Loading...
HomeMy WebLinkAboutAGENDA REPORT 1997 0618 CC REG ITEM 10FTo: The Honorable City Council From: Kea Gilert, Director of Puldic Works Dirk Lovett, Anislost City Engineer Prepared By Anthony Cooper, Civil Engineer �Ia -,, "' TTEM /o• F• i- Ctry Cr lOONUM CALHUM City CoWO Meeting Date: June 6, 1997 (Council Meeting of June 18, 1997) Subject: Notice of Completion of the Arroyo Vista Community Park Access Roam. 1. On February 19, 1997, the City Council awarded a contract to Mendez Concrete, Inc. for construction of the exteOSion of the Arroyo Vista Park Access Road. The contract was awarded in the amount of $187,347.91. An additional 10% contingency was also authorized for the contract. 2. On May 7, 1997, the City Council approved certain change orders for the project, increased the approved contract amount to $218,734 and approved a five percent (5 %) contingency of $10,936. The revised total authorized construction cost was, therefore, increased to $229,670. Construction of the perk access road began on March 24, 1997. Correction of all punch list items was completed on June 5, 1997. The project called for the construction of pavement (including reconstruction of the a*4we sad giacement of base material) over the gravel road serving Arroyo Vifa Community Park. Constructm of other related improvements including sue, guNers and o her drainage irnprovemeots was also included. The limits of the work extended front a point just east of the paved parking lot, easterly to the paved pathway to be constructed with the Pedestrian bridge project. avprd3 . cap U4 Park Access Road June 18, 1997 Page 2 1. Addiuciaid Qwwies: Actual construction required more quantities of bid items than initially estimated by the design engineer. The cost of the additional quantities required is $3,762.38. 2. CAw ge Orders: Six construction change orders were issued. They are summarized as follows: (1) Due to the relocation of water valves on the north side of the new access road, it was assumed that construction of a block wall would be necessary to protect them from the adjacent sloping grade. After relocation of the valves was complete, the slope was graded so that placement of the wall was not necessary. (2) Because of insufficient cross slope on the east end of the existing paved access road, removal and repaving of a portion of this existing pavement was necessary to match the finished grade of the new access road. (3) Due to the elevation of the new sidewalk on the south side of the access road, placement of additional fill was necessary to provide adequate drainage from the park to the new sidewalk. (4) The southeast temporary dirt parking lot, and the football field, just south of the ling lot, was lower than the elevation of the new access road. In order to provide positive drainage between the field and the south flowline of the access road, fill was placed and compacted in the field and the parking lot. (5) The relocation of the two water meters, serving the park on the south side of the access road, were required to be relocated as part of the construction. Since Venwm County Water Works District does not allow splices, a new service lateral was planed between the water main and the meter box. The contractor was paid for the material to install new service laterals. (6) Overtime was required of the City's inspector to provide inspection of the project. The cofactor was backcharged to pay the premium of the overtime for inspection beyond the 8 hour work day. 3. Nm -Cmeta wt Work: The subject work required the relocation and reconstruction of domestic water lines serving facilities east of the Community Center. That work was done by in -house staff, with assistance from the City's landscape maintenance contractor. The total cost for this work was $8,054.41. avprd3.cop t1W1S9 Park Access Road June 18, 1997 Page 3 C. Fiscal Impact I . Total Contract Costs: A summary of the total construction contract costs are as follows: Bid Amount: Additional Quantities Sub -Total Change Orders No. 1: a No. 2: No. 3: No. 4: No. 5: No. 6: Total $ 0.00 $ 1,350.00 $ 2,716.00 $ 11,484.00 $ 835.05 47 $187,347.91 $ 3,'609.38 $190,957.29 $ 16.042.05 $206,999.34 Note a: Approved Change Order No. I in the amount of $880.00 for a retaining wall, was not constructed and not paid. 2. Total Project Cost Estimate: A summary of the total project cost is as follows: Element _ Total(,) Contract Construction 207,000 Non - Contract Work 8,054 Sub -total ** 215,054 Design 14,220 Admin / Insp 13,380 Total * ** 242,654 Notes: ** The authorized limit for all construction costs was $229,670. * ** The authorized limit for all project costs was $268,670. avprd3.cvp vV ():Ls() Park Access Road June 18, 1997 Page 4 3. Bicycle Facilities Grant (Project Related): The City's SB-821 grant states that grant fund shall be restricted to one -third (331/3%) of the construction costs related to the Bike Path improvements, not to exceed $54,000. Based on the bids received, a calculation of the anticipated expenditures eligible for grant funding is as follows: Description Amount Area of Bike Path-. 29,300 sf Divided by total Area of Pavement 69.100 sf Percent of Construction Related to Bike Path: 42% Estimated Construction Costs Related to Bike Path $90,323 [$215,054 x 42% p Grant Funded Project Expenses 1331/3%1 $30,105 Remaining Grant Funds to go to Other Projects a $23,895 [$54,000 - $30,1051 Note a: A portion of these remaining SB -821 funds will be applied to a portion of the costs for pavement improvements to be constructed with the Pedestrian Bridge. The remainder of these funds will be carried over to fund a portion of the Poindexter Avenue widening project. 4. Project Funding: Based on the above analysis, a summary of the recommended funding for this project is as follows: Funding Source 201: Traffic System Management [201.801.8003.000.99031 212: Park Improvement [212.710.7218.000.9903' 242: SB -821 [Project; [242.801.8003.000.9903', Sub -Total 242: SB -821 [Non - Project] [242.801.8003.000.9903' Total avprd3.cmp Construction Bike Other Pa Costs f$) 60,218 62,366 Non - Co t Total (S1 13,800 136,384 Notes a b c d 000161 62,366 13,800 76,166 _ 30,105 0 0 30,105 90,323 1241731 27,600 242,654. �.._ 0 0 0 23.895 90,323 124,731. 27,600 266,549 Notes a b c d 000161 Park Access Road June 18, 1997 Page 5 Notes: a • Bike Path Costs: Total Cost [$90,323] less grant funds [$30,105] = Local Share [$60,218] • Non -Bike Path Costs: One -half non -Bike Path construction costs, plus one -half of all non - construction costs. b One -half non -Bike Path construction costs, plus one -half non - construction costs. The other one -half of these costs are charged to TSM funds. c Project related Bicycle Facilities grant funds. d Non- Project related Bicycle Facilities grant funds to be transferred to other projects at a future date. 5. Budget: Based on the above analysis, a summary of the final budget for this project is as follows: Funding Source _ Current Estimated Estimated Approved Year -End Year -End d et Costs Surplus (5) 201: Traffic System Management L50,800 136,384 14,416 [201.801.8003.000.9903] 212: Park Improvement 86,200 76,166 10,034 [212.710.7218.000.9903" 242: SB -821 54,000 30,105 23,895 [242.801.8003.000.99031 Total 291,000 242,655 48,345 Of the $48,345 projected year -end surplus, $23,895 is SB -821 monies "earmarked" for other projects. The remainder is $24,450. In that these are estimated and not final numbers, it is not recommended that the budget be revised at this time. All unexpended surplus appropriations will automatically be returned to funding sources subsequent to the final accounting for this project. t 1 The City Engineer has completed a final inspection of the project and has found the work to be acceptable. The final total contract construction cost ($207,879.34) plus other construction ($8054) are less than the total authorized construction cost of $229,670. avprd3.cmp 0001" Park Access Road June 18, 1997 Page 6 Staff recommends that the City Council take the following actions: Accept the work as complete; 2. Instruct the City Clerk to file a Notice of Completion for the project; and, 3. Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period avprd3. cap W0163