Loading...
HomeMy WebLinkAboutAGENDA REPORT 2012 1017 CCSA REG ITEM 10H ITEM 10.H. 'y Council M.eetin�, MOORPARK CITY COUNCIL CTiOly. 4L AGENDA REPORT ��Q•�y-rn, �Ca. , TO: Honorable City Council FROM: Hugh R. Riley, Assistant City Manage BY: Ky Spangler, Special Projects Consultan DATE: October 9, 2012 (CC Meeting of 10/17/12) SUBJECT: Consider Additional Funding for Grading and Paving Services and Amendment No. 5 to the to the Agreement with Damar Construction, Inc. for the Ruben Castro Human Services Center BACKGROUND & DISCUSSION The Ruben Castro Human Services Center (RCHSC) was constructed as a multiple- prime contract project with construction management provided by Barnhart Balfour- Beatty Construction (Balfour-Beatty). Bids were solicited from trades in September, 2010, opened on October 21, 2010 and bids were awarded by the Moorpark City Council on January 19, 2011. Damar Construction, Inc. (Damar) was selected as the lowest responsive and responsible bidder for the Grading and Paving bid package and a construction agreement was executed on February 25, 2011. Through the course of construction of the RCHSC, amendments to the Construction Agreement were processed to address various changes necessary, including additional soil import and compaction requirements, and revisions generated to civil engineering design amendments. These amendments have totaled $56,142.74 to date. During the last several weeks of construction and as part of the initial and final paving operations, minor additional work was necessary to complete the project. Additionally, the City requested that parking lot stall numbering be added to the scope of work for the project to facilitate designated parking areas for the medical center and tenants in Building B. Also, credits were sought for items that were able to be omitted from the scope based on changes to the sequencing of work flow. The total amount of the changes required to complete the grading and paving component of the project is $5,629.92. 168 Honorable City Council October 17, 2012 Page 2 A recap of the Damar agreement and amendments to date is shown below: Original Contract $411,431.00 Amendment No. 1 $ 33,800.00 Amendment No. 2 $ 7,300.00 Amendment No. 3 (Approved by Council 1/18/12) $ 5,258.00 Amendment No. 4 (Approved by Council 6/6/12) $ 9,784.74 Current Agreement Amount $467,573.74 Amendment No. 5 Additional demolition of pedestrian ramp $ 1,537.67 Parking stall numbering requested by City $ 2,533.00 Striping labor cost (weekend work) $ 2,814.00 Seal coat labor cost (weekend work) $ 546.00 Temporary striping following initial paving $ 2,898.00 Credit for deduction of prime cost $ (3,098.75) Credit for Spring Road driveway patch $ (1,600.00) $ 5,629.92 Deduction for demolition of Catholic Charities trailer $ (25,000.00) Total Amendment No. 5 Amount $ (19,370.08) Revised Agreement Amount $ 448,203.66 Currently there is no contingency available under Damar's contract; however, there is an unused allowance for demolition in the amount of $25,000 remaining in the contract which has already been accounted for in the Project budget. Staff proposes to offset the final construction changes through use of the trailer demolition budget, resulting in a net decrease of $19,370.08 to the construction contract. FISCAL IMPACT The Capital Improvement budget for the Ruben Castro Human Services Center (Fund 5020) is $13,770,119. No additional funds are required to approve this Amendment. 