SUBJECT: Consider Proposed Los Angeles Avenue Traffic Study Request for
Proposals
BACKGROUND
State Route 118 (SR 118)/Los Angeles Avenue (LA Avenue) is the primary east/west
arterial street through the City of Moorpark. Since the 1980's, it has served as
Moorpark's major commercial corridor. For at least as long, truck traffic through the City
has been a critical issue. As a State Route, the City must receive Caltrans' approval for
any improvements or changes to current conditions. The City has assumed
responsibility for funding virtually all of the improvements to LA Avenue. Funding
includes conditioning development projects and use of the Los Angeles Avenue Area of
Contribution (LA AOC) funds, which are collected from both residential and
commercial/industrial developers for specified improvements.
The LA AOC was originally created by the County of Ventura in the late 1970's, prior to
incorporation, to fund certain identified major improvements that were beyond a
reasonable scope for a single development project to fund. Generally, the developer
constructs its frontage improvements, including the emergency parking/bike lane and
adjacent travel lane, and the LA AOC funds the balance of the travel lanes and the
planned center median. Funding for traffic signals is based on the individual
circumstances of the proposed development and may or may not include a contribution
from the LA AOC.
Further background information about LA Avenue and related matters is included in the
attached Traffic Study Request for Proposals (RFP).
DISCUSSION
The intended purpose of the proposed study is two-fold. It's intended to determine
ways to improve and optimize traffic flow on LA Avenue and to serve as the primary
source document for updating the Circulation Element.
153
Honorable City Council
Re: Consider Proposed Los Angeles Avenue Traffic Study Request for Proposals
August 30, 2016 (CC Meeting of 9/07/16)
Page 2
•
The proposed study is not considered a project under CEQA and does not require an
environmental review. Any recommendations for changes to the Circulation Element
would be analyzed under CEQA as part of the Circulation Element update.
Traffic in general but especially truck traffic on LA Avenue as well as SR-23 (Walnut
Canyon Road/Moorpark Avenue) remains a major community concern. The information
that will be produced by the study is needed in order to convince Caltrans to authorize
improvements that can improve traffic flow. Staff expects information from the study
may also be useful in further evaluating the objective of obtaining permanent truck
scales on LA Avenue. Staff is currently gathering additional information about existing
truck scales on state highways and identifying potential consultants that could assist the
City's efforts in convincing the State of the need for LA Avenue truck scales. State
funding for truck scales is expected to remain very difficult to obtain. Funding for
construction is overseen by the California Transportation Commission. Historically,
funding for operations at truck scales is part of the CHP budget, which is considered
State general funds, while maintenance of the facility would be included in Caltrans'
budget. Staff will report to the Council on this in the near future.
The final form of the RFP will conform to City's standard for services. Staff expects the
Traffic Study to take approximately six months. The Sheriffs Department and City's
Traffic Consultant have reviewed the RFP's scope of work.
FISCAL IMPACT
Staff estimates the cost of the proposed study to be between $60,000 and $100,000.
The FY 2016-17 Budget includes $90,000 for updating the Land Use and Circulation
Elements. Proposed sources for additional funding are the LA Avenue AOC and
General Fund Reserve. A funding recommendation will be made at the time a contract
for services is considered.
STAFF RECOMMENDATION
Approve the Los Angeles Avenue Traffic Study Request for Proposals subject to final
language approval of the City Manager and authorize staff to proceed with obtaining
proposals.
Attachment: Traffic Study Request for Proposals (RFP)
154
ATTACHMENT
City of Moorpark
Los Angeles Avenue Traffic Study
Request for Proposals
INTRODUCTION
The City of Moorpark ("City") is requesting proposals from qualified consulting firms to
perform an analysis of traffic flow and related information for Los Angeles Avenue/State
Route 118 as specified in the Scope of Work.
BACKGROUND
State Route 118 (SR 118)/Los Angeles Avenue (LA Avenue) within the City of Moorpark
is the focus of this proposed Traffic Study. LA Avenue is a conventional highway and is
the City's major east/west route. The 1992 Circulation Element included the addition of
a 4-to-6 lane arterial street (known as North Hills Parkway) extending from LA Avenue
east with a connection to the SR 118 freeway. None of this route has been built. Based
on current Caltrans' criteria for a freeway connection, it's likely that this arterial would
only be constructed between LA Avenue and Spring Road as a two-lane road. On
February 7, 2001, the City Council effectively eliminated the SR 118 Bypass (now
referred to as North Hills Parkway) as a truck route alternative to LA Avenue. At that
meeting, the Council directed this east/west arterial street would terminate at Spring
Road. Prior Council action had prohibited all non-local truck traffic on Spring Road.
