TO: Honorable City Council
FROM: Mary K. Lindley, Parks, Recreation, & Community Services Director
BY: Roger O. Blais, Parks and Landscape Manager
DATE: November 20, 2008 (Meeting of December 17, 2008)
SUBJECT: Consider Approval of the Plans and Specifications for Poindexter
Park Expansion and Consider an Agreement with PICON for
Construction Management
BACKGROUND
On April 18, 2007, the City Council approved the conceptual design for a 2.2 acre
expansion of Poindexter Park. The approved conceptual plan included: 14,000 square
foot in-ground skatepark, full-court basketball court, new play lot designed for youth
between the ages of 8 and 12 (sometimes referred to as "tweens"), and picnic
amenities. On June 20, 2007, the Council approved an amendment to its agreement
with Community Works Design Group (CWDG) expanding their scope of work to include
the preparation of the project's construction plans and specifications. On October 27
and December 15 of 2007, the City held skatepark design planning workshops to solicit
input from the community and skateboarders on the facility's design elements.
DISCUSSION
In previous Agenda Reports there was discussion about the possibility of utilizing the
western most parking lot at Chaparral Middle School. As the Council will recall, the idea
was to construct a driveway from Poindexter Avenue on the park site connecting with
the School's parking lot. It was proposed that access to the School's parking lot from the
Park would be restricted to non-school hours. The School District has declined the
City's request. As a result, the plans being presented to the Council include no
additional parking at Poindexter Park.
The completed plans being presented to the Council include skatepark design elements
that are consistent with the comments and suggestions expressed by interested skaters
who attended the two workshops. These elements include a large bowl (pool), snake
run, stairs, ramps and banks, rails, and other jump features. It also includes a
design/skate element that will be unique to Moorpark, a large upright "M" (3 foot, 8
inches), on a peninsula above the snake run. Skaters will be able to skate on three
��,0 005
Honorable City Council
December 17, 2008
Page 2
sides of the "M". The area near the inside entrance to the skatepark has been identified
as the beginner area. The elements in that area are designed to accommodate less
experienced skaters. Staff plans to use that area for skateboard classes and clinics. The
skatepark is enclosed within an enhanced 6 foot galvanized chain link fence. The fence
enhancement includes smaller mesh with black vinyl coating on the bottom half of the
fence laid out in a wave-like pattern. The smaller mesh will discourage climbing while
still allowing for visibility. We believe the fence's design will allow the City to secure the
facility, provide desired visibility into the facility from the street, while maintaining an
attractive appearance. It is staff's intent to lock the skatepark at dusk.
As noted above, the improvements will include a full court basketball court, playground
with equipment designed for older adolescents, and an open turf area. All trees, with the
exception of three Pepper trees, will remain including a palm that is in the center of the
skatepark. Additionally, shrubs, bushes, and tree stumps will also be removed.
Consistent with the existing park design, the walking paths will be decomposed granite.
The plans include landscape improvements that will blend the existing park with the
expansion area.
There are no plans to include lights for the skatepark; however, the construction plans
include the installation of electrical conduit for security cameras and lights if in the future
the City wishes to add those elements. Staff will present guidelines and policy
recommendations regarding the operation of the skatepark for Council consideration at
a future meeting.
The Council is now being asked to consider approval of the Poindexter Park Expansion
construction plans and specifications. If approved, staff will proceed with the
construction bidding process.
Project Budget
Prior to the December 17 Council meeting, the project's plans and specifications were
provided under separate cover for the Council's review. Based on the completed
construction documents, CWDG estimates construction costs to be $1,876,000. As
previously reported, of the total project cost, it is anticipated that the skatepark portion of
the project is approximately $700,000. Combining construction costs with all other
project costs, the total project's estimated budget is as follows:
Description Completed Pending Total
Work Work
Construction $1,876,000*
Construction Plans & Specifications $ 77,000*
Conceptual Plan $26,000
Plan Check, Permits & Reproductions $ 15,000
9J 0
SACommunity Services\ADMINISTRATIVE\CC Reports\2008\12-17-08 (Poindexter Plans and Specifications).doc
Honorable City Council
December 17, 2008
Page 3
Soils/Lab Testing $ 47,000*
Construction Management $ 43,000
Contingency (15%)* $ 300,000
Preliminary Site Work** $14,000
Total $40,000 $2,358,000 $2,383,000
Included in calculation of 15% contingency
Water well and tree removal
The FY 2008/09 budget includes $2,326,269 for the project costs listed above. A budget
amendment will need to be processed when the Council considers the bid results, at
which time we have a clearer project cost estimate.