169 Honorable City Council October 17, 2012 Page 3 STAFF RECOMMENDATION Approve Amendment No. 5 to Damar Construction, Inc. for the Ruben Castro Human Services Center resulting in a net decrease of $19,370.08 to the Construction Agreement, and authorize the City Manager to execute Amendment No. 5 subject to final language approval of the City Manager and City Attorney. Attachment 1: Amendment No. 5 to Damar Construction, Inc. 170 ATTACHMENT 1 FIFTH AMENDMENT TO AGREEMENT 2011-061 FOR BID PACKAGE #1 — GRADING AND PAVING AT THE RUBEN CASTRO HUMAN SERVICES CENTER THIS FIFTH AMENDMENT TO THE AGREEMENT FOR BID PACKAGE #16 — ELECTRICAL ("Fifth Amendment"), is made and entered into this day of , 2012, ("the Effective Date") between the City of Moorpark, a municipal corporation, hereinafter referred to as "CITY", and Damar Construction, Inc., a California corporation, hereinafter referred to as "CONTRACTOR". WITNESSETH: WHEREAS, on February 25, 2011, the CITY and the CONTRACTOR entered into an Agreement for grading and paving for the Ruben Castro Human Services Center; and WHEREAS, on May 11, 2011, the CITY and the CONTRACTOR executed a First Amendment in an amount not-to-exceed thirty-three thousand eight hundred dollars ($33,800.00) for additional grading and paving for the Ruben Castro Human Services Center increasing the total not-to-exceed amount to four hundred forty-five thousand two hundred thirty-one dollars ($445,231.00); and WHEREAS, on December 28, 2011, the CITY and the CONTRACTOR executed a Second Amendment in an amount not-to-exceed seven thousand three hundred dollars ($7,300.00) for additional grading work for the Ruben Castro Human Services Center increasing the total not-to-exceed amount to four hundred fifty-two thousand five hundred thirty-one dollars ($452,531.00); and WHEREAS, on February 6, 2012, the CITY and the CONTRACTOR executed a Third Amendment in an amount not-to-exceed seven thousand three hundred dollars ($5,258.00) for additional grading work for the Ruben Castro Human Services Center increasing the total not-to-exceed amount to four hundred fifty-seven thousand seven hundred eighty-nine dollars ($457,789.00); and WHEREAS, on June 28, 2012, the CITY and the CONTRACTOR executed a Fourth Amendment in an amount not-to-exceed nine thousand seven hundred eighty- four dollars and seventy-four cents ($9,784.74) for additional grading work for the Ruben Castro Human Services Center increasing the total not-to-exceed amount to four hundred sixty-seven thousand five hundred seventy-three dollars and seventy-four cents ($467,573.74); and WHEREAS, the CITY wishes to further amend the Agreement to include additional demolition of a pedestrian ramp due to the relocation of the northern driveway on Spring Road at a cost not-to-exceed one thousand five hundred thirty-seven dollars 171 and sixty-seven cents ($1,537.67) as described in the Change Order Proposal dated June 15, 2012, and incorporated herein as Exhibit A to this Fifth Amendment; and WHEREAS, the CITY wishes to further amend the Agreement to include installation of parking stall numbering at a cost not-to-exceed two thousand five hundred thirty-three dollars ($2,533.00) as described in the Change Order Proposal dated August 17, 2012, and incorporated herein as Exhibit B to this Fifth Amendment; and WHEREAS, the CITY wishes to further amend the Agreement to include labor costs for parking lot striping conducted during weekend hours at a cost not-to-exceed two thousand eight hundred fourteen dollars ($2,814.00) as described in the Change Order Proposal dated August 17, 2012, and incorporated herein as Exhibit C to this Fifth Amendment, and WHEREAS, the CITY wishes to further amend the Agreement to include labor costs for slurry sealing conducted during weekend hours at a cost not-to-exceed five hundred forty-six dollars ($546.00) as described in the Change Order Proposal dated August 21, 2012, and incorporated herein as Exhibit D to this Fifth Amendment, and WHEREAS, the CITY wishes to further amend the Agreement to include the cost of temporary parking lot striping at a cost not-to-exceed two thousand eight hundred ninety-eight dollars ($2,898.00) as described in the Change Order Proposal dated August 23, 2012, and incorporated herein as Exhibit E to this Fifth Amendment; and WHEREAS, the CITY wishes to further amend the Agreement to include a credit for the elimination of the parking lot prime cost at a deductive cost not-to-exceed three thousand ninety-eight dollars and seventy-five cents ($-3,098.75) as described in the Change Order Proposal dated September 20, 2012, and incorporated herein as Exhibit F to this Fifth Amendment; and WHEREAS, the CITY wishes to further amend the Agreement to include a credit for driveway patching at Spring Road at a deductive cost not-to-exceed one thousand six hundred dollars ($-1,600.00) as described in the Change Order Proposal dated September 20, 2012, and incorporated herein as Exhibit G to this Fifth Amendment; and WHEREAS, the total dollar amount of $5,629.92 for the additional grading and paving services exceeds of the ten percent (10%) contingency amount approved with the original Agreement; and WHEREAS, the CITY wishes to further amend the Agreement to include the deduction of the trailer demolition allowance in the amount of twenty-five thousand dollars ($-25,000.00) from the original Agreement; and Construction Agreement Page 2 of 4 Fifth Amendment Between City of Moorpark and Damar Construction, Inc. 172 WHEREAS, on October 17, 2012 the City Council of the City of Moorpark approved the costs for the additional grading and paving services, and applying these costs against the trailer demolition allowance included in the original construction agreement. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto AMEND the aforesaid Agreement follows: I. Section 2 of the Agreement is amended to include: CONTRACTOR'S Scope of Services is amended to include the labor, materials, and equipment required to: • expand demolition limits to include a pedestrian ramp due to the relocation of the north project driveway on Spring Road per Change Order Request dated June 15, 2012; and • install parking lot stall numbering per the request of the City of Moorpark per Change Order Request dated August 17, 2012; and • install final parking lot striping during weekend hours per Change Order Request dated August 17, 2012; and • install a final seal coat for the project parking lot during weekend hours per Change Order Request dated August 21, 2012; and • provide temporary driveway striping following the initial driveway paving necessary for issuance of a certificate of occupancy, and per Change Order Request dated August 23, 2012; and • deduct the cost to provide the parking lot prime coat per the direction of the City Engineer/Public Works Director and per Change Order Request dated September 20, 2012; and • deduct the cost to patch the southern driveway on Spring Road per Change Order Request dated September 20, 2012. The Scope of Services for the additional grading and paving work is described on the Change Order requests dated June 15, August 17, August 21, August 23, and September 20, 2012 respectively, attached hereto and incorporated herein as Exhibits A, B, C, D, E, F and G to this Agreement by this Fifth Amendment. II. Section 7 of the Agreement is amended to include: CITY hereby decreases the not-to-exceed amount of $467,573.74 under this Agreement by $-19,370.08 to $448,203.66. Construction