TO: Honorable City Council
FROM: Hugh R. Riley, Assistant City Manage
BY: Ky Spangler, Special Projects Consultant
DATE: June 26, 2012 (CC Meeting of 7118112)
SUBJECT: Consider Additional Funding for Glass and Glazing Additions
and Revisions and Amendment No. 2 to the Agreement with
Center Glass Company No. 9 for the Ruben Castro Human
Services Center
BACKGROUND & DISCUSSION
The Ruben Castro Human Services Center (RCHSC) is being constructed as a multiple-
prime contract project with construction management provided by Barnhart Balfour-
Beatty Construction (Balfour-Beatty). Bids were solicited from trades in September,
2010, opened on October 21, 2010 and bids were awarded by the Moorpark City
Council on January 19, 2011. Center Glass Company No. 9 (Center Glass) was
selected as the lowest responsive and responsible bidder for the Glass and Glazing bid
package and a construction agreement was executed on April 11, 2011.
During the course of construction the County of Ventura Health Care Agency and other
future tenants have requested various additions or modifications to their suites including
addition of security glass for the medical center and addition of interior suite windows for
Catholic Charities. These changes were issued as Amendment No. 1 to the
Construction Agreement and within the available contingency amount.
An additional change was requested by the City of Moorpark to add an exterior door
(originally specified as a window) into the Shared Space Conference Room located in
Building B, thereby permitting the space to be used after hours without the need to
access the Catholic Charities suite. The cost for this change was $3,171.00 as shown
on Exhibit F of Attachment 1. A recap of the contract costs to date is shown below:
217
Honorable City Council
July 18, 2012
Page 2
Original Contract $ 198,000.00
Amendment No. 1 $ 18,156.25
Current Agreement Amount $ 216,156.25
Amendment No. 2
Add exterior door into Conference Room 104, Bldg. B $ 3,171.00
Total Amendment No. 2 Amount $ 3,171.00
Revised Agreement Amount $ 219,327.25
Currently there is $1,643.75 in contingency available under Center Glass's contract.
The cost for the glass and glazing additions and revisions is $3,171.00 which exceeds
the available contingency. Therefore staff is seeking the approval of this additional
amount.
FISCAL IMPACT
The Capital Improvement budget for the Ruben Castro Human Services Center (Fund
5020) is $11,038,064. To date $7,934,754 has been expended with $2,568,203 left in
encumbrances and $535,107 available project balance. Therefore, no additional funds
need to be budgeted for the proposed work at this time. Sufficient funds exist in the
budget to cover this work.
STAFF RECOMMENDATION (ROLL CALL VOTE)
Approve additional funding in the amount of$1,643.75 for glass and glazing changes for
the Ruben Castro Human Services Center and authorize the City Manager to execute
Amendment No. 2 in the amount of $3,171.00 to Center Glass Company No. 9 subject
to final language approval of the City Manager and City Attorney.
Attachment 1: Amendment No. 2 to Center Glass Company, No. 9
Exhibit F: Center Glass Proposal Letter dated January 31, 2012
218
ATTACHMENT 1
SECOND AMENDMENT TO AGREEMENT 2011-097
FOR BID PACKAGE #11 — GLASS AND GLAZING
AT THE RUBEN CASTRO HUMAN SERVICES CENTER
THIS SECOND AMENDMENT TO THE AGREEMENT FOR BID PACKAGE #11 —
GLASS AND GLAZING ("Second Amendment"), is made and entered into this
day of , 2012, ("the Effective Date") between the City of
Moorpark, a municipal corporation, hereinafter referred to as "CITY", and Center Glass
Company No. 9, a California corporation, hereinafter referred to as "CONTRACTOR".
WITNESSETH:
WHEREAS, on April 11, 2011, the CITY and the CONTRACTOR entered into an
Agreement for glass and glazing for the Ruben Castro Human Services Center; and
WHEREAS, on June 21, 2012, the CITY and the CONTRACTOR executed a
First Amendment for glass and glazing for the Ruben Castro Human Services Center;
and
WHEREAS, the CITY wishes to further amend the Agreement to include the
addition of one (1) exterior aluminum storefront door and hardware in Conference Room
104 in Building B at a cost not-to-exceed three thousand one hundred seventy-one
dollars ($3,171.00) described in Exhibit F dated January 31, 2012 and attached hereto
as part of this Second Amendment; and
WHEREAS, this total dollar amount of $3,171.00 exceeds the ten percent (10%)
contingency amount approved with the original Agreement; and
WHEREAS, on July 18, 2012, the City Council of the City of Moorpark approved
additional funding for this glass and glazing work.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto AMEND the aforesaid Agreement follows:
I. Section 2 of the Agreement is amended to include:
CONTRACTOR'S Scope of Services is amended to include the labor and
materials required to:
• delete one (1) fixed glass "A"-type window, and furnish and install one (1) exterior
aluminum storefront door and associated door hardware in Conference Room
104 in Building B in response to the request of the City, the architect of record's
Instruction Bulletin #15R, and per CONTRACTOR'S Proposal (11.03).
