HomeMy WebLinkAboutAGENDA REPORT 2012 0718 CC REG ITEM 10W ITEM 10.W.
MOORPARK CITY COUNCIL
AGENDA REPORT
TO: The Honorable City Council
FROM: Jeremy Laurentowski, Landscape and Parks Manager jV
DATE: July 5, 2012 (CC Meeting of July 18, 2012)
SUBJECT: Consider Resolution Amending the Fiscal Year 2012/13 Budget
for Replacing the Security Lights at Campus Park and
Poindexter Park
DISCUSSION
Recently, several of the security light standards at Campus Park have been
removed by staff due to the fact that the light poles have outlived their life
expectancy. In addition, there is a need for additional lighting at Poindexter Park
to deter night time loitering and to increase security.
Two of the five light standards at Campus Park were removed by staff over the
last several months. One was leaning precariously after a high wind event and
the other was removed as a precaution, as the steel pole base exhibited
extensive signs of corrosion, particularly at the anchor bolt locations. The
remaining three poles are sound at this time. However, staff anticipates that they
will also require replacing within the next one to two years as they also exhibit
signs of stress and corrosion at the pole bases. The lighting at Campus Park
was originally installed in 1991 and consists of 250 watt high pressure sodium
lights on 25' high poles. The lighting is left on during all hours of the night to
increase security levels within the park.
In addition, the City has been experiencing vandalism to the low level security
lighting at Poindexter Park, particularly the lighting around the gazebos, restroom
and along the east park boundary adjacent to the school site. The existing light
standards consist of 10' high decorative pedestrian level lights. The lighting is
left on all night to maintain security within the park. However, due to the
relatively low level of the light standards that have been installed, the lights have
457
Honorable City Council
July 18, 2012
Page 2
become the targets of vandalism. Staff suspects that park patrons are
vandalizing the fixtures to keep specific areas of the park in the dark. Several
common acts of vandalism that have been observed by staff include attempts to
push the poles over, regular damage to the bulbs and fixtures and various other
attempts to keep areas in the dark. In addition to several requests from local
residents to increase the lighting at Poindexter Park, staff has discussed this
issue with the City's Police Captain, who has also discussed several concerns
with the park lighting and concurs with staff's recommendation that increased
security lighting at Poindexter Park is necessary.
Staff recommends replacing all five (5) light standards at Campus Park and
replacing twelve (12) existing low level pedestrian lights at Poindexter Park with
125 watt vandal resistant LED security lights on 25' light poles. In addition, staff
recommends installing occupancy sensors on all the light standards. Occupancy
sensors will reduce illumination to 30% of the light's full potential during the
majority of the time that the lights are on and will increase illumination when the
occupancy sensor is activated. Occupancy sensors distribute a 360° infrared
light array and are activated when the array is interrupted by movement. The
sensors are installed with an impact resistant plexiglass shield and are mounted
directly to the light fixture, 25' above the ground surface to minimize vandalism.
Once activated, the sensor increases the wattage directly to the light fixture, thus
increasing illumination. This feature will decrease energy use by approximately
70% during normal operation, while still providing adequate night time light
levels. However, when the occupancy sensor is activated, light levels will
increase to 100%, providing a visual warning for police patrols that there is
current activity within the park. The sensitivity of the sensors is adjustable in
order to filter small movements and minimize false alarms, such as plant material
swaying in the wind or small animals walking by. Staff also recommends
replacing the restroom lights with new vandal resistant LED lighting, as the
restroom lights at both parks are also vandalized on a regular basis.
Due to the extent of these two projects, staff recommends that the City contract
with a lighting consultant to prepare plans and specifications for this work. Staff
has obtained several quotes and has determined that $11,730 is required to
complete this work. A summary of these costs follows:
Item/Location Cost
Poindexter Park: $4,900
Campus Park: $3,800
Reimbursable costs (i.e. prints mailing & delivery, site survey) $1,500
Sub-total $10,200
15% Contingency $1,530
Total $11,730
458
Honorable City Council
July 18, 2012
Page 3
Once the plans and specifications have been completed, staff will obtain bids to
complete the lighting installation. Based on preliminary conversations with
several electrical contractors, staff anticipates that this work will cost the City
approximately $80,750. Approximately $23,750 will be required to replace the
five light poles and restroom lights at Campus Park, and approximately $57,000
to replace twelve light poles and restroom lights at Poindexter Park. Based on
this estimate, the City can expect a cost recovery of approximately ten (10) to
twelve (12) years, when compared to standard 250 watt metal halide or high
pressure sodium lights. In addition, staff anticipates that the City will qualify for
direct cost rebates from Southern California Edison (SCE) for this project. Staff
will request additional appropriation for this work once the bids have been
obtained and will prepare a detailed cost analysis and an estimated cost recovery
for the City Council to review at that time.
FISCAL IMPACT
The cost for this work has not been included in the FY 2012/13 operating budget.
Staff is requesting an additional appropriation from the General Fund (1000) in
the amount of $11,730 to the Parks Division (7800) to complete the lighting plans
and specifications.
STAFF RECOMMENDATION (ROLL CALL VOTE)
Adopt Resolution No. 2012- amending the FY 2012/13 budget to
appropriate $11,730 from the General Fund (1000) to the Parks Division (7800)
to prepare the plans and specifications.
Attachment: Resolution 2012-
459
Honorable City Council
July 18, 2012
Page 4
RESOLUTION NO. 2012-
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF MOORPARK, CALIFORNIA, AMENDING THE
FISCAL YEAR 2012/13 BUDGET TO ALLOCATE
$11,730.00 FROM THE GENERAL FUND (1000) TO
THE PARKS DIVISION (7800) FOR LIGHTING PLANS
AND SPECIFICATIONS
WHEREAS, on June 20, 2012, the City Council adopted the Operating
and Capital Improvement Budget for Fiscal Year 2012/13; and
WHEREAS, a staff report has been presented to City Council discussing
the need for lighting plans and specifications, in order to replace the five (5)
security lights at Campus Park and twelve (12) security lights at Poindexter Park,
in the amount of$11,730.00, and
WHEREAS, an additional appropriation of $11,730.00 is requested from
the General Fund (1000) to the Parks Division (7800) to fund this work, and
WHEREAS, Exhibit "A" hereof describes said budget amendment and its
resultant impact to the budget line item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF
MOORPARK DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment allocating $11,730.00 from the General
Fund (1000) for lighting plans and specifications, more particularly described in
Exhibit "A" attached hereto is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of this resolution
and shall cause a certified resolution to be filed in the book of original resolutions.
460
Honorable City Council
July 18, 2012
Page 5
PASSED AND ADOPTED this 18th day of July, 2012.
Janice S. Parvin, Mayor
ATTEST:
Maureen Benson, City Clerk
Attachment: Exhibit A— Budget Amendment
461
Honorable City Council
July 18, 2012
Page 6
EXHIBIT A
BUDGET AMENDMENT FOR THE GENERAL FUND
FOR LIGHTING PLANS AND SPECIFICATIONS
FY 2012/13
FUND ALLOCATION FROM:
Fund Title Fund Account Number Amount
General Fund 1000-5500 $11,730
Total $11,730
DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS:
BUDGET NUMBER CURRENT BUDGET REVISION ADJUSTED BUDGET
1000-7800-7805-9102 $0 $6,498 $6,498
1000-7800-7801-9102 $0 $5,232 $5,232
Total $0 $11,730 $11,730
Finance approval:
462