry Signs
• Mountain Tail Street/Spring Road Pavement Rehabilitation
S:\Public Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(7 Year CIP).doc 4
Honorable City Council
July 18, 2012
Page 5
2011
Streets & Trails
• Metrolink Security Wall & Camera System
Traffic Signal
• Collins Drive & University Drive
• Los Angeles Avenue & Tierra Rejada Road
O. Funding Sources: Definitions
Appendix `II' of the CIP is a listing of the major funding sources for the program,
along with a description for each.
P Conclusion
The subject CIP is designed to serve many purposes.
• It is a budget planning document.
• It is a funding source reference.
• It is a plan for future improvements.
• It is a list of infrastructure needs.
• It sets forth the scope and estimated cost of specific projects.
• It is a tool for prioritizing and scheduling capital improvement projects.
• It provides a list of projects already completed.
• It provides a list of potential projects.
• It documents compliance with requirements of the Congestion Management
Program.
• Additionally, it is a "hands-on" working reference document to identify, define
and describe future planned capital improvement projects.
FISCAL IMPACT
None.
STAFF RECOMMENDATION
Approve the updated CIP for FY 2011/12 — FY 2017/18.
S:\Public Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(7 Year CIP).doc 5
City Enyineerlftffic Worlds Department
2
i
O
MEMORANDUM ITEM 9.A.
2�
o �
9
QO99TFb dV�y w
TO: Honorable City Council
FROM: Dave Klotzle, City Engineer/Public Works Director
DATE: July 12, 2012
SUBJECT: Seven-Year Capital Improvement Program for
FY 2011/2012 — FY 2017/2018
Enclosed is a copy of the Seven-Year Capital Improvement Program for FY 2011/2012
— FY 2017/2018. This item is scheduled for presentation to the Council on July 18,
2012.
Should you have any questions, please call me at (805) 517-6285.
c: Steven Kueny, City Manager
Hugh Riley, Assistant City Manager
Deborah Traffenstedt, Deputy City Manager
Maureen Benson, City Clerk
Dave Bobardt, Community Development Director
Ron Ahlers, Finance Director
Al Gali, Assistant Engineer
Ashraf Rostom, Public Works Superintendent/inspector
Q PpK Cq`'�
'3
a
2 �
A�9q TF J Jay
D
CITY OF MOORPARK
DEPARTMENT OF PUBLIC WORKS
Seven Year '
Capital Improvement Program
FY 2011/2012 - FY 2017/2018
JANICE PARVIN,MAYOR
ROSEANN MIKOS,COUNCILMEMBER
KEITH MILLHOUSE,COUNCILMEMBER
DAVID POLLOCK,COUNCILMEMBER
MARK VAN DAM,COUNCILMEMBER
STEVEN KUENY
-CITY MANAGER-
DAVID KLOTZLE,P.E.
-CITY ENGINEER/PUBLIC WORKS DIRECTOR-
June 2012
Table of Contents
Page
A. Introduction A-1
B. Project Descriptions
100 Streets
101 8002: Slung Seal Program B-4
102 8076: SR118/Collins Drive Westbound Off-Ramp Improvements and Signals B-5
Modification.
103 Walnut Canyon Road Sidewalk Improvements B-6
104 8026: Spring Road Widening B-7
105 8012: Princeton Avenue Widening B-8
106 8013: Los Angeles Avenue Widening: Spring Road to Moorpark Avenue B-9
107 8069: Spring Road/Charles Street Bus Turn-Out. B-10
108 8058: Los Angeles Avenue Widening at Shasta Avenue B-11
109. Underground Utility Projects B-12
110 8051: Underground District No.2: L.A. Avenue Transmission Lines B-13
111 8066: Underground Utilities: L.A.Avenue at the Arroyo Simi Bridge B-14
112 8039: Rail Crossing Improvements at Spring Road B-15
113 8084 Arroyo Drive Overlay B-16
114 8071: Bus Shelter Improvements and Other Bus Stop Amenities B-17
115 8061: North Hills Parkway B-18
116 5056: High Street Streetscape/Parking Improvements B-19
117 8045: 23 FWY North Alignment B-20
118 8079: SR 23 FWY Soundwalls at Tierra Rejada Road B-21
119 8056: Metrolink South Parking Lot South Entry B-22
120 Gabbert Road Rail Crossing B-23
121 High Street [West] Reconstruction B-24
122 8091 Alderbrook Street Asphalt Overlay B-25
123 8080: Railroad Crossing Improvements at Arroyo Drive B-26
124 8040: Moorpark Avenue Widening Project B-27
125 Lengthen Curb Radii at Designated Intersections B-28
126 Los Angeles Avenue Widening West of Tierra Rejada Road B-29
127 Casey Road Extension B-30
128 8087: Moorpark Left Turn Lane B-31
129 Asphalt Overlay on Spring Road, Princeton Avenue,and Poindexter Avenue B-32
200 Trails and Walkways
201 8001: Sidewalk Reconstruction Project B-34
202 Pedestrian/Bicycle Projects B-35
203 8035: Arroyo Trail Bridge Ramp Project B-36
204 8059: Drain No.2 Trail B-37
205 8086 Sidewalk&Bicycle Lane at AVRC B-38
206 Walnut Canyon Road Westside Championship Drive to Peter's DrivewayB-39
207 Civic Center Pedestrian Access and Bus Stop Improvements B-40
CIP 2011/2012 5/16/2012
Table of Contents (Cont.)
Page
300 Traffic Signals
301 Not Assigned B-42
302 8058: Los Angeles Avenue and Shasta Avenue B-43
303 8077: SR118/Collins Drive Eastbound On/OffRamps B-44
304 Not Assigned B-45
305 8013: Los Angeles Avenue and Millard Street B-46
306 8061: Los Angeles Avenue West of Butter Creek Road B-47
400 Medians and Parkways
401 8047: Medians: Los Angeles Avenue B-50
402 8026: Medians: Spring Road B-51
403 Not Assigned B-52
404 8048: Parkway: Poindexter Avenue B-53
405 SR-23/Tierra Rejada Road Interchange Landscaping B-54
406 Not Assigned B-55
407 Not Assigned B-56
408 Peach Hill Parkways B-57
500 Storm Drains
501 8088 Master Plan of Drainage B-60
502 Gabbert Canyon/Walnut Canyon System Improvements B-61
503 Shasta Drain B-62
504 8065: Millard Drain B-63
505 Villa Del Arroyo Drain B-64
506 Miscellaneous Drainage Improvements B-65
507 Arroyo Simi Channel Improvements B-66
C. Program Expenditure Summary C-1
• Total Program Project Costs: Spread to Funding Year
• FY2011/12 Total: Spread to Funding Sources
• Total Program: Spread to Funding Sources
D. Projects on the Congestion Management Plan [CMP] Road Network ' D-1
Appendix `I': List of Completed Projects I-1
Appendix `II': Description of Funding Sources II-1
Appendix `III': List of Potential Objectives III-1
CIP 2011/2012 5/16/2012
City of Moorpark
Capital Improvement Program
A. Introduction
This is the updated Seven Year Capital Improvement Program (CIP) for both the City of Moorpark,
Department of Public Works for the period covering FY 2011/12 through FY 2017/18. The primary
purpose of this CIP is to provide the City Council with a framework for identifying, planning and
prioritizing needed municipal capital improvements. The year each project is recommended to be
funded, is an indication of the priority given to each project. The figures cited in the FY 11/12 column,
should be identical to the appropriations approved in the FY 2011/12 Budget for capital improvement
projects for(8000 series).
Projects have been organized into the five (5) Sections noted below. The projects identified in this CIP
include both City funded projects as well as major projects which are likely to be constructed by land
developers. The projects listed in Section 100 include future streets which are identified in the
Circulation Element of the Moorpark General Plan. The projects listed in Section 500 include future
needed storm drains identified in the Moorpark Master Drainage Study. Also included in Section 500
are certain projects of importance to the City which are planned to be constructed by the Ventura
County Watershed Protection District.
A brief description of the contents of this CIP is as follows:
-- -A: this Introduction;
• B: a project description page for each project;
• C: a summary of total program expenses by fiscal year•,
• D: a list of the projects on the Network Congestion Management Program(CMP);
• Appendix `I': a list of completed projects through 2011.
• Appendix 'H': a description of the funding sources referenced herein.
• Appendix `III': a list of potential objectives.
A summary of the total estimated program expenditures is as follows:
Section FY11/12 FY12/13 FY13/14 FY14%15 �I
100 Streets 16,244,209 3,109,798 1,861,208 _420,000
200 Trails&Walkways 1 197,000 240,000 ; 115,000 40,000
300 Traffic Signals 0 , 0 550,000 0
400 Medians/Parkways 91,599 ± 850,000 ! 316,000 i 52,000 500 Storm Drains 150,000-1 0 1 450,000 800,000
Total _ _ 16,682,808 1 4,199,798 _ 3,292,208 1,312,000
Section FY15/16 i FY16/17 FY17/18 Total
100 Streets _ __ _ 150,000 i 5,000,000_ _
- ---- 000
-----�- 000 �.-------5,000,000_ __ 31,785,215 i
200 Trails& Walkways 40,000 ! 40,000 40,000 1 712,000
300 Traffic Signals 0 t 0 0 550,000 1
400 Medians/Parkways 0 0 I 0 1,309,599 1
500 Storm Drains 01 7,500,000 7,500,000 ! 16,400,000 j
Total j 12,540,000 T 50,756,814
CIP 2011'201 A-1 51161.2012
THIS PAGE LEFT BLANK
INTENTIONALLY
i
1
C,I P "011/2012- A-2 5;•1611,120 1
City of Moorpark
Capital Improvement Program
B. Project Descriptions
Individual project descriptions are set forth in this section. Each project description
includes a location map, a project cost estimate, a proposed schedule, and recommended
funding sources.
It should be noted that there has been no preliminary engineering performed for most of
the projects programmed in future years. The cost estimates provided for those projects
are a rough estimate only and should not be relied upon to predict actual costs. These
estimates were included in the project descriptions in order to provide a general idea of
the total estimated program costs. Individual project cost estimates will be revised as
engineering for each project is developed.
CIP 2011/2012 B-1 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 B-2 5/16/2012
4
Streets
C1P 2011.2012 B-3
5.1&2012
City of Moorpark
Capital Improvement Program
Project Name: Slurry Seal Program Code No.__LO 1_
Account No. 0_0=
Location Map
Various Streets (to be determined)
i
Project Description
Bi-annual Slurry sea/ARAM project. Resurfacing of one-third of the City's streets every other year. Past
Slurry Seal Projects are listed in Appendix `I'. The scope of work often includes the removal and
' replacement of pavement in poor condition, and the application of crack sealer where needed. The next
slurry seal project is scheduled for Summer 2012.
Project Funding Schedule Total Cost: A 4.125.023
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 34,741
R-O-W
Construction 3,536,843 405,435 369,565
Inspection 146,209 1,795 48,205
Total 3,717,793 407,230 417,770 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2603: LTF 2,508,292
2606:HUTA 94,347 363,770
2609:Grant 54,000
2610: Grant 479,323 405,435
2611:Grant 582,628 1,795
2400:Parks 53,203
Total 3,717,793 1 407,230 417,770 0 0 0 0 0 F
1
CIP 21011,'2012 B-4 5"16/20 12
City of Moorpark
Capital Improvement Program
Project Name:.SR 1 I8/Collins Drive Westbound Off-Ramp Improvements and Signal Code No. 102 .
Modification. Account No. 8076 .
Location Map
0
r
fit
PROJECT '
Project Description
This project involves the modification of the westbound SR 118 off-ramp and signal to provide an un-signalized
right turn lane from the westbound SR 118 off-ramp to Collins Drive. This project is partially funded by
Moorpark Community College:
Project Funding Schedule Total Cost: $550,000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 75,000
R-O-W
Construction 475,000
Inspection
Total 0 0 0 75,000 475,000 1 0 1 0 1 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2603:LTF
1000 General
Other Sources 75,000 475,000
Total 0 0 0 75,000 475,000 0 0 0
CIP 2011/2012 B-5 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Walnut Canyon Road.Sidewalk Improvements Code No. 103.
Account No. ----
Location Ma
�a
� c PROJE
e°
Cas R ad N'
Project Description
Construction of additional pavement and a sidewalk on the west side of Walnut Canyon Road, north of
Casey Road. This project'is to be constructed by the developer of Tract 5130.
Project Funding Schedule Total Cost: _ $500.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 500,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 500,000
Developer
Total 0 0 0 500,000 0 0 0 0
CIP 2011/2012 B-6 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Spring Road Widening: Los Angeles Avenue to Flinn Avenue . Code No. 104
Account No. 8026
Location Ma
I T-
li
PROJECT
6LL141 Is
an
a
® ® $
Los Angeles Ave(SR 118)
Project Description
Construction of improvements and modifications to Spring Road, from a point south of Los Angeles
Avenue northerly to Flinn Avenue. This project requires the acquisition of additional street right-of-way,
widening, new curb, gutter and sidewalk along the east side of the street. Ultimate improvements will
include four (4) travel lanes, six foot (6') wide bike lanes, a fourteen foot (14') wide landscaped median
and double left-turn lanes southbound on Spring Road. The project extends south of Los Angeles Avenue
to accommodate a shift of the centerline to the east. The project also includes new signal poles at the
northeast and southeast corners of Los Angeles Avenue and Spring Road.
Project Funding Schedule Total Cost: 1,250,000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 77,778 42,222
R-O-W 273,096 86,904
Construction 44,380 655,620
Inspection 70,000
Total 395,254 854,746 0 0 0 0 0 1 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501:L A AOC 395,254 854,746
Total 395,254 854,746 0 0 0 0 0 0
CIP 2011/2012 B-7 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Princeton Avenue Widening Realignment and Reconstruction Code No. 105
Account No. 8012
Location Map
23 FWv
- as
PROJECT �
— =FWY
Project Description
Widening, realignment and reconstruction of Princeton Avenue from a point east of Spring Road to South
Condor Drive. Additional street right-of-way is being acquired to provide an eighty-eight feet (88') wide
corridor — sufficient to allow for future widening of the road to four lanes. The current project design
provides for only one lane in each direction with a paved median and paved shoulders. The project plans
call for the realignment and reconstruction of the street pavement, the construction of storm drains and the
construction of retaining walls as required.
Project Funding Schedule Total Cost: $4.931.573.
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 769,247
R-O-W 2,061,649 121,422
Construction 29,410 1,849,845
Inspection 100,000
Total 2,860,306 2,071,267 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501:LAOC 2,841,550 984,023
2609:Grant 18,756 1,087,244
Total 2,860,306 2,071,267 0 0 0 0 0 0
CIP 2011/2012 B-8 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Widening: Spring Road to Moorpark Avenue Code No. 106 .
Account No. 8013
Location Map
g l l l l l l l l ICI lei
11 HIM
a `
� a
Los 1 v
rn-
PR T a
Project Description
Widening of Los Angeles Avenue to provide for six (6) travel lanes of traffic. At Spring Road the
centerline will be shifted to the south to avoid acquiring right-of-way from the residential properties along
the north side of the street. The additional right-of-way in this area will be acquired from the south side of
the street. At Moorpark Avenue the additional street right-of-way will be acquired from the north side of
the street. The project includes westbound right-turn lanes at Spring Road and at Moorpark Avenue, and a
new traffic signal at Millard Street.
