HomeMy WebLinkAboutAGENDA REPORT 2012 0718 CC REG ITEM 09C ITEM 9.C.
<. l v OF FAOORROAK,CALIFORNI?,�
City Council Meeting
of ----
ACTION:y�,r,:u.a.,..,L
MOORPARK CITY COUNCIL : _ • __. _ _
AGENDA REPORT
TO: Honorable City Council
FROM: David Klotzle, City Engineer/Public Works Director
DATE: July 9, 2012 (CC Meeting of 07/18/12)
SUBJECT: Consider Conceptual Design for Moorpark Avenue Railroad Crossing
Improvements
BACKGROUND
The Southern California Regional Rail Authority (SCRRA) also known as Metrolink, has
secured eight million dollars in State of California grant funding administered through
the Ventura County Transportation Commission (VCTC) for the Ventura County Sealed
Corridor project. The project funding is for the design and construction of railroad grade
crossing safety improvements at four crossings, one in Moorpark on Moorpark Avenue
and three in Simi Valley. The City has been coordinating with Metrolink and Caltrans to
include the widening of Moorpark Avenue (State Route 23) in the vicinity of the rail
crossing as well as intersection improvements at High Street.
DISCUSSION
The Ventura County Sealed Corridor project at Moorpark Avenue includes safety
improvements such as a raised median with new crossing arm signals, and pedestrian
safety gates. Upon being contacted by Metrolink regarding the Sealed Corridor project,
staff has been working to incorporate elements of the City's capital improvement
projects planned for Moorpark Avenue into the Metrolink project.
The City's Capital Improvement Program (CIP) includes projects to widen Moorpark
Avenue (Project 8040) and improve the intersection of Moorpark Avenue and High
Street (Project 8087). Project 8040 includes adding a second southbound through lane
to Moorpark Avenue from Casey Road to Third Street. Project 8087 includes widening
the east side of Moorpark Avenue south of High Street to accommodate a dedicated
&Tublic Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(Moorpark Ave.RR X-ing Concepts).doc 1 1
Honorable City Council
July 18, 2012
Page 2
northbound left-turn lane in addition to the northbound through and right-turn lanes.
Since Moorpark Avenue is State Route 23, all of these improvements must meet
Caltrans standards for approval and permitting.
A critical design constraint of the widening of Moorpark Avenue is the existing railroad
turnout switch just west of the existing crossing which connects to Metrolink's rail
layover facility. Relocation of this switch to the west, and the resulting required
relocation of multiple other switches and track in the layover facility, is too costly to be
included in Metrolink's current project.
At the City's request to include as many of the City's ultimate CIP widening and
intersection project improvements in their design, Metrolink has prepared interim and
ultimate design concepts (Attachment 1 and 2, respectively). These concepts are
based on meeting Caltrans design standards with the exception of the raised median
width of nine feet (the Caltrans standard is twelve feet) which is expected to be
approved by Caltrans through a design standard exception process. It is expected that
the interim design concept will be completed and approved by Caltrans before
Metrolink's grant funding deadline for design completion of the end of December 2012.
The interim design concept relocates the west curb of Moorpark Avenue as far west as
possible (approximately six feet) without affecting the turnout switch or existing power
poles. The east curb is relocated approximately eight feet to the east to accommodate
the nine-foot raised median and standard Caltrans lane and shoulder widths. This
relocates the east curb to its ultimate location. Dedication of City property to Caltrans
would be required on both sides of Moorpark Avenue north of the rail crossing to
accommodate the interim improvements. Dedication of Metrolink property on both
sides of Moorpark Avenue south of the rail crossing may also be required.
The constraints of meeting Caltrans standards, the turnout switch and maintaining the
northbound through lane aligned with the same lane north of High Street render it
infeasible to include a dedicated northbound left-turn lane in the interim design concept.
A more complicated and time consuming process could be initiated to obtain
exceptions from Caltrans for meeting the lane-width requirements, but there is no
guarantee of approval of the exceptions and the process would not be completed
before the grant funding deadline. Staff will coordinate with Caltrans to include a
change to the High Street signal timing as a part of the interim design concept to
provide a protected (green arrow) northbound left-turn movement for as much time as
possible without excessive delays to the southbound traffic.
The ultimate design concept maintains the interim east curb location, the east
pedestrian crossing gates and Caltrans standard lane and shoulder widths, but requires
the relocation of the raised median, crossing arm signals, west curb and pedestrian
crossing gates, turnout switch, and associated layover facility switches and track to the
west. The ultimate design concept provides a second southbound through lane from
S:\Public Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(Moorpark Ave.RR X-ing Concepts).doc 12
Honorable City Council
July 18, 2012
Page 3
High Street to Poindexter Avenue and a dedicated northbound left-turn lane in addition
to the northbound through and right-turn lanes at High Street. Additional dedication of
City, Metrolink and private property to Caltrans would be required to accommodate the
ultimate improvements.
Both the interim and ultimate design concepts require the relocation of traffic signal
poles and equipment at High Street. Both concepts also provide sufficient width for the
Caltrans design standard for large trucks, such as those used by the Post Office for
mail transport, to turn right onto southbound Moorpark Avenue.
