HomeMy WebLinkAboutAGENDA REPORT 2016 0518 CCSA REG ITEM 09A ITEM 9.A.
CITYOF MOORPARK,CALIFORNIA
City Council Meeting
Of—
MOORPARK
fMOORPARK CITY COUNCIL AC :
AGENDA REPORT �, . _ o/ ,
TON
Y. i. .O
TO: Honorable City Council �f
FROM: Sean Corrigan, City Engineer/Public Works Director y7,4,..
Prepared by: Shaun Kroes, Program Manager
DATE: April 29, 2016 (CC Meeting of 05/18/16)
SUBJECT: Consider Resolution Approving the Ventura County Transportation
Measure Investment/Expenditure Plan and Determination of Exemption
from the California Environmental Quality Act; and Authorize the City
Clerk to Transmit the Adopted Resolution to the Ventura County
Transportation Commission, Acting as the Ventura County Local
Transportation Authority
BACKGROUND
At a special meeting of the Ventura County Transportation CommissionNentura County
Local Transportation Authority (VCTC or Commission) held Friday, April 22, 2016, the
Commission approved, by a 14-0 vote, the attached draft Ventura County Transportation
Measure Investment/Expenditure Plan (Plan) for distribution to all cities within Ventura
County and the County of Ventura (Attachment 1). The action by the Commission is the
first formal step, pursuant to Public Utilities Code(PUC) Section 180206,towards placing a
transportation sales tax measure on the November 2016 general election ballot. This
action followed a presentation by VCTC's voter research consultant, Dr. Richard Bernard,
of the firm Fairbanks, Maslin, Maulin, & Metz who presented results from recent polling of
600 likely Ventura County voters that showed that 67% were in favor of a half-cent sales
tax measure for transportation investments, projects and programs. The 67% level of
support is critical since a transportation measure is considered a"special tax"and as such
state law requires two-thirds voter approval for passage.
DISCUSSION
The Plan approved by the Commission is a 30-year$3.3 billion transportation investment
strategy funded by a countywide half-cent sales tax and would be distributed in general as
described in the table on the following page.
123
Honorable City Council
May 18, 2016
Page 2
Investment/Expenditure Plan Component 30 Year Total %
1. Local Streets and Roads $1,650,000,000 50.00%
2. Freeway Program $ 660,000,000 20.00%
3. Regional Roads/Military Access/Freight Movement $ 227,700,000 6.90%
4. Bus Transit Enhancements & Fare Support $ 191,400,000 5.80%
_5. Commuter Rail Enhancements $ 191,400,000 5.80%
6. Bicycle and Pedestrian Improvements $ 99,000,000 3.00%
7. Transportation Environmental Mitigation $ 198,000,000 6.00%
8. State Board of Equalization Fees $ 49,500,000 1.50%
9. Admin/Taxpayer Oversight $ 33,000,000 1.00%
Total $3,300,000,000 100.00%
A clear area of concern for Ventura County residents and virtually all transportation
stakeholders is the importance of maintaining local streets and roads. This message was
heard through VCTC's voter research as well as through the community meetings as VCTC
developed the VCTC Comprehensive Transportation Plan. The Ventura County
Investment/Expenditure Plan recognizes this concern and allocates $35 million annually,
the largest amount of any category, to a local streets, roads, and transportation priorities
program. This funding, which is 50% of the funds generated, would be distributed by
VCTC directly to cities and the County of Ventura for local street and road needs and local
transportation priorities as determined by City Council and the Board of Supervisors.
Based on the street lane miles formula recommended by the Ventura County City
Managers group, the amount of funding for local transportation needs and priorities for the
City of Moorpark is projected to be $1.21 million, annually.
The remaining 50% of the funds will be focused on regional transportation priorities
administered by the Commission. Over the 30-year Plan life, $660 million (20% of
measure revenues) will match an equivalent amount of State and Federal transportation
funds to provide major improvements to the US 101 corridor through urban Ventura County
and improvements to State Route 118 between Simi Valley and Moorpark.
The Regional Road/Freight Movement program is allocated approximately$228 million to
fund regional roads, arterials, and state highways that play a significant role in the safe and
efficient movement of freight, provide access for Ventura County's military installations and
connect Ventura County communities on routes other than freeways.
Public Transit, including bus and passenger rail transit, is allocated a combined $383
million (nearly 12% of measure revenues) split evenly between bus transit enhancements
124
Honorable City Council
May 18, 2016
Page 3
and commuter rail enhancements. The bus system enables mobility for those who do not
drive or do not have a vehicle and offers a choice to those who do. Measure funding would
be used to ensure fares are kept affordable for those who need it most: seniors, students,
people with disabilities and veterans and will fund the expansion of bus services,
connections, bus infrastructure and improvements to countywide services. Commuter and
passenger rail plays an important part in the overall transportation mix. Funding from the
measure provides a stable and continuous source of funding for Metrolink rail operations,
ensuring that passenger rail remains an option for commuters, and provides funding for
additional capital improvements when needed.
A comprehensive transportation system must support all modes, including bicycles and
walking. The Plan includes $99 million that will be used to match Federal and State funds
and includes funding for cycling and pedestrian projects such as Class 1 dedicated bike
and pedestrian trails, improved street bike lanes and signage on routes connecting
communities and safe routes to schools. It is anticipated that with local funds being used
consistent with Complete Streets ordinances this program will enable local jurisdictions to
make transformative investments in bicycle and pedestrian projects.
Lastly, from a funding allocation perspective, the Plan allocates $198 million for capital
investments and programs that have a transportation nexus to the natural environment.
This program will match State and Federal resource agency grants, foundation grants and
other non-governmental organization grants to fund restoration efforts and protect habitat
impacted by transportation infrastructure. This program will also support local agency
efforts to reduce runoff from highways, streets and roads, and maintain and improve
drainage filters and facilities.
The Plan has strict safeguards and accountability measures, including an independent
Taxpayer Oversight Committee and requires annual independent audits. Administration
expenses are capped at 1% as required by law. The Plan includes a "maintenance of
effort" provision to ensure the funds augment existing funds, not replace existing local
investments.
The law requires that at least six (6) Ventura County cities representing no less than
50%+1 of the incorporated population plus the Board of Supervisors approve the Plan
before the Commission can request that the measure be placed on the ballot. Every city
council and the Board of Supervisors is being asked to approve the Plan during the months
of May and June by Resolution (Attachment 2). Assuming the requisite number of cities
consisting of the required population and the Board of Supervisors approve the Plan, the
Commission will consider the required ordinance adopting the final plan at the regularly
scheduled July 8th Commission meeting. State law requires a two-third's affirmative vote
for the ordinance to be approved. Additionally the Commission may then act to formally
125
Honorable City Council
May 18, 2016
Page 4
request that the Board of Supervisors place the sales tax revenue measure including the
Plan on the November 2016 ballot.
The decision to prepare the draft Ventura County Transportation Measure
Investment/Expenditure Plan and approve it for distribution to and consideration by Ventura
County and the cities therein pursuant to Public Utilities Code Section 180206 is part of the
process for creation of a government funding mechanism and is exempt from the California
Environmental Quality Act pursuant to CEQA Guidelines Section 15378(b)(4). The
Community Development Director has reviewed the exemption and concurs.
FISCAL IMPACT
None at this time. If the Plan is approved by Ventura County voters, it is estimated that the
City will receive $1.21 million annually for streets and roads projects. The City will also be
eligible for funding generated by the sales tax for transit and environmental improvements.
STAFF RECOMMENDATION
1. Adopt Resolution No. 2016- approving the Ventura County Transportation
Measure Investment/Expenditure Plan and Determination of Exemption from the
California Environmental Quality Act; and
2. Authorize the City Clerk to transmit the Resolution to the Ventura County Local
Transportation Authority
Attachments:
1. Ventura County Transportation Investment/Expenditure Plan
2. Resolution No. 2016-
126
Attachment 1
VENTURA
,,
COUNTyz
1
TRANSPORTATION _:
INVESTMENT/
EXPENDITURE PLAN ,,,,
,,,
.,
., . _,._ ..„,,_ ,. ,„ ,J _ mo ,;
Fillmore 111
KEEP TRAIN`_ � o KEEP BUS FARE
�:
& BUSES ROLLIN _ , ,
-*-1640
IMPROVELOW FOR
LOCAL STREETS 23 SENIORS &
VETS
entura DISABLED
Q Ofel ® Santa Paula
0 REPAIR BIKE PATHS
REGIONAL ROADS CONNECTING COMMU► IES db
IP
Q °' ® Camari ALL FUNDS
STAY LOCAL
IMPROVE Thousand
SAFETY AT INTERSECTIONS
& RAIL CROSSINGS ^ Oaks
U
Oxnard eine CREATE JOBS
FIX OUR BOOST
:ill FREEWAYS LOCAL ECONOMY
ANNUAL AUDITS PEDESTRIAN
&TIGHT FINANCIAL
CONTROLS IMPROVEMENTS
ENVIRONMENTAL
PRESERVATION 4
Ventura County CLEAN WATER
_V/' C7'C= Transportation RUN O F F
`' Commission
127
VENTURA COUNTY TRANSPORTATION
INVESTMENT/EXPENDITURE
PROGRAM T H E
PLAN
Investment/Expenditure Plan Component 30 Year Total Percent of Total
1. Local Streets and Roads $1,650,000,000 50.0%
2. Freeway Program $660,000,000 20.0%
3. Regional Roads/Military Access/ Freight Movement $227,700,000 6.9%
4. Bus Transit Enhancements & Fare Support $191,400,000 5.8%
5. Commuter Rail Enhancements $191,400,000 5.8%
6. Bicycle & Pedestrian Improvements $99,000,000 3.0%
7. Transportation Environmental Mitigation $198,000,000 6.0%
8. State Board of Equalization Fees $49,500,000 1.5%
9. Admin/Taxpayer Oversight $33,000,000 1.0%
Total $3,300,000,000 100.0%
Transportation touches every area of our collected in Ventura County, which should
lives on a daily basis and we often overlook help support local roads, go to other
its importance. We expect our roads to counties that offer local matching funds. All
carry us safely and efficiently to where we this contributes to a transportation system
want to go, that we have options to driving which cannot meet our current or future
and can bike, walk or take a bus. Business needs. Local investment in our transportation
owners need and should have easy access system enables Ventura County to compete
to their locations for their workers, customers for federal and state funds and bring your
and goods so that Ventura County's economy tax dollars back to the County.
thrives. Mobility is an essential ingredient in
the quality of life that we've come to expect The Ventura County Transportation
in Ventura County. Commission/Ventura County Local
Transportation Authority (VCTC) coordinates
The transportation system that enables funding for most transportation activities in
mobility in Ventura County is beginning Ventura County and believes now is the time
to show the strain of many years of for residents to invest in the future and
under-funding. Highways once free flowing repair, preserve and improve the transportation
are now congested, pot holes are an all too system that adds so much to Ventura County's
familiar sight on city streets and bus and rail quality of life. The VCTC has been talking
services are struggling just to maintain with communities throughout the County
current schedules and fares. and has developed this County Transportation
Investment/Expenditure Plan, pursuant to
While maintenance costs are increasing Public Utilities Codes section 180206 that
significantly, State and Federal funding for prioritizes investments in the areas that residents
transportation is diminishing and typically want to see improvement in, hereinafter
requires a commitment (sometimes dollar for referred to in the "Plan" that is set forth in
dollar) for a local investment before funds - the following pages.
are allocated. Absent local funding, taxes
1
128
INVESTMENT IN LOCAL STREETS,
ROADS & TRANSPORTATION
PRIORITIES ESTIMATED INVESTMENT:
Whether by car, bus, bike or walking, nearly This Plan includes assistance for the cities and
every trip in Ventura County begins on a the County of Ventura that must maintain
local street. The upkeep and maintenance our local streets. A total of 50 percent of all
of local streets and roads affects all of us as Plan funds, approximately $1,650,000,000,
we travel throughout our day. Typically, we would be returned to local jurisdictions to
only think about streets and roads when the augment their revenues for the maintenance
conditions start to deteriorate. Every city and improvement of the nearly 2,500 miles
and the County of Ventura have expressed of local streets and local transportation
and quantified their struggle to maintain the systems. To ensure an equitable distribution
condition of local streets and have advised of those funds to the local jurisdictions, a
of a substantial shortfall in funding just to formula has been developed by the cities
maintain road conditions in their current and the County of Ventura, that a) provides
state. a minimum of$500,000 to each jurisdiction
annually; b) provides the County of Ventura
with 22.3% of the local street and roads
funds; c) allocates the remainder of local
streets and roads funds based on the
percentage of lane miles within a jurisdiction.
Each jurisdiction will receive funds as shown
in the table below.
INVESTMENT LOCAL STREETS & ROADS
Juris.criction Approximate Percentage Approximate 30 Year Total- Approximate I Year Total
Camarillo 8.64% $142.4 $3.02
Fillmore 1.59% $22.7 $0.50
Moorpark 3.45% $56.9 $1.21
Ojai 1.59% $24.7 $0.53
Oxnard 15.31% $252.6 $5.36
Port Hueneme 1.59% $26.3 $0.56
San Buenaventura 12.66% $208.8 $4.43
Santa Paula 2.04% $33.6 $0.71
Simi Valley 14.13% $233.1 $4.94
Thousand Oaks 17.02% $280.9 $5.96
County of Ventura 22.3% $367.9 $7.79
2
129
INVESTMENT IN LOCAL STREETS,
ROADS & TRANSPORTATION
PRIORITIES ESTIMATED INVESTMENT:
The County of Ventura and the cities are ;_
-
best positioned to determine their local °
needs for maintenance and improvements * 4r'
and thisro ram is designed to
p g g give local
jurisdictions the greatest flexibility in the use
of these funds. Local jurisdictions may apply � ---
these funds to any transportation related
project including but not limited to street
repair, pavement maintenance, road
- •
widening, installation of bike lanes, side-
walks, pedestrian walkways, transit stop
improvements, contributions to transit
services, Safe Routes to School Programs, _ .r ,; '�
Intelligent Transportation Systems (ITS), ' • -'` `
and/or other transportation projects as local
jurisdictions deem necessary for the
betterment of their residents under the
conditions as follows:
• The funds distributed through this Plan
to local jurisdictions are intended to
augment local jurisdictions' funds that
are normally or typically designated for
transportation programs or projects.
Local jurisdictions must continue their
normal practices to fund transportation
projects.
• To ensure that all users of streets and
roads are considered, all jurisdictions
must be compliant with Assembly Bill
1358, the California Complete Streets
Act of 2008. If a jurisdiction has not yet
updated its circulation plan to include a
complete streets element, it may utilize
the first year's Plan allocation to become
compliant but no other funds will be allo-
cated until the jurisdiction has completed
a Complete Streets Plan as required by
the legislation.
• All jurisdictions must comply with re-
porting requirements by submitting a
five year Capital Improvement Plan out-
lining the anticipated use of Plan funds,
provide an annual accounting of Plan
funds expended, and provide a timely
use of Plan funds report for review by
the Taxpayer Oversight Committee.
3
130
FREEWAY
PROGRAM
$660 MILLION
Traffic relief is the focal point of the freeway
program in the Plan.Over the past 10 years '. 1
Caltrans with funding allocated by VCTC has built
several freeway traffic flow improvement projects, -.. �a�.; ,t.� �! --- -
thanks to the 2006 passage of Proposition 1B,a 0!ikt<1:*-
_
statewide transportation bond measure. However, '
as the economy has improved traffic has become ��-,. •_
a source of frustration for commuters and - -- ' • -- ; . •
businesses alike,especially on sections of 101
and 118 that have not recently been improved.All
of the Proposition 1B funds are now spent and •
meanwhile other state funds for road improve- •1 'I ti
ments have dwindled.With current state and
federal funding it will be many years before there
can be any new freeway traffic flow improvement
projects started in Ventura County.
This Plan will implement critically-needed freeway
projects to improve the 101 and 118 freeways. By
making local tax funds available,state and federal
funds available for freeways can be leveraged
more quickly. The funding plan for these
improvements includes the cost of related
environmental mitigation measures such as new
soundwalls and water runoff pollution control
features.
The Plan and tax measure make available $660
million for the freeway program. The overall
transportation program is also funded using 100%
of expected State Transportation Improvement
Program revenue ($249 million) and 100% of
federal Surface Transportation Program funds
($332 million), for a total of$1,241,000,000.
•
4
131
FREEWAY PROGRAM
Route 101 from Ventura/Los Route 118 from Route 23 in
Angeles County Line to Route 33 Moorpark to Tapo Canyon Road
in Ventura in Simi Valley
Route 101 is the"Main Street"of Ventura County Thanks to Proposition 1B, Route 118 has been
and most of this freeway has not been improved widened from Tapo Canyon Road in Simi Valley
since the 1980's.Congestion has become much to the Ventura/Los Angeles county line at
worse in the past 10 years,causing several major Santa Susanna Pass Road. However, choke-
bottlenecks, including those near the Moorpark points have now formed at Tapo Canyon, and
Road, Rice Avenue,and Johnson Drive inter- also at the western end of the 118 Freeway
changes,as well as the entire stretch through where it joins the wider 23 Freeway.
Camarillo.
The Plan includes widening over 9 miles of
The freeway carries an average of 140,000 freeway between Tapo Canyon and Route 23,
vehicles per day,and traffic congestion is to eliminate the traffic bottlenecks and
expected to increase by 50%by 2035.The increase safety. Besides adding lanes, the
planned improvements will improve traffic flow, widening plan includes soundwalls, a concrete
increase safety,and expedite VCTC Intercity median safety barrier, and interchange and
Bus service over 28 miles through Thousand bridge improvements. Caltrans will take the
Oaks,Camarillo,Oxnard,and Ventura, by adding lead in implementing the project with VCTC
carpool lanes in the center median and merging administering the funds. When completed, the
lanes between interchanges.Additionally, local project will result in Routes 23 and 118 forming
interchanges will be rebuilt to accommodate a continuous freeway of 3 lanes in each
mobility and safety improvements. VCTC will direction from the 101 in Thousand Oaks to
take the lead in the project,with Caltrans Collins Drive in Moorpark, and 4 lanes in each
providing oversight in its role as the freeway direction from Collins Drive in Moorpark to
owner/operator. Specific improvements will be Santa Susana Pass Road near Simi Valley.
subject to approved plans developed in Specific improvements will be subject to
cooperation with local jurisdictions and affected approved plans developed in cooperation with
communities. local jurisdictions and affected communities.
n Fillmore
232
.smr tea-- �' - m�...,- -..
• WWW /
K^ ,..,.....-.«...... Li
42 a aoo.Pe:k
del
• 5
132
REGIONAL ROADS/
MILITARY ACCESS/ ESTIMATED
FREIGHT MOVEMENT INVESTMENT:
$227.7 MILLION
Freight movement plays a vital role in The project will build a bridge for Rice
maintaining Ventura County's economy. It's Avenue to pass over the tracks and also
particularly important to keep freight over Fifth Street. Traffic ramps will be built
flowing quickly and safely to and from the to connect Rice and Fifth.
Port of Hueneme as well as to allow people
and goods to access Naval Base Ventura • Enhance traffic flow, safety, and pavement
County without degrading local traffic. The strength on the main access route serving
County's regional roads and state highways the Port of Hueneme, by implementing
play a significant role in connecting together the following: (1) widening Hueneme Road
the cities within the County, and linking Routes from 2 to 4 lanes from Edison Drive to Rice
101 and 126. Avenue;and (2) Install safety improvements
and strengthen pavement on Rice Avenue
The proposed road improvements will reduce from Route 101 to Hueneme Road.
the chance of auto, truck and bicycle
accidents in rural areas. These projects will • Better connect 101 and 126 through the
also make it easier for residents to access following projects: (1) widen from 2 to
freeways, for emergency vehicles to respond 4 lanes Rose Avenue from Central in
quickly to serious incidents, and for goods, Oxnard to Route 118 in Saticoy, Rice Avenue
including agricultural products, to move freely from Auto Center Drive in Oxnard to 118
throughout Ventura County. The final scope in Saticoy, and Central Avenue between
and project limits of all improvements will be Santa Clara Avenue and Del Norte Road in
determined through noticed public hearings, Oxnard; and (2) improve the Rose/118 and
environmental clearance process, and agree- Rice/118 intersections in Saticoy.
ment with affected agencies.
• Construct other projects selected by
Congress recently authorized a new federal VCTC on a competitive basis. Projects
• program to annually make available $1.9 bil- will be selected based on congestion
lion nationwide for freight projects. Given that relief,safety improvement,cost effectiveness,
VCTC has already developed a comprehensive project readiness, and similar criteria to be
transportation plan that addresses freight determined. State highways including but
movement needs, Ventura County is well- not limited to, State Route 1, 23, 33, 34, 232,
positioned to benefit from this federal and 150 will be eligible for these funds.
program, but only if there are local funds to
leverage the newly-available federal funds. • Implement qualifying projects in the
This Plan will provide those necessary funds. local jurisdictions' General Plan Circulation
Elements.
The Plan will provide nearly $228 million for
the regional road program. Under the Plan this
funding would be used to leverage an
additional $63 million over 30 years from the
newly-established federal freight program. Ventura
The projects will be implemented by local
jurisdictions such as the County of Ventura r ✓�+ �r
and the cities.
Gamar1110
**A Oxnard ZZ
The Plan includes the following projects:
Port cis., i
• Improve safety and traffic flow on Rice o w°'.: ueneme
Avenue at Fifth Street in Oxnard, by
eliminating the train crossing which has
been the site of several recent accidents.
6
133
BUS TRANSIT ENHANCEMENT
& FARE SUPPORT
PROGRAM ESTIMATED INVESTMENT:
,. . 4 .:aFP ... ..... ........
Improving bus transit is a key component in II ,
Ventura County's transportation system. The r
bus system enables mobility for those who _
j,'
don't drive and offers a choice to those who ' .'r
do. Underscoring the need for improved bus '.
service is the projection from the U.S. Census I .14x77
Bureau that the 65 and older population will /
double by 2030. The bus transit elements of ` •
this Plan benefits people who live in Ventura
County by keeping fares affordable for
seniors, youth/students, veterans, and . : ; ,
people with disabilities, and maintaining and
expanding bus, and demand responsive
services. This program provides transit
operators with a flexible, consistent funding
source for maintaining, restoring, and
improving transit services in Ventura County.
Countywide Affordable Fares
Program: $38,280,000
The plan provides funding for regional fare
programs that keep fares affordable for
seniors, youth/students, veterans, and people
with disabilities. VCTC will work collaboratively
with all Ventura County transit operators,
providing direct funding to keep fares
affordable and utilizing proven technologies
and fare mediums to ensure an effective and
sustainable program.
County Transit Improvement
Program: $153,120,000
This program provides funds for local
solutions to the growing transportation
needs through a flexible need-based process
that will expand public transit services
(including services to seniors and persons
with disabilities) through increased
frequencies, neighborhood feeder services,
peak hour commute and express service,
bus-rapid transit, expanded bike/bus
programs, vehicles purchases, capital
improvements and improved connectivity
through enhanced intercity and intercounty
service.
7
134
$191.4 MILLION
These funds will maintain and increase safe _
and reliable commuter/passenger rail service � =
for Ventura County residents. This program -�� ---
provides a stable and continuous source of I _likiu w -• ,i�>'�,
funding for Metrolink commuter rail service. Ilvirl,- ,,
.
Metrolink commuter rail service is critical +
to all residents of Ventura County to relieve - -
congestion and provide a commute ''"' _ .-
alternative. Moreover, Metrolink service plays -
a key role in our environment, by reducing ,/
vehicle emissions to keep our air clean. This
plan provides the funds to continue f
commuter/passenger rail operations in
Ventura County and make the needed safety
and capital improvements on all commuter/
passenger rail lines and support operating
costs. Eligible expenditures are capital and
operating costs.
Legend
Metrolink Stations
11111 Metrolink Tracks
'1- Coast Mainline
v U3.i
Fillmore
•
01 i ‘-'-'7,:1-7-,..r.--:-.'-'''-VaaWra, SiniValayi--
_ — <,-
Oxnard _ '' s
_ Hi H� Thousand
oaks
Port
8
135
INVESTMENT IN
BICYCLE & PEDESTRIAN ESTIMATED
IMPROVEMENTS INVESTMENT.
$99 MILLION
A comprehensive transportation system
must ensure that all modes of transportation
are integrated
udes intotit anced or supported.
ortted This � - -Plan
ns
specifically for bicycle and pedestrian - : !.1.�" n l
projects. A total of 3% of all Plan funds, ` • ,r ,. J.`, °'o l4lyilb�l�E(li"�,
approximately $99,000,000, will be ;�,_s ' '1
dedicated for bicycle and pedestrian '•�
projects. ,
. . � \\\\\\\1\jl',
1)4.:�
���
Funding would occur through a competitive ,�
grant program designed to improve both 111 1 -1
the bicycling and pedestrian infrastructure '
throughout Ventura County. Funds could be
used for planning, project development,
construction, maintenance and/or to match
federal and/or state grant funds including
but not limited to Safe Routes to School
Programs, Active Transportation Program
(ATP) and Congestion Mitigation and Air
Quality (CMAQ). Along with the cities and
the County of Ventura, school districts,
colleges, and universities would be eligible
to compete for these funds.
These funds are meant to augment any
existing funds and not as a replacement for
funds that an entity has historically used for
this activity. Each grant recipient would be
subject to requirements for the timely use of
funds and an annual reporting of expenditures
for review by the Taxpayer Oversight
Committee.
9
136
TRANSPORTATION INVESTMENT
IN THE NATURAL ESTIMATED INVESTMENT:
ENVIRONEMENT $198 MILLION
A transportation system that ensures „,`
mobility throughout Ventura County adds „ay!
substantially to the quality of life but
development of that transportation system
cannot ignore the impacts that it may have 1
on the environment. While individual
projects in this Plan would include project
specific mitigations, this program includes a
total of 6% of all Plan funds, approximately
$198,000,000, for transportation invest- Priority will be given to projects that have
ments that enable the preservation and/or
improvement of Ventura County's natural strong community and stakeholder support,
environment. demonstrated readiness, and the ability to
attract matching funds, grants, and in-kind
A regional advanced mitigation program will contributions from local state, federal and
enhance funding for individual project non-profit entities. Projects must provide a
mitigations by enabling comprehensive, direct nexus to transportation and may
rather than piecemeal mitigation of the include but are not limited to:
environmental impacts of major regional
transportation improvements funded by • Reduction or elimination of runoff from
the Plan. Funds will be available to provide highways, streets and roads including
high-value, landscape-scale benefits such drainage improvements; bioswales and
as habitat protection, wildlife corridors, biofiltration channels; maintenance of
and watershed protection in exchange for catch basins, filters and screens; or other
streamlined programmatic permits and water quality improvements.
approvals from regulatory agencies such as: • Protection and/or restoration of habitat
• California Department of Fish and and watersheds including wetlands, rivers,
Wildlife streams, riparian corridors, and removal or
• U.S. Fish and Wildlife Service modification of fish passage barriers that
State and Regional Water Quality are or have been impacted by transporta-
• Control Boards tion infrastructure.
• U.S. Army Corps of Engineers
• U.S. Environmental Protection Agency • Infrastructure or programs designed to
enhance and protect opportunities for
Funding would occur through a competitive human interaction in natural areas such as
grant program, based upon an open, hiking trails, raised trails, biking trails, trail
science-based process, involving interested, bridges, signage, or other improvements.
knowledgeable stakeholders, to ensure Along with the cities and the County of
maximum benefit and protection to impacted Ventura, special districts, Caltrans, California
areas and sensitive,threatened and endangered
habitat and species. Funds could be used Department of Fish and Wildlife, U.S. Fish
for planning, project development, land and Wildlife and U.S. Army Corps of
acquisition, construction, maintenance, and/ Engineers would be eligible to compete for
or to match other grant funds. these funds. Each grant recipient would be
subject to requirements for the timely use of
funds and an annual reporting of expenditures
for review by the Taxpayer Oversight
Committee.
Plan funds must augment, not replace,
existing transportation related environmental
quality, environmental mitigation, water
quality and watershed expenditures.
10
137
ADMINISTRATION,
ACCOUNTABILITY & ESTIMATED
OVERSIGHT INVESTMENT:
$33 MILLION
Implementation of the Transportation No Diversion of Funds
Investment/Expenditure Plan and all Funds can be spent only on projects and
spending is subject to the following specific programs that serve Ventura County out-
safeguards and requirements to ensure that lined in the Plan. Under no circumstances
sales tax funds collected for the Plan may may these funds be appropriated by the
be spent only for the purposes identified in State of California or any other entity not
the Plan. Under no circumstances may the identified in the Plan. The state and other
proceeds be applied to any purpose other public agencies may qualify for grant
than transportation and transportation- funding identified elsewhere in the Plan.
related improvements, projects, and
programs benefitting Ventura County, Open Decision Making Process
including administration of the Plan, the All decisions must be made through a fully
costs of which will be limited to one percent noticed public process. The Commission
of funding over the 30-year life of the Plan. will hold noticed public meetings subject to
Under no circumstances may these funds the Brown Act open meeting law; prepare
be diverted or appropriated by the State of annual budgets, strategic plans and annual
California or any other governmental spending reports with full public review and
agency. The State and other public agencies participation.
may qualify for grant funding identified
elsewhere in the Plan. Strict Limit on Administrative
Administration Costs
Cost for staff salaries and benefits to
Plan and Sales Tax Duration administer the Plan will be strictly limited to
no more than one percent of the revenues
The duration of the Plan will be thirty years
or $33 million over thirty years. Costs of
beginning April 2017 and terminating March administration include reasonable consultant
2047. The Plan and the sales tax revenue costs; reasonable attorneys' fees, including
cannot be extended unless they are re- costs of defense of the Plan or the sales tax
submitted to the voters under the laws and measure; and the costs of the election
regulations in effect at that time. seeking voter approval of the sales tax.
Governing Body Annual Spending Limit
The governing body for the Plan will be A limit on the amount that the Commis-
the Ventura County Transportation sion may spend annually will be established
Commission (Commission), acting as pursuant to Section 4 of Article XIII B of the
the Local Transportation Authority under California Constitution.
the Local Transportation Authority and
Improvement Act, California Public Utilities Maintenance of Effort
Code Section 180000 et seq. The Pursuant to California Public Utilities Code
Commission consists of seventeen Section 180000 (e), it is the intent of this
voting members as follows: Plan that funds generated by the sales tax
of be used to supplement, not replace, existing
• oard of AllSupervisors five members rs of the Ventura County local revenues used for transportation
Bpurposes.
• A mayor or councilmember from each of
the ten cities in Ventura County
• Two citizen representatives
11
138
ADMINISTRATION, ACCOUNTABILITY
& OVERSIGHT CONT.
Comprehensive Review of Progress Matching Funds
and Performance Leveraging matching funds from federal,
At least every ten years, a comprehensive state and local sources is strongly encouraged
review of all programs and projects and incentivized by the Plan. Any sales tax
implemented under the Plan will be under- funds made available through replacement
taken to evaluate the status and performance by matching funds will be allocated to
of the overall program. The review shall another project or program of the same type
include consideration of changes to local, as outlined in the Plan and shall not be
state and federal transportation plans and diverted to any other use.
policies; changes in land use, travel and
growth projections; changes in environmental Project and Program Financing
standards and policies; changes in project "Pay as you go" is the preferred method of
cost estimates and revenue projections; financing transportation improvements and
project constraints; level of public support operations under the Plan. However, the
for the Plan; and the progress of the Commission may and is authorized to use
Commission and local jurisdictions in bond financing as an alternative method if
implementing the Plan. The Commission may the scope and timing of planned expenditures
amend the Plan based upon its comprehensive makes "pay as you go" infeasible. If used,
review, subject to the following amendment bonds will be repaid with the proceeds of the
process. sales tax. Costs associated with bonding,
including interest payments, will be borne
Amendments Require 2/3rd only by the capital projects or programs in
Support of the Commission the Plan that utilize bond proceeds. All costs
The Plan may be amended to provide for the and risks associated with bonding will be
use of additional federal, state or local presented in the Commission's strategic plan
revenues, to account for unexpected and subject to public comment before any
revenues, to take into consideration unfore- bond sale is approved.
seen circumstances or respond to a
comprehensive review. An amendment must
be adopted by a two-thirds vote of the
Commission acting as both the Commission
and the Local Transportation Authority. The
public and all jurisdictions in the County will
be given a minimum of 45 days to comment
on any proposed amendment.
12
139
AUDITS & ANNUAL
SPENDING REVIEW
All funds will be subject to an annual audit, • Each city and the County of Ventura
and all expenditures will be reviewed annually shall solicit and appoint a member of the
by a Taxpayer Oversight Committee. public from its jurisdictional boundaries
to the Committee. Appointees should
Taxpayer Oversight Committee have expertise in one of the following
The Taxpayer Oversight Committee will have areas: accounting, active transportation,
the responsibility to review and oversee all construction, environmental sciences,
expenditures of sales tax funds under the engineering, finance, mobility, public
Plan. The Committee reports directly to the transit, or project management. Terms
public and has the following responsibilities: of service will be four (4) years with no
appointee serving more than two terms.