Project Funding Schedule Total Cost: $3.896,994 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 721,821 15,000 50,000
R-O-W 583,144 1;074,600
Construction 354,876 796,770 203,230
Inspection 4,019 93,534
Total 1,663,860 1,979,904 253,230 0 0 1 0 1 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501:LAAOC 1,663,860 1,183,134 253,230
2604:Grant 796,770
CIP 2011/2012 B-9 5/16/2012
Total 1 1,663,860 1 1,979,904 1 253,230 F-0 1 0 0 0 0
City of Moorpark
Capital Improvement Program
Project Name: Spring Road/Charles Street: Bus Turn-Out Project . Code No. 107
Account No. 8069
Location Map
L�L y
a G
m
o
.a
Charles St
R'RQjEC
Princeton Ave
High St
w
v
3
m
70
a
Project Description
The construction of a bus turn-out on the east side of Spring Road just south of Charles Street. Additional
street right-of-way will have to be acquired in order to implement this project.
Project Funding Schedule Total Cost: $164,216
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 13,968
R-O-W 248 39,000
Construction 0 106,000
Inspection 0 5,000
Total 14,216 0 150,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2001:TSM 14,216 150,000
0
0
Total 14,216 0 150,000 0 0 0 0 0
CIP 2011/2012 B-10 5/16/2012
City of Moorpark
Capital Improvement,Program
Project Name: Los Angeles Avenue Widening at Shasta Avenue Code No. 108 .
Account No. 8058 .
Location Map
rest Ave
OR E-.IIF
Ion Mom A%m
Foo
PROJECT
Project Description
The construction of widening the south side of Los Angeles Avenue between Maureen Lane and Leta
Yancy Road, along the frontage of the vacant property of Tentative Tract 5053 [Pacific Communities]. A
traffic signal Will be constructed at the intersection of Los Angeles Avenue and Shasta Avenue during the
development of Tract 5053 [Pacific Communities]. It is the intent of the City to seek reimbursement from
the developer of Tract 5053 for City costs incurred to implement this project.
Project Funding Schedule Total Cost: $1,200,000.
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 68,876 131,124
R-O-W
Construction 900,000
Inspection 100,000
Total 68,876 1,131,124 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501:L A AOC 68,876 1,131,124
CIP 2011/2012 B-11 5/16/2012
Total 68,876 1 1,131,124 1 0 1 0 1 0 1 0 0 0
City of Moorpark
Capital Improvement Program
Project Name: Underground Utility Projects Code No. 109
Account No. ----
Location Map
Locations to be determined
Project Description
City costs related to the development and implementation of various underground utility projects and/or
formation of Underground Utility Districts for such purpose. Project Codes 110 and 111 describe
immediate future efforts in this regard. This project (#109) has been included in order to program future
"undergrounding" projects, the location and scope of which are to be determined. As projects are
identified,they will be added to the CIP as separate projects.
Project Funding Schedule Total Cost: 10,000,000 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 5,000,000 5,000,000
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined
Undetermined 5,000,000 5,000,000
CIP 2011/2012 B-12 5/16/2012
Total o 0 I o F--o----] o 0 5,000,000 F 5,000,000
City of Moorpark
Capital Improvement Program
Project Name: Underround Utility District No 2 Code No. 110.
Account No. 8051 .
Location Map
P JEC °
9 °
D t Ave .
w
r
Los An eles Ave
g
3
°
Project Description
Establishment and implementation of an underground utility district along Los Angeles Avenue between
Shasta Avenue and Millard Street to underground the high voltage transmission lines and remove all poles
and overhead wires. SCE Rule 20A monies in the approximate amount of$400,000 are not included in the
budget figures shown below.
Project Funding Schedule Total Cost: $ 726,448 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction 240 726,208
Inspection
Total 240 0 0 726,208 0 0 0 0
Funding Sources
Source Prior Yrs FYA 1/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2330:AD 92-1 426,447
2501:LA AOC 240 299,761
Rule 20A
Total 240 0 0 726,208 0 0 0 0
CIP 2011/2012 B-13 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Underground Utilities at the Los Angeles Avenue Bridge Code No. 111.
Account No. 8066
Location Map
9stft s
Pie
Ios
a
�o
e�
PROJECT
Project Description
This is a project to "underground"the overhead utility wires on the north side of Los Angeles Avenue east
and west of the Arroyo Simi Bridge. Currently, project funding via the LA AOC is proposed to be
reimbursed from unexpended funds from the Community Facilities District for the Moorpark Marketplace
project.
Project Funding Schedule Total Cost: _ $430,000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 17,504 104,496
R-O-W
Construction 305,000
Inspection 3,000
Total 17,504 412,496 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501:LA AOC 5,500 412,496
2001:TSM 12,004
Total 17,504 412,496 0 0 0 0 0 0
CIP 2011/2012 B-14 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Rail Road Crossing Improvements at Spring Road . Code No. 112 .
Account No. 8039
Location Map
"-4J CD-
m
�o
a
Princeton Ave
High St
auun�uuuuuumm�uunmminnnunauum unuuWi wxuunnmtm
PROJECT
3
3
Q
Dorothy Ave
CL
Project Description
This project provides for street widening and improvements to the rail crossing by adding a center median
and four(4) crossing gates. The project also includes acquisition of additional street right-of-way and street
widening on the east side of the street between the rail crossing and Princeton Avenue to provide an
additional right-turn lane and bike lanes on both sides of the street.
Project Funding Schedule Total Cost: $3,249,766
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 132,918 66,974
R-O-W 116,848
Construction 2,893,026
Inspection 1 1 40,000
Total 1 249,766 J 3,000,000 1 0 1 0 1 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2603:LTF 127,339
2902:MRA 122,427 173,244
2501:LA AOC 1,726,756
SCRRA 1,100,000
Total 249,766 3,000,000 0 1 0 1 0 0 0 0
CIP 2011/2012 B-15 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Arroyo Drive Overlay . Code No. 113
Account No. 8084
Location Map
Campus Rark Dr
rrr
k _ o
Ufta PROJECT
ze
1.
Project Description
Pavement rehabilitation on Arroyo Drive from Collins Drive to entrance of Villa del Arroyo Mobile Home
Park.
Project Funding Schedule Total Cost: _ $532,000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 5,000
R-O-W
Construction 517,000
Inspection 10,000
Total 0 532,000 0 0 1 0 1 0 1 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2611:Prob 1B 532,000
Total 0 532,000 0 0 0 0 0 0
h
CIP 2011/2012 B-16 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Bus Shelters and Other Bus Stop Improvements Code No. 114 .
Account No. 8071
Location Map.
Various Locations (to be determined)
Project Description
The construction of Bus Stop improvements at various locations. Current year costs are for the relocation
of the bus stop at the Community Center and the installation of five (5) new bus stop shelters at various
locations. Future funding is for other Bus Stop improvements which may be required in the next few years.
Project Funding Schedule Total Cost: _ $350.978
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction 144,562 52,618 153,798
Inspection
Total 144,562 52,618 153,798 1 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
5000 Transit 141,369 52,618 153,798
2601 STA 3,193 .
undetermined
Total 144,562 52,618 153,798 0 0 0 0 0
CIP 2011/2012 B-17 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: North Hills Parkway Code No. 115 .
Account No. 8061
Location Map
IVi�
• rlNiYr� Or 0
PROJECT ��� o ■
i!•
1 S IL i♦■ isi
F � Y
i
i■ ■ I � �J ri
i �i t
}� ■ — Ids 11l4�e
01 W
it ®■ �
f I �� • ids 1� Ii
Project Description
The construction of a new east-west arterial street north of Casey Road. The westerly end of the street is
proposed to connect to Los Angeles Avenue, via a future railroad.undercrossing, at a point west of Butter
Creek Road. Currently, the easterly terminus of this new street will be Spring Road. Segments of this
project will be constructed by developers (Tract 5147, Tract 5130, Tact 5045, Hitch Ranch, and Centex)
and other segments funded by the Citywide Traffic Mitigation Fund.
Project Funding Schedule Total Cost: $2,536.250 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 922,598 1,068,652
R-O-W 242,109 2,891
Construction 300,000
Inspection
Total 1,164,707 1,371,543 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2002:Traf Mit 1,164,707 1,371,543
Total 1,164,707 1,371,543 0 0 0 0 0 0
CIP 2011/2012 B-18 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: High Street Streetscape Code No. 116
Account No. 5056
Location Map
Charles St Charles St
m
-4 Ha m
V
• HIGH ST a
Ninllll Iflll 1111111
CFO!
n111nInmIIIINAIIIIIIIIIINIIIIIIIIImImIIIInnIImlllnnllllllmllnnl111111g11111111111110111111111111111nm1 mlllnnlnnllllnlAlllllnllllmm�lnnlllnmmmllm nlnn m
Project Description
Development of a project to make possible modifications and improvements to the streetscape and parking
along High Street. When and if a project is deemed feasible, further design and construction expenditures
will be budgeted.
Project Funding Schedule Total Cost: $1,012,525 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 12,525 1,000,000
R-O-W
Construction
Inspection
Total 12,525 1,000,000 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2902:MRA 12,525
2905:MRA 1,000,000
Undetermined.
Total 12,525 1,000,000 0 0 0 0 0 0
CIP 2011/2012 B-19 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: 23 FWY North Alignment Code No. 117 .
Account No. 8045.
Location Map
7- T
a�
r
5•
P11J JECT
e
1.
� � a
1
�L
WS
1 -
W
N� C
Project Description
Construction of a roadway north of Princeton Avenue to connect to Broadway. Initial costs are for the
development of design,concepts.
Project Funding Schedule Total Cost: $214.489
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14115 FY 15/16 FY 16/17 FY 17/18
Design 214,489
R-O-W
Construction
Inspection
Total 1 214,489 1 0 1 0 0 0 1 0 1 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2002:Trf.Mit. 214,489
Undetermined
Total 214,489 0 0 0 0 0 0 0
a
CIP 2011/2012 B-20 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: SR 23 FWY Soundwalls at Tierra Rejada Road Code No. 118 .
Account No. 8079
Location Map
.,SCI TY OF MOORPAR
III % r/ 99T5
UH I
�`
lY RM —I - i PROPOSED NORTHERN WALL
MA
ESL S Y,NO xr
-t--J. :.f
II
-- ._
a�
PROPOSEd SOUTHERN WALL
II �
Project Description
Construction of freeway sound walls adjacent to the homes on Crab Apple Court at the eastern boundary of
Tract 4975 (Toscana at Serenata) within the Carlsberg Specific Plan area, bordering the wet side of the SR-
23 Freeway
Project Funding Schedule Total Cost: $2.100.000 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 363,519 36,481
R-O-W
Construction 1,600,000
Inspection 100,000
Total 363,519 1,736,481 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Carlsberg Mit 363,519 1,736,481
Fund
Total 363,519 1,736,481 1 0 1 0 .0 0 0 0
CIP 2011/2012 B-21 5/16/2012
City of Moorpark
Capital Improvement Program -
Project Name: Metrolink South Parking Lot South Entry Code No. 119
Account No. 8056 .
Location Map
LLIL
a High St
a
g
MetrollnklAmtrak Station
PROJECT I
Po' Ave
First St as
m
Project Description
Relocation of the entry to the south Metrolink parking lot to a point on First Street east of Moorpark
Avenue.
Project Funding Schedule Total Cost: _ $1,489,095 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 35,050
R-O-W 625,000 410,000
Construction 404,045
Inspection 1 15,000
Total 660,050 829,045 0 1 0 1 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2001:TSM 321,067 166,250
2603:LTF 33,983
2604:CMAQ 120,000 462,795
4004: Special 185,000
5000:TDA 200,000
Total 1 660,050 829,045 0 0 0 0 0 1 0
,
CIP 2011/2012 B-22 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Gabbert Road Rail Crossing Improvements Code No. 120
Account No. ----
Location Map
PROJECT
Nlnnnnnmlumuln
1101100,010minnNl Ave
NIINIII IIINI INIINIIIIIIIIIINIININNIIIININN
Pd
INromNn11Nn110NO o
unN�InmNluuel a
mnnmlunln��INn � �
Ir
a
Project Description
The construction of the street widening and related improvements on Gabbert Road at the rail crossing will
be undertaken by AB Properties (Tract 5147) per the conditions of their Tract Map and Development
Agreement requirements. There will be no City funds used for the construction of these improvements. The
project is shown here in order to identify projects which are implementing components of the Circulation
Element of the General Plan.
Project Funding Schedule Total Cost: _ Developer
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Developer
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-23 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: High Street West Code No. 121
Account No. ----
Location Map
PROJEC o
O
� R
HIGH ST
�nm nniunaammnmm un u�iamiamm�ua�nmmmmmmmm� ens UUMMI llimmmilIMMMIlONUMIMIMMffdMMIMIMN
SAR.R.
Project Description
Widening, realignment, and reconstruction of High Street west of Moorpark Avenue. The scope of work
would include a study to determine the precise alignment of this roadway project, as well,as the westerly
extension of the project to serve the properties in this area(Hitch Ranch).
Project Funding Schedule Total Cost: $430,000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 30,000
R-O-W 80,000
Construction 300,000
Inspection 20,000
Total 0 0 0 110,000 320,000 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 110,000 320,000
Total 0 0 0 110,000 320,000 0 0 0
CIP 2011/2012 B-24 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Alderbrook Street Asphalt Overlay Code No._1
Account No. 8091_
Location Map
0
PROJECT
r94pG3
Project Description
Pavement rehabilitation on Alderbrook Street from Honeybrook Court to Rivergrove Court.
Project Funding Schedule Total Cost: 290.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15116 FY 16/17 FY 17/18
Design 15,000
R-O-W
Construction 240,000
Inspection 35,000
Total 0 0 290,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2606:14UTA 290,000
Total 0> 0 290,000 0 0 0 0
0
= C:IP 2011,12012' B-25 5/1 6/201'
City of Moorpark
Capital Improvement Program
Project Name: Railroad Crossing IWrovements at Arroyo Drive . Code No. 123
Account No. ----
Location Map
PW
U or
irk
WL
U10 PROJECT
i
avli3iizf�rr° 1„ 118
NAM
•�. .. Vii~ �,.
Project Description
The construction of street widening and other improvements on Arroyo Drive at the railroad crossing east
of Collins Drive. PUC and Caltrans has proposed funding through Section 130 for this project.
Project Funding Schedule Total Cost:_ 1,000.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 1 0 1 0 1 1,000,000 1 0 1 0 1 0 1 ()--+-o
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 1,000,000
Total 0 0 1,000,000 0 0 0 0 0
CIf' 2011:'2012 B-26 5/16/2012 :
City of Moorpark
Capital Improvement Program
Project Name: Moorpark Avenue Widening Project Code No. 124
Account No. 8040 .
Location Map
'T
PTT
LiL
I �
PROJECT SITE
i
Project Description
Widening of Moorpark Avenue to add a southbound lane along the west side from Casey Road to Third
Street. Includes street realignment at First Street and Poindexter Avenue (Prior Project 8057) and rail
crossing improvements(Prior Project 8038). Prior year appropriations for those projects have been returned
to funding sources.
