SUBJECT: Consider Amendment No.1 to Contract with Barnhart Balfour Beatty
(formerly known as Douglas E. Barnhart, Inc.) for Construction
Management Services for the Ruben Castro Human Services Center
BACKGROUND
On January 16, 2008 -the City Council authorized the release of a Request for
Qualifications for Construction Management Services using the CM - Multiple Prime
delivery method for the Ruben Castro Human Services Center (RCHSC). Using the CM
– Multiple Prime delivery method the Construction Management Firm basically takes the
place of a general contractor for a negotiated services fee and assists the city with
obtaining separate bids for the numerous contract trades such as electrical, steel,
plumbing, etc. in addition to the traditional construction management duties. On April 16,
2008, the City Council awarded a contract to Douglas E. Barnhart, Inc. (DEB) for
$1,272,876.
DISCUSSION
At the time the contract was awarded to DEB, it was anticipated that the project would be
out to bid and completed by December 2009. However, as the Council is aware, issues
with the leases at the RCHSC, delayed the project for two years. During this delay, a
number of issues occurred that are outside of the scope of the original agreement with
DEB-
1) DEB senior staff provided services and participated in meetings that went beyond
the scope of the original agreement in order to assist the City with securing
tenants for the building.
2) Other DEB staff assigned to this project had to be demobilized, reassigned to
other projects, or laid off. This requires re-mobilizing staff to work on the project,
and bring all new and returning DEB staff up to speed on the project.
161
Honorable City Council
June 2, 2010
Page 2
3) The City added an Emergency Generator to the project scope, which will need to
be added to the estimates and front end documents.
4) The current Storm Water Pollution Prevention Plan (SWPPP) for the project will
need to be modified to comply with the requirements of the New Construction
General Permit DWQ 2009-009, which becomes effective July 1, 2010.
5) Douglas E. Barnhart, Inc. merged with Balfour Beatty Construction Company and
is now known as Barnhart Balfour Beatty.
FISCAL IMPACT
Barnhart Balfour Beatty (BBB) is proposing a fee amendment for these additional items
totaling $27,744, which would bring their total construction contract amount up to
$1,300,620. It is important to note that at the time the Agreement was signed, the current
construction cost for the Ruben Castro Human Services Center based on the Architect's
estimate was $10.1 million. BBB's fee for Construction Management is based on 4% of
the construction cost. The proposed fee for the not-to-exceed amount is based on a
probable construction cost of $13.9 million. If the actual construction cost is lower, the
fee for Construction Management will be reduced, which may result in a lower total
contract amount.
There are sufficient funds in the current project budget to pay for this increased cost.
STAFF RECOMMENDATION (ROLL CALL VOTE)
Approve Amendment No. 1 with Barnhart Balfour Beatty memorializing ownership
change from Douglas E. Barnhart, Inc. to Barnhart Balfour Beatty and increasing the
amount of their Agreement by $27,744 from $1,272,876 to $1,300,620 and authorize the
City Manager to execute said amendment, subject to final language approval by the City
Manager and City Attorney.
Attachment 1 —Amendment No.1
162
FIRST AMENDMENT TO AGREEMENT
FOR SERVICES
THIS FIRST AMENDMENT TO THE AGREEMENT FOR SERVICES ("First
Amendment'), is made and entered into this day of 2010, ("the
Effective Date") between the City of Moorpark, a municipal corporation, hereinafter
referred to as "CITY", and Barnhart Balfour Beatty, a California Corporation, hereinafter
referred to as "CONSULTANT".
WITNESSETH:
WHEREAS, on June 2, 2008, the CITY and the CONSULTANT entered into an
Agreement for construction management services for the Ruben Castro Human
Services Center; and
WHEREAS, City and Consultant find it necessary to amend that Agreement to
memorialize the change in ownership of Douglas E. Barnhart, Inc., now owned by
Barnhart Bafour Beatty as described herein; and
WHEREAS, additional services not covered by the original Agreement are
needed:
1. Project Re-Mobilization - $17,080
2. Tenant Procurement Assistance - $3,984
3. Add Generator to Project Scope - $2,480
4. Modify SWPPP - $4,200
NOW, THEREFORE, in consideration of the mutual covenants, benefits, and
premises herein stated, the parties hereto agree as follows:
Complete the Ruben Castro Human Services Center consistent with the original
contract, per Agreement Number 2008-090, to be completed by Barnhart Balfour
Beatty, according to the updated letter from Consultant dated May 17, 2010,
explaining change in business name and ownership of "Douglas E. Barnhart,
Inc." to "Barnhart Balfour Beatty" as identified in Exhibit "A", as attached.