Construction Agreement Page 1 of 2
Second Amendment Between City of Moorpark and Center Glass Company No. 9 219
The Scope of Services for the additional glass and glazing services is described
in the CONTRACTOR'S Proposal dated January 31, 2012, attached hereto and
incorporated herein as Exhibit F respectively to the Agreement by this Second
Amendment.
II. Section 7 of the Agreement is amended to include:
CITY hereby increases the not-to-exceed amount of $216,156.25 under this
Agreement by $3,171.00 to $219,327.25.
III. Remaining Provisions
All other terms and conditions of the original Agreement shall remain in full force
and effect.
CITY OF MOORPARK CENTER GLASS COMPANY NO. 9
By: By:
Steven Kueny Randy Gulden
City Manager President
ATTEST:
Maureen Benson, City Clerk
Exhibit F — Contractor's Proposal dated January 31, 2012 (11.03)
Construction Agreement Page 2 of 2
Second Amendment Between City of Moorpark and Center Glass Company No. 9 220
EXHIBIT F (11.03)
gel P ON IN
Date:January 31,2012
Balfour Beatty
ATTENTION: John S.
RE: Ruben Castro—III#15
PROPOSAL
We hereby propose to furnish All materials and labor to complete the following:
Provide Door number 104C with hardware#37 in lieu of original window type"A".
Credit Due- $1,007.00
38 sq.it glass @$6.75 $257.00
Aluminum Frame. $000.00 Previously purchased.
Labor 10 hrs @$75.00 $750.00
Added Cost- $4,178.00
Door frame I Door $1,482.00
32 sq.ft glass @ 6.75 $ 216.00
Hardware#37 $1,280.00
Labor 16 hrs @ 75.00 $1,200.00
Total Added Cost 1B#15 $3,171.00
By: Accepted by:
Randy Gulden Date:
3910-A Market Street Ventura,California 93003 (805)642-0149 Fax(805)642-8421
State Contractor's License#244559
221
HC Architects
633 W. Fifth Street, Third Floor, Los Angeles, CA 90071
PROJECT: City of Moorpark INSTRUCTION BULLETIN: 15R
Ruben Castro Human Services Center
HMC#2307002-000
DATE: November 07, 2011
LOCATION: Ruben Castro Human Services Center
612 Spring Road
!Moorpark, CA 93021
TO: Barnhart, Inc.
799 Moorpark Avenue
Moorpark, CA 93021
Attention: Dennis Kuykendall
DESCRIPTION OF WORK TO BE PERFORMED:
ITEM IB-15.1 R: Revised Door at Building B: Revise door at Building B in accordance
with attached Clarification Drawings CD-A15.1, CD-A15.2 and CD-
A15.311,CD-A15.4 and revised Specification Section 08710.
Justification: Design Coordination
Requested By: Architect
ACTION TO BE TAKEN:
1. Make the described change in the work at no change in the Contract Sum and no
change in the Contract Time of Completion.
2. X Make the described change in the work,with credit or cost for which will be determined in
accordance with the General and Supplementary Conditions of the Contract.
3. Promptly advise the Architect as to credit or cost proposed for the described change.
This is not an authorization to proceed with the change.
cc: File-IB-IB ARCHITECT
d
By: Emily Kay CCCA, LEED®AP
Associate
222
Instruction Bulletin 15R
November 07,2011
Page 2
AUTHORIZATION TO PROCEED:
When approved by both parties below, you are authorized to proceed with the work outlined in Item 15.1 R.
The amount for this change of$ will be (added/deducted)in a forthcoming Change Order.The
Contract Time will be adjusted by day(s)(added/deducted).