Project Funding Schedule Total Cost: $1,740,620.
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 262,920 365,755
R-O-W 655,237 300,000
Construction 156,708
Inspection
Total 1,074,865 665,755 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2002:TM Fund 134,245 665,755
2501:LAOC 156,708
2902:MRA 783,912
Total 1,074,865 665,755 0 0 0 0 0 0
CIP 2011/2012 B-27 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Lengthen Curb Radii at Designated Intersections on L A Avenue Code No. 125 .
Account No. ----
Location Map
Locations to be Determined
Project Description
This project constructs modifications to existing improvements on major arterials, including the State
Highways,to lengthen the curb radii at certain corners to facilitate turning movements and ease congestion.
Project Funding Schedule Total Cost: _$300.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 50,000
R-O-W 100,000
Construction 150,000
Inspection
Total 0 0 0 50,000 100,000 150,000 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 50,000 100,000 150,000
Total 0 0 0 50,000 100,000 150,000 0 0 ,
CIP 2011/2012 B-28 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Widening West of Tierra Rejada Road Code No. 126
Account No. ----
Location Map
Los Anueles (SR1 181
e �
a
�o
e
PROJECT
Project Description
The construction of street widening on Los Angeles Avenue west of Tierra Rejada Road, as a function of
the development of property in this area. This project is proposed to be funded by development. It is
shown here to reflect implementation of the Circulation Element of the Moorpark General Plan.
Project Funding Schedule Total Cost: _ Developer .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-29 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Casey Road Westerly Extension Code No. 127 .
Account No. ----
Location Map
PROJECT
Cr
g
Project Description
The Circulation Element of the Moorpark General Plan calls for the westerly extension of Casey Road to
connect to Gabbert Road. This future project is to be constructed by developers.
Project Funding Schedule Total Cost: Developer
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Developer
Funded
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-30 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Moorpark Avenue Left Turn Lane Code No. 128
Account No. 8087
Location Map
RLES STREET ---
MOOR ARK i
AN E l'
1 r
jl
11
i�
I
HIGH STREET
PROJECT
NORTH � I
Project Description
Dedicate left-turn lane on northbound Moorpark Avenue at High Street. Also includes improvements at
the southwest corner to improve turning movements.
Project Funding Schedule Total Cost: $ 200.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 25,000
R-O-W 150,000
Construction 25,000
Inspection
Total 0 200,000 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501:LA AOC 200,000
Total 0 200,000 0 0 0 0 0 0
CIP 2011/2012 B-31 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Asphalt Overlay on Sprnng Road Princeton Avenue Poindexter Avenue .Code No. 129
Account No.
Location Map
Q" pare
2
Project 0
111JJJ limits O
Project
Limits
Project
Limits
ve Con or r
Project Description
Pavement rehabilitation on Spring Road (Tierra Rejada Road to Monte Vista Nature Park); Princeton
Avenue (Condor Drive to Campus Park Drive); and Poindexter Avenue (Endeavor Court to Gabbert Road)
Project Funding Schedule Total Cost: $ 770.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 50,000
R-O-W
Construction 670,000
Inspection 50,000
Total 0 0 770,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2604: Grant 637,416
Undetermined 132,584
Total 0 0 770,000 0 0 0 0 0
CIP 2011/2012 B-32 5/16/20.12
e
Trails & Walkways
CIP 2011/2012 B-33 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Sidewalk Reconstruction Project Code No. 201
Account No. 8001
Location Map
Various Locations (to be determined)
Project Description
Replacement of sidewalks, curbs, and gutter at various locations. Recurring project each fiscal year with an
estimated cost of$50,000/Year.
Project Funding Schedule Total Cost: $305,084
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction 280,084 25,000
Inspection
Total 280,084 25,000 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2605:Gas Tax 280,084 25,000
Total 280,084 --25,000 0 0 0 0 0 0
6
CIP 2011/2012 B-34 5/16/2012
Y
City of Moorpark
Capital Improvement Program
Project Name: Bicycle/Pedestrian Facility Improvement Project Code No. 202
Account No. ----
Location Map
The Location of Future Projects
To Be Determined
Project Description
The construction of bicycle and/or pedestrian facility improvements, partially funded by a TDA Article 3
State grant [SB-821]. As projects are approved and added to the Budget, a new project will be added to the
CIP.
Project Funding Schedule Total Cost: $280.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction 40,000 40,000 40,000 40,000 40,000 40,000 40,000
Inspection
Total 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000
Funding Sources
Source Prior Yrs FY 11112 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2603:LTF 20,000 20,000 20,000 20,000 20,000 20,000 20,000
2602:TDA-3 20,000 20,000 20,000 20,000 20,000 20,000 20,000
Total 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000
CIP 2011/2012 B-35 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Arroyo Trail Bridge Ramp Project Code No. 203
Account No. 8035
Location Ma
MOORP RK
ME
-
a i
i `vim ARK
9 021 9302
film-4
i I
Project Description
Prior Year costs are for the Arroyo Simi Trail Study. That study evaluated options for the possible future
development of a trail system, generally along the levee road of the Arroyo Simi, from the westerly City
Limit easterly to Madera Road in the City of Simi Valley. Future expenses are for projects to implement
segments of that system. Ramps at the Spring Road bridge are included in the design for the channel
improvements planned by the Ventura County Watershed Protection District.
Project Funding Schedule Total Cost: $150.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17118
Design 150,000
R-O-W
Construction
Inspection
Total 1 150,000 1 0 0 1 0 1 0 1 0 0 0
Funding Sources
Source Prior Yrs FY.11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18.
2001:TSM 0
2603:LTF 30,000
2604:CMAQ 120,000
Undetermined.
Total 150,000 0 0 1 0 1 0 1 0 0 0
CIP 2011/2012 B-36 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Drain No.:2 Trail Code No. 204
Account No. 8059
Location Map
Campus Paris Or
/r B
'"t c is PROJECT.
. �i1LD N
�NII►
118
dIIAMP
- W I M hlt
Project Description
This project is to provide for the construction of a trail extending from the east end of Campus Park Drive,
across the watercourse referred to Drain No. 2, then south under the freeway through an existing access
tunnel to Los Angeles Avenue. Prior year costs were for the development of a feasibility study to determine
access and design requirements. Review and finalization of the study has been placed on hold. Future costs
are for the acquisition of those access rights,preparation of the design and construction of the project. Cost
estimates for this project have not yet been developed and the funding for future year projects has not yet
been determined.
Project Funding Schedule Total Cost: $28,554
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 28,554
R-O-W
Construction
Inspection
Total 28,554 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2001:TSM 28,554
Undetermined
Total 28,554 0 0 0 0 0 0 0
CIP 2011/2012 B-37 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Sidewalk&Bicycle Lane at AVRC Code No. 205
Account No. 8086 .
Location Map
LIM
M �Yrd�
r Mr,
-� Arroyo
Simi
' Project Site
ARROYO VISTA-
COMMUNITY
PARK
North
Project Description
Build a 1,200 foot sidewalk and bicycle path connecting Arroyo Vista Recreation Center's existing sidewalk
to the Pedestrian Bridge.
Project Funding Schedule Total Cost: $132.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 6,000
R-O-W
Construction 120,000
Inspection 1 6,000
Total 0 132,000 0 1 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2001:TSM 66,000
2602:TDA 66,000 ,
Total 0 132,000 0 0 0 0 0 0
CIP 2011/2012 B-38 5/16/2012
City of Moorpark
Capital Improvement Program -
Project Name: Walnut Canyon Road Westside Championship Drive to Peter's Driveway. Code No. 206
Account No. ----
Location Map
CHAMPIONSHIP DRIVE � ti
4
Project Site
y SPRING
-ROAD
1
�—
Project Description
Construct a five (5) foot P.C.C. sidewalk from Championship Drive to Peter's driveway along the existing
multi-purpose trail.
Project Funding Schedule Total Cost: $75.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction 75,000
Inspection
Total 0 0 0 75,000 0 0 0 1 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2001:TSM 75,000
Total 0 0 0 75,000 0 0 0 0
CIP 2011/2012 B-39 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Civic Center Pedestrian Access and Bus Stop Improvement Code No. 207
Account No. ----
Location Map
Case oa icks Roa
Moorpark Ave Everett Street
Civic Center
Charles Street
W nut Street
PROJECT
Project Description
Construct sidewalk, bus turn-out with shelter, and ADA ramps connecting the library to the Active Adult and
Community Center.
Project Funding Schedule Total Cost: 200.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 15,000
R-O-W 0
Construction 178,000
Inspection 7,000
Total 0 0 1 200,000 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2602:Art 3 100,000
5000:Art 8C 20,000
2001:TSM 80,000
Total 0 0 200,000 0 0 0 0 0
CIP 2011/2012 B-40 5/16/2012
A
Traffic Signals
CIP 2011/2012 B-41 5/16/2012
City of Moorpark
Capital Improvement.Program
Project Name: Code No. 301
Account No. ----
Location Map
Not Assigned
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 1 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermine
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-42 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Traffic Signal: Los Angeles Avenue and Shasta Avenue Code No. 302
Account No. 8058
Location Map
CL o w
z
m �
Eve t Ave
e
Los Angeles Ave(SRI 18)
m
PROJECT
CL
Project Description
Developer for Pacific Communities (TR5053) to construct the traffic signal at the intersection of Los
Angeles Avenue and Shasta Avenue.
Project Funding Schedule Total Cost: Developer
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Developer
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-43 5/16/2012
City of Moorpark
Capital Improvement.Program
Project Name: SR 118/Collins Drive Eastbound On/Off-Ramer Signalization and Striping Code No. 303
Modification. Account No. 8077 .
Location Map
rIt its
r�
R'ROWE-01
r?
rv,r
1ri�
i;
Project Description
This project involves signalizing the eastbound SR 118 on/off-ramps intersection and converting the
westbound through lane to a westbound through lane and a right turn lane, modifying the striping to provide
two left turn lanes from the off ramp to northbound Collins Drive if feasible. This project is partially funded
by Moorpark Community College
Project Funding Schedule Total Cost: $550.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 25,000
R-O-W
Construction 500,000
Inspection 25,000
Total 0 0 0 550,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2001:TSM
2501:LA AOC
2604:CMAQ
Other Sources 550,000
Total 0 0 0 550,000 0 1 0 1 0 0
CIP 2011/2012 B-44 5/16/2012
City of Moorpark
Capitat Improvement Program
Project Name: Code No. 304 .
Account No- -----
Not Assigned
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15116 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 1 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Fund 4000
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-45 5/16/2012
City of Moorpark -
Capital Improvement Program
Project Name: Traffic Signal: Los Angeles Avenue and Millard Street Code No. 305
Account No. 8013
Location Map
3
0 s n Ct
s
Los Angeles Ave (SRI 18)
8
P ROJ C """'8"d o
a
Project Description
The Los Angeles Avenue Widening Project between Moorpark Avenue and Spring Road [Project 106]
includes the construction of a traffic signal at the intersection of Los Angeles Avenue and Millard Street.
This project will be partially funded by the developer of property south of the intersection [Shea Homes —
Tentative Tract 5133].
Project Funding Schedule Total Cost: See# 106
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Fund 2501
Fund 2604
Total 0 0 0 0 0 0 0 0
L CIP 2011/2012 B-46 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Traffic Signal: Los Angeles Avenue West of Butter Creek Road Code No. 306
Account No. 8061
Location Map
WON
� �j�11sp
PROJECT now —•
WON
El ..._
OM
MINN
+ u s i
.. ME
NEW r 4
rlll IW i tw■
R.W Mar WINE
rIr
MM
3 NI ABM ` 111 !` ...r ON ��•
oil
Liar ■r �.
Project Description
This project is for the construction of a traffic signal at the future intersection of Los Angeles Avenue and
the westerly terminus of the North Hills Parkway [see Project 115].
Project Funding Schedule Total Cost: See#115
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 1 0 1 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-47 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 B-48 5/16/2012
L
Medians & Parkways
CIF 2011/2012 B-49 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Los Angeles Avenue Medians Code No. 401
Account No. 8047
Location Map
IRON
irr• a
� wr..
rA �� .•,rr
IN
! ! ...
NON ON
}� �■ ! ...
zz ,.
LOS ANGELES '• •�• __- �� -
r..r
�• PRO
Project Description
The construction of raised landscaped medians on Los Angeles Avenue (SR-118), from the SR-23 freeway
westerly to Tierra Rejada Road. Phase 1 will include that area east of Spring Road to the SR-23.
Project Funding Schedule Total Cost: $1,103,491 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 211,892 91,599
R-O-W
Construction 750,000
Inspection 1 50,000
Total 211,892 91,599 800,000 1 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2501: L A AOC 211,892 91,599 800,000
Total 211,892 91,599 800,000 0 0 0 0 0
CIP 2011/2012 B-50 5/16/2012
4
City of Moorpark
Capital Improvement Program
Project Name: Medians: Spring Road Code No. 402
Account No. 8026
Location Map
nnm
A
® c
CL
a)
PROJECT
OWN
Las Angeles Ave(SRM)
Project Description
The Spring Road Widening Project [Project 104] includes the construction of raised, landscaped medians
between Los Angeles Avenue and Flinn Avenue.
Project Funding Schedule Total Cost: See No. 104
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Fund 2501
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-51 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Code No. 403
Account No.
Location Map
Not Assigned.
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2502: STR AOC
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-52 5/16/2012
y
City of Moorpark
Capital Improvement Program
Project Name: Poindexter Avenue parkways Code No. 404
Account No. 8048
Location Map
�a
d°r
PROJECT Ui ion Pacff c SCRRA -�
n
NIIIIIIIIIIIIIiII IIIIIIN�uNINI NNIa1111NNII11N1 IIIIIIINIIIIIINIIUi1111NNN1 II Ia11n111H i11NII1111N111N11 nIIINBIII
lmuu'N'N'manmu�lnlu o
n11uu p,Ve
r
11111 IIIIIIIIIIIIIIIIINIIIIIIIIIIIIN Pointe � <
Project Description
The installation of trees and shrubs, with irrigation, along the north side of the street east of Gabbert Road,
on railroad property. This project will require the approval by the Southern California Regional Rail
Authority [SCRRA] for the easterly portion, and the Union Pacific Railroad [UP] for the westerly portion.
A funding source for future maintenance costs has not yet been determined.
Project Funding Schedule Total Cost: _ $115.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 10,000
R-O-W
Construction 100,000
Inspection 1 5,000
Total 0 0 0 115,000 1 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2150:Trees 115,000
Total 0 0 0 115,000 0 0 0 0
CIP 2011/2012 B-53 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Freeway Landscaping at the Tierra Rejada Road Interchange Code No. 405
Account No. ----
Location Map
`• Ii�r
1 � •
PROJECT
�ss
r
Project Description
This project calls for the installation of irrigation and landscaping within the on/off ramp areas at the Tierra
Rejada Road / State Route 23 Freeway interchange. This project will require a Cooperative Agreement
with Caltrans related to City funding of both construction and future maintenance of this landscaping. A
project cost estimate has not yet been developed and the funding source has not yet been determined. In
2008, the City funded the planting of over 100 oak trees in the ramp areas during the SR-23 Freeway
Widening project.