Figure 2 from the 1992 Circulation Element is attached.
In the City of Moorpark, LA Avenue extends approximately 3.2 miles from the west City
limits to its intersection with the SR 118/SR 23 freeway interchange (freeway
interchange). SR 118 is part of the National Highway System. The number one concern
expressed by Moorpark residents is truck traffic. SR 118 and SR 23 are the only
designated truck routes within the City. There is a sense (and some evidence) that a
large number of trucks traveling LA Avenue do so to avoid the CHP's commercial scales
at Conejo Grade on US Highway 101 and the steep grade there. The CHP currently
operates a platform scale on westbound Los Angeles Avenue west of the City limits on
a part-time basis. The approximate 1.2 mile segment of LA Avenue from the freeway
interchange west to Moorpark Avenue (SR 23) is the combined SR 118/SR 23. The
approximate 1.0 mile segment east of the west City limits is one travel lane in each
direction. The segment east of the Gabbert Road/Tierra Rejada Road (GR/TRR)
intersection includes a painted fourteen foot median, left-turn lanes at all street
intersections, and sections with two travel lanes and three travel lanes in each direction.
The ten signals between the interchange ramps and Tierra Rejada Road were
interconnected in 2007.
From approximately 1,000 feet east of GR/TRR intersection to Moorpark Avenue, there
are three travel lanes in each direction. Currently, the City is completing designs (not
yet approved by Caltrans) for improvements that add a third travel lane in each direction -
155
Los Angeles Avenue Traffic Study
Request for Proposals
Page 2
between Moorpark Avenue and Spring Road. The proposed improvements include a
dedicated right-turn lane for westbound LA Avenue to northbound Moorpark Avenue
(SR 23). There are currently three eastbound travel lanes in each direction east of
Spring Road to the freeway interchange and three westbound travel lanes from this
interchange to about 1,500 feet east of Spring Road. The conditions of approval for
Industrial Planned Development (IPD) Permit No. 2009-01/Conditional Use Permit
(CUP) No. 2009-01 require the improvement of LA Avenue from GR/TRR west about .6
miles. The improvements will include two travel lanes in each direction, eight foot (8')
bike lanes on each side, a raised median, and a new signalized intersection at the
westerly point of the described improvements. The City is also planning a raised
median along the entire 3.2 mile segment of LA Avenue. Caltrans has conditionally
approved a raised median from the freeway interchange to about 1,200 feet east of
Spring Road. SR 118 between the west City limits and SR 232 (Vineyard Avenue) is
currently one travel lane in each direction with no passing lanes and with numerous
driveways and intersections, most without dedicated turn lanes. Neither Caltrans nor
the County of Ventura have future projects planned for improving this section of SR 118.
Between about 2000 and 2008, the City funded a project to interconnect the traffic
signals along LA Avenue. As of early 2008, Caltrans assumed responsibility for its
operation and maintenance. Part of the scope of work will be to determine the status
and effectiveness of this system.
In 2002, the City Council authorized a study to assess the feasibility and cost related to
possible establishment of a prohibition or restriction (Restrictions) of non-local truck
traffic on LA Avenue between the SR 23 freeway and SR 232 (Vineyard Avenue). The
study limit was originally to SR 34 and later expanded to SR 232. Parsons was the
consultant retained for this study.
In the.initial phase of the study, Parsons concluded:
1. The National Highway System (MIS) designation for SR 118 would not have to
be rescinded in order to place Restrictions on non-local truck traffic; and
2. All of the truck Restrictions established on State Highways were justified for
safety reasons and further Federal law prohibits any State from restricting truck
traffic on State Highways, except for safety reasons.
On May 21, 2003, Parsons and City staff presented findings and recommendations to
the City Council as follows:
1. No basis for safety reasons to justify a truck Restriction was supportable;
2. Request increased enforcement at the existing truck inspection station; and
156
Los Angeles Avenue Traffic Study
Request for Proposals
Page 3
3. Request Caltrans to pursue a permanent truck inspection station.
In the 2003 Parsons study for LA Avenue corridor, traffic volumes ranged from 29,400
to 57,800 vehicles per day with about ten percent (10%) of those numbers being truck
traffic. It was estimated that about sixty-five percent (65%) of the traffic was not
generated by land uses along the study corridor.
