AGENDA REPORT
TO: Honorable City Council
FROM: Hugh R. Riley, Assistant City Manager
BY: Ky Spangler, Special Projects Consultant
DATE: October 19, 2011 (CC Meeting of 11/2/11)
SUBJECT: Consider Amendment No. 6 to Architectural Agreement with HMC
Architects (HMC) for Design Revisions for Driveway Realignment,
Site Boundary Wall and Storm Drain System Modifications, and
Separating Water Meters for Ruben Castro Human Services
Center
BACKGROUND & DISCUSSION
HMC was awarded the full design contract for the Ruben Castro Human Services
Center (RCHSC) in 2006. As the design process has progressed, amendments to the
contract have been necessary to provide for additional design services, tenant
improvement plans, the addition of an emergency generator for the facility, and changes
associated with the Ventura County Medical Center (those specific costs being borne by
the County of Ventura).
With the commencement and progress of construction, minor plan updates and site
design revision needs have become necessary. These include an update to the
Stormwater Pollution Prevention Plan per State requirements; refinements requested by
the Southern California Regional Rail Authority ("Metrolink") with respect to the northerly
Spring Road driveway location and northern site boundary wall materials; modifications
to the onsite storm drain system to provide drainage along the site boundary wall based
on the City Engineer's recommendations; and minor courtyard concrete design
modifications to appropriately provide structural support for the Art in Public Places
sculpture recently approved by the City Council.
Additionally, original design plans did not include separate water meters for each
building which are necessary to allow for the Ventura County Medical Center to be billed
independently from other Ruben Castro Human Services Center tenants.
93
Honorable City Council
November 2, 2011
Page 2
HMC is providing professional services and direction to their subconsultants, including
the project Civil Engineer, to modify the plans as necessary to accommodate the
project's needs and regulatory requirements.
The following figure illustrates the additional fee proposal:
Total current contract through Amendment No. 5 $1,383,443
Task #1 $9,215
(Revisions to water services and updates to SWPPP)
Task #2 $12,600
(Revisions to storm drain system, site boundary wall
and courtyard modifications for Art in Public Places)
Total Amendment Amount $21,815
Total New Contract Amount $1,405,258
FISCAL IMPACT
The Fiscal Year 2011/12 approved Capital Improvement budget for the Ruben Castro
Human Services Center includes $318,711 within Fund 2905 for Design/Engineering
costs. There are sufficient funds in the project budget (5020) to pay for the proposed
$21,815 increase.
STAFF RECOMMENDATION (ROLL CALL VOTE)
Approve Amendment No. 6 to the professional services agreement with HMC to
increase the amount of the agreement by $21,815 for design revisions from $1,383,443
to $1,405,258 and authorize the City Manager to execute said amendment, subject to
final language approval by the City Manager and City Attorney.
Attachment 1: Amendment No. 6
94
SIXTH AMENDMENT TO AGREEMENT 2006-029
FOR ARCHITECTURAL DESIGN AND CONSULTING SERVICES
THIS SIXTH AMENDMENT TO THE AGREEMENT FOR SERVICES ("Sixth
Amendment"), is made and entered into this day of , 2011,
("the Effective Date") between the City of Moorpark, a municipal corporation, hereinafter
referred to as "CITY", and HMC Architects, a California corporation, hereinafter referred
to as "CONSULTANT'.
WITNESSETH:
WHEREAS, March 21, 2006, the CITY and the CONSULTANT entered into an
Agreement for architectural design and consulting services for the Ruben Castro
Human Services Center; and
WHEREAS, December 29, 2009, the CITY and the CONSULTANT entered into
a First Amendment for additional design fees to reflect increases in construction costs
since the original Agreement was signed; and
WHEREAS, February 16, 2010, the CITY and the CONSULTANT entered into a
Second Amendment for additional design fees for Clinicas tenant improvements and
landscape changes; and
WHEREAS, August 10, 2010, the CITY and the CONSULTANT entered into a
Third Amendment to delete certain unnecessary design fees and add additional fees to
reflect additional changes that were made to the project; and
WHEREAS, February 25, 2011, the CITY and the CONSULTANT entered into a
Fourth Amendment to provide an allowance for reimbursable expenses; and
WHEREAS, June 14, 2011, the CITY and the CONSULTANT entered into a Fifth
Amendment to include additional design fees for changes requested by the County of
Ventura Health Care Agency to the Health Services Building that will be purchased by
the County of Ventura; and
WHEREAS, the CITY wishes to amend the Agreement to include additional
minor plan updates and site design revisions with respect to items that have arisen
during the construction process.
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto AMEND the aforesaid Agreement as follows:
Professional Services Agreement Page 1 of 2
Sixth Amendment Between City of Moorpark and HMC Architects 95
I. Section 3 of the Agreement is amended to include:
CITY hereby increases the maximum payable under this Agreement by $21,815
for minor plan updates and site design revisions in accordance with Exhibit "A".
