Loading...
HomeMy WebLinkAboutAGENDA REPORT 2011 0105 CC REG ITEM 10DMOORPARK CITY COUNCIL AGENDA REPORT ITEM /'.5. "A-v- C /. —_. _ . to ,7 4:2see -.J � -ce TO: Honorable City Council FROM: Dave Klotzle, Interim City Engineer /Public Works Director DATE: December 23, 2010 (CC Meeting of 01/05/11) SUBJECT: Consider Plans and Specifications and Authorization to Advertise for Bids for the Construction of a Traffic Signal at Collins Drive and University Drive — Project 8078 BACKGROUND In May 2005, a traffic signal warrants analysis was performed at the intersection of Collins Drive and University Drive. The analysis found that the installation of a traffic signal at this location is warranted based on traffic volume and accident history. In May 2008, the City and the Ventura County Community College District ( "District ") entered into a settlement agreement which requires the City to complete the construction of the subject traffic signal by June 30, 2011. That agreement further requires the City to fund the design and construction of these improvements using the District's tax increment allocation for property taxes received from the Moorpark Redevelopment Agency. The settlement agreement stipulates that the District's tax increment allocation is to be transferred to the City for the period of Fiscal Year 2006/07 to Fiscal Year 2024/25, up to a cap of $1,000,000. On February 4, 2009, the City Council approved this project by establishing Project 8078 in the City's Capital Improvement Budget. The firm of Hartzog and Crabill was retained to prepare the plans and specifications for the project. Project plans and specifications have now been completed and the project is ready to advertise for bids for construction. DISCUSSION The proposed improvements include all the signal poles, electrical equipment, video detection system, traffic signs and thermoplastic striping for a fully signalized, four -way intersection. The signal improvements can be constructed without the need for additional S \PubhC Wortcs'Everyone�Reports,Statf Reports\201 IUan"ary\01 05 11 (Collins & University Signal Aavertise) aoc 94 Honorable City Council January 5, 2011 Page 2 right -of -way. On October 6, 2010, the City Council authorized staff to proceed with the procurement of the traffic signal poles, controller and cabinet to expedite the project. It is anticipated that the poles and equipment will be available when the Notice to Proceed with construction is issued. The preparation of plans and specifications for the project has been completed and a copy of the bid documents has been placed on top of the file cabinet in the City Council Conference Room for review by the City Council. The anticipated project schedule is as follows: Advertise for Bids 01/0712011 Bid Opening 02/15/2011 Award of Construction Contract 03/02/2011 Notice to Proceed 04/04/2011 Project Completion 05/27/2011 FISCAL IMPACT This project is funded from the College District's tax increment allocation for property taxes received by the Moorpark Redevelopment Agency (Fund 4000). The estimated project costs are summarized as follows: Description Total ($) Design 33,240 Construction Expenses ($) City Acquired Poles, Cabinet and Controller 42,000 Traffic Signal Construction Contract 180,000 Construction Total 222,000 Inspection 10,000 Total 265,240 The current Fiscal Year 2010/11 budget for this project is summarized below. S \Public WoncsxEveryonexReoortskStaN Reports\201 Wanuarpol 05 11 (Collins d University Signal Aavertise) aoc 95 Prior Years FY 2010/11 Total Account No. Expenses ($) Budget ($) Budget ($) 4000.8310.8078.9601 - Design 9,630 23,610 33,240 4000.8310.8078.9640 - Construction 0 175,000 175,000 4000.8310.8078.9650 - Inspection 0 10,000 10,000 Total 9,630 208,610 218,240 S \Public WoncsxEveryonexReoortskStaN Reports\201 Wanuarpol 05 11 (Collins d University Signal Aavertise) aoc 95 Honorable City Council January 5, 2011 Page 3 At the time of contract award, staff will present a budget amendment to allocate additional funds as required based on the actual construction bid. STAFF RECOMMENDATION Approve the plans and specifications for the subject project and authorize staff to advertise for construction bids. S kPubilc WoncsiE veryonekReportsiStatt ReportsQ0 t WanuarylO 1 05-11 (Coilins d University Signai Advertise) doc 96