Even prior to this date, the City had been working with Caltrans, VCTC, and the County
of Ventura to place truck inspection stations on LA Avenue. In December 2002, staff
presented a Caltrans prepared Project Study Report (PSR) for the SR 118 Weigh
Stations. The PSR recommended two Class C Weigh Stations (one for each direction)
west of the City limits. The estimated cost was then $20 million. The PSR did not
address staffing of the Weigh Stations. Staff estimates it would cost between $750,000
to $1,000,000 annually to staff and maintain the scales in each direction for eight (8)
hours per day, Monday to Friday. The PSR identified a potential State funding source
subject to California Transportation Commission approval. To date, funding has not
been secured and no further work has been performed by Caltrans.
SCOPE OF WORK
The primary purpose of the study is to determine ways to improve and optimize traffic
flow on LA Avenue including achieving and maintaining Level of Service (LOS) C at all
intersections. The study will also be used as the primary source document for an
update to the City's Circulation Element. An update of the Land Use Element is
currently being prepared. Consultant will be provided Base Year and General Plan
build out projections. The Scope of Work does not include:
1. Preparation of a Traffic Model
2. Evaluation of complete streets requirements
3. Preparation of General Plan Goals and Policies
The following items are to be included in the Scope of Work:
1. Since LA Avenue is a State highway, the work shall conform to Caltrans'
requirements.
2. Current and future traffic volumes for all vehicles with separate count and
projections for commercial vehicles (trucks); Compare this data to US 101
(between 1-405 and SR 126) and SR 126 (between US 101 and 1-5) and to
similarly situated conventional state highways in Southern California.
3. Truck volumes; Impact of trucks on travel speeds/intersection capacity; Include
an hourly count of weekday truck volumes.
4. Benefits and negative traffic impacts, if any, of installing a raised median.
5. Evaluate signal synchronization and signal timing. Is Caltrans' signal coordination
optimum? Is the interconnect system operating as designed?
157
Los Angeles Avenue Traffic Study
Request for Proposals
Page 4
6. If allowed by Caltrans, would permissive/protected left-turn signals improve
intersection capacity?
7. Peak hours - What will the addition of a third travel lane have on travel speeds
during peak hours?
8. Benefit, if any, of lengthening left-turn lanes or adding a second left-turn lane at
certain intersections; e.g. westbound LA Avenue to southbound Moorpark
Avenue.
9. Benefit, if any, of having a larger curb radius where there are no right-turn lanes
10. Pedestrian crossing impacts; Are there potential benefits of pedestrian bridges?
If so, where? What design criteria needs to be considered (height, width, length,
accessibility)?
11. Distance between signalized intersections and best locations for signals. What
impacts/benefits if eliminate signal at Park Lane and make it right-turn only and
require traffic on south side of LA to use Moorpark Avenue to go west and on
north side to go to Leta Yancy to go east? What are impacts/benefits of not
constructing proposed signals at Millard/LA and Shasta/LA? Will additional
signals reduce regional traffic? If so, by how much?
12. Is there a need for parallel routes north and south of LA Avenue; i.e. Lassen
Avenue between Park Lane and Moorpark Avenue, and from 1984 LLG Study,
Unidos/Majestic from Leta Yancy to Spring Road?
13. Do existing "Bypasses" such as Gabbert Road to Poindexter Avenue to Moorpark
Avenue to High Street and Moorpark Town Center alley between Moorpark
Avenue and Park Lane divert significant amount of traffic? Does Tierra Rejada
Road divert a significant amount of regional traffic from LA Avenue?
14. What impact will future North Hills Parkway from LA Avenue to Spring Road have
on LA Avenue traffic volumes?
15. Assuming no further widening of LA Avenue beyond three travel lanes in each
direction and 118 feet of right of way, the street configuration is:
8ft 8ft
Parkway - Parkway
16. Forecast 2035 traffic volumes.
17. Conduct traffic safety review including but not limited to traffic accident data.
18. Confirm current LOS at all LA Avenue signalized intersections and what future
actions are needed to achieve/maintain LOS C at each intersection at all peak
times out to 2035.
19. Would the installation of and operation of permanent commercial vehicle scales
on LA Avenue have an impact on truck volumes?
20. What are the current traffic volume and future capacity of SR 118 west of the City
to SR 232 (Vineyard Avenue) if it remains a two-lane highway?