Owner Date Contractor Date
Attachment: Clarification Drawings CD-A15.1,AC-A15.2, CD-Al 5.3R, CD-A15.4 and Specification
Section 08710
NAProjects\2307 Moorpark Human Sery Center\002\1 1-IB\IB\IB 15\IB 15R.doc
223
Bow Beaty
Construction
Oxnard,CA
To: All Trade Contractors November 16, 2011 Palm F)es eIt, ;"A
Rivei'_ide,CA
Subject: HMC Job#2307002 T`''"''
Project Name: Ruben Castro Human Services Center
Instruction Bulletin: #15R—Revised Door at Building B
Attached you will find supplemental instructions from the Owner's Representative on the issues stated
below for the above referred project. Balfour Beatty Construction is requesting your company to review
the Instruction Bulletin #15R and determine if there will be any impact or coordination issues to your
scope of work per your contract and or plans and specifications. There will be a five (5) working day
response time allowance for any possible cost,time or coordination impacts to be brought to our attention
and returned with sufficient data to back up the claim of the impact on original scope of work. Include with
the response, detailed explanation on how the response has impacted the original scope of work, a
breakdown of additional labor, material needed to complete the issue(s) at hand. If sufficient data is not
included claim will be rejected. Please reference Instruction Bulletin#15R on all correspondence.
Attached is Instruction Bulletin#15R dated November 7, 2011 instructing all trades to revise door
at building B in accordance with attached Clarification Drawings CD-A15.1, CD-A15.2 and
CDA15.3R,CD-A15.4 and revised Specification Section 08710.
Scope by Trade:
GENERAL NOTE:Work items listed in this section are for clarification only and are not intended to
be a comprehensive list of inclusions. It is the responsibility of each Trade to identify and include
all plant, labor material, and equipment necessary to complete the work of his Bid Package as
shown on the attached plans or contained in specifications.
BID PACKAGE No. 11 —GLASS&GLAZING:
A. Furnish and install all aluminum entrances and storefront systems complete, including but not
limited to; aluminum frame system, spacers, shims, setting blocks, gaskets, reinforcement
sections, fasteners, sealants, glass, glass setting accessories, all specified and/or required
hardware for a complete operating system including but not limited to; panic devices, hinges,
stops, sill sweeps, thresholds, push/pull devices, lever devices, closers, hold opens, door stops
and locks.
B. Provide a credit for the deleted aluminum window B12 complete including but not limited to; fixed
extruded aluminum windows, glass and glazing and perimeter sealants for a complete system
installation per the plans and specifications.
C. Furnish and install head, jamb and sill aluminum flashings at aluminum systems per plans and
specifications.
D. All keying requirements including temporary keying per plans and specifications.
E. Temporary construction locks until final keying is released to proceed.
F. Caulking/joint sealant of aluminum openings, window frame openings, and all glass systems to
adjacent surfaces for weather tight seal, inside and outside regardless of sequence of installation
of other Trade Contractor work.
G. Cleaning as required per plans and specifications of any materials scheduled to receive paint or
other finishes.
224
BID PACKAGE No.12—Finishes:
A. Coordinate, furnish and install revised metal stud framed openings for items which pass into or
thru metal stud walls, ceiling or soffits including but. not limited to; door/window openings,
structural framing penetrations.
B. Cleaning as required per plans and specifications of any materials scheduled to receive paint or
other finishes.
BID PACKAGE No. 1 2 3 4 5, 6,7,8, 9, 10, 13, 14, 15,&16.
A. Verify no scope changes and submit notice of such.
Due to the potential impact of this work on the current Project Schedule, your response is requested
immediately. If you have any questions, please contact John Squillace Jr. at 805-523-0015.
Respectfully,
John Squillace Jr
Field Engineer
Balfour Beatty Construction
cc. Richard Bruce, Balfour Beatty Construction
Dennis Kuykendall, Balfour Beatty Construction
Jeff Hammond, Balfour Beatty Construction
225
STORAGE C
UWA .t 14
4
B ,6 ENT PROCESSING 9
110
EQ.
I EQ.B '-4" '-5"
A 0
°
D 2 6 Q CONF/MULT1—PURPOSE AV J 4� 1 'It
A8.a w F1 0-4-1 4 / TOILET I
o'
k 10
1A E I /RECUM
— — — A7.1
A.2 101
I 1 —5" _
20'-0"
L .