CITY does hereby appoint CONSULTANT in a contractual capacity to perform
the services in addition to the scope of services of the original agreement, in
accordance with Exhibit "B" of First Amendment, with the authorities, and
responsibility ordinarily granted to this type of work.
Professional Services Agreement Page 1 of 2
First Amendment Between City of Moorpark and Barnhart Balfour Beatty
163
All other terms and conditions of the original agreement shall remain in full force
and effect.
CITY OF MOORPARK Barnhart Balfour Beatty
By: By:
Steven Kueny Tex Barnhart.
City Manager Chief Operating Officer
Date: Date:
ATTEST:
Deborah S. Traffenstedt, City Clerk
Professional Services Agreement Page 2 of 2
First Amendment Between City of Moorpark and Barnhart Balfour Beatty
164
EXHIBIT A
barnhart
Balfour Beatty
Oxn.ud CA
PAIni De>eri CA
HIYPIS-(1f(.A
.jq-I CA
San Diego.CA
May 17,2010
Jessica Sandifer
Management Analyst
Assistant City Manager
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
5803200
Ruben Castro Human Services Center
Moorpark,CA
Name Change
Dear Jessica,
As of January 2010, Barnhart became Barnhart Balfour Beatty. We will continue providing services to
the City of Moorpark under the terms of our existing agreement between the City of Moorpark and
Douglas. E. Barnhart. Inc. Please issue a contract amendment reflecting our name change to Barnhart
Balfour Beatty.
Please call me if you have any questions. Thanks.
Sincerely,
Chris Haga
Senior Vice President
Corporate Headquarters
18')R 3RD 11?0()
t-4b8 385 8'U 1
i Ll ffi?1"O'nm n(�Iuatl
0 e.;0 CA q?:J1
-(,- ,eNr 73y4O7
165
EXHIBIT B
( 1 of 2 )
barni-hart
Balfour Beatty
Palm DPSen.CA
;an P ego.CA
Tv'Gn CA
Oxnard,CA
1005983 1550
f 8115 983 7249
Ion[ Fsr,lanaile Cave
5mle 350
Oxnard.CA 93036
April 26,2010
Hugh R. Riley
Assistant City Manager
799 Moorpark Ave.
Moorpark CA 93021
8032 Ruben Castro Human Services Center
City of Moorpark
Additional Services Proposal-Extended Pre-Construction Services
Dear Hugh,
To follow up on our conversation, Barnhart submits this proposal for additional services related to our
contract.The three components to this proposal are outlined below:
Project Suspension
Our contract included fixed General Condition costs to fumish Pre-Constriction and Bidding services
over a continuous four month period. Based upon the State budget crisis and the resultant loss of a
project tenant. our work on the project was suspended for approximately 14 months.
Prior to suspension, Bamhart had completed front end documents and was awaiting authorization to be
from the City to proceed with bidding. Due to demobilization, Barnhart staff assigned to the project prior
to the suspension was laid off.Together with the 14 month suspension, the reassignment of other new
staff to the project has resulted in a loss of continuity.
We propose to both bring new staff up to speed on the project, and to fumish a complete review of the
front end documents to ensure that changes to the plans due to tenant re-procurement and other
design/specification changes made over the last 14 months are coordinated for a fixed fee of$17.080.
Tenant Rerrocurement
During the demobilization period, Barnhart furnished additional services to assist the City in evaluating
the impact of potential design changes required to secure multiple replacement tenants.These services
included representation at meetings and modification of the estimate to support tenant reprocurement
activities.We propose a reimbursement of$3,984 as compensation for these completed services.
Added Generator
An emergency generator will be added to the project scope. Barnhart proposes a fixed fee of$2,480 to
incorporate this new scope into the front end documents. It is understood that the generator will likely
be added into the project as Addendum#1, after the project is put out to bid.
Corporate Headquarters
f 85R 385 8200
f 958 385 8201
107601Immnum Road
Sao Dcgn.CA 92121
IILUUSe Nu 439107
166
barnhart
Ballow Beatty
Total
The total fixed fee for these three services is $23,544. A breakdown by phase is attached. Should this
meet your approval,please issue a contract amendment.
Thanks again for giving Barnhart the opportunity to serve the City of Moorpark.