158
Los Angeles Avenue Traffic Study
Request for Proposals
Page 5
21. Review most current Traffic Studies at each intersection including traffic counts.
As a bid option, provide scope of work and cost to conduct traffic counts
including specific truck counts.
22. Prepare estimate of the amount of traffic volume on LA Avenue generated by
land uses within the City.
23. As needed, consult with City staff, County of Ventura, Caltrans, Ventura County
Transportation Commission, Sheriffs Department and CHP.
Anticipated Schedule
December 7, 2016 Award Contract
TBD Present Report to City Council
Anticipated Meetings
Consultant will be expected to attend the following meetings at City Hall with City staff:
1. Kick off meeting. City Staff will answer questions of the Consultant and finalize
timeline.
2. Other meetings. As proposed by Consultant with final determination to be made
as part of selection process.
PROPOSAL SUBMITTAL REQUIREMENTS
Each proposal shall include as a minimum the following information; and the proposal
shall be formatted to enhance ease of reading including:
Primary Contact. Provide the name and title of the person who will be the primary
contact and manager for the contract, plus contact phone number(s), email, and mailing
address.
Company Information. Provide an overview of the history of the company, such as but
not limited to, range of services typically provided, expertise, number of employees, and
states in which company operates.
Firm and Staff Qualifications. Provide a summary of three (3) recent similar projects or
studies that the firm has recently completed. Include similarities in scope of work and
other relevant information as it pertains to this proposal, as well as professional
resumes of key personnel and a minimum of three (3) client references that may be
contacted.
159
Los Angeles Avenue Traffic Study
Request for Proposals
Page 6
Cost Proposal. Provide a detailed cost proposal. Include details on a payment
schedule and any reimbursable expenses and rates including but not limited to any
proposed software, graphics, models, GIS or other mapping and traffic counts.
Acknowledgements.
1. The proposing firm shall provide a statement noting that it has the available
capacity within its current personnel and workload to complete this scope of work
within the anticipated timeframe.
2. The proposing firm shall provide a statement noting any conflicts of interest that
may exist with other clients or projects currently underway.
3. The proposing firm shall confirm it can provide insurance for automotive liability,
commercial general liability, and errors and omissions for professional services in
the amounts and with the endorsements required by the City. A copy of the
City's standard agreement is attached.
PROPOSAL EVALUATION
The following identifies the selection criteria that will be used to evaluate the proposals:
The City may, at its option, interview one or more consultants. The City's decision to
select a consultant will be based upon the following criteria, plus any other relevant
factors that would further demonstrate a consultant's qualifications:
• Completeness of Proposal
• Experience of Firm and Proposed Personnel (providing similar services)
• Timeliness/Meeting Deadlines
• Cost
Attachments:
1992 Circulation Element, Figure 2
Copy of City's Standard Agreement (not included in City Council Agenda Packet)
M:\\CITYMGR\Los Angeles Avenue Traffic Study RFP 2016 0831.doc
160
ATTACHMENT
2
a
E
l
d
l.. BROADWAY8RQ^DvyA
R
R ------...4
•
T.
/ \ __
t !_._. 1
/ i
V .i
b V CAMPUS PARK
1 a �- f
A f 3 '^ `IIMIT VALLEY FREpw,41a
•
�r1� I .r- .. A.
4114114.141
• .
t._._.
.....:Irs's "I' llii IF°
i
, • 11.. ::...... 1ppillt
I 111111
li
II zap WW1 am - it
7
C
D
7-PC}END FIGURE 2
FREEWAY CM OF MOORPARK
INTERCHANGE' GENERAL PLAN CIRCULATION ELEMENT
SOMME ARTERIAL
..�� rotrwuNE wR�>�AL
-R- RURAL GOUECIQR HIGHWAY NETWORK
LOCAL COLUECOR •
R SION/42360 INFESSECrION September 1999
Q ATO*A RR O
u GRADE EITRRATED RR CROSSING
_._._._._. CV LEATBOUNPARY
i SR431 FREEWAY CORRIDOR
NOTE: 0••••••1•• r ow.Sal
CID'fim pie iPM.I�/.e4
Woks O p .tutO..w..IpfWw1iq.NMOgrara
W.tlite.J WWo nd.adi as r
•
GENERAL PLAN CIRCULATION ELEMErn.
FIGURE 2 . CIRCULATION NETWORK