Project Funding Schedule Total Cost: $296,281
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W 50,000
Construction 46,281 200,000
Inspection
Total 46,281 0 50,000 1 200,000 1 0 1 0 1 0 1 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 50,000 200,000
2150 trees 46,281
Total 46,281 0 50,000 200,000 0 0 0 0
R
E 2012 B-54 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Code No. 406
Account No. ----
Location Map
Not Assigned.
Project Description
Project Funding Schedule Total Cost: $
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 1 0 1 0 1 0 1 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undet.
Undetermined
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-55 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Code No. 407
Account No. ----
Location Map
Not Assigned
Project Description
Project Funding Schedule Total Cost:
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-56 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Peach Hill Parkways Code No. 408 .
Account No. ----
Location Map
s
IZ6ACT
qa A
Bodega PI ` Silver Oak Ln
c � �
io 0
Peach Hill Rd m
77 mill 1 02 "
70
1717 7 7 7 7 71717 7 T 7 7
Laurelhurst Rd a C:�� C F
Project Description
Installation of Parkway Landscaping on both sides of the "east-west" segment of Peach Hill Road between
Mesa Verde Drive and Rolling Knoll Road.
Project Funding Schedule Total Cost: $53.000 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16117 FY 17/18
Design 1,000
R-O-W
Construction 50,000
Inspection 2,000
Total 0 0 0 1,000 52,000 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 1,000 52,000
Total 0 0 0 1,000 52,000 0 0 0
CIP 2011/2012 B-57 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 B-58 5/16/2012
Storm Drains
CIP 2011/2012 B-59 5/16/2012
City of Moorpark
Capital Improvement Program -
Project Name: Master Plan of Drainage Update Code No. 501
Account No. 8088
Location Map
Entire City
Project Description
This project is to prepare an update to the 1995 Citywide Master Plan of Drainage. This project will be
undertaken upon completion of the Letter of Map Revisions to the Digital Flood Insurance Rate Maps.
Project Funding Schedule Total Cost: _ $150,000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 150,000
R-O-W
Construction
Inspection
Total 0 150,000 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
2800: 150,000
Endowment
Total 0 150,000 0 0 0 0 1 0 0
CIP 2011/2012 B-60 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Gabbert Canyon/Walnut CM on n Improvements Code No. 502
Account No. ----
Location Map
walnut��•
Canyon ■
MEL Drain �.�..
It
IN
•
• M W
• • • •� � _.tea ���
• f
•
Gabbert ! .ate i �•
:,,,,.,,Canyon
i r• �"
Drain i `+
• � rr
r r r
Project Description
The existing Ventura County Watershed Protection District [VCWPD] facilities within the Gabbert Canyon
and Walnut Creek watersheds are inadequate. This project calls for the construction of new detention,
diversion and capacity enhancement improvements to those existing facilities. The 2006 cost estimate for
those improvements was estimated to be $12,000,000 plus financing costs. No implementation or
financing plan has yet been developed. Some of the required improvements have been, or are planned to
be, constructed by land development projects within this watershed.
Project Funding Schedule Total Cost: $15.000,000 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Ins ection
Total 0 0 0 0 0 1 0 7,500,000 7,500,000
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 7,500,000 7,500,000
Total 0 0 0 0 0 0 7,500,000 7,500,000
CIP 2011/2012 B-61 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Shasta Drain Code No. 503
Account No. ----
Location Map
l—1 I I I 1
ar
9
•
•
at
■
■
■
■
■
■
■
■
■
■ EXMPU Urnin ••• •
■
■ Pro �■■■■
rest
■
A
•
• Los Angeles Ave(SRI 18)
Project Description
Construction of a storm drain to serve the residential area north of the intersection of Los Angeles Avenue
and Shasta Avenue, as identified in the City's Master Plan of Drainage. No funding source has been
identified for this project. The 1995 cost estimate for this project was $188,000. However, the full scope
and cost of this project has never been determined.
Project Funding Schedule Total Cost: _ $800.000 .
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 800,000 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 800,000
Total 0 0 0 0 800,000 0 0 0
CIP 2011/2012 B-62 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Millard Drain Code No. 504
Account No. 8065
Location Map
■
■
■
Existing Drain: • • • • Esther Ave
c Prolect:■ ■ ■ ■
■
■
■
■ Sherman Ave
Moonsong Ct ■
■
■
Los Angeles Ave(SR118) •
•
Project Description
Construction of a storm drain similar in function to that identified in the City's Master Plan of Drainage as
the "Freemont Drain", located north of the intersection of Los Angeles Avenue and Millard Street. The
current design concept for this project anticipates a storm drain running easterly along the north side of Los
Angeles Avenue from the existing Los Angeles Avenue culvert to Millard Street, and then northerly along
the east side of Millard Street for a short distance.
Project Funding Schedule Total Cost: $250.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design 25,000
R-O-W
Construction 200,000
Inspection 1 25,000
Total 0 0 1 0 1 250,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 250,000
Total 0 0 0 250,000 0 0 0 0
CIP 2011/2012 B-63 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Villa Del Arroyo Drain Code No: 505
Account No. ----
Location Map
lWL J r a
�■IIE
� I � •
t�ane�z*;Drain- - - wr
To bs dobraanidl t
Simi
.. `°�_ ' � '•. fir = w-�-a; ..� �''�_,
Project Description
There is a culvert under Arroyo Drive at the entrance to the Villa Del Arroyo Mobile Home Park, which
connects to a storm drain pipe owned by the Mobile Home Park. This"private"drain line extends southerly
to the arroyo. It has been determined that the function of that storm drain is impaired and that remedial
action must be taken in order to provide adequate drainage for both the_City street and the Mobile Home
Park. Consistent with the provisions of a Settlement Agreement between the City and the Mobile Home
Park,the property owner is required to take corrective action to remedy this problem.
Project Funding Schedule Total Cost: By Property Owner
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17118
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Total 0 0 0 0 0 0 0 0
F
JLCIP011/2012 B-64 5/16/2012
City of Moorpark
Capital Improvement Program
Project Name: Miscellaneous Drainage Improvements Code No. 506
Account No. ----
Location Map
Location of Improvements To Be Determined
Project Description
This project is for the construction of miscellaneous drainage improvements, throughout the City, as
required.
Project Funding Schedule Total Cost: $200.000
Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 200,000 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Undetermined 200,000
Total 0 0 0 200,000 0 0 0 0
CIP 2011/2012 B-65 5/16/2012
City of Moorpark
Capital Improvement.Program
Project Name: Arroyo Simi Channel Improvements Code No. 507
Account No. ----
Location Map
Arro o Simi Pro'ect
W
Project Description
A number of projects, to be undertaken by the Ventura County Watershed Protection Agency, to construct
improvements to the Arroyo Simi to render it capable of containing flows from a 100 year storm event, in a
manner satisfactory to the Federal Emergency Management Agency [FEMA]. When those projects are
completed, revisions to the FEMA flood zone maps will be processed to remove as many areas as possible
from flood zones.
Project Funding Schedule Total Cost: by VCWPD .
Prior Yrs FY 11/12 -FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Design
R-O-W
Construction
Inspection
Total 0 0 0 0 0 0 0 0
Funding Sources
Source Prior Yrs FY 11/12 I FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
Total 0 0 0 0 0 0 0 0
CIP 2011/2012 B-66 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 B-67 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 B-68 5/16/2012
City of Moorpark
Capital Improvement Program
C. Program Expenditure Summaries
• Total Program Project Costs: Listed By Fiscal Year C-3
• FY 2011/12 Total: Spread to Funding Source C-7
• Total Program [All Seven Years}: Spread to Funding Sources C-11
CIP 2011/2012 C-1 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 C-2 5/16/2012
Total Program Project Costs
Listed by Fiscal Year
CIP 2011/2012 C-3 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 . C-4 5/16/2012
i
C Program Summary Page C-5
Account Prior FY 11/12-FY 17/18
Code Project Name Number Year; FY 11/12 FY INN FY 13/141 FY 14/15 FY 15/16 FY 16/I7 FY 17/18 Total
Street bWovements
101 Slurry Seal 8002 3,717,793 407XM 417,770 0' 0 0 0 0 825,000
102 SRI INDIfins DrRatttp/Sig Mod 8076 0 0 75,000 475,000: 0 0 0 0 550,000
103 Walnut Canyon Rd S/W Imp -- 0 0 0 500,000 0 0 0 0 500,000
104 Spring Rd Widening 8026 395,254 854,746 0 0 0 0 0 0 854,746
105 Princeton Ave.Widening 8012 2,860,306 2,071,267 0 0 0 0 0 0 2,071,267
106 LA Ave: Spg to Mpk 8013 1,663,860 1,979,904 253,230 0 0 0 0 0 2,233,134
107 Sprg/Charles Bus Turnout 8069 14,216 0 150,000 0; 0 0 0 0 150,000
108 LA Ave:Shasta 8058 68,876 1,131,124 0 0 0 0 0 0 1,131,124
109 Underground Utilities - 0 0 0 0 0 0 5,000,000 5,000,000 10,000,000
110 LA Ave Transnession Lines 8051 240 0 0 726,208 0 0 0 0 726,208
111 Undrgrnd QN LA Brg 8066 17,504 412,496 0 0 0 0 0 412,4%
112 Rail Xing:Spring Rd 8039 249,766 3,000,000 0 0 0 0 0 0 3,000,000
113 Arroyo Drive Overlay 8084 0 532,000 0 0 0 0 0 0 532,000
114 Bus Shelterlmprovements 8071 144,562 52,618 153,798 01 0 0 0 0 206,416
115 North Llrlls Parkway 8061 1,164,707 1,371,543 0 0 0 0 0 0 071,543
1.16 High Street Streetscape 5056 12,525 1,000,000 0 0 0 0 0 0 1,000,000
117 North FadensionofSR23 8045 .214,489 0 0 0 0 0 0 0 0
118 SR23 FWY Sound Walls TRRd 8079 363,519 1,736,481 0 0 0 0 0 0 1,736,481
119 Metrolink S.Parking Lot S.Fntry 8056 660,050 829,045 0 0 0 0 0 0 829,045
120 Cabbert Rd.Rail}Gng - 0 0 0 0 0 0 0 0 0
121 Hrgh Street West Reconstrcution 0 0 0 110,000 320,000 0 0 0 430,000
122 Alderbrook Street Asphalt Overlay 8091 0 0 290,000 01 0 0 0 0 290,000
123 Rail Road Xing hT at Arroyo Dr. - 0 0 1,000,000 01 0 0 0 0 1,000,000
124 Moorpark Ave Widening Project 8040 1,074,865 665,755 0 0 0 0 0 0 665,755
125 Lengthen Curb Radii - 0 0 0 50,000 100,000 150,000 0 0 300,000
126 LA Ave Widening W/OT:R.Rd - 0 0 0 0 0 0 0 0 0
127 Casey Rd Fatension 0 0 0 0 0 0 0 0 0
128 Moorpark Avenue Left Turn Lane 8087 0 200,000 0 0 0 0 0 0 200,000
129 Overlay Spring,Princeton,&Poindexer 0 0 770,000 0 0 0 0 0 770,000
Sub-Total 12,622,532 16,244,209 3,109,798 1,861,208 420,000 150,000 5,000,000 5,000,000 31,785,215
Trails&Walkways
201 Sidewalks 8001 280,084 25,000 0 01 0 0 0 0 25,000
202 Ped/Bicycle Project 0 40,000 40,000 40,0001 40,000 40,000 40,000 40,000 280,000
203 Arroyo Trag 8035 150,000 0 0 0 0 0 0 0 0
204 Drain#2 Trail 8059 28,544 0 0 01 0 0 0 0 0
205 Sidewalk&Bicycle Lane at AVRC 8086 0 132,000 0 0 0 0 0 0 132,000
206 Peter's Driveway 8086 0 0 0 75,000, 0 0 0 0
207 Civic Center Ped Access&Bus Irrrp 0 0 200,000 0; 0 0 0
Sub-Total 458,628 197,000 240,000 115,0001 40,000 40,000 40,000 40,000 712,000
c C1P2011:-?012 C-5 5t16/G012
i ® ,
C.Program Summary Page C-5
Account Prior FY 1I/12-FY l7/18
Code Project Name Number Years FY 11/12 FY 12113 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 Total
Street improwments
101 Slurry Seal 8002 3,717,793 407,230 417,770 0 0 0 0 0 825,000
102 SRI I S/Collins Dr Ramp/Sig Mod 8076 0 0 75,000 475,000 j 0 0 0 0 550,000
103 Walnut Canyon Rd S/W Irm - 0 0 0 500,000 0 0 0 0 500,000
104 Spring Rd Widening 8026 395,254 854,746 0 0 0 0 0 0 854,746
105 Princeton Ave.Widening 8012 2,860,306 2,071,267 0 0 0 0 0 0 2,071,267
106 LA Ave: Spg to Mpk 8013 1,663,860 1,979,904 253,230 0 ' 0 0 0 0 2,233,134
107 Sprg/Charles Bus Turnout 8069 14,216 0 150,000 0 0 0 0 0 150,000
108 LA Ave:Shasta 8058 68,876 1,131,124 0 0 0 0 0 0 1,131,124
109 Underground Utilities - 0 0 0 0 0 0 5,000,000 5,000,000 10,000,000
110 L A Ave Transmission Lines 8051 240 0 0 726,208 0 0 0 0 726,208
III Undrgmd®N L A Brg 8066 17,504 412,496 0 0 0 0 0 412,496
112 Rail Xing:Spring Rd 8039 249,766 3,000,000 0 0 I 0 0 0 0 3,000,000 `
113 Arroyo Drive Overlay 8084 0 532,000 0 01 0 0 0 0 532,000
114 Bus Shelterhnprovements 8071 144,562 52,618 153,798 0 0 0 0 0 206,416
115 North Hills Parkway 8061 1,164,707 1,371,543 0 0 0 0 0 0 1,371,543
116 High Street Streetscape 5056 12,525 1,000,000 0 0! 0 0 0 0 1,000,000
117 North Bdension of SR 23 8045 214,489 0 0 01 0 0 0 0 0
118 SR23FWYSoundWallsTRRd 8079 363,519 1,736,481 0 0 0 0 0 0 1,736,481
119 Metrolink S.Parting Lot S.Entry 8056 660,050 829,045 0 0 0 0 0 0 829,045
120 Gabbert Rd.Rail Xing - 0 0 0 0 0 0 0 0 0
121 High Street West Reconstrcution - 0 0 0 110,0001 320,000 0 0 0 430,000
122 Alderbrook Street Asphalt Overlay 8091 0 0 290,000 0 0 0 0 0 290,000
123 Rail Road Xing Irnp at Arroyo Dr. - 0 0 11000,000 0 0 0 0 0 1,000,000
124 MoorparkAve Widening Project 8040 1,074,865 665,755 0 01 0 0 0 0 665,755
125 Lengthen Curb Radii - 0 0 0 50,000 100,000 150,000 0 0 300,000
126 L A Ave Widening W/O T.R Rd - 0 0 0 0 0 0 0 0 0
127 Casey Rd Extension - 0 0 0 0 0 0 0 0 0
128 Moorpark Avenue Left Turn Lane 8087 0 200,000 0 0 0 0 0 0 200,000
129 Overlay Spring,Princeton,&PoindeAer 0 0 770,000 0 0 0 0 0 770,000
Sub-Total 12,622,532 16,244,209 3,109,798 1,861,2081 420,000 150,000 5,000,000 51000,000 31,785,215
Trails&Walkvtays
201 Sidewalks 8001 280,084 25,000 0 0'; 0 0 0 0 25,000
202 Ped/Bicycle Project - 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000 280,000
203 Arroyo Trail 8035 150,000 0 0 01 0 0 0 0 0
204 Drain#2 Trail 8059 - 28,544 0 0 0i 0 0 0 0 0
205 Sidewalk&Bicycle Lane at AVRC 8086 0 132,000 0 01 0 0 0 0 132,000
206 Peter's Driveway 8086 .0 0 0 75,0001 0 0 0 0
207 Civic Center Ped Access&Bus Imp 0 0 200,000 01 0 0 0
Sub-Total 458,628 197,000 240,000 115,0001 40,000 40,000 40,000 40,000 712,000
i?t:312
(:'111201 1 C-5 x/16/1-012
FY 2011/12 Total Project Costs
Spread to Funding Sources
CIP 2011/2012 C-7 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 C-8 5/16/2012
2011112 to 2017M 8 Capital Improvement Program
FY2011112 Funding Sources
Account 1000 2000 2001 2002 2150 2501 2502 2602
Code Project Name Number General Fund Traf Saw. TSM Traf Mitigiation Trees L A AOC §TR AOC TDA Art 3
Streets&Trails
101 Slurry Seal 8002
102 SRIle/Colrms Or Ramp/Sig Mod 8076
103 Walnut Carryon Rd S/W Imp —
104 Spring Rd Widening 8025 854,746
105 Princeton Ave.Widening 8012 984,023
106 L A Ave: Spg to Mpk 8013 1,183,134
107 Spring/Charles Bus Tum-Out 8069
108 LA Ave:Shasta Boss 1,131,124
109 Underground UH14 Projects —
110 L A Ave Undergrounding 8051
111 Undrgmd:New L A Ave 8066 412,496
112 Rail Xing:Spring Rd 8039 2,826,756
113 Arroyo Drive Overlay 8084
114 Bus Shelter Improvements 8071
115 North Hills Parkway 8061 1,371,543
116 High St.Steel="/Parking 5056
117 North Extension of SR 23 8045
118 SR 23 FWY Soundwalis at TR Rd 8079
119 Metrolink South Parking Lot Entry 8056 166,250
120 Gabbert Rd Rail Xing —
121 High Street West —
122 Akterbrook Street Asphalt Overlay 8091
123 Arroyo Drive —
124 Moorpark Ave Widening Proj 8040 665,755
125 Lengthen Curb Radii —
126 L.A.Ave West of T.R.Rd. —
127 Casey Rd Ext. —
128 Moorpark Ave Left Turn Lane 8087 200,000
— 129 --OWffj SP�g.Prinfeton,-PdirfdeM& -- --—_——------
Sub-Total 0 0 166,250 2,037,298 0 7,592,279 0 0
Trails&Walkways
201 Sidewalks 8001
202 Ped/Bicycle Project — 20,000
203 Arroyo Trail Study 8035
204 Drain fit Trail 8059
205 Sidewalk&Bicycle Lane at AVRC 8086 66,000 66,000
206 Peter's Driveway —
207 Civic Center Ped&Bus Stop Imp —
Sub-Total 0 0 66,000 0 0 0 0 86,000
Traffic Signals
301 Not Assigned —
302 L A Ave/Shasta 8058 see 108
303 SRI 1B/Collns Or EM Ramps 8077
304 Not Assigned —
305 L A/Millard 8013 see 106
306 L A/Near ButterCreek 8061 see 115
+
Sub-Total 0 0 6 0 0 0 0 0
Medians and Parkways
401 L A Ave Medain 8047 91,599
402 Spring Median 8026 see 104
403 Not Assigned —
404 Poindexter Pkwy 8048
405 T R at Freeway —
406 Not Assigned —
407 City Entry Signs —
408 Peach Hill Pkwy —
Sub-Total 0 0 0 0 0 91,599 0 0
Stone Drains
501 Master Drainage Study 8088
502 Gabert/Walnut —
503 Shasta Drain —
504 Millard Drain 8065
505 Villa Del Arroyo Drain —
506 Misc.Improvements —
507 Arroyo Sim Channellmpr. —
Sub Total 0 0 0 0 0 0 0 0
Total 0 232,250 2,037,298 0 7,683,878 0 66,000
(',.I.P 2011,'21}1? C-9 51161/220 1? .
