Loading...
HomeMy WebLinkAboutAGENDA REPORT 2009 0318 CC REG ITEM 09A ITEMIM� G1* • CITY OF MOORPARK,CAL 4F14Q1'"'�.` City Council Meeting Of / ADO 92 ACTION: lay: d42nwMAJZ ay, MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Barry K. Hogan, Deputy City Mana g David Lasher, Senior Manageme A lyst DATE: March 5, 2009 (CC Meeting f 3/18/2009 g ) SUBJECT: Consider a Report on the Status of Solar Photovoltaic Conversions and Other Energy Saving Installations and Programs in Moorpark, Ventura County and Los Angeles County BACKGROUND With emphasis coming from the state and federal government on reduction of greenhouse gases and reducing our carbon footprint, public agencies and private companies are looking at a variety of installations and programs. This report is intended to provide the Council with a broad overview of what measures and programs are being utilized in Moorpark, other Ventura County cities and other cities within the greater metropolitan area of Los Angeles. DISCUSSION State Building Code: The state of California in July 2008, and the City of Moorpark shortly thereafter by reference, adopted Green Building Standards which will be used on a voluntary basis until 2010. While we do not know of the specific requirements of the Green Building Ordinance as it is not scheduled to be published until July 2009, we know that it will not just be tailored to reduce greenhouse gases, but to be more broad) geared to increased energy efficiencies, the use of environmentally friendly products that are not only renewable, but that do not require large amounts of non-renewable energy to produce, i.e. their production has a low environmental impact. If all goes as anticipated, the Green Building Ordinance will be mandated by the state in the next building code update in 2010. Moorpark would update its building ode after the state's g adoption. It is anticipated that Moorpark's code adoption would occur some time in July 2010. According to the "Build It Green" advocacy group, "only residential [properties] '�I Honorable City Council March 18, 2009 Page 2 will have a short list of mandatory requirements at that time. The commercial section consists of a longer list of measures that are voluntary and are not slated to be mandatory. The code is meant to set the minimum [required] and does not preempt local governments to go above and beyond..." Solar Vo,,ltai_C Inversions in Moorpark: There have been thirty-five (35) single family Y residences which have converted to solar voltaic systems between January 2006 and January 2009. This number represents a very small fraction of the total number of single family homes in Moorpark. Four businesses were converted to solar voltaic during this same two year period. These businesses are Kohl's, Bagwell Construction, Staples, and Kish Rigging. Two of these businesses are commercial retail establishments and two are found in the industrial sector. Moorpark General Plan Update: Over the last year, City staff has been in the process of updating the City's General Plan. As part of this update, a revision to the OSCAR (Open Space, Recreation and Conservation) Element has been included. In the OSCAR Element, staff has included a new set of goals, policies and implementation measures for Council consideration. These components would be used to guide City staff in the City's efforts to reduce greenhouse gases, reduce the City's carbon footprint, and increase energy conservation. It is anticipated that the draft OSCAR Element will be presented to the Council's Community and Economic Development Committee at its September 2009 regular meeting. As part of the consideration of the OSCAR Element City staff will have calculated the baseline year (1990) for greenhouse gases and will provide the Committee with a "reduction guide" showing what the greenhouse gas savings could be if certain measures are implemented. Solar Energy Projects i Ventura County Cities: Many Ventura County municipalities have previously implemented, have considered, or plan to implement, solar energy and other emerging energy technologies to reduce their municipal energy consumption, promote energy conservation and reduce greenhouse gases. For example, a number of Ventura County Fire Stations have solar systems in place that reduce their use of fossil fuels on a daily basis by up to twenty-five percent. The City of Oxnard, as a component of its new water treatment facility, incorporates `green' standards such as: . Using solar panels to generate power thereby improving air quality and reducing the consumption of fossil fuels, while providing a ten-year payback