Agreement Page 3 of 4 Fifth Amendment Between City of Moorpark and Damar Construction, Inc. 173 Ill. Remaining Provisions All other terms and conditions of the original Agreement shall remain in full force and effect. CITY OF MOORPARK DAMAR CONSTRUCTION, INC. By: By: Steven Kueny Erbie Daw City Manager President ATTEST: Maureen Benson, City Clerk Exhibit A — Contractor's Change Order Proposal dated June 15, 2012 Exhibit B — Contractor's Change Order Proposal dated August 17, 2012 Exhibit C — Contractor's Change Order Proposal dated August 17, 2012 Exhibit D — Contractor's Change Order Proposal dated August 21, 2012 Exhibit E — Contractor's Change Order Proposal dated August 23, 2012 Exhibit F — Contractor's Change Order Proposal dated September 20, 2012 Exhibit G — Contractor's Change Order Proposal dated September 20, 2012 Construction Agreement Page 4 of 4 Fifth Amendment Between City of Moorpark and Damar Construction, Inc. 174 a J_ EXHIBIT A June 15, 2012 O C0NSTAUCT10N INC. CONTRACTOR'S LICENSE NO.722632 Balfour-Beatty 300 E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: Dennis Kuykendall RE: Ruben Castro HSC—Moorpark, CA— Bid Pack#2—Grading & Paving Costs Associated With I13#9—Revision#1 Dennis: Per Instruction Bulletin#9 (IB#9)which we received on 517/12, we are forwarding the associated costs due to the civil changes. Please see the attached spreadsheets and change order worksheets for the cost breakdowns showing labor, equipment, mark-up and bond premiums. We have separated the costs out for the individual items that were changed. They are as follows: Cut Subgrade for Added Ribbon Gutter: $2,676.93 Gut Out Additional Sectional Thickness For Turn-outs: $782.48 Gut Out Additional Sectional Thickness For Trash Pad Approach: $391.24 Remove/Recom act Sp2ills Due To Grade Chan es-NIE Parking; S4,149.43 dditional Demolition and Haul-off for North DW Entrance: $1,537.67 In addition to the increase in costs, we are requesting 3 working days for this added work. If you should have any questions, please contact our office at(805) 654-8438. Sincerely, Dama onstruction, Inc. aso calini stimator 1-02-Costs Associated IB#9-rev1 Enclosure 4773 ORTEGA STREET • VENTURA, CA 93003 PHONE 805 654-8438 FAX 805 654-8553 175 '��} truction, Inc. Costs Associated With IB#9 o/1�/LU.L z'^ega Street Additional Demo for North DW Entrance CA 93003 i 5%Subs- Item { Qiy. Unit Labor Rate; Labor Ext. Tx/Ins/SS Tx/Ins/SS Ext. Equip Equip.Ext. Mtls Mtls Ext. Sub-Total 15%LEM I Total Additional Demo for North DW Entrance Operator 4 Hr $41.84 $167.36 $29.86 $119.44 $0.00 $0.00 $0.00 $0.00 $286.80 $43.02 $329.82 2105kipioader 4 Hr $0.00 $0.00 $0.00 $0.00 $39.75 $159.00 $0.00 $0.00 $159.00 $23.85 $182.85 Concrete Cutting/Breaking 4 Hr $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $140.00 $560.00 $560.00 $28.00 $588.00 Dump Fees 1 Ld $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $380.00 $380.00 $380.00 $57.00 $437.00 Totals $167.35 $119.44 $159.00 $445.80 $66.87 $1,537.67 N J 01 EXHIBIT B Ji- I August 17, 2012 , CONSTRUCTION INC. Balfour-Beatty CONTRACTOR'S LICENSE NO.722632 300,E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: Dennis Kuykendall RE: Ruben Castro HSC-Moorpark, CA--Bid Pack#2—Grading,.& Paving Request For Change Order—'Add Stall Numbers per City's`Request Dennis: As requested, we are forwarding this proposal for the addition of stall numbering in the parking lot. Add for Stall Numbering: $2,533.00. If you should have any questions,please contact our office at (805) 654-8438. Sincerely, Damar Construction, Inc. E-02-RFCO-Add alini Stall Numbers 4773 ORTEGA STREET VENTURA,CA 93003 PHONE 605 654-8438 FAX 805 654-8553 177 Ourr,11C DLAL & Zill<IFE X001 Airport*Highway' Street* Parking Lot Striping*Markers•Thermoplastic Signs Sealcoat*Crackfill LIC.