2011/12 to 2017H8 Capital Improvement Program
FY2011112 Funding Sources
Account 2603 2604 260512806 2609/2610 2902/2904
Code Project Name Number LTF Fed Grant Gas Tax State Grants Other Undetermined MRA Total
Streets&Trails
101 Slurry Seal 8002 405,435 1,795 407,230
102 SR118/Cotins Dr Ramp/Sig Mod 8076 0
103 Walnut Canyon Rd SAW Imp -
0
104 Spring Rd Widening 8026 854,746
105 Princeton Ave.Widening 8012 1,087,244 2,071,267
106 L A Ave: Spg to Mpk 8013 796,770 1,979,904
107 Spring/Charles Bus Tum-Out 8069
0
108 LA Ave:Shasta 8058 1,131,124
109 Underground Utility Projects -
0
110 L A Ave Undergiounding 8051
0
111 Undrgmd:New L A Ave 8066 412,496
112 Rail 70ng:Spring Rd 8039 173,244 3,000,000
113 Arroyo Drive'Oveday 8084 532,000 532,000
114 Bus Shelter Improvements 8071 52,618 52,618
115 North Hills Parkway 8061 1,371,643
116 High St.Streetscape/Parking 5056 1,000,000 1,000,000
117 North Extension of SR 23 8045 0
118 SR 23 FWY Soundwalls at TR Rd 8079 1,736,481 1,736,481
119 Metrolink South Parking Lot Entry 8056 462,795 200,000 829,045
120 Gabbert Rd Rag)trig - 0
121 High Street West - 0
122 Alderbrook Sheet Asphalt Overlay 8091 0
123 Railroad Crossing at Arroyo Drive - 0
124 Moorpark Ave Widening Praj 8040 665,755
125 Lengthen Curb Radii -
0
126 L.A.Ave West of T.R.Rd. - 0
127 Casey Rd Wes"Ext. - 0
128 Moorpark Ave Lei Turn Lane --Way- ----- _-- -- -- - ---------------------_---
_200;00'0- -
129 Overlay Spring,Princeton,Poindexter - 0
Sub Total 0 7259,565 0 1,492,679 2,522,894 0 1,173,244 16,244,209
Trails 3 Walkways
201 Sidewalks 8001 25,000 25,000
202 Ped I Bicycle Project - 20,000 40.000
203 Arroyo Trail Study B035 0
204 Drain#2 Trail 8059 0
205 Sidewalk 3 Bicycle Lane at AVRC 8086 132,000
206 Peters Driveway - 0
207 Civic Center Ped&Bus Stop Imp - 0
Sub-Total 20,000 0 25,000 0 0 0 0 197,000
Traffic Signals
301 Not Assigned - 0
302 L A Ave/Shasta 8058 0
303 SRI IB/Colfms Dr E/B Ramps 8077 0
304 Not Assigned - 0
305 L A/Millard 8013 0
306 L A I Near ButterCreek 8061 0
Sub-Total 0 0 0 0 0 0 0 0
Medians and Parkways
401 LA Ave Medain 6047 91,599
402 Spring Median 8026 0
403 Not Assigned - 0
404 Poindexter Pkwy 8048 0
405 T R at Freeway - 0
406 Not Assigned - 0
3
407 City Entry Signs - 0
408 Peach Hill Pkwy - 0
Sub-Total 0 0 0 0 0 0 0 91,599
Storm Drains
501 Master Drainage Study 8088 150,000 150,000
502 Gabert/Walnut - 0
503 Shasta Drain - 0
504 Millard Drain 8065 0
505 Villa Del Arroyo Drain - 0
506 Misc.Improvements - 0
507 Arroyo Sim Channel impr. - 0
Sub-Total 1 0 1 0 1 0 0 150,000 0 0 150,000
Total 20,000 1,259,565 25,000 1,492,679 2,672,894 0 1,173,244 16,882,808 L
C 1 2011/20 12 C-10 5`16.1?01?
Total Program
FY 2011/12 Thru FY 2017/18
Spread to Funding Sources
CIP 2011/2012 C-11 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 C-12 5/16/2012
2011112 to 2017118 Capital Improvement Program
Funding Sources Totals:FY 2011112 thru FY 2017118
Account 1000 2000 2001 2002 2150 2501 2502 2802
Code Project Name Number General Fund Traf Safety TSM Traf Mitigiatiah Trees L A AOC STR AOC TDA Art 3
Streets 3 Trams
101 Slurry Seal 8002
102 SR118/Collins Dr Ramp/Sig Mod 8076
103 Walnut Canyon Rd S/W Imp —
104 Spring Rd Widening 8026 854,746
105 Princeton Ave.Widening 8012 984,023
106 L A Ave: Spg to Mpk 8013 1,436,364
107 Spring/Charles Bus Tum-Out 8069 150,000
108 L A Ave:Shasta 8058 1,131,124
109 Underground Utility Projects —
110 L A Ave Undergrounding 8051 299,761
111 Undrgmd:New L A Ave 8066 412,496
112 Rail Xing:Spring Rd 8039 2,826,756
113 Arroyo Drive Overlay 8084
114 Bus Shelter Improvements 8071
115 North Hills Parkway 8061 1,371,543
116 High St..Streetscape/Parking 5056
117 North Extension of SR 23 8045
118 SR 23.FWY Soundwalls at TR Rd 8079
119 Metrolink South Parking Lot Entry 8056 166,250
120 Gabbert Rd Rail Xing —
121 High Street West —
122 Alderbrook Street Asphalt Overlay —
123 Arroyo Drive —
124 Moorpark Ave Widening Proj 8040 665,755
125 Lengthen Curb Radii —
126 L.A.Ave West of T.R.Rd. —
127 Casey Rd Ext. —
- -
128—Moorpark Ave Lett Tum Lane--8087---.---- -- - ----.-_.- —_ -
129 Overlay Spring,Princeton,Poindexte . —
Sub-Total 0 0 316,250 21037,298 0 8,145,270 0 0
Trails&Walkways
201 Sidewalks 8001
202 Pod/Bicycle Project — 140,000
203 Arroyo Trail Study 8035
204 Drain 02 Trail 8059
205 Sidewalk 8 Bicycle Lane at AVRC 8086 66,000 66,000
206 Peter's Driveway — 75,000
207 Civic Center Ped 8 Bus Stop Imp — 80,000 100,000
Sub-Total 0 0 221,000 0 0 0 0 308.000
Traffic Signals
301 Not Assigned —
302 L A Ave/Shasta 8058 see 108
303 SRI 18/Gollins Dr E/B Ramps 8077
304 Not Assigned —
305 L A/Millard 8013 see 106
306 L A/Near ButterCreek 8061 see 115
Sub-Total 0 0 0 0 0 0 0 0
Modians and Parkways
401 L A Ave Medain 8047 891,559
402 Spring Median 8026 see 104
403 Not Assigned —
404 Poindexter Pkwy 8048 115,000
405 T R at Freeway —
406 Not Assigned —
407 City Entry Signs —
408 .Peach Hill Pkwy
Sub-Total 0 0 0 0 115,000 891,559 0 0
Storm Drains
501 Master Drainage Study 8088
502 Gabert/Walnut —
503 Shasta Drain —
504 Millard Drain 8065
505 Villa Del Arroyo Drain —
506 Misc.improvements —
507 Arroyo Sim Channel Impr. —
Sub-Total 0 0 0 0 0 0 0 0
Total 0 0 537,250 2,037,298 1 115,000 9,036,829 0 306,000
C'1I'2011 120 12 C-13 >`16,,;"-0 12
W11112>Oo 2017118 CaPHa1 1MProvsmaM Program
Funding Sources Totals:FY 2011112liuu FY 2017118
Account 2603 2604 2505/2606 2609/2510 2902/2904
Code Project Name Number LTF Fed Grant Gas Tax State Grants Other Undetermined MRA Taal
Streets&Trails
101 Slurry Seal 6002 363,770 459,435 1,795 825,000
102 SRIle/Collins Or Ramp/Sig Mod 8076 550,000 550,000
103 Walnut Canyon Rd S/W Imp - 500,000 500,000
104 Spring Rd Widening 8026 854,746
105 Princeton Ave.Widening 8012 1,087,244 2,071,267
106 L A Ave: Spg to Mpk 8013 796,770 2,233,134
107 Spring/Charles Bus Tum-Out 8069 150,000
108 L A Ave:Shasta 8058 1,131,124
109 Underground Utility Projects - 10,000,000 10,000,000
110 L A Ave Undergrounding 8051 425,447 726,208
111 Undrgmd:New L A Ave 8066 412,496
112 Rail Xing:Spring Rd 8039 173,244 3,000,000
113 Arroyo Drive Overlay 8084 532,000 532,000
114 Bus Shelter Improvements 8071 206,416 206,416
115 North Hills Parkway 8061 1,371,543
116 High St.Streetscape/Parking 5056 1,000,000 1,000,000
117 North Extension of SR 23 5045 0
118 SR 23 FWY Soundwalls at TR Rd 8079 1,736,481 1,736,481
119 Metrolink South Parking Lot Entry 8056 462,795 200,000 829,045
120 Gabbert Rd Rail Xing - 0
121 High Street West - 430,000 430,000
122 Aldertxook Street Asphalt - 290,000 290,000
123 Railroad Crossing at Arroyo Drive - 1,000,000 1,000,000
124 Moorpark Ave Widening Proj 8040 665,755
125 Lengthen Curb Radii - 300,000 300,000
126 L A.Ave West of MR.Rd. - 0
- --------- ------- -
127 Casey Rd Westerly Ext. - - ---- ---0 -
128 Moorpark Ave Left Turn Lane 8087 200,000
129 Overlay Spring,Princeton,Poindex - 637,416 132.584 770,000
Sub-Total 0 1,896,981 653,770 1,546,679 3,653,139 12,362,584 1,173,244 31,785,215
Trails&Walkways
201 Sidewalks 8001 25,000 25,000
202 Ped/Bicycle Project - 140,000 280,000
203 Arroyo Trail Study 8035 0
204 Drain#2 Trail 8059 0
205 Sidewalk&Bicycle Lane at AVRC 8086 132,000
206 Walnut Canyon Rd Peter's Drwy - 75,000
207 Civic Center Ped&Bus Stop Imp - 20,000
Sub-Total 140,000 0 25,000 0 20,000 0 0 712,000
Traffic Signals
301 Not Assigned - 0
302 L A Ave/Shasta 8058 0
303 SRI 18/Collins Or E/B Ramps 8077 550,000 550,000
304 Not Assigned - 0
305 L A/Millard 8013 0
306 L A/Near ButterCreek 8061 0
Sub-Total 0 0 0 0 550,000 0 0 550,000
Medians and Parkways
401 L A Ave Medain 8047 891,599
402 Spring Median 8026 0
403 Not Assigned - 0
404 Poindexter Pkwy 8048 115,000
405 T R at Freeway -
250,000 250,000
406 Not Assigned - 0
407 City Entry Signs - 0
408 Peach Hill Pkwy - 53,000 53,000
Sub-Total 0 0 0 0 0 303,000 0 1,309,599
Storm Drains
501 Master Drainage Study 8088 150,000
502 Gabert/Walnut - 15,000,000
503 Shasta Drain - 800,000
504 Millard Drain 8065 250,000
505 Villa Del Arroyo Drain -
506 Misc.improvements - 200,000
507 Arroyo Sim Channel Impr. - r
Sub-Total 0 0 0 0 0 16,400,000 0 16.400,000
Total 140,000 1,896,981 678,770 1,546,679 4,223,139 29,065,684 1,173,244 50,756,814
C P 201 U2'01? C-14 51116/201?
