Loading...
HomeMy WebLinkAboutAGENDA REPORT 2012 0919 CC REG ITEM 09C ITEM 9.C. OF MOORPARK,CALIF 0t,>..:. City Council fleeting ogw_� g-/9- fat ACTION:_(� - �. MOORPARK CITY COUNCIL -- - -�—�, AGENDA REPORT --- TO: Honorable City Council FROM: Dave Klotzle, City Engineer/Public Works Director Prepared by: Ashraf Rostom, Public Works Superi tendent/ Inspector DATE: September 9, 2012 (CC Meeting of 09/19/12) SUBJECT: Consider Award of Contract for 2012 Sidewalk Reconstruction Project (Project 8001) BACKGROUND The Sidewalk Reconstruction Project is a recurring project to replace damaged sections. of sidewalk, curb and gutter at various locations throughout the City. Public Works staff inspects all public sidewalks for tripping hazards on an annual basis. Minor tripping hazards (typically vertical offsets between three-quarters of an inch and two inches) are removed by grinding the sidewalk down. Larger tripping hazards (typically vertical offsets of two inches or greater) are removed by replacing the damaged sections sidewalk. This project also includes the replacement of damaged sections of curb and gutter that have been identified by staff for replacement. This project includes the replacement of sidewalk, curb and gutter on Poindexter Avenue in front of Chaparral Middle School. These locations were damaged by the roots of trees that have recently been removed. New concrete in the parkway will be added leaving spaces for approximately twenty-four new trees to be planted by the Parks Department after the concrete replacement project is completed. This project will also replace the middle driveway approach to the main school parking lot. The Moorpark Unified School District (MUSD) will reimburse the City for the cost to replace this driveway. DISCUSSION Public Works staff prepared the project plans and specifications and sent a request for construction bids to six construction firms. Of that number, three bids were received and S:\Public Works\Everyone\Reports\Staff Reports\2012\September\09-19-2012(2012 Sidewalk Reconstruction Project Award).doc 146 Honorable City Council September 19, 2012 Page 2 opened on September 7, 2012. The low bidder is Toro Enterprises, Inc., of Oxnard, California. The low bidder possesses the necessary qualifications and experience to perform the work and additionally, is a responsive and responsible bidder. A summary of the bid results is listed as follows: No. JBidder Bid 1 Toro Enter rises, Inc. $149,806.00 2 Berry General Engineering Contractors, Inc. $181,447.50 3 R-Help Construction $188,986.00 The detailed analysis of bids is attached. The Engineer's estimate is $125,000.00. Project administration and construction inspection will be performed by City staff. The anticipated project schedule is as follows: Award of Construction Contract 09/19/2012 Notice to Proceed 10/08/2012 Project Completion 11/30/2012 FISCAL IMPACT The Fiscal Year 2012/13 Capital Improvements Budget includes $125,000.00 of TDA Article 8A (Fund 2603) funds for the construction of this project. The low bid for the project exceeds the budgeted amount by $24,806.00. Staff recommends postponing the replacement of approximately fifteen driveway aprons located on Roberts Avenue, Esther Avenue, and Sherman Avenue, equating to approximately $25,000.00 in replacement costs. Since receiving the bids for construction, staff has determined that significant coordination with the property owners will be required to complete the driveway replacements which may require work to be performed on private property, thus requiring documentation for rights of entry. Staff recommends proceeding with a construction contract for the remaining portions of the project in an amount not to exceed $125,000.00. The coordination and replacement of the driveways mentioned above will be included in a project in the near future. The work included in this project on Poindexter Avenue in front of Chaparral Middle School will cost approximately $26,000.00 including the driveway replacement at an estimated cost of $4,500.00 to be reimbursed by MUSD. SAPublic Works\Everyone\Reports\Staff Reports\2012\September\09-19-2012(2012 Sidewalk Reconstruction Project Award).doc 147 Honorable City Council September 19, 2012 Page 3 STAFF RECOMMENDATION 1. Award a construction contract to Toro Enterprises, Inc., and authorize the City Manager to execute the construction contract, subject to final language approval by the City Manager and City Attorney, in an amount not to exceed $125,000.00 for the subject project. Attachment— Bid Analysis SAPublic Works\Everyone\Reports\Staff Reports\2012\September\09-19-2012(2012 Sidewalk Reconstruction Project Award).doc 148 City of Moorpark 2012 Sidewalk Reconstruction Project-Bid Results Bid Opening:09/07/12 Engineer's Estimate Toro Enterprises Inc. Berry General Engineering R-Help Construction 2101 East Ventura Blvd. 350 West Lewis Street 3255 Grand Vista Drive Oxnard CA,93036 Ventura CA,93001 Newberry Park,CA 91320 Schedule of Work Item# Item Code I Item Description Quantity Unit of Measure Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total 1 702-5 Traffic Control 1 LS $1,000.00 $1,000.00 $12,000.00 $12,000.00 $13,850.00 $13,850.00 $12,000.00 $12,000.00 2 703-5 Remove&Replace Concrete Sidewalk 8700 SF $9.00 $7$,300.00 $7.90 $68,730.00 $10.96 $95,352.00 $11.15 $97,005.00 3 703-5 Remove&Replace Concrete Curb 270 LF $20.00 $5,400.00 $25.00 $6,750.00 $75.73 $20,447.10 $80.00 $21,600.00 4 703-5 Remove&Replace Concrete Curb&Gutter 95 LF $30.00 $2,850.00 $67.00 $6,365.00 $104.20 $9,899.00 $112.00 $10,640.00 5 703-5 Remove&Replace Concrete Driveway Apron 1420 SF $20.00 $28,400.00 $21.00 $29,820.00 $15.18 $21,555.60 $17.00 $24,140.00 6 703-5 Remove&Replace Concrete Curb Ramp 1 EA $1,500.00 $1,500.00 $6,500.00 $6,500.00 $4,510.00 $4,510.00 $4,500.00 $4,500.00 7 704-6 Remove and Replace Asphalt 750 SF $8.00 $6,000.00 $16.00 $12,000.00 $15.60 $11,700.00 $16.00 $12,000.00 8 703-5 Remove and Replace Cross Gutter 40 SF $20.00 $800.00 $41.00 $1,640.00 $83.32 $3,332.80 $90.00 $3,600.00 9 705-1 Provide Coordination 1 LS $1,000.00 $1,000.00 $6,000.00 $6,000.00 $800.00 $800.00 $3,500.00 $3,500.00 10 706-2 Release on Contract 1 LS $1.00 $1.00 $1.00 $1.001 $1.00 $1.00 $1.00 $1.00 Total Bid Amount $125,251.00 1 $149,806.00 $181,447.50 $188,986.00 D v 0 S 3 fD ,-t F� �A