#396027 4MBE/SBE/UDBE VZU03 CHANGE ORDER COMPANY: DANAR CONST ATTN, JASON CITY: PHONE: 654-8438 FAX: 654-8553 ZIP: JOB NAME: RUBEN CASTRO HUMAN SERVICES-PACKAGE 2,MOORPARK,CA ADDRESS: CITY: PLANS: SPECS: ESTIMATOR: SHARON EMAIL: Sharon su persealandstdpe.com BID DATE ACCEPTANCE START DATE COMPLETION DATE 8113/2012 1 ITEM# DESCRIPTION QTY U/M U.C. TOTAL INSTALL IN ONE COAT PAINT TEMPORARY STRIPING 1 LS $2,110.00 $2,110.00 INSTALL STENCILING NUMBERS 1 LS $2,412.00 $2,412.00 INSTALL AT PREMIUM RATE FOR WEEKEND WORK I LS $2,680.00 $2,680.00 R30A SIGN 2 EA $305.00 $610.00 21 1 l 5/- 2 2/6-bt? + THIS PROPOSAL EXCLUDES THE FOLLOWING: REMOVAL OF EXISTING STRIPING/PAVEMENT MARKINGS ANY ADDITIONAL WORK IN EXCESS OF THE QUANTITIES PRICE WILL BE BILLED AT THE ABOVE UNITS, NO DISCOUNTS GIVEN FOR UNDER-RUNS WITHOUT THE APPROVAL OF SUPER SEAL&STRIPE. PRICE ES NOT INCLUDE PREMIUM FOR SATURDAY OR SUNDAY WORK HOURS CALL TIM TANNER FOR SCHEDULING-(805)432-3620 PAGE 1 OF 2 ITOTAL $7,812.00 A CONTRACT AND TEN(10)WORKING DAYS NOTICE MUST BE GIVEN PRIOR TO STARTING WORK. UPON ACCEPTANCE PLEASE SIGN AND RETURN.ABOVE PRICE NOT VALID AFTER 30 DAYS. P.O.BOX 755,FILLMORE,CA 93016-0755 (805)524-7345-FAX(805)524-7428 LIC.#396627 SSE/DBE/WBE CCA-8087 178 Ju E L-� 4 EXHIBIT C August 17, 2012 CONSTRUCT10N INC. Balfour-Beatty CONTRACTOR'S LICENSE NO.722632 300 E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: Dennis Kuykendall RE: Ruben Castro HSC— Moorpark, CA Bid Pack#2—Grading & Paving Request For Change Order—Striping To Take Place On Sunday Dennis: As requested, we are forwarding this proposal for the increase in price to perform the permanent striping on Sunday 9123112. Add for striping on Sunday: $21814.00 If you should have any questions, please contact our office at (805) 654-8438. Sincerely, Damar Construction, Inc. E4 en scalini stimator 11-02-RFCO-Stri ping on Sunday 4773 ORTEGA STREET • VENTURA, CA 93003 • PHONE 805 654-8438 FAX 805 654-8553 179 -�'Z U rr IK bUAL & S11<1VE IM 001 Airport*Highway*Street'Parking Lot Striping*Markers*Thermoplastic Signs Sealcoat*Crackfill LIC.# 396627 *MBE/5BEI UDBF- 92003 CHANGE ORDER COMPANY: DAMAR CONST ATTN: JASON CITY: PHONE: 654-8438 FAX: 654-8553 ZIP: JOB NAME: RUBEN CASTRO HUMAN SERVICES-PACKAGE 2, MOORPARK, CA ADDRESS: CITY: PLANS: SPECS: ESTIMATOR: SHARON EMAIL: sharon su persealandstripe.corn BID DATE ACCEPTANCE RT DATE COMPLETION DATE 8/1312012 1 . ITEM# DESCRIPTION QTY U/M U.C. TOTAL INSTALL IN ONE COAT PAINT TEMPORARY STRIPING 1 LS $2,110.00 $2,110.00 INSTALL STENCILING NUMBERS 1 LS $2,412.00 $2,412.00 INSTALL AT PREMIUM RATE FOR WEEKEND WORK 1 LS $2,680.00 $2,680.00 R30A SIGN - 2 EA $305.00 $610.00 92l 1 io- 21?-)to %F 21-1 1 f A- 5/- �2 533 2 2 THIS PROPOSAL EXCLUDES THE FOLLOWING: REMOVAL OF EXISTING STRIPING/PAVEMENT MARKINGS ANY ADDITIONAL WORK IN EXCESS OF THE QUANTITIES PRICE WILL BE BILLED AT THE ABOVE UNITS. NO DISCOUNTS GIVEN FOR UNDER-RUNS WITHOUT THE APPROVAL OF SUPER SEAL&STRIPE. I PRICE DOES NOT INCLUDE PREMIUM FOR SATURDAY OR SUNDAY WORK HOURS I CALL TIM TANNER FOR SCHEDULING-(805)432-3620 PAGE 1 OF 2 TOTAL $7,81-27050 A CONTRACT AND TEN(10)WORKING DAYS NOTICE MUST BE GIVEN PRIOR TO STARTING WORK. UPON ACCEPTANCE PLEASE SIGN AND RETURN.ABOVE PRICE NOT VAUD AFTER 30 DAYS. P.O. BOX 755,FILLMORE,CA 93016-0755 (805)524-7345-FAX(805)524-7425 LIC.