on the investment. . Using materials with bona fide recycled content. • Recycling or salvaging at least fifty-percent of construction and demolition waste. . Reducing the burden on the City's water supply by using thirty-percent less water for on-site water uses. SACommunity Development\City Council\CC,Solar,090318.doc �► ;� ' Honorable City Council March 18, 2009 Page 3 The City of Thousand Oaks saved $91,000 in the first half of 2008 at its wastewater treatment plant through the implementation of solar facilities and energy cogeneration and is currently considering plans to add solar panels and other energy conservation technologies at the Civic Arts Plaza and the City's main library. While previously available incentives helped fund the addition of solar facilities in Thousand Oaks and Ventura, this flow of money has slowed intentionally. The goal of the ongoing California Solar Initiative program has been to reduce the costs of solar power in the future. Accordingly, the program initially provided monetary incentives to reduce installation costs. The market for solar systems is expected to grow, but this initial seed and startup money is no longer available. Previously, Ventura funded a 650- panel solar array at the City's maintenance yard using initiative funds. With these monies now unavailable, Ventura and other municipalities throughout the state have delayed purchasing new systems (again, especially given their own current budget and recessionary concerns). Some Other ,Pr_ oposals: The City of Los Angeles is currently embroiled in a controversial solar energy proposal, Measure B, a ballot measure found on the March 3 Los Angeles City ballot. (As of 5:00 p.m., on March 4, 2009, the election results were too close to call, but the measure was losing with only absentee and provisional ballots outstanding). The measure was developed by Los Angeles Mayor Antonio Villaraigosa and the City's Department of Water and Power. The goal of Measure B is to add 400 megawatts of solar panels on city properties throughout Los Angeles by 2014 with twenty-percent of the city's electricity needs provided through solar energy by 2025. There is some controversy regarding the cost estimates for implementation of the plan. Current estimates are at least $1.5 billion and as much as $4 billion, all of which would be paid by DWP ratepayers Separately, Southern California Edison has been working with owners of large industrial buildings to install solar voltaic panels in an effort to reduce electrical demand. The idea is to have solar voltaic panels installed on large industrial buildings throughout the SCE service area in order to supplement electricity production. No installations are planned within the City of Moorpark. According to an article from Priority Focus, October, 2008, "the average U.S. household emits 42 metric tons of CO2 annually according to Cool California..." To lessen this impact, the City of Davis launched a "low carbon diet" program between October and November of last year as part of a pilot program to encourage residents to increase energy efficiency, reduce waste and reduce greenhouse gas emissions. Where Do We Go From Here?: The City of Moorpark General Plan Update will have new goals and policies for energy conservation, greenhouse gases and reduction of the City's carbon footprint. City Council's consideration and ultimately the adoption of these goals, policies and implementation measures will be the "guide" for City staff to follow. The current energy conservation measures that the City is employing are certainly appropriate and should continue. However, any future concentrated efforts should be SACommunity Development\City Council\CC,Solar,090318.doc Honorable City Council March 18, 2009 Page 4 part of an overall plan for the City and include not only City-owned facilities, but address residential, commercial and industrial areas as well. It may also be appropriate to reexamine the City's Transportation System Management (TSM) Fund Program which was adopted in March 3, 2004. At that time, the TSM program contained six general categories: • Bicycle Facilities • Trails • Transit • Alternative Fuel Vehicles • Building Technology • Administrative Various funding program priorities were established for each of these categories. Some of the programs have been accomplished, such as the adoption of a Bikeways Plan and related Administration. With greater focus on "green technology", it may be appropriate to rethink the TSM program categories, expanding or contracting the programs under each category. FISCAL IMPACT None. STAFF RECOMMENDATION Direct Staff as deemed appropriate. Attachment: March 3, 2004 CC Agenda Report on TSM Fund Program SACommunity Development\City Council\CC,Solar,090318.doc . CC ATTACHMENT 1 • D• f JA s" 3-..3-a_o.o L4 _. .. .. - r ... 