In the April 18, 2007, Council Agenda Report, the proposed funding source of the
project was $89,495 from the State Park Bond and the remaining from the Park
Improvement Fund (PIF). At that time, it was proposed that $700,000 (the approximate
cost of the skatepark) come from the PIF - Communitywide Zone, used for projects with
communitywide benefit including Arroyo Vista Community Park, and the remaining from
PIF - Zone 1 (downtown), the Zone that Poindexter Park is within. PIF consists of fees
paid by residential developers in-lieu of setting aside parkland. It was recognized that
Zone 1 does not have the necessary fund balance available; however, it was projected
that within the next 10 years or at build out, Zone 1 will have a fund balance of
approximately $5.5 million and that the Communitywide Zone would have a fund
balance of approximately $8.8 million. As a result, the Council was told that a loan from
either the City's Endowment Fund, General Fund, or Redevelopment Agency would be
necessary. It was also discussed that action on the loan would be taken at the time the
Council awarded a contract to construct the project since construction cost would be
known at that time. Based on our current cost estimates, funding for the project is as
follows:
Funding Source Allocation
State Park Bond $ 89,495
PIF — Zone 1 (requires a temporary loan $1,593,505
of approximately $1.5 million)
Communitywide Zone $ 700,000
Total Revenue $2,383,000
Staff recommends that the Council approve the construction plans and specifications as
presented. Additionally, the City needs to secure the services of a project manager and
a soils testing firm. The proposed project manager has provided review of the plans and
specifications during the preparation phase and needs to participate and be available
during the bidding and construction phases. For action at the December 17 Council
SACommunity Services\ADMINISTRATIVE\CC Reports\2008\12-17-08(Poindexter Plans and Specifications).doc
Honorable City Council
December 17, 2008
Page 4
meeting, staff recommends that the Council award an agreement to PICON (Phil Vein)
at a cost not to exceed $43,000 and authorize the City Manager to execute the
agreement. The Council will be asked to award an agreement for soils testing and lab
work at the time the construction bid results are presented, most likely at the February 4
Council meeting.
FISCAL IMPACT
As discussed above, the total estimated cost of the project is $2,383,000. One of the
identified revenue funding sources (PIF Zone 1) requires a temporary loan of approximately
$1.5 million. In addition, the interest that would be earned by the interim funding source will be
negatively impacted in an amount of $20,000 to $50,000 per year for every $1 million loaned;
although, the interest would be repaid along with the principal. The repayment of the loan will
depend on the pace of new development and the payment of parkland fees.
STAFF RECOMMENDATION
Approve the plans and construction specifications for the Poindexter Park Expansion
Project; authorize staff to solicit construction bids; and authorize the City Manager to
execute an agreement with PICON for project management services at a cost not to
exceed $43,000, subject to final language approval of the City Manager and City
Attorney.
Attachment A: Poindexter Park Expansion Site Plan
SACommunity Services\ADMINISTRATIVE\CC Reports\2008\12-17-08(Poindexter Plans and Specifications).doc
-- — - -- — _ - ATTACHMENT A
POINDEXTER AVENUE
jr■■■■■■■■E■■■■■■W■■■ M_■■■■-M■■■■■■■■■■NONE■■
/MONUMENT +
■ �' <" / O-, � _ .� LAWN
■I - ` bECOMPOAE6�RnNrtE>r
■ / / LAWN
' OPEN TURF
■� �� i
' r1■I ti .l - •�',+r J/. - SKAiE PARK ' i - ,' • t
I
nB.000sr, ,� (Chaparral
r■ i� � _-
LAWN � eaa• /
M ,� Middle School)
■ � . • -
I - I PLAY a°�
I
■ �K L---rte-- �, � -
�I s II BASKETBALL I • \�T � ', ,',irj '� -