#396627 SBE/DBE/WBE CCA-8087 180 EXHIBIT D f-T ((1 August 21, 2012 V __1 CON STOUCTiON Balfour-Beatty CONTRACTORS LICENSE NO.722632 300 E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: Dennis Kuykendall RE: Ruben Castro HSC— Moorpark, CA-Bid Pack#2—Grading & Paving Request For Change Order-Apply Seal Coat on a Saturday Dennis: As requested,we are forwarding this proposal for the additional costs to apply the seal coat on a Saturday. If you review the attached proposals (original bid dated 10/21110 and the revised proposal dated 8/2/12) you will see a base difference of$520:00. V11ith the allowable mark up,of. 5% on subs, the total request amounts to: Seal Coat on Saturday: $546.00 If you should have any questions, please contact our office at (805, ) 6, 54-8.4.38. Sincerely;' Darnar Construction, Inc. ) son iscalini stimator 1-02-RFCO-Seal Coat on Saturday Enclosure 4773 ORTEGA STREET • VENTURA, CA 93003 • PHONE 805 654-8438 FAX 805.654-8553 181 im Oil Spreading Services, Inc Proposal %i6 Mission Rock Road October 21,2010 Santa Paula.CA 93060 1 806-647-0693 Fax 805-525-4438 Contrail l.ic#62.5518 Project: #9647 Demar Consrction-seal coat 4) 10-M- Client: Jason Fiscalini Job Site: #9547 Demur Construction, Inc. Ruben Castro Building 4773 Ortega Street' 812 Spring Street Ventura,Ca.93403 Moorpark,Ca. Phone(805)664-8438 'Mobile(B05)258-4215 Fax(805)6544YM COMPANY INFORMATION Ca�traciors,license 17t�nlberl32.5a'L9 SCOPE OF WORK Please accept our proposal for performing the following work. Square footage=38,158 (excludes striping) 1) Thorouahty clean the esostinIl asphalt of loose dirt and light debris using high.powar blowers and brooms. 2 This proposal is based on 1 days work, 3) Apply 1 coat of Black Diamond asphalt sealer to the entire area. 4,) All water needs to be turned off 24 hours prior to and 24 hours after our work is complete. 6.) All traffic to stay:off of nowly coated surfacs for a 24-48 hours,or until completely dry. 6.) T_his.prgposal:rs-good for 75 days. Thank you Brian'Came Add to below price if second coat can be installed same day.. $1,730.00 Add to below.price if second coat must be installed on different day.' $3,000.00 PAYMENTS. The Owner agrees to pay any and all payments according to the payment schedule detailed below.Should said Payment(s)not be made,or'rf satisfactory arrangements for.payment have not been made,the Contractor reserves the right to stop all work unfit such time as payment is rendered or satisfactory:payment rrangements have been made, All prices are good for thirty days unless agreed otherwise in writing.. Customer must fumish ,prellminety,Information at our request. Total price for the completion of this project 53,573.42 1.) ;Payment due upon completion of_job. COD EXCLUSIONS 11) We are not liable for cleaning of seal coat off of concrete aprons,curbs,gutters,stamped concrete or re-striping due to the negligence of others. 2_) Customer must remove all ground in or caked on mud&dirt prior to our arrival on site. At�CEPIMCE_ You are hereby authorized to proceed with this worst as stated in this proposal. Please call to discwa yr.nrri,rn Signed: Date: PtcEst E9knadng 182 Western Oil Spreading Services, Inc roposa1 736 Mission Rock Road August 2,2012 Santa Paula,CA 83060 a05-647-0693 Fax 805-525-4438 `�R1�2DAr Contractors Lic#625519 t�VBfL1� FJL0fo5q L Project: #9547 Damar Construction-seal coat Client: Jason Fiscalini Job Site. #9547 PROPOSAL FOR SATURDAY WORK Damar Construction, Inc, Ruben Castro Building 4773 Ortega Street 612 Spring Street Ventura,Ca.93003 Moorpark,Ca. Phone;(805)654-8438 Mobile,(605)256-4215 Fax; (605)654-8553 COMPANY INFORMATION Contractors license number 825519 SCOPE OF WORK Please accept our proposal for performing the following work. Square footage 38,156 (excludes striping) FOR SATURDAY WORK. 1.) Thoroughly clean the existing asphalt of loose dirt and tight debris using high power blowers and brooms: 2 This proposal is based on 1 days.work, 3.) Apply 1_coat of Black Diamond asphalt sealer to the entice area. ; 4.) :All water needs to be turned off 24 hours prior to and 24 hours after our work Is complete. 