Loading...
HomeMy WebLinkAboutAGENDA REPORT 2010 0901 CC REG ITEM 10RMOORPARK CITY COUNCIL AGENDA REPORT ITEM 10.13. —OF MOOR ?ARK, CALIF-U.`(- City Council Meeting of IN-010 /0 ACTION: ' D 0- Y: TO: Honorable City Council FROM: David A. Bobardt, Community Development ctor Prepared by: Joseph Fiss, Principal Planner DATE: August 24, 2010 (CC Meeting of 9/1/2010) SUBJECT: Consider Amendment to Agreement for Professional Services with Parsons Transportation Group for Preliminary Engineering, Environmental Analysis, Design, and Right -of -Way Activities for the Installation of Soundwalls on SR -23 and Resolution Amending the Fiscal Year 2010/2011 Budget to Fund Additional Professional Services BACKGROUND /DISCUSSION On March 18, 2009, the City Council awarded a agreement to provide professional services with Parsons Transportation Group for preliminary engineering, environmental analysis, design, and right -of -way activities for the installation of the soundwalls along the west side of State Route 23, north of Tierra Rejada Road. The $257,932.94 agreement was finalized and executed on May 28, 2009. The term of the agreement (one year) and the scope of work were based on early discussions with Caltrans on what was needed for encroachment permits for the construction of the soundwalls. Caltrans has taken longer than expected in its review of materials and most recently has requested a study on aerially deposited lead and has asked for an increased overlap of the portion of the wall that extends across the southbound off -ramp at Tierra Rejada Road. Staff is now requesting an amendment of the agreement for professional services to extend the timeframe one year to cover any more unexpected delays and to expand the scope of work to cover the additional study and engineering needed to obtain an encroachment permit to build the soundwall. Aerially Deposited Lead (ADL) Testing — Caltrans has required ADL testing to address the handling and disposition of dirt that will be hauled off the site when the footings for the soundwall are excavated. ADL results from emissions of vehicles that used leaded gasoline. It is typically found within the top several feet of material in unpaved areas 283 Honorable City Council September 1, 2010 Page 2 within the highway right -of -way. ADL could create a potential hazard to workers when disturbed and could require placement at a landfill approved for contaminated dirt. If ADL is found above acceptable levels, Parsons will include a Lead Compliance Plan in the construction bid documents. The contractor will be required to mitigate the lead in a manner acceptable to Caltrans. This can include proper disposal and replacement of any contaminated soil, or mixing the contaminated soil with on -site soil such that the percentage of lead is reduced to acceptable levels. Parsons has proposed to complete the ADL testing at a cost of $23,660.68. Soundwall Overlap — During the design process, Caltrans required that the soundwalls be longer than originally presented in the City's Request for Proposals and the associated noise study in order to better accommodate additional overlap between the two soundwalls on either side of the Tierra Rejada Road off -ramp. Originally, the combined length of the soundwalls was expected to be approximately 1,500 linear feet. Caltrans overlap requirement leaves the total combined length of the soundwalls at 1,724 linear feet. This requires additional engineering design at a proposed cost of $12,822.94. The additional engineering consists of: • Designing the horizontal and vertical alignments of the wall extensions. • Designing the pile foundations in relation to existing underground utilities for the wall extensions. • Including the wall extensions in the layout, contour grading, drainage, utility, electrical, landscape, irrigation, stage construction, and pavement delineation sheets. • Updating the Storm Water Data Report, Fact Sheet, NBSSR, Cost Estimate, and environmental documents, if necessary, to include the new wall lengths and impacted areas based upon the wall extensions. Attached is Parson's Proposal for Additional Services, including Aerially Deposited Lead Assessment and Testing, and Additional Engineering Services, for an additional contract