City of Moorpark
Capital Improvement Program
D. Congestion Management Program
The purpose of the Ventura County Transportation Commission's (VCTC) Congestion
Management Program (CMP) is to monitor certain street segments and/or intersections
on the CMP Road Network (see Map), to confirm that the Level of Service (LOS) [a
measurement of the level of congestion] on those segments, or at those intersections,
does not deteriorate below certain stipulated levels. Increased traffic generated by
development is one of the major causes of increased traffic congestion and, therefore,
the deterioration of the LOS. The CMP requires each Agency to identify projects
designed to increase capacity and/or otherwise improve the efficient and effective
movement of traffic. The projects set forth in this seven year program,which are on the
CMP Road Network and which could reduce congestion, are listed on the following
page.
CIP 2011/2012 D-1 5/16/2012
THIS PAGE LEFT BLANK
INTENTIONALLY
CIP 2011/2012 D-2 5/16/2012
� r
lam
-1 o
mr-M
Jul
1
4 --
irIn - �� r
I AM-
D. Projects on the Congestion Management Program [CMP]Road Network
Account Prior FY 11/12-FY1.7/18
Code Project Name Number Years FY 11/12 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18 Total
Street Improvements
106 L A Ave: Spg to Mpk 8013 1,663,860 1,183,134 253,230 0 0 0 0 0 1,436,364
108 L A Ave:Shasta 8058 68,876 1,131,124 0 0 0 0 0 0 1,131,124
117 North Extension of SR 23 8045 214,489 0 0 0 0 0 0 0 0
124 Moorpark Ave Widening Proj 8040 1,074,865 665,755 0 0 0 0 0 0 665,755
126 L A Ave W/O T R Rd ---- 0 0 0 0 0 0 0 0 0
Sub-Total 3,0229090 2,980,013 253,230 0 0 0 0 0 3,233,243
Traffic Signals
302 L A Ave/Shasta 8058 0 0 0 0 0 0 0 0 0
305 L A Ave/Millard --- See 4106 0 0 0 0 0 0 0 0
306 L A Ave/West of ButterCreek --- See#115 0 0 0 0 0 0 0 0
Sub-Total 0 0 0 0 0 0 0 0 0
Page Total 3,022,090 2,980,013 253,230 0 0 0 0 0 39233,243
CIP 2011/2012 D-3 511612012
City of Moorpark
Capital Improvement Program
Appendix T
Completed Projects
The following is a list of known Streets and Roads Projects constructed subsequent to the incorporation
of the City in 1983.
Project Name Description
1985
Streets& Trails
Sidewalk Construction East Side of Moorpark Avenue,Third Street to Los Angeles Avenue
Sidewalk Construction West side of Moorpark Avenue from Community Center to High Street
Sidewalk Construction West side of Moorpark Avenue from North of Poindexter Avenue to Third Street
Asphalt Overlay Various Streets including High Street,Gabbert Road,Third Street,Bard Street,
Sherman Avenue, Second Street and Sarah Avenue
1987
Streets&Trails
Asphalt Overlay Spring Road South of Williams Ranch Road(by Developer)
Sidewalk Construction South side of Williams Ranch Road(by Developer)
Slurry Seal Project Various Streets throughout the City
Railroad Crossing Construction of rubberized railroad crossing on Old Los Angeles Avenue(east of
College View Avenue)
Traffic Signals
Los Angeles Avenue& Construction of a traffic signal at Los Angeles Avenue&Tierra Rejada Road/
Tierra Rejada Road Gabbert Road
Los Angeles Avenue& Construction of a traffic signal at this intersection
Condor Drive
Parkways and Medians
Campus Park Drive Construction of landscape improvements to medians on Campus Park Drive(two
Developers)
Tree Replacement Removal and replacement of parkway trees on a number of streets in the
downtown area
Spring Road&Peach Construction of landscape improvements at the southwest corner
Hill Road
CIP 2011/2012 I-1 5/16/2012
Project Name Description
Spring Road Drainage Construction of a box culvert on the west side of Spring Road south of Los
Improvement Angeles Avenue
1988
Streets& Trails
Tierra Rejada Bridge Construction of a four lane(with median)bridge across the Arroyo Simi
Traffic Signals
Traffic Signal: Los Construction of a traffic signal at this intersection
Angeles Avenue&
Princeton Avenue
1989
Streets& Trails
Spring Road Railroad Construction of rubberized railroad crossing on Spring Road
Crossing
Moorpark Avenue Construction of rubberized railroad crossing on Moorpark Avenue
Railroad Crossing
Curb/Gutter/Sidewalk North side of High Street,east of Magnolia Street
Construction
Asphalt Reconstruction Various streets including Millard Street, Harry Street,Dorothy,Esther,Roberts
&Overlay Avenues,Laurelhurst Road,Campus Park Drive&Maureen Lane
Traffic Signals
Los Angeles Avenue& Construction of a traffic signal at this intersection
Science Drive
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)
Peach Hill Road
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)
Walnut Creek Road
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)
Mt.Meadows Drive
Storm Drains
Moorpark Avenue Construction of storm drain improvements north of High Street(by Caltrans)
1990
Streets&Trails
Slurry Seal Project Various streets throughout the City
Sidewalk Construction East side of Spring Road,Los Angeles Avenue to Roberts Avenue(by Developer)
Sidewalk Reconstruction Replacement of damaged sidewalks(including tree limb and root pruning)
throughout the City.
CIP 2011/2012 I-2 5/16/2012
Project Name Description
Traffic Signals
Los Angeles Avenue& Major reconstruction of the traffic signal at this intersection(by Developer)
Spring Road
Traffic Signal: Campus Construction of a traffic signal at this intersection
Park Drive&Delfen
Street
Parkways and Medians
Tierra Rejada Road Construction of landscape improvements to Tierra Rejada Road medians from the
Median Edison Easement easterly to a point east of Southhampton Road
Tierra Rejada Road Construction of landscape improvements to the parkway on the north side of
Parkway Tierra Rejada Road east of Peach Hill Road(Developer)
1991
Streets&Trails
High Street&Spring Reconstruction of curb,gutter& sidewalk at southeast corner(by Caltrans)
Road
Avenida Colonia& Reconstruction of these two streets including the construction of new curbs,
Nogales Street gutters and sidewalks and the construction of a portion of the Happy Camp
Canyon covered box culvert to allow for the connection of these two streets
Los Angeles Avenue North side street improvements from Liberty Bell Road to Maureen Lane,
Widening including an additional westbound travel lane,curb,gutter and sidewalk
Sidewalk Construction West side of Spring Road,Los Angeles Avenue to Roberts Avenue
Sidewalk Construction North side of Los Angeles Avenue between Spring Road and Millard Street
Sidewalk Construction West side of Spring Road between Roberts Avenue and the railroad tracks
Handicap Access Ramps Construction of handicap access ramps at various locations throughout the City
Traffic Signals
First St./Poindexter Construction of.a traffic signal at this intersection to fulfill the City's portion of a
Avenue @ Moorpark City/State Agreement to signalize both this intersection and Moorpark Avenue/
Avenue High Street
Storm Drains
Happy Camp Box Construction of a covered box culvert for the Happy Camp drain at Los Angeles
Culvert Avenue crossing(Unit III)and at the intersection of Nogales Street and Avenida
Colonia
16/20.12
CIP 2011/2012 I-3 5/
Project Name Description
1992
Streets&Trails
Sidewalk Reconstruction The reconstruction of the sidewalk on the east side of Tierra Rejada Road south of
Los Angeles Avenue,including the replacement of street trees
High Street Storm Drain Construction of a storm drain from Walnut Street to Magnolia Street and a
and Sidewalks sidewalk on the north side of the street between Bard Street and Magnolia Street
Charles Street Reconstruction of the street from Moorpark Avenue to Bard Street, including the
Reconstruction(Ph. I) construction of a storm drain and new curbs, gutters and sidewalks
Traffic Sienals
Spring Road&Peach Construction of a traffic signal at this intersection
Hill Road
Collins Dr. &Campus Construction of a traffic signal at this intersection by Caltrans as a part of the
Park Dr. freeway construction project
High St. &Moorpark Construction of a traffic signal at this intersection by Caltrans to fulfill Caltrans'
Avenue portion of a City/State Agreement to signalize this intersection and Poindexter
Avenue/First Street/Moorpark Avenue
Peach Hill Rd& Spring Construction of a traffic signal at this intersection
Rd
Parkways and Medians
Williams Ranch Road Construction of a landscaped barrier across Williams Ranch Road near the Edison
Landscape Barrier Easement
East side Tierra Rejada Replacement of the street trees on the east side of the street south of Los Angeles
Road @ Los Angeles Avenue in conjunction with the reconstruction of sidewalks in that area
Avenue
1993
Streets&Trails
Asphalt Overlay Project Construction of an asphalt overlay on the following streets: 1)Tierra Rejada Road
at the Route 23 Freeway;2)Peach Hill Road;&3)Campus Park Drive
Slurry Seal Project Construction of Slurry Seal on various streets throughout the City
Los Angeles Avenue @ Construction of street improvements, storm drains,traffic signals,landscaping and
Park Lane,etc. related improvements on Los Angeles Avenue,Park Lane,Lassen Avenue and
Liberty Bell Road required for the construction of the Mission Bell Plaza,funded
by Assessment District 92-1 [**CMP].
Peach Hill Road East of Extension of Peach Hill Road east of Spring Road to the future Science Drive
Spring Road (constructed by the developer of the Carlsberg Specific Plan to serve the Mesa
Verde Middle School)
CIP 2011/2012 I-4 5/16/2012
Project Name Description
Traffic Signals
Tierra Rejada Rd& Street widening project included the construction of a"permanent'traffic signal to
Spring Rd replace the temporary traffic signal at this location [**CMP]
Los Angeles Ave&Park Construction of a traffic signal at this intersection as a part of the street and storm
Lane drain improvements funded by Assessment District 92-1 [**CMP]
Los Angeles Avenue& Construction of a traffic signal at this intersection as a part of the off-site and
Liberty Bell Road storm drain improvements funded by Assessment District 92-1 [**CMP]
Parkways&Medians
Sherman Avenue Replacement of the rear property walls for the properties on the south side of
Property Wall Sherman Avenue(north side of Los Angeles Avenue between Spring Road and
Millard Street)
Los Angeles Avenue: Construction of parkway landscaping on the north side of Los Angeles Avenue
Spring Road to Millard between Spring Road and Millard Street
Street
Tierra Rejada Road/ Repair of a slope failure on the south side of Tierra Rejada Road east of Peach Hill
Peach Hill Road Slope Road
Repair
Storm Drains
Sunnyslope Place Debris Construction of an access road to facilitate the maintenance of a storm water
Basin Access Road debris basin north of Sunnyslope Place
1994
Streets&Trails
Lassen Alley Construction of pavement improvements to complete the drainage improvements
Improvements at the south end of McFadden Avenue and Cornett Avenue
Charles Street Reconstruction of the street from Bard Street to Spring Road, including the
Reconstruction(Ph. Il) construction of a storm drain and new curbs, gutters and sidewalks
Spring Road Berm Construction of an asphalt berm on the east side of the street north of Peach Hill
Road in order to prevent erosion of the slope supporting the street
Flory Area Sidewalks Construction of sidewalks on certain streets in the vicinity of Flory Elementary
School,partially funded by an SB-821 pedestrian facility grant, including Second
Street,Bard Street,Third Street,Flory Avenue,Millard Street, Roberts Avenue,
and Harry Street
Tierra Rejada Road Realignment and reconstruction of Tierra Rejada Road east of Spring Road,
Realignment and increasing the roadway to four lanes and adding a center raised median [**CMP]
Reconstruction
Grimes Canyon Road Street improvements(including widening)near the entrance(Turfway Road)to
Tract 4081 (constructed by the developer)
Park Lane and Lassen Improvements to Park Lane north of Los Angeles Avenue and Lassen Avenue,to
Avenue serve the Mission Bell Plaza Shopping Center(AD 92-1)
CIP 2011/2012 I-5 5/16/2012
Project Name Description
Traffic Sienals
Tierra Rejada Road& Construction of a traffic signal at this intersection(Developer)[**CMP]
Mountain Trail Street
Tierra Rejada Rd& Construction of a traffic signal at this intersection(Developer) [**CMP]
Arroyo Vista Access Rd
/Countrywood Drive
Tierra Rejada Road @ Construction of a traffic signal at this intersection(Developer) [**CMP]
Shopping Center Entry
Parkways&Medians
Installation of landscaping in the extension of the center median in Tierra Rejada
Tierra Rejada Rd Road just west of Spring Road
Median at Spring Rd
Construction of a block wall and landscaping at the northeast comer of Los
Shasta Avenue/Los Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements
Angeles Avenue Wall
[NE Corner]
East Side Spring Road Construction of parkway landscaping on the east side of Spring Road south of
South of Peach Hill Road Peach Hill Road
Los Angeles Avenue @ Construction of parkway landscaping on the north side of Los Angeles Avenue at
Shasta Avenue Shasta Avenue
Storm Drains
AD 92-1 Construction of storm drains along the north side of Los Angeles Avenue,Park
Lane,and within easements on the Mission Bell Plaza property
1995
Streets&Trails
High Street Decorative Installation of underground conduits for electrical,telephone,.cable television,
Street Lights street lights and a decorative lighting system,plus the installation of nostalgic
decorative street lights on High Street
Freeway Connector Construction of bridges and related improvements required to connect the Route
Project 23 Freeway to the Route 118 Freeway(Caltrans) [**CMP]
City Maintenance Yard Conversion of property at 675 Moorpark Avenue to a City Maintenance facility
Metro Link Parking Lot/ Construction of the south Metro Link parking lot and access driveway(SCRRA)
Driveway [**CMP]
Lassen Avenue @ Modifications to Lassen Avenue to provide entrances to the north end of the
Mission Bell Plaza Mission Bell Plaza Shopping Center parking lot from Siena Avenue and from
Park Lane
CIP 2011/2012 I-6 5/16/2012
Project Name Description
Slurry Seal Project Application of slurry seal and related work to approximately one-third of the
residential streets in the City
Tecolote, Canario,Etc. Construction of an asphalt overlay on Tecolote Court,Canario Court, and a
portion of North Granadilla Drive
Walnut Canyon Road @ Widening of Route 23 by Caltrans to provide a center turning lane at Wicks Road
Casey Road and Casey Road
First Street/Bard Street Reconstruction of First Street and Bard Street including reconstruction of
pavement,curb, gutter and sidewalks
Parkways&Medians
Moorpark Estates Entry Installation of entry signs at Shasta Avenue and Los Angeles Avenue and at
Poindexter Avenue and Sierra Avenue
Shasta Avenue/Los Construction of a block wall and landscaping at the northwest corner of Los
Angeles Avenue Wall Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements
[NW Corner]
Poindexter Avenue @ Construction of parkway landscaping on the south side of Poindexter Avenue at
Sierra Avenue Sierra Avenue
Princeton Avenue Construction of parkway and median landscaping on Princeton Avenue
Campus Park Drive Construction of parkway landscaping on the south side of Campus Park Drive east
and west of Princeton Avenue
Tierra Rejada Road Restoration of slope slippage on the south side of Tierra Rejada Road near Peach
Slope Restoration Hill Road
Bard Wall Construction of a wall at the north end of Bard Street,just north of First Street
Virginia Colony Planter Construction of a landscaped planter at the corner of Virginia Colony Place and
Los Angeles Avenue
Irrigation Crossover Construction of conduits for future irrigation water lines and valve control wires at
Conduits a number of locations including: Tierra Rejada Road at Courtney Lane;Courtney
Lane on the west side of Tierra Rejada Road and Southhampton Road at Tierra
Rejada Road
Spring Road Parkway Removal and replacement of damaged sidewalks and the installation of tree well
Trees grates along the west side of Spring Road south of Peach Hill Road,to preserve
existing parkway trees.