5.) AII traffic to stay off of newly coated surface for a Z4-48 hours,or.until completely dry. , B.) This proposal is good for.75 days_ Thank you:__Brian Corrie Add to below price K second coat can.be installed same day. $1.730;00 Add tq_below'price If second_coat must be Installed on different day. $3,000.00 PAYMENTS The Owner agrees to pay any and all payments according to the payment schedule detailed below,Should said Payments)not be made,or if ZU63fa6tory arrangements for payment have not been made,the Contractor reserves the right to stop all work until such time as payment is rendered or satisfactory payment arrangements have been made. All prices are good for thirty days unless,agreedethervvise'in writing. Customer must furnish putAminary Information at our request_ Total price for the completion of this project: $4,093.42 1.) Payment due upon completion of job. COD ' '° EXCLUSIONS Llvacr,�nt:520 "' 1.) We are not liable for cleaning of seat coat off of concrete aprons,curbs,gutters,stamped concrete or re-striping due to the negligence of others. 2.) Customer must remove all ground In or caked on mud t;,dirt prior to our arrival on site. ProEaf Eatimaung ne r of �` 183 EXHIBIT E i August 23, 2012 - CON'STRU CT ION INC. CONTRACTOR'S LICENSE NO.722632 Balfour-Beatty 300 E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: Dennis'Kuykendall RE: Ruben Castro HSC—Moorpark, CA- Bid Pack#2—Grading & Paving Request For Change Order—Temporary Parking Stall Striping Dennis: As requested, we are forwarding this proposal for the temporary striping of the parking lot stalls. This temporary striping is to be single line and only one coat. This includes the handicap stalls as well. This does not include any stall numbering, stop bars, curb.markings or any other items beyond the parking stalls. Temporary Parking Stall Striping: $2,898.00 In addition to the increase in costs, we are requesting 1 working day for this added work. If you should have any questions, please contact our office at (805) 6548438. Sincerely, Damar Construction, Inc. Aso` 'scalini stlmator 11-02-Temporary Single Line Parking Stall Striping-rev. 4773 ORTEGA STREET • VENTURA, CA 93003 • PHONE 805 654-8438 • FAX 805 654-8553 184 vo/ GJLGVIL' Iq.VU rn,v - JUI'L'tt ,L'AL Ik Stt<3!'E I�QQ1 _ Airport' Highway`Street" Parking Lot Striping*Markers Thermoplastic t- Signs*Sealcoat*Crackfill t LIC.#.396627 '*MBE/SBEI UDBIE REVISED CHANGE ORDER COMPANY:-DAMAft-CONST ATTN: JASON.' CITY PHONE:-654-8438. FAX:,654-8553 ZIP: JOB NAME _RUBEN-CASTRO HUMAN SERVICES-PACKAGE 2MOORPARK,GA ADDRESS: _ - �GITY.. PLANS: '- .. SPECS: ESTIMATQR'SHARON EMAIL .sharon sd persealandstrl` e_com BID DATE 8113(2012 ACCEPTANCE START DATE COMPLETION-DATE 8!23[2012 ITEM# DESCRIPTION-:_ QTY =U/M U.C.`- TOTAL :. INSTALL-1N ONE"COAT PAiNTTEMPORARY STRIPING"`* 1 L5 1$2,760:00 $2,760.00 INSTALL STENCILING'NUMBERS 1 LS $2,412.00 $2,412;00 INSTALL AT PREMIUM RATE FOR WEEKEND WORK 1 LS $2,680,00. $2,680.00 R30A SIGN 2 EA $305:00 $610,00 "*"CIANCLUDE.FOUR HANDICAP STALLS AND DEUVER RED PAINT FOR CURB MARKING.''