7341 AV :.. . MOORPARK CITY COUNCIL - - - AGENDA REPORT TO: Honorable City Council FROM: Barry K. Hogan, Community Development Director By: Laura Stringer, Senior Management Analys DATE: February 5, 2004 ACC Meeting of 03/03/04) SUBJECT: Consider Transportation System Management (TSM) Fund Program BACKGROUND On February 4, 2 0 0 4, the Budget and Finance Committee (Mayor Hunter and Councilmember Harper) considered staff recommendations on funding program priorities for the City of Moorpark' s designated Transportation System Management (TSM) Fund (2001) , established consistent with the requirements of Government Code Section 66006. The report presented to the Committee is attached. The suggested .programs have been divided into six general categories: Bicycle Facilities Trails Transit Alternate Fuel Vehicles (AFV) Building Technolo y Administrative Table 1, included in the Committee Agenda Report, identifies potential programs to be funded with TSM Funds under each of the general categories identified above. A very general estimate of the initial cost or annual cost for on-going programs has been included. Once priorities are set, and the scope of each program refined, more detailed cost analysis will be performed. S:\City Share\Community Development\ADMIN\FORMS\New\Corresp\MEMO.doc 1 Honorable City Council March 3, 2004 Page 2 Staff is requesting City Council consideration of the suggested TSM funding program, along with recommendations for any additional programs that City Council considers a priority. Should City Council approve the program, it will be included with the Capital Improvement Program priority considerations. STAFF RECO14M MATION Approve the Transportation System Management (TSM) Fund Program. Attachment: Budget and Finance Committee February 4, 2004 Agenda Report -'J 1 BUDGET AND FINANCE COMMITTEE AGENDA REPORT TO: Budget and Finance Committee FROM: Barry K. Hogan, Community Development Director By: Laura Stringer, Senior Management Analyst DATE: January 16, 2004 (B&FC Meeting of 02/04/04) SUBJECT: Consider Transportation System Management (TSM) Fund Programs BACKGROUND Development projects within the City of Moorpark are subject to assessment for air quality impacts. If a proposed project exceeds certain air quality thresholds, mitigation of air quality impacts is required. Some projects are required to provide project specific mitigation measures to directly mitigate air quality impacts resulting from the development. A Transportation Demand Management (TDM) Program is an institutional framework for approaches that reduce and manage the demand for transportation projects and improve the operational characteristics of the transportation system. One of the goals of a TDM is reduction in transportation related air pollution. An off-site TDM Fund is identified in the Ventura County Air .Quality Guidelines as a mobile source emission reduction fund established to specifically reduce emissions from transportation sources that may be used as a mitigation measure by proponents of projects that exceed the Reactive Organic Compounds (ROC) and Nitrogen Oxide (NOk) thresholds set by the Federal, State and local air quality regulations. The City of Moorpark' s designated TDM Fund is the Transportation System Management (TSM) Fund (2001) , established consistent with the requirements of Government Code Section 66006. Commercial, industrial, institutional and residential projects are conditioned to contribute to the Fund, with the contribution based upon the CC ATTACHMENT 4i S:\Cit Y Share\Community Development\ADMIN\FORMS\New\Corresp\MEMO.doc Budget and Finance Committee February 4, 2004 Page 2 amount of emissions that need to be mitigated. Citywide off- site mitigation programs are then financed through this Fund. DISCUSSION Over the past several years, a number of projects have contributed to the City' s TSM Fund, which currently has a balance of approximately 3. 