The new maximum contract amount is $1,405,258.
II. Section 4 of the Agreement is amended to include:
CONSULTANT will incorporate plan updates and site design revisions to the
Ruben Castro Human Services Center plans in accordance with Exhibit "A"
dated October 19, 2011, attached.
Ill. Remaining Provisions
All other terms and conditions of the original agreement shall remain in full force
and effect.
CITY OF MOORPARK HMC ARCHITECTS
By: By:
Steven Kueny Kate Diamond
City Manager Principal
ATTEST:
Maureen Benson, City Clerk
Exhibit A— Consultant's letter proposal dated October 19, 2011
Professional Services Agreement Page 2 of 2
Sixth Amendment Between City of Moorpark and HMC Architects 96
EXHIBIT A
October T9,2011
(Supersedes Previous Letter Dated October 10, 2011)
Mr. Hugh Riley
Assistant City Manager
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93201
j�
111 V 1CArchitects Dear Mr. Riley.
HMC Architects sincerely appreciates your time and attention to the review of this revised
Add Service Request. Contained herein is the Civil scope originally contained in the Add
Service Request submitted to you on August 15, titled "Task #1", below. Additionally, as
requested by the City of Moorpark we have included, titled "Task #2", revisions for both
Civil and Architectural Services pertaining to the Metrolink driveway and site wall
revisions, storm drain redesign, and courtyard flatwork changes due to the City furnished
sculpture, which bring us up to date with forseable changes for these scopes. We had
previously reviewed and modified the costs included in Task#1, and ensure you that the
same level of scrutiny was utilized in review of Task #2 costs. Please feel free to contact
us to discuss any of the items that follow.
A. Scope of Work:
Task#1 -Civil Engineering services for sitework and utility design as follows:
- $2,880: Project re-start
- $ 990: Revisions due to City comments
- $ 270: CADD files to Construction Manager
- $ 855• Review SWPPP prepared by others for SWPPP certification
- $3,510: Modify utility plans to provide a separate water service to
each building with an independent meter
Task#2-Civil Engineering services for Metrolink Coordination and Storm Drain
Redesign as follows:
- $2,000: Revise onsite storm drain system to connect to new proposed
offsite storm drain main line
- $1,800: Revise onsite Hydrology and Hydraulics
- $1,600: New onsite storm drain system design to pick up offsite
Metrolink sheet flows
- $1,200: Revise location of northerly driveway
- $2,000: Project Management and Approvals
Task#2 -Architectural Design Services for Metrolink Coordination, Storm Drain
Redesign, and Courtyard Redesign for new Artist Sculpture, as follows:
- $4,000. Meeting Coordination and attendance, drawings and CAD
updates, Construction Administration and Consultant
coordination
633 W.5th Street,Third Floor/Los Angeles,CA 90071 /T 213 542 8300/www hmcarchitec ts.corn c� 97
Mr. Hugh Riley
Assistant City Manager
October 19, 2011
(Supersedes Previous Letter Dated October 10, 2011)
Page 2
B. Compensation:
HMC ARCHITECTS will provide the additional services outlined in the Scope of
Work above for a fixed fee of Twenty-one Thousand, Eight Hundred and Fifteen
Dollars ($21,815)as follows:
Task#1:
AMEC: $ 8,505
HMC: 1,710
Subtotal: $ 9,215
Task#2:
AMEC: $ 8,600
HMC: 4,000
Subtotal: $12,600
Total Revised Fee:
C. Additional Services:
If Additional Services are required beyond the original Scope of Work, HMC will
bill on an hourly basis per Attachment"C", HMC Rate Schedule.
D. Reimbursable Expenses:
Reimbursable expenses including costs related to printing, plotting and delivery
charges in the interest of the project are in addition to compensation for Basic
and Additional Services. These expenses shall be billed by the Architect to
the Owner at one and one tenth (1.10) times the expense incurred by the
Architect and Architect's Consultants.
Please review this Proposal and if you have any questions, please contact me at(213)
542-8300, ext. 110.
Sincerely, (�
Emily Kay,Kay, CCCA, LEE AP
Associate
EK:le
Encls.: Attachment"A"-AMEC Add Service Breakdown, Task#1
Attachment"B"-AMEC Proposal Dated September 28, 2011, Task#2
Attachment"C"-HMC Hourly Rate Schedule
cc: L.Eloff,J.Woolum,K.Diamond,File-CN-AOA
11La•1Wofe0sVNvj Ws12307 Moorpark Human Sery Cen1er=Z01 CMAOXPending OANrmen Add SvckL-HFLIey Add Svcs for
Cw i Engineering 110726.Rev 111004 doc
98