3 4 5
BUILDING B FLOOR PLAN SCALE 1 -o
/ • r w
\;��w.Gl� �Fc� CITY OF MOORPARK Project No
HMC( RUBEN CASTRO HUMAN 2307002
I* Na C-28826 *I Architecture Interiors Planning SERVICE CENTER Date
HMC ARCHITECTS 09/12/2011
612 SPRING ROAD
9 -� 1-31%{�� 633 W.STH STREET,THIRD FLOOR Drawing No
ll ti\ of CN4A' one: CALIFORNIA 90012
00 MOORPARK, CA 93021 CD
226
Fax: 213.542.8301
226
HMCAMC ARCHITECTS
RUBEN CASTRO HUMAN
SERVICE CENTER
CITY OF MOORPARK
Address
2 2 612 SPRING ROAD
4
A6 n6z A6 s MOORPARK,CA 93021
I p 13 I 4 5
2 I 1 ( 24 TYP. .a�SE`o ARp,j
1 1 I I I //i.Gi
I 41 TYP. I�
29'Y
STEEL---- _ RO.C-2a0M *%
T__F_
O.PARAP T 1
i
21'-F
T.O.PARAPET
T a.O.SOFFR _
T TOP OF GATE RECESS
Y F F
]Tj BUILDING B
gab w- 2XIAW TYP. TYP T . TYP. TYP. TYP. Rekm A6.2
Sws:1/e'=1'-0' Sa.: 09/12/2011
BUILDING 'B' EXTERIOR ELEVATION - SOUTH Drew gNumber
1 CD-A15.2 IB #15
N 1Projacls1230]Moorpark Human Sam Cemerb02H8-CAOVdoorpm Orewirg S,RSheelsNrchileclw IV,5.2 EXTERIOR ELEVATIONS-CATHOLIC CHARITIESA-9
227
BUILDING B DOOR SCHEDULE
DOOR FRAME
SIZE LOUVER TRANSOM w DETAIL FIRE <Oz
MARK MATL TYPE GLAZING MATL a RATING
i.- NOTES
It WD HGT THK WD HGT HGT GLASS HEAD JAMB SILL a rn
001 6-0 9 1-3 4 AL T 2 1 HM - 4=10.4 7 A10.4 - --- Ot ---
003 B-0 9-0 1-3 4 AL T 2 1 HM - 4 A 0.4 A10.4 - --- Oi ---
101 3 -0 1-3 4 Sc D HM - 1 A10.4 1 A10.4 - --- 11 ---
102 -0 -0 1-3/4" SC A HM A10.4 T A10.4 - --- 12 --
1 -0 -0 1-3 4 SC A HM -- 1 10.4 1=10.4 - --- 13 --
104A -0 I T-0- 1-31C SC A HM -1 1 A10.4 1=10.4 --- 14 -
104C -0 9-0 1-3 J. AL I U 1 1 AL -- 8=104 A10.4 - --- 37 --
- --- - - --- ---
106 1-3 4 SC A --- - 1 A10.4 1 A10:4 - --- 14 --
107 3-0 1-3 4 SC I A --- F6A - 1 A10A 1 A10.4 - --- 14 --- --
108A 3-0 z,1-3/4 HM G --- 1 1 FCJ -- B A10.4 6 A10.4 -- --- 03 ---
1088 3-0 -0 1-3 4 SC A --- HM - 1 A10A 1 A 0.4 - --- 15 --
109 5-0 7 1-3/4! SC Q HM - t Ai0.4 1 A10.4 - --- --- 2 PAIR OF DOORS
110 3-0 -0 1-3 4 SC 0 HA - 9 A10.4 S A10.4 --- 28 PO(9(ET DOOR
111 1-3 4 SC A --- HM - i 10.4 1 ---
112 -0 1--J 4 SC F --- HM - i A10.4 1 A70.4 --- 14 --
113
3'-T 7-0 1-3 4 HM G 1- 1 HM -- 6 A10.4 8 A10.4 - - 03 ---
114 7-0 i-3 4 HM A --- HM -- 1 A10A 1 A10.4 - --- 17 --
115A 3-0 -0 1-3/4" HM C 4 HM -- i Ai0.4 i A10.4 --- 12 ---
1158 -0 -0 1-3 4 HM C 4 HM - 1 At 4 1 17 --
t 1611 16-0 14-0 - S1L R HM --19 10.4.1 19 A10.4.1 6 At0.4. -- --- ROLL UP DOOR
fl-fib 3-0 -0 1-3 4 HM G 1-8 HM - A104 A10.4 - --- 03 --
117A 31 1-31r HM G 1 HM - B A104 A10.4 1 - - 09 --
1178 3 -0 1-3 4 SC A HM - 1 A10.4 1=10.4 - 14 --
118 3 -0 1-3 4 SC A HM -- TA10.4 1 A10.4 --- 13 --
119 3'--u- -0 1-3 4 SC A HM - 1 A10.4 1 A10.4 - 13 -
20A 3 -0 1--3/4' HM _A 1 HM -- 1 A10.4 1 A10.4 - --- 16 --
1208 -0 11-314- HM A 12 12 HM -- 1 A10.4 1 Ai0.4 - --- 16 --
121 3 -0 1-3 4 till G 1' HM - A10.4 6 Al - 03 ---
122 3- 1-3 4 SC A HM -- t Ai0.4 1 AIUA - - 15 ---SCALE
G�C�iTFc1 DOOR SCHEDULE FOR BUILDING B N.T.S.