FISCAL IMPACT
Metrolink has requested that the City contribute funds towards the cost of designing and
constructing the interim improvements that are a part of the City's planned capital
improvement projects. There is currently $370,755.00 budgeted for the design of
Project 8040, Moorpark Avenue Widening, and $200,00.00 budgeted for the design,
construction and inspection of Project 8087, Moorpark Avenue Left Turn Lane, in the
adopted FY 2012/13 Capital Improvement Budget.
Since Metrolink's interim design concept does not include the ultimate widening
improvements identified in Project 8040, staff recommends that City Council only
approve a contribution to Metrolink of the $200,000.00 budgeted for Project 8078 which
includes left-turn signal modifications and the widening of the east side of Moorpark
Avenue.
STAFF RECOMMENDATION
1. Approve Metrolink's Interim Design Concept for Moorpark Avenue Railroad
Crossing Improvements.
2. Approve a contribution of $200,000.00 from Project 8078 to Metrolink for the
design, construction and inspection of Metrolink's Interim Design Concept for
Moorpark Avenue Railroad Crossing Improvements.
3. Authorize the City Manager to execute any agreements necessary to effectuate this
project subject to final language approval by the City Manager and the City
Attorney.
Attachments:
1. Interim Design Concept for Moorpark Avenue Railroad Crossing Improvements
2. Ultimate Design Concept for Moorpark Avenue Railroad Crossing Improvements
S:\Public Works\Everyone\Reports\Staff Reports\2012\July\07-18-2012(Moorpark Ave.RR X-ing Concepts).doc 13
F- p 1 � �� Sd � 30�01� 3tt�0 �.., �y•
I
ZI Son zo o�
Y CA LECAL 50
i 'd.
� EL. •ii. 4 'dt
.. I V c u a 9 ,6.0
C •In y R6.3
T
1 r er Trcc4
,
, r �
E.LIST.TURNOUT TO REMN+•'\
{`4 r
NO 9 904A1 R"5•
lREMOVE EIUSTWO N0.9 SIGIIAL � /i ... •i .,
OB 9'M10E
f� RY51RT1 N0.9 SIGNAL _'
RIGHT TURN ONLY" ry f- RELOCATE DRAIN INLET
Q MOORPARK AVE 1. -16-
R
n__ -
..,.i RELOCATE pRNN NLEi ... ..
ii
LL
-.. PAVEUENi MARKING
REMOVE EFT TURN 'f
TYPI
/��/pplTpN ESiRIN1 TREATMENTS 1 -
j t SURF E L I1 P7
RE40V�E%IS1.N0.4 51G"k ~
N0.9 S1CpIVk r•. � I
4 I
-SCRRA 400RPAl( SUING _
-
SCRRA.O.tIIiACx �
,TriXbc --
r .
,
0
t
.K
f r ° Preliminary Only
r
Not for Construction
20 0 20 40
B
a N n
?
METROLINK® METROLINK COMMUTER RAIL SYSTEM o:wN'Na
€.g.c „°, L� VENTURA COUNTY SEALED CORRIDOR
R`g rcB B.0'"'R' 17r1� •r,r.ry.4usOr BE VISION SNEEI NO. VOI.r J
MOORPARK AVE ^*
" 1n/20u werTtEm� ,,RO Ep: INTERIM DESIGN CONCEPT-REVISION 1 SCIE
REV.d�T wR. COMBINED LEFUHROUGH LANE ALTERNATIVE
I--L
FA
x
wo o,
j I c
0 0
A LEC'L '..�
I � I
ao «•��g�°�.Ym. en
211GAE YA YMO LEAD TRACK
r
I
r k �
9 5CNAL
i
r
I
J
1.WIDE 40. /
RIGHT TURN ONLY• RELOCATE DRAIN NIEi
r
DOUBLE YELLOW STRIPMO t -�
*-<► R MOORPARK AVE
-RELOCATE DRAW INLET
REMOVE`EFT TLRN
EY PAVEMENT MMIXNG _—P&STRbW TREATMENTS(1111
TIryry A�LA�ADp A�,�p _.. .'
I— ` )� SUtFACE P"LlLS ITYPtI -
I'. - ! REMO E%5i.N0.9 SIGNAL L
_ Z .. NO.9 SIGNAL w
< o � � i �scnRA MOORPMN wMC z
SCRRA MAIN.TRACK
"ACTIVE TRACK _
4 31
Y
{ 5.
N !
yy
p 1 Preliminary Only » D
{, K
Not for Construction 20 •0® 20 40
h
3
sw';`' a
n� w
.
r8
0
# .„q•
.'E.NE. IN.M.
CD M ETR O LI N K® METROLINK COMMUTER RAIL SYSTEM wl1C N0,
VENTURA COUNTY SEALED CORRIDOR
ngS� G.N.R. '( ^r .`L°. REV15rON SnEEr NO. vOL.I ��
MOORPARK AVE N
ULTIMATF E SDHEOSUIGLN D ECR OANLCTEEPRT N A-TIRVEE v pqr E 7/S/2072 SRYi a VISION 1 scuE
T"=40'
F-A
LTI