6 million dollars. In addition, staff has estimated the potential additional fees that might be collected over the next twenty years to be approximately 4 million dollars. This amount could be adjusted significantly if threshold criteria changes. Staff suggests that the existing fund balance be utilized for specific one-time improvements, with subsidies to on-going programs to be limited within the range of predicted revenue over the next few years. Staff has researched potential mitigation programs that may be appropriate for use of these TSM Funds. The general categories considered by staff, which could include both one-time and on- going programs, are: Bicycle Facilities Trails Transit Alternate Fuel Vehicles (AFV) Building Technology Administrative Signal synchronization, intersection improvements and channelization, have not been included in this list because Ventura County Air Quality Guidelines suggest that these funds not be used for traffic engineering projects, as these projects are related to improving traffic congestion and not air quality. The City' s current budget includes support for a number of TDM type programs through other funding sources that might be freed for other projects if TSM Funds are earmarked for those programs. For example, the TDA funded portion of the transit system (FY 2003/04 expenditure budget of $626, 168) is funded primarily through TDA Local Share 8c funds. Several Capital Improvement Projects including a trail study, bus stop improvements and Metrolink landscape improvements (Budget Detail Sheets, Attachment 1) might provide opportunities for freeing up funds from other funding sources. In addition, TSM funds may be 0()(,t8 Budget and Finance Committee February 4, 2004 Page 3 used as "local match" for grants that provide funding for TSM programs. The Community Services Director has provided information transit system enhancements that may be financed through TSM funds (Attachment 2) . Attached Table 1 identifies potential programs to be funded with TSM Funds under each of the general categories identified above. The programs within each category have been ranked with staff' s suggested priority first. The general categories have not been ranked by priority. Each of the programs has been identified as either one-time expenditures, or as potential on-going expenditures. A very general estimate of the initial cost or annual cost for on-going programs has been included. Once priorities are set, . and the scope of each program refined, more detailed cost analysis will be performed. Staff is seeking the Committee' s recommendation on priorities for TSM program expenditures to present to the City Council . RECONWMATION Direct staff as deemed appropriate on recommended priorities to present to the City Council. Table 1: TSM Funding Program Priorities Attachments 1. 2003-04 Capital Improvement Budget Detail Sheets 2 . January 15, 2003, Memorandum from Community Services Director c: Hugh Riley, Assistant City Manager Cynthia L. Borchard, Administrative Services Director -- ,, 19 + E Table 1 TSM Funding Program Priorities :<. c> f aE..i `>-�'<+'1.ci. '`° �5: <► y.; :. °.:: ,, :- f t :.:;•> i hdi 't oa2. f ?k -:1rs..fir;t .• :> <_•!' •;' .E. 41C. .i;.•.• - i': _,:-: _,f? .•. 1,ff•'S '. .-< -; v}l. '< -^S:- .t. •>. fly le Preparation of a Bicycieffraii Master Plan Initial one-time expenditure,may require future update $50,000 Fa_iti�_tits Improvement and expansion of existing bike la Initial one-time expenditure, will require maintenance $100,000 and bike paths,including striping, funding Bicycle parking facilities,including racks Initial one-time expenditure, wi11 require maintenance $100100 nd's Sub-Total $250,00 Trails Preparation of a B' rail Master Plan see above see above Trail Connection from Moorpark High School parking Possible shared cost with Moorpark Unified School $2009000 lot to Arroyo Vista Recreafion Center District. Initial one-time expenditure, will require maintenance which might be shared or with,or done by school district Purchase and Installation of Street Furniture t One time cost at Various locations throughout the City $200,00 encour a eedesMan use. Build Levee Road trails under existing four bridges. Tierra Rejada, Pedestrian, Spring Road and New Lo $400900 n eles Avenue Maintenance of existing trails On-going expense I annual cost for five years at 50,000 $250900 per year Sub-Total $120509000 Transit_ Purchase new alternate fuel transit equipment Initial one-time expenditure, will require maintenance $400,00 Included in 2003-04 Bud flundim if not a Le Iacement Matching local funds for Metrolink second access and Initial one-time expenditure, may require maintenance $200900 edestrian crossin enhancements funding Security Improvements to Metrolink station including Initial one-time expenditure, may require maintenance $100,00 surveillance cameras, guard, landscaping, and stree funding furniture to encourage ridership Improve and expand bus turn out and Initial one-time expenditure,may require $500900 shelter facilities maintenance fundi Support Increased Level of