HMC CITY OF MOORPARK Project No
RUBEN CASTRO HUMAN 2307002
* NO. C-28826 * ArcNIecture Intenors Plannin g SERVICE CENTER Date
HMC ARCHITECTS 11/07/2011
633 W.5TH STREET,THIRD FLOOR 612 SPRING ROAD Drawing No
LOS ANGELES,CALIFORNIA 90012 MOORPARK, CA 93021
OF C AM0
Telephone: 213:542.8301 C D-Al 5.3 R
228
r-4• r-4•
INTERIOR WOOD & HOLLOW METAL DOORS
Q 0' 4• 3 Q 2'-4• 4•
TYPE A TYPE 8 TYPE C TYPED TYPE E TYPE F
SPECIAL INTERIOR DOORS
I I I I I
1 t 1 I I
14— I f I I I —NM
I I I I I FANEl
I I I I i
1 I I I I
4066 BYPASS 410 POCKET to DUAL TYPE M TYPE 0
CLOSET DOOR DOOR POGffT DOOR (2 PER LOCATION)
TYPE N TYPE 0 TYPE P 6'-4'
r-4•
EXTERIOR ALUMINUM & HOLLOW METAL DOORS
Q 4•FRAME b
01
TV _ TV N n
a
a ••:.2 � ... ':.:
T-4
TYPE O TYPE N TYPE J TYPE K TYPE l TYPE T _
1-0'4•
SPECIAL EXTERIOR DOORS I
EA EO EO EO EO b
6'-6• 0 .i F
r-4•
0
N M.W.
1
A
n 13
li fOA.
116A EXTERIOR ROLL-UP DOOR-TYPE R 404A EXTERIOR FOLDING DOOR-TYPE S TYPE F TYPE U
SCALE
A CyiTFo DOOR TYPE SCHEDULE N.T.S.
CITY OF MOORPARK Project No
i
HMC RUBEN CASTRO HUMAN 2307002
* NO. C-28826 * ArlileduInteriors Plannin 9 SERVICE CENTER Date
HMC ARCHITECTS LDr
/2011
r 612 SPR ING ROAD� 633 W.5TH STREET,THIRD FLOOR o
LOS ANGELES,CALIFORNIA 90012 MOORPARK, CA 93021
OF C A�-� Faxephone: 213.542.8 01 Al 5.4
229
Fi= 8t
Standard Drywall Inc. Request for Information
Ruben Castro Human Services
Job #C-4592
Architect: HMC SDI RFI No: 047
Contractor: Barnhart Balfour Beatty Cons't RFI No:
Attn: John Squillace, Jr. Date: 05102/2011
Subject: Sheet A2.2 Conference room 104 Grid line A.2
Drawing No:
Spec. Section:
Information Requested:
Please confirm that the exterior opening in room 104 Conference grid line A.2 is an
exterior window and not a door opening. If the intent is to have a door in this
opening please provide the door, frame and hardware information as it would
appear on the door schedule.
Please also reference SDI RFI #022.
Suggested course of action:
Submitted by: Mark Louk Date Response Required: 5/23/11
Schedule Impact: Cost Impact:
Response:
230
10010.Rosedale Hwy
Bakersfield,CA 93312
license.#761$80
commercial•.plaster+drywall*frai.ridnq :661-588-8870
Fax 661-688-1578
www.tyeinr-.net
To: Zachary Miederhoff Company: Standard Drywall Inc.
Phone: 951-256-8649 Fax: 951-256-8657
From: Tino Perez Date: 4-29-11
Project: Ruben Castro RFI No. 2
Subject: Conference Room 104 Opening Bldg B
Reference:Sheet A2.2 Conference room 104 Grid line A.2
Question: Please confirm that the exterior opening in room 104 Conference grid line A.2 is an
exterior window and not a door opening. If the intent is to have a door in this
opening please provide the door,frame and hardware information as it would
appear on the door schedule.
[] Other Trades 1 Subcontractors involved (to the best of our knowledge, no warranty as to the
accuracy of statement regarding other trades is intended)
Reply By: (If a definitive response is not received by this date, it[)will/[]will not, cause
a delay. We[]will/[]will not, proceed pending your written direction.)
Response:
By: Date: