AGENDA REPORT
TO: Honorable City Council
FROM: Jeremy Laurentowski, Parks and Re ation Directo
BY: Jessica Sandifer, Program Manage r
DATE: May 20, 2016 (CC Meeting of 0611511 )
SUBJECT: Consider Report on Electric Vehicle Supply Equipment Usage and
Continuing Availability for Use by the Public
BACKGROUND
On December 19, 2012, the City Council approved the installation of two Blink Level
2 Commercial Pedestal Chargers and two ChargePoint Dual Level Charging
Stations, collectively known as Electric Vehicle Supply Equipment (EVSE). On
January 31, 2013, the two Blink charging stations were installed at the Metrolink
Station. One was installed in the north lot on High Street and one was installed in the
south parking lot. One ChargePoint charging station was installed at the Civic Center
parking lot and one was installed at the public parking lot adjacent to the Post Office
on High Street. As discussed in the December 19, 2012 staff report, the City funds
the electrical costs and service fees in order to provide this equipment for public use.
In February 2014, staff updated the Council on the first year of usage and costs to
continue to offer the EVSE's for public use. At that time, staff informed the City
Council that ECOtality had filed for bankruptcy and the Blink charging stations were
subsequently purchased by CarCharging, Inc. As a reminder, the manufacturers of
the EVSE's charge fees predetermined by the City, and subsequently reimburse the
City a percentage of the revenue generated by the use of the EVSE based on the
service agreements. Typically, the revenue that the City receives is based on a
percentage of use, predetermined by the manufacturer, and has been established to
compensate for electrical and annual subscription fees. In 2015, the City Council
approved one more year of service. Please note that in January of 2014, the City
installed a separate charging station at the Civic Center, which is used solely to
charge the Chevrolet Volt pool car. This charger is not considered a part of this
report.
90
Honorable City Council
June 15, 2016
Page 2
DISCUSSION
It has been three years since the four EVSE's were put in service. The Blink
Chargers have a four year Agreement that started in 2015, so no decision needs to
be made on the service agreement at this time, however, staff is providing a recap of
the usage for the calendar year 2015. The ChargePoint chargers' service agreement
has expired and it is time to consider whether the City should renew the network
service agreement.
During 2015, the ChargePoint charging station installed at City Hall was the most
heavily used of the four chargers and comprised the bulk of the charge time and kwh
usage of all four chargers. The Blink Chargers at the Metrolink station had minimal
usage during calendar year 2015 with a total of 11 charging sessions. Staff is unsure
of the reasoning as Car Charging hasn't responded to our request, but it was noticed
that several times during the year, the stations were out of order. A quick review of
current 2016 usage shows that the stations are already being used more than last
year. Due to the Blink usage dropping, the usage at the four chargers was less in
2014 in total, however, charging sessions increased at the ChargePoint Chargers by
10% over 2014 usage. During 2015 the ChargePoint chargers logged 252 sessions
or on average 4.8 sessions per week at the ChargePoint Stations. A summary of the
actual usage and costs for all locations can be found below.
CURRENT REPORTING PERIOD ACTUAL
(January 2015-`December 2015)
Sessions Gross KWH Service Net
Charger (both Usage Revenue* Cost** Fees Fees Revenue/
stations) (approx.) Cost
ChargePoint 252 2,458 $597.70 $614.51 $57.97 $560.00 -$634.78
Blink 11 103 $0 $25.66 $0 $0 -$25.66
* no revenue provided by Blink as they retain it all in exchange for no services fees during four year term
** estimated $0.25 per kwh
mAPREVIOUVREPORTING PERIOD
January 2014'. ecember,.2014}
SessionsKWH Gross KWH Fees*** Services Net
Charger (both Revenue Cost** Fees Revenue!
stations) Usage * (approx.) Cost
ChargePoint 229 1,730 402.18 380.60 40.33 $460.00 -$478.75
Blink 112 111 $0 $24.42 $0 $0 -$24.42
* no Agreement was in place with CarCharging, Inc. during 2014, so all revenues were retained by them
and no service fees were charged to the City
** estimated $0.22 per kwh
For the third year, the costs of providing the ChargePoint stations for public use were
covered by the City. Even though the usage of the ChargePoint chargers increased,
91
Honorable City Council
June 15, 2016
Page 3
the increase in usage resulted in an increase in electricity costs. With the increased
electricity cost plus the service fee, the ChargePoint chargers operated at a net cost
of $634.78 for calendar year 2015.
For the Blink stations, the chargers operated at cost to the city of $25.66, which was
the cost of the electricity provided to the chargers. The current service agreement
stipulates that if the monthly revenues are not enough to cover the fees, the fees will
accrue to the next month. If at the end of the term there is an amount due to
CarCharging, Inc. from the City, CarCharging, Inc. will then waive the remaining fees
owed. We will receive no revenue from the chargers as long as the revenues are less
than the applicable fees and service charges. The current service agreement has a
four-year term with a four-year renewal option.
For calendar year 2016, the service fees for each of the ChargePoint charging
stations has remained the same ($280/station) for a total of $560. The service fees
cover maintenance of the software. However, ChargePoint is no longer servicing the
hardware for the units. The City can elect to maintain the units themselves, or pay for
the maintenance program provided by ChargePoint. The cost of the maintenance
program for both stations for one year is $2,832. City maintenance staff do not have
the necessary training or time to maintain the machines. Therefore, a service plan
with ChargePoint, or other third party maintenance agreement, would be needed to
continue to maintain the units. The total operating cost with the maintenance plan is
$3,967 for the year. As illustrated above, the chargers are already operating at a net
cost of $634.78. The total net cost to the City will increase to approximately $3,467
annually at the current usage.
The costs of providing the chargers will likely continue to exceed revenues until
electric vehicles become more mainstream and usage increases. In order for the City
to break even, usage would need to increase by approximately 77 sessions or more
per week at the current fee for the ChargePoint chargers. Due to the proposed
revenue structure at the Blink chargers, usage would likely need to be 10 sessions or
more per week before the City will start receiving revenues. Currently users are
averaging 4 sessions per week at the ChargePoint and Blink chargers.
As mentioned, revenue generated by the charging stations is not expected to cover
the costs of the chargers until the use of the chargers has increased significantly. In
addition, the maintenance requirement for the ChargePoint Chargers was not
provided to the City when the City accepted the gift of the chargers. Due to the high
cost of the maintenance plan, staff is recommending that the City discontinue the use
of the ChargePoint Chargers and maintain the Blink chargers through the term of the
CarCharging, Inc. agreement. The majority of the use of the ChargePoint chargers is
at the City Hall location and, historically, only the Blink charger at the north Metrolink
parking lot location is used on a regular basis. Staff recommends relocating the Blink
charger that is currently located in the south Metrolink parking lot to the City Hall
location. Staff recommends maintaining the Blink charger at the north Metrolink
92
Honorable City Council
June 15, 2016
Page 4
parking lot and removing the ChargePoint charger at the post office parking lot. The
ChargePoint chargers are the property of the City and can be deployed if there is a
future demand.
FISCAL IMPACT
Staff is recommending discontinuing the public charging service for the ChargePoint
Chargers. This would save the City approximately $3,967 in service, maintenance,
and electricity fees for the stations annually. The cost to relocate the Blink Charger
to City Hall is approximately $800 and would be paid for with Traffic System
Management (TSM) funding.
STAFF RECOMMENDATION
1. Approve discontinuing the ChargePoint Electric Vehicle Charger service at
City Hall and the Post Office; and
2. Direct staff to relocate a Blink Charger from the south Metrolink Parking Lot to
the City Hall location.
•