Sincerely,
A�-
Chris Haga
Senior Vice President
Distribution:
Jessica Sandifer,Management Analyst, City of Moorpark
Dennis Kuykendall, Senior Project Manager,Barnhart
Attachment:
Summary of Additional Work
167
Project Suspension
14 month project suspension J staff reassignment/loss of continuity/remobilization
Project Manager 56 hrs $84.00 /hr $4,704.00
Superintendent 56 hrs $71.00 /hr $3,976.00
Coordinating Supervisor 56 hrs $94.00 /hr $5,264.00
Risk Manager 32 hrs $98.00 /hr $3,136.00
Subtotal $17,080.00
Tenant Reprocurement
Tenant reprocurement assistance during suspension
Project Manager 16 hrs $84.00 /hr $1,344.00
Superintendent/ Estimator 16 hrs $71.00 /hr $1,136.00
Coordinating Supervisor 16 hrs $94.00 /hr $1,504.00
Subtotal $3,984.00
New Scope
Coordinate-added generator into front-end documents
Project Manager 16 hrs $84.00 /hr $1,344.00
Superintendent 16 hrs $71.00 /hr $1,136.00
Coordinating Supervisor hrs $94.00 /hr $0.00
Subtotal $2,480.00
TOTAL $23,544.00
168
EXHIBIT B
( 2 of 2 )
barnf-hart
Balfour Beatty
Palm Oeseu.CA
Rwersrde.CA
April 26,2010 San orego.CA
tvun CA
Oxnard,CA
1 805 983 1558
i Wi 983 774y
31101 Esplanade Dr,%,,
Stole 350
Ihnxd.CA 93016
Hugh R. Riley
Assistant City Manager
799 Moorpark Ave.
Moorpark CA 93021
8032 Ruben Castro Human Services Center
City of Moorpark
Additional Services Proposal-SWPPP Modifications
Dear Hugh,
To follow up on our conversation, Barnhart submits this proposal for additional services related to our
contract.
Modifications to SWPPP
It will be necessary to modify the current SWPPP to comply with the requirements of the new
Construction General Permit DWQ 2009-0009 which becomes effective July 1, 2010. This needs to
happen prior to the release of bid documents, as the SWPPP will be a necessary part of the bid
documents.
Geosphere who completed the 1/27/2009 report, is now part of Barnhart.A proposal letter from Yolanda
Yea), Project Environmental Specialist is attached. Please note that there are two components to this
proposal. The amount required for modifications and preparation for electronic filing is $2,700. The
$1,500 is an optional amount for a full day of informational training open to City staff, project staff, and
the selected trade contractor for purposes of understanding compliance requirements and how to avoid
fines and penalties.
Thanks again for giving Barnhart the opportunity to serve the City of Moorpark.
;Sinc ly,
Chris Haga
Senior Vice President
Distribution:
Jessica Sandifer, Management Analyst,City of Moorpark
Dennis Kuykendall. Senior Project Manager, Barnhart
Attachment:
Barnhart proposal dated 03/02/2010
Corporate Headquarters
1 858 385 8200
1 058 305 8201
10160 ihornmun RUdO
San rhqu.CA 97127
iwemr No.439407
169
March 2, 2010
TO. Hugh R. Riley
Assistant City Manager
Public Information Officer
799 Moorpark Ave.
Moorpark, CA 93021
RE: Ruben Castro Human Services Center—City of Moorpark
I have carefully reviewed the SWPPP prepared by Geosphere dated 1/27/2009 and have identified
the following modifications that will be necessary to ready this document for electronic submittal
per the requirements of the new Construction General Permit DWQ 2009-0009 coming into effect
on July 1, 2010.
Done PAGE ITEM
Add Qualified SWPPP Developer Statement
Add to Purpose of SWPPP BMP Monitoring, Visual Monitoring for
pollutants, Rain Event Action Plan, Construction Site Monitoring
Add to page ii program
Information on Stormwater Multi Application Report Tracking System
Add (SMARTS) and Permit Registration Documents (PRDs)
Numeric Effluent Limits and Numeric Action Level Compliance Reporting
Add information
Add Annual Report Information
Add New Verbiage regarding Notice of Termination
Add Risk Determination Calculations
Section 5.0 Post-Construction BMP measures to be installed description
Revise and measure for short term and long term maintenance.
1 170
Done PAGE ITEM
J
Revise Section 6.0 Monitoring, Inspection, and Maintenance
Revise Training Requirements
Revise
Handout Inspection Log
Add Handout Rain Event Action Plan Template
Add Handout Construction Site Monitoring Program
Add Handout Checklist for Permit Registration Documents
Add Handout Checklist for Annual Report Compliance
Add Handout Exceedance Report and Corrective Action Report
Add List of Contractors and Subcontractors
Approx. time for updates: 30hours at 90/hr = $2,700
Optional Training Fee 8 hours = $1,500
Thank You,
Yolanda Leal
Barnhart Inc.
CPESC-IT#5610, CISEC#0440
Project Environmental Specialist