• Hold public hearings and issue reports on
at least an annual basis to inform Ventura Commitments from Fund Recipients
County residents about how sales tax • All local jurisdictions receiving funds
funds are being spent. Meetings and hear- under the Plan for transit, roads, highways,
ings of the full Committee will be open to bicycle and pedestrian improvements,
the public and subject to the Brown Act goods movement, and environmental
open meeting law. enhancements must expend funds
expeditiously and report annually on
• The Committee will have full access to completed or committed expenditures
the Commission's independent auditor and any future planned expenditures.
and will have the authority to request and The reports will be made available to the
review specific information regarding the public.
use of sales tax funds and to comment on
the auditor's reports. • All recipients of funds allocated under
the Plan will be required to sign a Master
• The Committee will have access to all Funding Agreement which details their
sales tax audit reports prepared for role and responsibilities in spending the
local jurisdictions who receive sales tax funds. Funding agreements will include
allocations under the Plan. performance and accountability measures,
and recipients will be required to have an
• The Taxpayer Oversight Committee will annual audit conducted by an independent
prepare an annual report on spending and CPA to ensure that funds are managed
progress in implementing the Plan, and and spent in accordance with the require-
will make an annual finding, published ments of the Plan and Master Funding
and given broad distribution through- Agreement.
out Ventura County, as to whether the
Commission is proceeding in accordance Annual Budget and Strategic Plan
with the Plan. Each year the Commission will adopt an
annual budget that projects expected sales
• Taxpayer Oversight Committee tax receipts, other anticipated revenues and
members will be private citizens who are planned expenditures for administration,
not elected or appointed officials at any programs and projects under the Plan. The
level of government, nor public employees Commission will also prepare a strategic plan
from agencies that either oversee or that will identify the priority for projects, and
benefit from the proceeds of the sales tax. dates for project and/or program implemen-
Membership is limited to individuals who tation based upon readiness, the ability to
live in Ventura County. Members will be attract matching funds and other relevant
required to submit an annual statement criteria. Both the budget and the strategic
of financial disclosure, and membership plan will be adopted at a fully noticed public
is restricted to those with no economic meeting of the Commission.
interest in any of the Plan's projects or
programs. 13
140
Attachment 2
RESOLUTION NO. 2016 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, APPROVING THE VENTURA
COUNTY TRANSPORTATION INVESTMENT/EXPENDITURE
PLAN AND DETERMINATION OF EXEMPTION FROM THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT
WHEREAS, the City of Moorpark is in receipt of the Ventura County
Investment/Expenditure Plan approved for distribution to cities and the County of Ventura
by the Ventura County Transportation Commission acting as the Ventura County Local
Transportation Authority on April 22, 2016, by a 14-0 vote. The Ventura County
Investment/Expenditure Plan was prepared pursuant to Public Utilities Code Section
180206 and is required as part of consideration of the potential placement of a retail
transactions and use tax (1/2 cent sales tax) revenue measure on the ballot for the
November 8, 2016 general election. The revenue measure, if placed on the ballot and
approved by the voters, is estimated to generate $70,000,000.00 annually to repair,
preserve, and improve the transportation system of Ventura County; and
WHEREAS, the lack of a "self-help" transportation revenue measure has placed
Ventura County at a competitive disadvantage when competing for federal and state
transportation funds with other California counties; and
WHEREAS, 50% of the revenue received from a voter-approved revenue measure
and allocated pursuant to the proposed Ventura County Transportation
Investment/Expenditure Plan will go back to each of the ten cities and the County of
Ventura for local transportation needs. This represents an estimated $1,650,000,000 of
funding over thirty years; and
WHEREAS, the City of Moorpark has significant transportation needs, including
local street and road repair, pedestrian improvements, and active transportation needs.
Moreover, the cost in recent years of deferred street maintenance needs has grown, while
traditional sources of funding for street repairs have diminished; and
WHEREAS, the Community Development Director has determined that the Ventura
County Investment/Expenditure Plan is exempt from the California Environmental Quality
Act(CEQA) pursuant to CEQA Guidelines Section 15378(b)(4) in that the CEQA definition
of a "Project" does not include the creation of government funding mechanisms or other
government fiscal activities, which do not involve any commitment to any other specific
project which may result in a potentially significant physical impact on the environment.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. ENVIRONMENTAL DETERMINATION: The City Council concurs with
the determination of the Community Development Director that the Ventura County
141
Resolution 2016 -
Page 2
Investment/Expenditure Plan is exempt from CEQA pursuant to Section 15378(b)(4), in
that the CEQA definition of a"Project"does not include the creation of government funding
mechanisms or other government fiscal activities, which do not involve any commitment to
any specific project which may result in a potentially significant physical impact on the
environment.
SECTION 2. The City of Moorpark approves the County Investment/Expenditure
Plan dated April 22, 2016.
SECTION 3. The City Clerk is directed to transmit a copy of this resolution to the
Ventura County Transportation Commission, acting as the Ventura County Local
Transportation Authority.
SECTION 4. The City Clerk shall certify to the adoption of the resolution and shall
cause a certified resolution to be filed in the book of original Resolutions.
PASSED AND ADOPTED this 18`" day of May, 2016.
Janice S. Parvin, Mayor
ATTEST:
Maureen Benson, City Clerk
142