_- �ievl�ti� THIS.PROPOSAL EXCLUDES THE FOLLOWING: REMOVAL OF;EXISTING STRIPINGIPAVEMENT MARKINGS _=ANY ADDITIONAL_VORK IN EXCESS OF THE QUANTITIES_PRICE WlLL;BE 81LLED AT THE ABOVE UNITS, NO DISCQUNTS GIVEN FOR1jNDER=RUNS-WITHOUT71HE APPROVAL OF SUPER SEAL'&STRIPE. - PRICE DOES NOT INCLUDE PREMIUM FOR SATURDAY OR SUNDAY W ORK HOURS CALL`=_TIM TANNER FOR SCHEDULING 805 432-3620 _ -PAGE- OF 2 TOTAL $8,462:00 A CONTRACT-ANO TEN;(10)WORKING DAY'S NOTICE MUST 8E GIVEN PRIOR TO STARTING WORK - UPON ACCEPTANCE'PLEASE SIGN ANO;RETURN-A60VE PRICE NOT VALID AFTER 30 DAYS - P.O.BOX 755,FILLMORE,CA_93016-0755 (805)524-7345-FAX.(805)524-2428 LIC.#E 396627 SBEIDBE/Wl3E CCA-8087. 185 y EXHIBIT F o z Y 'xx rr September 20, 2012 Q CONSTRUCTION INC. Balfour-Beatty CONTRACTOR'S LICENSE NO.722632 300 E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: John Squillace RE: Ruben Castro HSC—Moorpark, CA—Bid Pack#2—Grading & Paving Request For Change Order—Credit for the Deletion of Prime Coat John: As requested, we are forwarding this credit for the deletion of the prime coal Credit for Deletion of Prime Coat: <$3,098.75> If you should have any questions, please contact our office at(805) 6548438. Sincerely, Damar Construction, Inc. F-O2-RFCO-Credit lini for Deletion of Prime Coat 4773 ORTEGA STREET - VENTURA, CA 93003 - PHONE 805 654-8438 - FAX 805 654-8553 186 Squillace, John Jr From: Hammond, Jeff Sent: Monday, August 06, 2012 2:57 PM To: Jason Fiscalini Cc: Kuykendall, Dennis; Squillace, John Jr; Butts, Dan Subject: FW: Prime Coat For your use. Prime coat no longer required. Jeff Hammond I Superintendent CISEC,QSP office: 805.983.1558 1 mobile:805.815.1523 ( email:jeffhammond @balfourbeattyus.com Balfour Beatty Construction 1 300 E. Esplanade Drive,Suite 1120,Oxnard, Calif.93036 lwww.balfourbeattyus.com Connect with us: Facebook I Twitter I YouTube I Linkedln Proud to be one of FORTUNE magazine's 100 Best Companies to Work For—three years in a row! From: Dave Klotzle [mailto:DKlotzle @ci.moorpark.ca.us] Sent: Monday,August 06, 2012 2:55 PM To: Hammond,Jeff Cc: sanderson @rjreng.com; Dave Klotzle Subject: RE: Prime Coat I agree that prime coat on the base course is not needed. Thanks, Dave Klotzle,P.E. City Engineer/Public Works Director City of Moorpark 799 Moorpark Avenue Moorpark,CA 93021 (805)517-6285 dklotzleCa.ci.moorpark.ca.us From: Hammond,Jeff[mailto:Jeff iammond@balfourbeattyus.com] Sent: Monday, August 06, 2012 2:15 PM To: Dave Klotzle Cc: sanderson @dreng.com Subject: FW: Prime Coat The project is completing the drive approach at Fitch and Minor.This may be accomplished as early as Wednesday. This may allow us to accelerate the paving schedule.Your thoughts on prime coat can assist in this discussion.Thanks. Jeff Hammond I Superintendent CISEC,QSP office: 805.983.1558 1 mobile:805.815.1523 1 email:ieffhammond balfourbeattyus.com Balfour Beatty Construction 300 E. Esplanade Drive,Suite 1120, Oxnard,Calif.93036 lwww.balfourbeattyus.com Connect with us:Facebook Twitter I YouTube I Linkedln Proud to be one of FORTUNE magazine's 100 Best Companies to Work For—three years in a row! i 187 EXHIBIT G 1r 0 - September 20, 2012 O y 'K CONSTRUCTION INC. Balfour-Beatty CONTRACTOR'S LICENSE NO.722632 300 E. Esplanade Dr., Suite 1120 Oxnard, CA 93036 Attn: John Squillace RE: Ruben Castro HSC—Moorpark, CA—Bid Pack#2—Grading & Paving Request For Change Order—Deduct for Patching @ Spring Road Entrances John: As requested, we are forwarding this credit for the A/C patching at the Spring Road Entrances. This work was picked up by another contractor during the off-site work that was done. Credit for A/C Patching @ Spring Road Entrances: <$1,600.00> If you should have any questions, please contact our office at(805) 6548438. Sincerely, Damar Construction, Inc. F-02a-RFCO-Credit calini for A/C Patch @ Spring Road Entrances 4773 ORTEGA STREET - VENTURA, CA 93003 - PHONE 805 654-8438 - FAX 805 654-8553 188