amount of $36,483.62. FISCAL IMPACT A budget amendment is required to allocate funds for this proposal and is attached. The funding source is the Carlsberg portion of the Citywide Traffic Mitigation Fund, which currently has a net balance of $1,877,437.79. $1,700,000.00 of this amount has been appropriated for the soundwall project, leaving an available balance of $127,437.79. Staff estimates that there will be additional revenue to this fund of approximately $780,000.00 as a result of the build -out of the Patriot Commerce Center, the Home Depot site, and the former Peach Hill Medical site. S: \Community Development\DEV PMTS\S P\SP 92 -1 Carlsberg Specific Plan\Soundwall\Parsons SR 23 Soundwall ContractkParsons Contract Amendment 100901 \cc agenda report 100901 doc • Honorable City Council September 1, 2010 Page 3 The following table shows the estimated total project costs for the soundwall: Engineering /Design (Current Proposal, Completed /Paid) $193,381.66 Engineering /Design (Current Proposal, Remaining /Unpaid) $64,551.28 Aerially Deposited Lead (ADL) Testing $23,660.68 Additional Engineering $12,822.94 Construction Costs (City Estimate based on future costs, contingencies, and inspections) $1,700,000.00 Total $1,994,416.56 The Fiscal Year 2010/2011 budget includes $1,760,000 for this project, with $60,000 allocated for the completion of design /engineering, $1,600,000 for construction, and $100,000 for construction inspection. A resolution is attached for Council consideration to add $40,000 to the budget for this project for the additional study /design work outlined in this report. STAFF RECOMMENDATION (Roll Call Vote Required) Adopt Resolution No. 2010- approving a budget amendment for up to $40,000.00. 2. Authorize the City Manager to amend the agreement with Parsons Transportation Group for preliminary engineering, environmental analysis, design, and right -of -way activities for the soundwalls on SR -23 for a one (1) year period and for a new total amount not to exceed $294,416.56, subject to final language approval by the City Manager and City Attorney. ATTACHMENTS: 1. Draft Resolution with Appropriation and Budget Detail 2. Draft Amendment to Agreement for Professional Services 3. Proposal for Additional Services S:\Community Development\DEV PMTS \S P\SP 92 -1 Carlsberg Specific Plan\SoundwaIRParsons SR 23 Soundwall Contract\Parsons Contract Amendment 100901\cc agenda report 100901 doc 285 RESOLUTION NO. 2010- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR 2010/2011 BUDGET TO APPROPRIATE FUNDS FROM CITY- WIDE TRAFFIC MITIGATION FUND (2002), IN THE AMOUNT OF $40,000.00 FOR PRELIMINARY ENGINEERING, ENVIRONMENTAL ANALYSIS, DESIGN, AND RIGHT -OF -WAY ACTIVITIES FOR THE INSTALLATION OF SOUNDWALLS ON SR -23 WHEREAS, on June 16, 2010, the City Council adopted the Operations and Capital Improvement Projects Budget for Fiscal Year 2010/2011; WHEREAS, the adopted budget includes appropriations totaling $1,760,000 in the City -Wide Traffic Mitigation Fund (2002) for the 23 Freeway Soundwall at Tierra Rejada Road Capital Improvement Project (8079); WHEREAS, on May 28, 2009 the City entered into a one -year agreement with Parsons Transportation Group (Parsons) to perform preliminary engineering, environmental analysis, design and right -of -way activities for the installation of soundwall on SR -23 for a total contract cost of $257,932.94. As of July 20, 2010 the City has paid Parsons $193,381.66 for work completed through May 27, 2010; WHEREAS, an agenda report has been presented to Council discussing the status of the project and outlining the additional scope of work required by Caltrans for the construction of the soundwalls; WHEREAS, the same agenda report recommends amending the design and engineering Agreement for Professional Services with Parsons for one -year and modifying the scope of work to include the Aerially Deposited Lead (ADL) testing and Soundwall Overlap for a new total contract amount not to exceed $294,416.56; WHEREAS, a budget amendment increase of $40,000 is required from the City - Wide Traffic Mitigation Fund (2002) for the 23 Freeway Soundwall At Tierra Rejada Road Capital Improvement Project (8079) to pay for the additional testing and engineering services ; and WHEREAS, on September 1, 2010, a staff report was presented to the City Council requesting a Budget appropriation in the aggregate amount of $40,000; and WHEREAS, Exhibit "A" attached hereto and made a part hereof, describes said Budget amendment and its resultant budget impacts to the Budget line item(s). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: CC ATTACHMENT 1 - Resolution No. 2010 - Page 2 SECTION 1. That a Budget appropriation in the aggregate amount of $40,000.00 as more particularly described in attached Exhibit "A ", is hereby approved. SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 1 st day of September, 2010. Janice S. Parvin, Mayor ATTEST: Deborah S. Traffenstedt, City Clerk Exhibit "A ": Appropriation and Budget Detail S. \Community Development\DEV PMTS\S P\SP 92 -1 Carlsberg Specific Plan\Soundwall \Parsons SR 23 Soundwall Contract\Parsons Contract Amendment 100901\Draft Reso 100901 doc 287 Resolution No. 2010 - Page 3 *CII :3rr_l BUDGET AMENDMENT FOR THE CITY -WIDE TRAFFIC MITIGATION FUND FOR CONSULTANT SERVICES TO PROVIDE PROFESSIONAL SERVICES FOR PRELIMINARY ENGINEERING, ENVIRONMENTAL ANALYSIS, DESIGN, AND RIGHT -OF -WAY ACTIVITIES FOR THE INSTALLATION OF SOUNDWALLS ON SR -23 FY 2010/2011 FUND ALLOCATION FROM Fund Account Number Amount City -wide Traffic Mitigation Fund (Carlsberg Portion 2002 -5500 $40,000.00 DISTRIBUTION OF APPROPRIATION TO EXPENSE ACCOUNTS Account Number Current Budget Revision Amended Bud et 2002 -6440- 8079 -9601 $60,000.00 $40,000.00 $100,000.00 Finance Approval: S NCommunity Development\DEV PMTSI,S P1SP 92 -1 Carlsberg Specific Plan\.SoundwallWarsons SR 23 Soundwall ContractlParsons Contract Amendment 100901\Draft Reso 100901 doc • -, AMENDMENT NO. 1 TO AGREEMENT BETWEEN THE CITY OF MOORPARK AND PARSONS TRANSPORTATION GROUP Original Agreement No.: Date of Original Agreement: Organization / Firm: Amendment No.: Effective Date of This Amendment: 2009 -078 May 28, 2009 Parsons Transportation Group 1 Subject of Amendment: Additional consulting services provided by Parsons Transportation Group including Aerially Deposited Lead Assessment and Testing, and Additional Engineering for Soundwall Overlap, and One Year Extension of Existing Agreement RECITALS A. Whereas the City of Moorpark ( "City ") and Parsons Transportation Group ( "Consultant"), entered into an Agreement on May 28, 2009, setting forth the terms, conditions and scope of work for certain services to be provided to City by Consultant; and, B. Whereas City and Consultant find it necessary to amend the Agreement to authorize certain additional work as described herein; and, C. Whereas additional time is necessary to perform the additional work. NOW, THEREFORE, in consideration of the mutual covenants, benefits and premises herein stated, the parties hereto agree to AMEND the aforesaid Agreement as follows: I. Section 1 is amended as follows: 1. Term The termination date of this agreement is extended until May 30, 2011. CC ATTACHMENT 2 WE PTG Agreement Amendment No. 1 Page 2 11. Section 2 is amended as follows: 2. Services Additionally, Consultant shall Complete Aerially Deposited Lead Assessment and Testing; and Additional Engineering for Soundwall Overlap, as identified in Exhibit "A ", as attached and incorporated herein. III. Section 5 is amended as follows: 5. Payment d) For furnishing services as specified in this Agreement, City shall pay and Consultant shall receive additional compensation of $36,483.62 for Aerially Deposited Lead Assessment and Testing and Additional Engineering for Soundwall Overlap, invoiced at the completion of each task. Total compensation not to exceed $294,416.56 as identified in Agreement No. 2009 -078 and Exhibit A, as attached and incorporated herein. IV. Remaininq Provisions All other provisions of the aforesaid Agreement shall remain in full force and effect. CITY OF MOORPARK: Steven Kueny, City Manager Date Attest: Deborah S. Traffenstedt City Clerk Date PARSONS TRANSPORTATION GROUP: Tony Velasquez, P.E., Project Manager Date 290 PARSONS 100 West Walnut Street • Pasadena, California 91124 . (626) 440 -6100 • Fax (626) 440 -6155 www parsons corn August 10, 2010 Mr. Joseph Fiss Principal Planner City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 