1996
Streets&Trails
Millard Street Area Construction of sidewalks on Sherman Avenue,Esther Avenue,Roberts Avenue
Sidewalks and other streets
Poindexter Avenue Complete reconstruction of this street west of Chaparral Middle School
Everett Street Complete reconstruction of this street, including curb, gutter and sidewalk
CIP 2011/2012 I-7 5/16/2012
Project Name Description
Walnut Street Complete reconstruction of this street,including curb,gutter and sidewalk
Bard Street Complete reconstruction of this street between Charles Street and High Street
Magnolia Street Complete reconstruction of this street north of Charles Street
Tierra Rejada Road Construction of an asphalt overlay on this street east of Spring Road
Spring Road Construction of an asphalt overlay on this street south of Peach Hill Road
Old Los Angeles Avenue Construction of an asphalt overlay on this street east of the rail crossing located
east of Collins Drive
Flory Avenue Construction of an asphalt overlay on this street
Magnolia Street Construction of an asphalt overlay on this street south of Charles Street
Goldman Avenue Construction of an asphalt overlay on this street
Spring Road Median/ Construction of modifications to the south leg of the intersection of Spring Road
Double Left Turn Lane and Los Angeles Avenue to provide for a double left turn lane and a raised center
median
Painted Sky Street Repair of street improvements damaged by a street subsidence
Subsidence Repair
Public Works Yard Construction of additional improvements to expand the City Maintenance Yard at
Expansion 675 Moorpark Avenue
Traffic Signals
Collins Drive&Campus Construction of a traffic signal at this intersection by Caltrans, as a apart of the
Park Drive Freeway Connector construction project
Moorpark Road&Tierra Construction of a traffic signal at this intersection by the City,with partial funding
Rejada Road from the County of Ventura
Parkways&Medians
Home Acres Buffer Area Construction of a landscaped buffer area,including an emergency access road and
a flood control maintenance road,at the west end of Shadyridge Drive in Tract
4021 (funded by Zone 8 of AD 84-2)
Storm Drains
Tierra Rejada Road Sub- Construction of a sub-drain system along Tierra Rejada Road between Walnut
Drain System Canyon Road and Mountain Trail Street to convey subsurface water to storm drain
inlets
Tierra Rejada Road Inlet Installation of a catch basin on the north side of the center median on Tierra
East of Spring Road Rejada Road east of Spring Road
1997
Streets&Trails
Flinn Avenue Reconstruction of Flinn Avenue east of Spring Road,constructed in conjunction
Reconstruction with the Spring Road storm drain project s
CIP 2011/2012 I-8 5/16/2012
Project Name Description
Moorpark Avenue Construction of an asphalt overlay on this street, constructed in conjunction with
[South]A/C Overlay the construction of the Moorpark Avenue storm drain project
AVCP Access Bridge Construction of a pedestrian,equestrian,emergency access bridge across the
Arroyo Simi,to connect Arroyo Vista Community Park to Liberty Bell Road
Arroyo Vista Construction of a paved surface between the end of the park access road and the
Community Park Bike Arroyo Vista Park Access Bridge,partially funded by an SB-821 bicycle facilities
Path grant
Storm Drains
Moorpark Avenue Storm Construction of a storm drain system extending from the south side of Los
Drain System Angeles Avenue northerly to a point north of First Street,with storm drain laterals
serving Flory Avenue and the Metro Link parking lot
Spring Road Storm Drain Construction of a storm drain system extending from the south side of Los
System Angeles Avenue northerly to Flinn Avenue, and then extending easterly on Flinn
Avenue
1998
Streets&Trails
Downtown Alley Reconstruction of the alleys south of First Street
Reconstruction
Valley Road Reconstruction of the street
Construction of retaining walls and related improvements required to provide
Wicks Road Slope slope stabilization to support Wicks Road
Stabilization
Wicks Road A/C Construction of an asphalt overlay on the westerly portion of this street
Overlay
Bonnie View Street A/C Construction of an asphalt overlay on this street
Overlay
Maureen Lane Reconstruction of Maureen Lane south of Los Angeles Avenue
Reconstruction
Storm Drains
Science Drive Storm Construction of two storm drain systems serving the Carlsberg Specific Plan(by
Drain System Developer),one serving the streets and a separate system conveying run-off from
common areas to vernal ponds
1999
Streets& Trails
Peach Hill Road Widening to the south side of the street east of Spring Road, in order to provide a
westbound left-turn lane.
Poindexter Avenue Widening to the north side of the street east of Gabbert Road, including new curb,
gutter and sidewalk,and the re-striping of the street to provide a painted median
and Bike Lanes.
CIP 2011/2012 I-9 5/16/2012
Project Name Description
New Los Angeles Avenue Widening to the south side of the street to provide six (6) lanes of traffic(by
Widening Developer). [**CMP]
Spring Road Widening Construction of widening to the east side of Spring Road from Tierra Rejada Road
northerly to the Arroyo Simi Bridge(by developer).
Casey Road Widening Widening to the south side of the street west of Walnut Canyon Road.
Old L.A. Avenue Surface crossing improvements to the rail crossing(by SCRRA).
Rail Crossing
Gabbert Road Surface crossing improvements to the rail crossing(by Union Pacific)
Miller Parkway Construction of a new collector street between Tierra Rejada Road and New Los
Angeles Avenue(by developer).
Tierra Rejada Road Improvements to the north side of the street,just west of the freeway(by
developer).
Traffic Signals
Casey Road/Walnut Construction of a traffic signal,funded by the City,Caltrans and the Moorpark
Canyon Road Unified School District. [**CMP]
Peach Hill Road and Installation of a new traffic signal at this new intersection(by developer).
Miller Parkway
Tierra Rejada Road and Installation of a new traffic signal at this new intersection(by developer).
Miller Parkway [**CMP]
Commercial Entry and Installation of new traffic signal at this new intersection(by developer). This
Miller Parkway signal is to be made operational when the center is opened.
New Los Angeles Modifications to the traffic signal at the intersection of New Los Angeles Avenue
Avenue&Miller and Science Drive,to accommodate the addition of Miller Parkway as the south
Parkway leg of the intersection.(by developer)[**CMP].
New Los Angeles Installation of traffic signals at the on and off-ramps to the freeway, in order to
Avenue at the Route 23 allow ingress and egress traffic to and from White Sage Road(private) [by
Freeway Caltrans and the developer].
Parkways&Medians
Spring Road Medians Construction of new landscaped medians and parkways(east side)from Tierra
and Parkways Rejada Road northerly to the Arroyo Simi Bridge(by developer).
2000
Streets&Trails
Spring Road Bridge Reconstruction of the Spring Road Bridge at the Arroyo Simi,to provide
sidewalks,bike lanes and a raised median.
CIP 2011/2012 I-10 5/16/2012
Project Name Description
Asphalt Overlay The construction of an asphalt overlay and related improvements to the following
streets: Talmadge Rd.; Marquette St.; Gabbert Rd.(north of Poindexter Ave.);
Spring Road(north of High St.); Fitch Ave.;Minor St.; Robert St.; Harry St.;Ruth
Ave.;Dorothy Ave.; Mt. Trail(east of Walnut Creek Rd.); Collins Dr.; Campus
Park Dr.;Princeton Ave.; High Street; Spring Road(New L.A Ave.to Bridge);
and Christian Barrett Drive.
Spring Road Rehabilitation of Spring Road between New Los Angeles Avenue and High Street.
Rehabilitation The cost of this project was reimbursed by Caltrans as required by a Highway
Relinquishment Agreement.
Los Angles Avenue Rehabilitation of Los Angeles Avenue between High Street and Princeton Avenue.
Rehabilitation The cost of this project was reimbursed by Caltrans as required by a Highway
Relinquishment Agreement.Upgrades to the middle portion of this street segment
are being deferred until the Los Angeles Avenue East project is constructed.
Parkways& Medians
Freeway Landscaping Installation of freeway landscaping from Collins Drive to a point west of
Princeton Avenue(by Caltrans).
Storm Drains
Tierra Rejada Road Construction of additional storm drain inlets to better handle peak storm flows.
Inlets
L.A.Ave. Drain Installation of new inlets east of Spring Road to eliminate flooding.
2001
Streets&Trails
New Los Angeles Widening to the south side of the New Los Angeles Avenue [SR-118] bridge over
Avenue Bridge the Arroyo Simi to provide six(6)lanes of traffic. [**CMP]
Widening
Los Angeles Avenue: Widening to the south side of the street to provide three.(3)eastbound lanes(by
Moorpark Avenue to Developer). [**CMP]
Park Lane
Los Angeles Avenue: Construction of street widening to the south side of the street at the old Caltrans
East of Leta Y4ncy Rd Maintenance Yard,in order to provide three(3)eastbound lanes,curb, gutter and
sidewalk. [**CMP]
Traffic Sianals
Los Angeles Avenue& Modifications to the striping to provide a double left-turn lane at the east leg of the
Tierra Rejada Road intersection. [**CMP]
Parkways& Medians
Los Angeles Avenue Installation of median landscaping and irrigation in the new raised median on Los
Angeles Avenue south of the Princeton Avenue freeway ramps.
Tierra Rejada Road Installation of parkway landscaping on the north side of Tierra Rejada Road east
and west of Southhampton Road,funded by the Zone 2 improvement assessment
[AD84-2].
CIP 2011/2012 I-11 5/16/2012
Project Name Description
2002 ----
Streets& Trails
Underground Utility The undergrounding of all overheard utilities,other than high voltage electrical
District No. 2000-1 lines, on Los Angeles Avenue between Gabbert Road and Millard Street. Project
was constructed by SCE and funded by SCE pole replacement monies and Rule
20A undergrounding accruals.
Miller Parkway/Peach Construction of widening at the northeast comer to allow south-to-north U-Turn
Hill Road U-Turn movements.
2003
Streets& Trails
Arroyo Trail Study Feasibility Study and Implementation Plan for an arroyo levee trail from the
westerly City limit to Madera Road.in the City of Simi Valley.
Moorpark Road City costs related to a County of Ventura Road Department Project_ to construct a
Realignment new,realigned Moorpark Road intersecting Tierra Rejada Road at Miller
Parkway.
Curb Ramp Project Construction of curb ramps at a number of locations(mainly"T-intersections,,)
throughout the City.
2003 Slurry Seal Project Application of Slurry Seal to approximately one-third of the streets in the City.
2003 AC Overlay Construction of an asphalt overlay on a number of streets throughout the City.
Project
GASB-34 Infrastructure Preparation of a study to inventory,quantify,categorize and determine the value
Inventory Report of the City's infrastructure improvements. Depreciation rates and replacement cost
estimates were also derived from that effort.
Curb/Gutter Repair Replacement of damaged curb and gutter at numerous locations throughout the
Project City.
Parkways&Medians
Peach Hill Road Construction of parkway landscaping on Peach Hill Road between Mesa Verde
Parkway Drive and Peach Hill Park. This project was constructed by the Peach Hill HOA.
_Traffic Signals
L.A.Avenue at the Installation of a new traffic signal by the developer of the shopping center.
Marketplace Shopping
Center
Miller Parkway& Installation of a new traffic signal by the developer of the shopping center.
Patriot Drive
CIP 2011/2012 I-12 5/16/2012
Project Name Description
2004
Streets&Trails
Flinn Avenue The realignment of Flinn Avenue to align with Second Street.The project
Realignment included the widening of Spring Road north of Flinn Avenue,the construction of a
raised median on Spring north of Flinn Avenue and the construction of a traffic
signal at the intersection of Spring Road and Second Street.
Civic Center Driveway The widening of the driveway into City Hall.
Modification
Street Light A CDBG funded project to relocate and add street lights in the neighborhood
Modification—Millard southeast of Moorpark Avenue and First Street.
Tract
Traffic Signals
Double Left-Turn Lane Construction of improvements to provide a double left-turn lane for southbound
on Spring Road at Tierra traffic.
Rejada Road
Spring Rd and Second Construction of a traffic signal at the intersection of Spring Road and Second
Street Street/Flinn Avenue.
Parkways&Medians
Spring Road Parkway Removal of existing eucalyptus trees and the construction of new tree wells,with
West side deep root irrigation,between Peach Hill Rd. and Christian Barrett Drive.
Tierra Rejada Rd Removal of existing trees and installation of new tree wells,with deep root
Parkway,East side irrigation,between Harvester and Courtney.
Spring Road Median Installation of median landscaping north of Second Street.
Storm Drains
Loraine Drain Construction of storm drainage facilities northwest of the Spring Road Bridge(by
a developer)to meet needs identified in the Master Drainage Study as the"Loraine
Drain"or the"No Name Drain".
2005
Streets&Trails
Grimes Canyon Road at Construction of roadway improvements by a Developer. City costs related to the
Championship Drive acquisition of needed rights-of-way were reimbursed by the Developer.
Traffic Signals
Casey Signal The modification of the traffic signal at Casey Road and Walnut Canyon Road
Modification [State Route 23]to provide a left-turn arrow for northbound traffic [funded by
developer(Pardee Homes)].
Storm Drains
Little Hollow SubDrain Construction cf a sub-drain to intercept subsurface water and convey same to a
storm drain in an effort to prevent future damage to the asphalt pavement.
CIP 2011/2012 I-13 5/16/2012
Project Name Description
2006
Streets&Trails
Los Angels Avenue Construction of roadway widening to the south side of the street,including
Widening at Maureen addition pavement,curb, gutter,sidewalk and property walls,and the construction
Lane of a traffic signal at the intersection of Los Angeles Avenue and Maureen Lane.