Transit Service On-going expense f annual cost for five years a $750,000 150,000 ger year Addition of Minor Holidays to Transit Service On-going expense annual cost for five years at 5,500 $27,500 year Senior Dial-a-Ride On-going expense/annual cost for five years at 2,500 3121,500 1per ear Farebox Ratio Potential on-going expense (as needed) at 2,000 pe $10,004 YM Subsidize resident transit costs On-gang expense/annual cost for five years at 50,000 $250,000 MUM Subsidize Van Pool loans for employers May be managed through regional APCD program and $2509000 coordinated with State and Ventura County program. On-going expense I annual cost for five years at 50,000 r ear Investigate development of additional ride-shay Initial one-time expenditure, may require maintenance $200,000 parking facilities and/or improvement to existing funding ilities Sub-Total $ j50011000 Page},1 d 1 Table 1 TSM Funding Program Priorities 1-4 f, •{ -ti: . E%.s< f, i.• .., (i�(t-. •1- '3 •jF:•: .-s '>:_ . :i' f: •<.•j is • f .,fir f• •s i � :3 .Y` '- .c• , .t •€ ' f•- is `f:• -�: Alt rnae, Purchase of alternate fuel vehicles for City fleet Initial one-time expenditure, will require maintenance $800,00 Fuel funding if not a replacement (8 pool carstsmall truck Vehicles 25,000 each and 2 heavy equipment vehicles a qFV 250,200 e h Installation or financial support for alternate vehic Initial one-time expenditure, may require maintenance $200,00 fuel facilibes including electric charging stations andlo funding compressed natural gas(CNG) and liquefied natural as LNG) ue ing station Provide Incentive to other Service Agencies to instal Limited to one time expenditure. $100,00 fuelina facilities and better utilize AFV'st otal Sub-T $1210090001 •.1: _>_£. _;S •t ,:is c: .1' 'i. •i,.<>:} e.<•:. -i' _.Et:':�_ -!}; •;�:'.ii.. is ;,.. <, .j: t'• .4:: Building Lan aic grant program or retrofit program to Could be limited to one time cap for qualified project $250,000 T_echn_o� al and industrial buildings or established as an annual,on-going funding source. gram for retrofit of restaurants to red Could be limited to one time cap for qualifed project $250,044 missions or established as an annual,on-going funding source. $500,000 < .f;. >� tE!< < . '33:'i. 'f...:t�':.�: ;• i 't5-. �- ittf. .i:., i' .y ,' �(;!> ':�..<.1 :�_ .. : is Admini tra- Estimated cost of City Staff Person related to use o Limited to .25 FTE for five years plus 5% per yea $200,000 tive TSM Funds over 5 years increase. Sub-Total $200 40 Total $2.96009000 Page 2 of 2 4..' • CITY OF MOORPARK BUDGET LINE ITEM DETAIL FISCAL YEAR 2003104 CAPITAL IMPROVEMENTS Department: Public Works Account Number: ****.8310.8050 Project Titl e: ^ a ' Project Description: Construction of a Class I Bike Trail within or adjacent to railroad R-O-W, east of Moorpark Avenue Estimated Prior Total Prior Year(s) Year Carryover 2003/2004 New 2003/2004 Total Future Year{s} Object Code Activity Expenditures Amount Appropriations Bud et Amount Total Project Cost O 9601 Design $579000 : � -,. ; $570000 9610 R-O-W $0 $0 $0 - 9640 Construction $0 $0 $0 9650 Ins ection $0 $0 $0 $0 $0 $0 $0 �3 $0 $0 N $0 $0 Project Totals: $0 $0 L $57,000 $57,000 1 $0 $57,000 Funding Sources: $32,000 $32,000 $25,000 $25,000 $0 $0 $0 $0 Totals: $0 $0 $57,00011 $57,000 $0 $57,000 J _1 3 S'- Ak CITY OF MOORPARK BUDGET LINE ITEM DETAIL FISCAL YEAR 2003104 CAPITAL IMPROVEMENTS IDepartment: Public Works Account Number: ***'.8310.8035 Project Title: Project Description: Feasibility study regarding the construction of a grail system along the Arroyo Simi through the City and east to the City of Simi Valley. Estimated Prior Total Prior Year(s) Year Carryover 2003/2004 New 2003/2004 Total Future Year(s) Object Code Activit y Expenditures Amount A ropriations Budget Amount Total Project Cost 9601 Design $135,000 $15,000 Sm $150,000 9640 Construction $0 $Q 9650 fns action $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $o $0 Project Totals: $135,000 $158000 $Q $15,000 $0 $150,000 FundinS Sources: <.. a $27,400 $39000 :,ter. $30,000 :;. $1 08,000 $12,000 ` $1201000 $0 $0 $0 $o [Totals: $135,000 $15,000 $0 $159000 J $o $150,000 C CITY OF MOORPARK BUDGET LINE ITEM DETAIL FISCAL YEAR 2003/04 CAPITAL IMPROVEMENTS De artment: Communit y Services J Account Number: 5000.7310.7302.9632 Project Title ; _.,.. Project Description: Estimated Prior Total Prior Year(s) Year Carryover 2003/2004 New 2003/2004 Total Future Year(s) Object Code 1 Activi Expenditures Amount Appropriations Budget_ Amount Total Project Cost 9632 Bus Stops $42,175 $55,040 $1000000 -r `_ $197,175 $0 $0 $0 $4 