Subject: SR -23 Soundwall Project - Proposal for Aerially Deposited Lead Assessment and Testing, and Additional Engineering Services Dear Mr. Joseph Fiss, This letter outlines the additional services that we propose to accomplish for the City of Moorpark SR- 23 soundwall project. Aerially Deposited Lead: Caltrans has requested additional Aerially Deposited Lead (ADL) research and field testing that we did not originally anticipate as part of this project. Please see the attached memo from Caltrans that requests this analysis and the letter outlining the requirements. As part of this effort, Parsons will prepare an Aerially Deposited Lead assessment and technical memo of the historical uses of the site and the potential for the presence of lead. Also Fugro will conduct ADL field testing of the site and will report the results to the City and to Caltrans per Caltrans requirements, as outlined in the Fugro proposal attached. Additional Engineering Services: In addition, Caltrans has requested longer soundwalls than originally presented in the City's RFP and the associated noise study. The original RFP proposed a total of 1,500 linear feet of wall. Currently 1,724 linear feet of wall is proposed per Caltrans request. The additional length in wall will require additional engineering effort to obtain Caltrans approval of the Fact Sheet, NBSSR, and Construction Plans. As part of this effort, Parsons will: • Design the horizontal and vertical alignments of the wall extensions. • Design the pile foundations in relation to existing underground utilities for the wall extensions. • Include the wall extensions in the layout, contour grading, drainage, utility, electrical, landscape, irrigation, stage construction, and pavement delineation sheets. • Update the Storm Water Data Report, Fact Sheet, NBSSR, Cost Estimate, and environmental documents, if necessary, to include the new wall lengths and impacted areas based upon the wall extensions. CC ATTACHMENT 3 291 Please see the attached fee proposals for this scope of work. Parsons is requesting $12,822.94 for the Additional Engineering Services, and $23,660.68 for the Aerially Deposited Lead Assessment and Testing. Please review the attached fee proposal and Fugro's proposal, and let me know if this is acceptable. Please do not hesitate to call me at (626) 440 -2519 if you have any questions. Thank you very much. Sincerely, Eric Spangler, P. ., E. Project Engineer Ln 292 CITY OF MOORPARK - SR23 Soundwalls at Tierra Rejada Road - Additional Engineering due to Wall Extensions PARSONS Fee Proposal - August 2010 N �O W Project Engineer Highway Design Environmental Storm Water Data Eric Spangler JIHye Jung Planner Angela Schnapp ReporUHydrology Chris Hinds HOURS BV PARSONS TOTAL ACTIVITY LABOR f/68:81 $88.4•.. $111:27:-..,, f•t.•6 TASK DESCRIPTION 1 ADDITIONAL ENGINEERING FOR WALL EXTENSIONS 11 Design Horizontal and Vertical Alignments 6 16 _ _ 24 $2,683.76 Update Construction Plans (layout. contour grading, drainage, utility, electncal. 1 2 landscape, 1mg8bon. stage construction, and pavement delineation sheets) 20 _ _ _ 30 __ _ 50 $5,824.60 Update Storm Water Data Report. Fact Sheet, NBSSR, Cost Estimate, and 13 Environmental Documents 6 16 16 38 $4,314.58 HOURS: 34 46 16 16 112 LABOR: $5,389.34 $4,070.08 $1,780.32 $1,683.20 $12,822.94 N �O W CITY OF MOORPARK - SR23 Soundwalls at Tierra Rejada Road - Proposed Aerially Deposited Lead Assessment, Testing, & Reporting PARSONS Fee Proposal - August 2010 1 TASK DESCRIPTION AERIALLY DEPOSITED LEAD ASSESSMENT, TESTING. 6 REPORTING SUBCONSULTANT Project Engineer Environmental Hazardous Waste Environmental Eric Spangler Planner Angela Schnapp Oversight QA/QC Pike Fenjan ElAra Gaddi $155.34 $93.17 $111.27 $201.68, HOURS BY PARSONS TOTAL ACTIVITY LABOR FUGRO TASK TOTAL ADL TESTING 1.1 Aenally Deposited Lead Assessment & Caltrans Approval 2 -- - - - --- --- 4 16 - - - -- _ - $ 3 29 4 4 4 $3,296.60 $1,900.00 $1,900.00 $14,70000 $3.296.60 $2.52116 _ $2.521.36 515,321.36 L2 Aenally Depomted Lsad Tasting Work Plan _ Obtain Caltrans Encroachment Permit ADL field testing and Reponing $621.36 1.3 4 4 562116 14 S62136 HOURS:J 14 16 8 3 41 LABOR :J $2,174.76 1 $1,490.72 1 $890.16 $605,041 1 $6,160.681 $18,600.00 $23,660.68 N �O