[**CMP]
Traffic Signals
Los Angeles Avenue at Construction of a traffic signal at this intersection. [**CMP]
Maureen Lane
Parkways&Medians
Tierra Rejada Road Construction of median landscaping on Tierra Rejada Road between Spring Road
Medians and the Route 23 freeway.
2007
Streets&Trails
Freeway Sign Replacement of freeway off-ramp signs required by street name changes for New
Replacement Los Angeles Avenue and Princeton Avenue.
Downtown Trail Study The Downtown Trail Study was completed. Future implementation will be
considered when and if funding sources are identified.
Spring Road Extension Construction of the extension of Spring Road northerly from Charles Street to
connect to Walnut Canyon Road.
`C' Street(Ridgecrest Construction of the east-west local collector street(Ridgecrest Drive)along the
Drive) northerly boundary of the City(Pardee Homes),from Spring Road easterly to the
proposed realigned Route 23.
Traffic Signals
Campus Park Drive and Signal and striping changes were funded and constructed by the developer of the
Collins Drive property at the southwest corner. .
Spring Road and Charles New traffic signal installed by developer.
Street
Spring Road and Elk New traffic signal installed by developer.
Run Drive
Spring Road and New traffic signal installed by developer.
Ridgecrest Drive
Spring Road and Walnut New traffic signal installed by developer.
Canyon Road(SR-23)
Traffic Controller and Construction of controller and other hardware,improvements,and/or for the
Operations upgrading of traffic signal operations through-improved software,at designated
Improvements intersections.
Parkways&Medians
Los Angeles Avenue Construction of parkway landscaping on the south side of Los Angeles Avenue
and Tierra Rejada Rd from Butter Creek Road to Maureen Lane,and the construction of parkway and
median landscaping on Tierra Rejada Road south of Los Angeles Avenue.
LPrarkways
IP 2011/2012 I-14 5/16/2012
Project Name Description
Princeton Avenue Modification of the median and median landscaping on Princeton Avenue at
Median Modification Campus Park Drive.
2008
Streets&Trails
Lighted Crosswalk on -Replacement of freeway off-ramp signs required by street name changes for New
Moorpark Avenue at Los Angeles Avenue and Princeton Avenue.
Second Street
Asphalt Overlay Construction of an asphalt overlay, and related work,along the entire length of
Projects Tierra Rejada Road and on Second Street.
Slurry/ARAM Project Various locations(to be determined)
Traffic Signals
Traffic Signal Construction of a hardwire traffic signal interconnect system to allow for the
Interconnect:Los coordination of all of the traffic signals along the Los Angeles Avenue corridor
Angeles Avenue (SR 118).
Traffic Signal Construction of a hardwire traffic signal interconnect system to allow for the
Interconnect:Tierra coordination of all of the traffic signals along Tierra Rejada Road between
Rejada Road Countrywood Drive and the Route 23 freeway.
2009
Streets&Trails
Moorpark Road Dual Perform intersection modifications to provide dual left turn lanes on Moorpark
Left Turn Lanes Road to Tierra Rejada Road.
Lassen Avenue Construction of a Bikeway/Walkway path extending westerly from Moorpark
Bikeway/Walkway Avenue near Third Street,within the Lassen Avenue street right-of-way.
Parkways& Medians
Tierra Rejada Road Construction of median landscaping on Tierra Rejada Road between Brennan
Medians Road and the Route 23 freeway.
2010
Streets&Trails
Mountain Trail Street/ Pavement rehabilitation and construction of a landscaped median in
Spring Road Pavement Mountain Trail Street from Tierra Rejada Road to Country Hill Road, and
Rehabilitation pavement rehabilitation on Spring Road from Peach Hill Road to a point
approximately 2000 feet to the south.
Julliard Avenue and Asphalt overlay of Julliard Avenue from Campus Park Drive to Loyola Street and
Reedley Street Overlay Reedley Street from Julliard Avenue west to the end due to damage caused by a
ruptured waterline.
Parkways&Medians Installation of City Entry Signs on Princeton Avenue on each side of the
City Entry Signs '118 Freeway; and on Tierra Rejada west of the 23 Freeway.
Mountain Trail Street/ Construction of a landscaped median in Mountain Trail Street from Tierra
Spring Road Pavement sca p
Rehabilitation Rejada Road to Country Hill Road.
CIP 2011/2012 I-15 5/16/2012
Project Name Description
2011
Streets& Trails
Metrolink Security Wall Extension of the security wall along the Metrolink south parking lot
&Camera System property line. Metrolink security camera system completed in FY 07/08.
Traffic Sian al Construction of a traffic signal at the intersection of Collins Drive and
Collins Drive and University Drive.
University Drive
Los Angeles Avenue Modification of the traffic signal at this intersection to provide protected
and Tierra Rejada Drive phases(Left Green Arrows) for the north and south legs of the intersection,
as well as a right green arrow for northbound Tierra Rejada Road[**CMP]
"Note: CMP denotes that the project was on the Congestion Management Program roadway network and
was related to congestion management.
r
CIP 2011/2012 I-16 5/16/2012
City of Moorpark
Capital Improvement Program
APPENDIX II: Description of Funds
Fund Remarks
1000 — General Fund: Revenues derived It should be noted that State law requires the City to
from property tax, sales tax, motor vehicle in maintain an established level of effort of General Fund
lieu fees and other non-restricted sources. expenditures for streets [called a Maintenance of Effort
(MOE)], in order to continue to receive certain State
grant funds. The current MOE amount is$342.
2000 Traffic Safetv Fund: Revenues Revenue to this Fund is only about$125,000 per year. In
derived from vehicle code fines, which are recent years this fund has been used primarily to fund the
restricted to construction / maintenance of Crossing Guard program.
traffic control devices, streets, equipment, and
supplies for traffic enforcement, accident
prevention and crossing guards.
2001 — Traffic. Systems Management: The purpose of this Fund is finance system
Revenues derived from fees based on the air improvements that improve circulation and reduce
quality impacts of land development projects. emissions.
Said funds are to be used on projects or
programs designed to mitigate those air
quality impacts.
2002 �Cib We Traffic Mitigation: The purpose of this fund is to improve circulation by
Revenues derived from development fees to constructing major capacity enhancement projects.
fund mitigation measures to better
accommodate the increased traffic flow
generated by those development projects.
2150 — Trees and Landscaping: Revenues �`-
derived from development fees to fund
various landscape improvements.
23aa — Assessment Districts: Revenues Project 111, the Los Angeles Avenue Undergrounding
derived from maintenance & improvement Project, is partially funded by Fund 2330 [AD92-1:
district assessments, which have been Mission Bell Plaza].
earmarked for improvement projects. A
separate Fund has been established for each
District and/or Zone within a District.
Also included in this category are Community
Facility District Funds.
LCIP 2011/2012 II-1 5/16/2012
l
s
Fund Remarks
2501-Los Angeles Avenue AOC: Revenues Various projects to be financed by this Fund include: 1)a
derived from fees .paid by land development number of projects required in order to provide six (6)
projects located within a designated area, for lanes of traffic along the New Los Angeles Avenue/Los
the purpose of constructing roadway Angeles Avenue corridor, and 2) the reconstruction and
improvements within that area. The properties realignment of Princeton Avenue east of High Street.
subject to this fee consist of all of the areas of
the City located north of the Arroyo Simi,
plus the property south of the Arroyo and east
of the freeway[S.D.I. Property].
--- ----- - --- - — —_. _..._._........._.........
2502 - Suring Road /Tierra Reiada Road Projects funded or partially funded by this source include
AOC: Revenues derived from fees paid by the Tierra Rejada Traffic Signal Interconnect System and
land development projects located within a the Tierra Rejada Road median landscaping project.
designated area, for the purpose of
constructing roadway improvements within
that area. The properties subject to this fee
consist of all of the area of the City located
south of the Arroyo Simi.
2503 - Casey Rd / Gabbert Rd AOC: No appropriations have yet been made to projects from
Revenues derived from fees paid by land this Fund.
development projects located in that area
generally located. northwest of Walnut
Canyon Road(Moorpark Avenue)and the rail
corridor, for the purpose of constructing
roadway improvements within that area.
2602 - TDA Article 3: A portion of State- These funds are allocated to the cities in the County by
sales tax revenues which is restricted to the the Ventura County Transportation Commission (VCTC)
construction or improvement of pedestrian via a competitive grant process.
and/or bicycle facilities.
2603 - TDA Article 8A: TDA Article 8 Historically, these monies have been used to fund major
monies are derived from a portion of State street improvement and maintenance projects, such as
sales tax revenue, which is apportioned to slurry seal application and asphalt overlay projects.
each city based on population. The City
allocates these monies between TDA Article
8C funds, which become revenues to the
City's Transit Fund (Fund 5000), and TDA
Article 8A funds, which become revenues to
the Local Transportation Fund [LTF] (Fund
2603) to fund street improvement and
maintenance.
...............-...._......._.._...______..—.....
_..._.__..._._.._._-._ .--.--.__...._____..._.....__.._..---
2604 - Federal Grants: Revenues received
via various federal grant programs, including:
the Surface Transportation Program (STP)_..._...._----._.._-_.----._.._....__....---.._...-......_....__ ......._..__._....._...W........
D
0
P
CIP 2011/2012 II-2 5/16/2012
Fund Remarks
and Congestion Mitigation Air Quality
(CMAQ)•
2605 — Gas Tax: Revenues derived from a
tax on motor vehicle fuel sales,apportioned to
local agencies based on a formula using
population, road miles and other factors.
These revenues are restricted to expenditures
for street maintenance and related costs.
......................................................... ............................
2609 / 2610 Other State Grants: .
........................ .....................................
Revenues derived from various State grant
programs.
............................................................................................................................................................................................. ....................................... ..............................................
2902 — AIRA Operations: Revenues from
tax increment derived from property taxes
levied upon properties within the
Redevelopment Project Area. .
CIP 2011/2012 11-3 5/16/2012
3
c
THIS PAGE LEFT BLANK
INTENTIONALLY
b
P
L CIP 2011/2012 II-4 5/16/2012
City of Moorpark
Capital Improvement Program
Appendix `III'
Potential Objectives
1 Adopt formal traffic policies
2 Consider feasibility of pedestrian bridge over Poindexter Avenue and Union Pacific
Railroad(UPRR)from Specific Plan No. 1
3 Evaluate feasibility and cost for modifying traffic signal pedestrian crossing devices for
use by vision impaired and physically disabled persons as well as upgrading to include
time display
4 Install parkway landscaping and enhanced pavement on collector and arterial streets that
lack such improvements, including the south side of Peach Hill Road west of Rolling
Knoll Road,and north side of Peach Hill Road west of Bella Vista Drive,and consider
possible use of Xeriscape landscaping
5 Evaluate the establishment of a policy for installation of speed humps on City streets
6 Develop new design for City street name signs and a standard design for street
identification signs in medians
7 Work with U.S.Postal Service and homeowners' associations to relocate group mail
boxes to maximize on-street parking
8 Evaluate options for second location for vehicular access at Arroyo Vista Community
Park
9 Consider name change for Spring Road from Tierra Rejada Road to Walnut Canyon Road
10 Install parkway trees on the west side of Spring Road north to Peach Hill Road
11 Evaluate options for providing a continuous Class 1 bike lane on Campus Park Drive,
including a reduction of the number of travel lanes and attendant increase in landscaping
and use of Caltrans/SCE right-of-way between Princeton Avenue and Collins Drive
12 Construct raised landscaped median on Collins Drive from Campus Park Drive to
University Drive
13 Modify the intersection of Condor Drive(south), Princeton Avenue,and Virginia Colony
Place
14 Plant parkway trees on both sides of Princeton Avenue,east of Spring Road
CIP 2011/2012 III-1 5/16/2012
s
9
15 Construct enhanced entry statements at Spring Road and Roberts Street,and Spring Road
and Second Street.
16 Evaluate feasibility of installing raised median on Poindexter Avenue and Gabbert Road
south of Poindexter Avenue
17 Evaluate construction of Lassen Avenue from Park Lane to Moorpark Avenue to create a
four-way intersection at Third Street
18 Evaluate need for traffic signal at Campus Canyon Drive and Collins Drive
19 Construct sidewalks on one side of certain streets in industrial zoned areas to provide a
safe path for pedestrians and to encourage walking
20 Evaluate feasibility of modifying certain existing streets to increase landscaping and
reduce the amount of asphalt to be maintained
21 Evaluate benefits of revising current street standards to narrow the street width but not the
right-of-way to encourage more landscaping and reduce greenhouse gas generation and
pavement maintenance costs.
22 Widen Science Drive at Los Angeles Avenue(SR-118)to provide a dedicated right-turn
lane
23 Evaluate need for traffic signal at Campus Canyon Drive and Collins Drive
24 Develop conceptual plan and cost estimates for widening access road within Arroyo Vista ~
Community Park.
25 Evaluate feasibility of relocating the storm drain system on Poindexter Avenue just west
of Endeavor Court.
26 Install raised median landscaping on Princeton Avenue from Spring Road to
approximately 1,500 feet east of Spring Road.
27 Evaluate feasibility and cost of installation of"Blue Lights"(also known as Tattletale
Lights")on selected traffic signals to enhance traffic enforcement of red light violations.
28 Evaluate feasibility of constructing a sidewalk on Arroyo Drive from Collins Drive to east
City limits,and in conjunction with City of Simi Valley and County of Ventura,
investigate pedestrian and bike connections between Collins Drive and Madera Road.
29 Evaluate feasibility of pedestrian bridge on Los Angeles Avenue(SR 118)in vicinity of
Moorpark Avenue.
30 Evaluate feasibility of relocating=the Metrolink layover facility.
31 Develop design plan to:-.refurbish median landscaping and hardscape on Tierra Rejada
Road from Spring Road to Los Angeles Avenue and Campus Park Drive from Princeton
Avenue to Collins Drive including cost estimates,financing,phasing and water
conservation measures.
CIP 2011/2012 III-2 5/16/2012
°PaK 0``��4 City �2 ineer (P'u6Czc Works Department
F ti v
v
O
0,40 ^q
MEMORANDUM ITEM 9.A.
TO: Honorable City Council
FROM: Dave Klotzle, City Engineer/Public Works Director
DATE: July 18, 2012
SUBJECT: Errata for Seven-Year Capital Improvement Program for
FY 2011/2012 — FY 2017/2018
The following errata in the CIP document provided to you for Item 9.A. on the City
Council Meeting Agenda for July 18, 2012, are proposed to be corrected as described
below in a revised CIP upon Council approval.
1. Page B-6 -Add the limits of Tract 5130 to the Location Map.
2. Page B-18 —Revise the spelling of"Tact 5045"to "Tract 5045."
3. Page B-21 — Revise the spelling of"wet" to "west" in the project description.
4. Page B-32 — Revise the project description for Poindexter Avenue to be from
Commerce Avenue instead of Endeavor Court and to include a section of
Gabbert Road to match the Location Map.
5. Page C-5 - Replace the second duplicate page number reference of C-5 with
C-6.
6. Section D— Modify the page following D-2 to show the page footer including the
label of"D-3" and revise the next page to be labeled "D-4" instead of"D-3."
7. Page III-2 — Insert the word "on" in front of"Gabbert Road" in item 16.
8. Page 111-2 — Remove item 23 which is a duplicate of item 18. i
Should you have any questions, please call me at (805) 517-6285.