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4 Project Totals: $42,175 $559000 $1 00,000 $1 55,000 $0 $197,175 Fundin Sources: $197 175 ,..a�41r3' $42,175 $55,000 $1001000 ' Awsx� 7.211 i r: H $O $0 MR I I $0 $0 $0 $0 Totals: $42,175 $550000 $100,000 $155,000 $0 $197,175 Capital Improvement Form 9632.xis Bus Stops a CITY OF MOO RPARK BUDGET LINE ITEM DETAIL FISCAL YEAR 2003104 CAPITAL IMPROVEMENTS f Department: Communi Serve s. Account Number: 2604.7310.7020 Project Title:: Project Description: Landscape south entrance to metrolink Station(TEA 21) Estimated Prior Total Prior Year{s} Year Carryover 2003/2004 New 2003/2004 Total Future Year(s) Object Code Activit Exe2nditures Amount Appro riations Budget Amount Total Project Cost 9632 Landsca in $90422 $'140,578 $4 't 9.1 $150,000 r $O $O $d $0 $0 $0 $0 $0. $0 $o $o $0 $0 $0 Project Totals: $9,422 $140,578 $0 $140,578 $0 $150,000 'Funding Sources: $132,000 $0 $132,000 $0 " ' " $9A22 $89578 ' Y: $18,000 ..}.,:. $0 $0 $0 $0 Totals: $9,422 $140,578 $0 $140,578 $0 $1501 000 �a i� CITY of MOORPARK BUDGET LINE ITEM DETAIL FISCAL YEAR 2003104 CAPITAL IMPROVEMENTS Department: Public Works Account Number: ****.8310.8052 Project, Project Description: Development of a project to assess the feasibility of reconstructing curbs and sidewalks along High St. between Moorpark Ave.and Spring Rd. to provide for angle parking. Current budget is for preliminary engineering only. Estimated Prior Total Prior Year(s) Year Carryover 2003/2004 New 200312004 Total Future Years) Object Code Activity Ex enditures Amount A ropriations Budget Amount Total Project Cost f'•J��l j.- i• 9601 IDesign $309000 • ac " $0 9610 R-O-W $0 $0 $0 9640 Construction $0 $0 $0 9650 Inspection $0 $o $0 $0 $0 $0 $0 $0 $o $0 $0 Project Totals: $0 $0 $349000 $30,000 $0 Undetermined Funding Sources: .. rtiQ►`:. : $30,000 ^:ado $0 $o $o $0 $0 $0 $0 Totals: $0 $0 $30,000 $301000 $00-1 Undetermined E i MEMORANDUM COMMUNITY SERVICES DEPARTMENT" TO: Laura Stringer, Sr. Management Analyst FROM: Mary K. Lindley, Director of Community Services f DATE: January 15, 2004 SUBJECT: Transit Cost and Funding Information Steve asked me to provide you with transit information for inclusion in the funding report scheduled for the February 4.City Council Meeting. The purpose of the information was to identify costs that could be funded by the City's TSM fund. Sup ort Increased_Level of Transit Service: The City expanded its transit service in September 2000,from one bus route to two routes, and increased its hours of operation. The expansion of service amounts to an estimated annual increase, in today's dollars, of$139,137 (round to $140,000). This expense could be funded from the City's TSM fund. r ' ' r N li a s: With the adoption of the FY 03104 bud et the Addition of Mono o d y p g , Council allocated $5,500 to operate Moorpark Transit, ADA service, and Senior Dial-a-Ride on minor, City-observed, holidays. This additional expense could be funded from the City's TSM fund. Senior Dial-a-Ride: in FY 02/03, the City began offering Senior Dial-a-Ride service. The estimated annual cost for this service in FY 03/04 is $2,500. This service could also be funded from TSM monies. Farebox Ratio: The City must maintain a certain farebox ratio (14.9%) in order to use it's TDA funds. if it falls below the established ratio, it can make up the difference from another non-state funding source.TSM monies could be used to fund the difference. Based on past farebox ratios, which fell below 14.9%, 1 estimated the necessary inclusion of around $2,000 to fund the difference. However, for FY 04/05, John Brand is estimating that the City will exceed 14.9%. As a result, no additional funding source should be needed. Lastly, Steve asked about identifying another funding source for the proposed purchase of two additional transit buses.The adopted FY 03104 budget includes $400,000 for the purchase of two buses from TSM funds. If the City wants to free up some of its TSM funds, it can submit an application for the use of L ATTACHMENT 2 "_t o Moorpark/Thousand Oaks Urbanized Area (UZA)funds.A call for applications for these funds should take place in February 2004. I do not have an estimated time when approval of the applications will be made, but my guess would be sometime around June. The allocation of the UZA funds will basically be a negotiation process between Moorpark and Thousand Oaks. I feel confident that we can work out an arrangement with Thousand Oaks if we start early. I apologize for the lateness of this information. cc: Steve Kueny, City Manager John Brand, Sr. Management Analyst r.. L.. i. I