Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AG RPTS 2016 1025 PC REG
4PAK Cq�'T jliS 4.4 Resolution No. 2016-613 PLANNING COMMISSION 4,0 REGULAR MEETING AGENDA OCTOBER 25, 2016 7:00 P.M. Moorpark Community Center 799 Moorpark Avenue 1. CALL TO ORDER: 2. PLEDGE OF ALLEGIANCE: 3. ROLL CALL: 4. PROCLAMATIONS, COMMENDATIONS, AND SPECIAL PRESENTATIONS: 5. PUBLIC COMMENT: 6. REORDERING OF, AND ADDITIONS TO, THE AGENDA: 7. ANNOUNCEMENTS, FUTURE AGENDA ITEMS, AND REPORTS ON MEETINGS/CONFERENCES ATTENDED BY THE COMMISSION: 8. PUBLIC HEARINGS: (next Resolution No. PC-2016-613) A. Consider a Resolution Recommending Approval of Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016-04 for the Construction and Operation of a New Two-Story Food Market, Restaurant with Alcoholic Beverage Sales, Banquet Room, Commercial Kitchen, and Microbrewery Totaling 16,734 Square Feet on 1.02 Acres at 44 High Street, and Making a Determination of Exemption Under CEQA in Connection Therewith, on the Application of Sean Rasmussen, Wade Weissman Architecture, for Apricot Lane Market Holdings LLC. Staff Recommendation: 1) Open the public hearing, accept public testimony and close the public hearing; and 2) Adopt Resolution No. PC- 2016- recommending to the City Council conditional approval of Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016- 04. (Staff: Freddy Carrillo) All writings and documents provided to the majority of the Commission regarding all agenda items are available for public inspection at the City Hall public counter located at 799 Moorpark Avenue during regular business hours. The agenda packet for all regular Commission meetings is also available on the City's website at www.moorparkca.gov. Any member of the public may address the Commission during the Public Comments portion of the Agenda, unless it is a Public Hearing or a Discussion item. Speakers who wish to address the Commission concerning a Public Hearing or Discussion item must do so during the Public Hearing or Discussion portion of the Agenda for that item. Speaker cards must be received by the Secretary for Public Comment prior to the beginning of the Public Comments portion of the meeting; for a Discussion item, prior to the Chair's call for speaker cards for each Discussion agenda item; and for a Public Hearing item, prior to the opening of each Public Hearing, or beginning of public testimony for a continued hearing. A limitation of three minutes shall be imposed upon each Public Comment and Discussion item speaker. A limitation of three to five minutes shall be imposed upon each Public Hearing item speaker. Written Statement Cards may be submitted in lieu of speaking orally for open Public Hearings and Discussion items. Any questions concerning any agenda item may be directed to the Community Development/Planning office at 517-6233. Regular Planning Commission Meeting Agenda October 25, 2016 Page 2 B. Consider Resolution Recommending to the City Council Approval of General Plan Amendment 2016-02 to Include the 2015 Ventura County Multi-Hazard Mitigation Plan as Part of the Safety Element and Finding of Exemption from the California Environmental Quality Act in Connection Therewith. Staff Recommendation: 1) Open the public hearing, accept public testimony and close the public hearing; and 2) Adopt Resolution No. PC-2016- recommending to the City Council conditional approval of General Plan Amendment No. 2016-02. (Staff: David Bobardt) 9. DISCUSSION ITEMS: 10. CONSENT CALENDAR: A. Consider Approval of the Regular Meeting Minutes of September 27, 2016. Staff Recommendation: Approve the minutes. 11. ADJOURNMENT: In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, including auxiliary aids or services, please contact the Community Development Department at (805) 517-6233. Upon request, the agenda can be made available in appropriate alternative formats to persons with a disability. Any request for disability-related modification or accommodation should be made at least 48 hours prior to the scheduled meeting to assist the City staff in assuring reasonable arrangements can be made to provide accessibility to the meeting (28 CFR 35.102-35.104; ADA Title II). STATE OF CALIFORNIA ) COUNTY OF VENTURA ) ss CITY OF MOORPARK ) AFFIDAVIT OF POSTING AGENDA I, Joyce R. Figueroa, declare as follows: That I am the Administrative Assistant II of the City of Moorpark and that an agenda of the Regular Meeting of the Moorpark Planning Commission to be held on Tuesday, October 25, 2016, at 7:00 p.m. in the Council Chambers of the Moorpark Community Center, 799 Moorpark Avenue, Moorpark, California, was posted on October 21, 2016, at a conspicuous place at the Moorpark Community Center, 799 Moorpark Avenue, Moorpark, California. I declare under penalty of perjury that the foregoing is true and correct. Executed on October 21, 2016. Jo A e ". Figueroa, Administrative Assistant II ITEM 8.A. MOORPARK,CALIFORNIA Planning Commission of IL. 25 261(0 ACTION: I - / 01 Mnf'vn 1)(7.6 )I fon kin. PC 2nIA- BY: 1- -BY: ;)• riCi3P(OfL MOORPARK PLANNING COMMISSION AGENDA REPORT TO: Honorable Planning Commission 7) .(7 FROM: David A. Bobardt, Community Development Director Prepared by Freddy A. Carrillo, Associate Planner I DATE: October 14, 2016 (PC Meeting of 10/25/2016) SUBJECT: Consider a Resolution Recommending Approval of Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016-04 for the Construction and Operation of a New Two- Story Food Market, Restaurant with Alcoholic Beverage Sales, Banquet Room, Commercial Kitchen, and Microbrewery Totaling 16,734 Square Feet on 1.02 Acres at 44 High Street, and Making a Determination of Exemption Under CEQA in Connection Therewith, on the Application of Sean Rasmussen, Wade Weissman Architecture, for Apricot Lane Market Holdings LLC BACKGROUND On June 22, 2016, Sean Rasmussen, on behalf of Wade Weissman Architecture, submitted an application for Commercial Planned Development (CPD) No. 2016-01 and Conditional Use Permit (CUP) No. 2016-04 for the construction and operation of a new two-story food market, restaurant with alcoholic beverage sales, banquet room, commercial kitchen, and microbrewery totaling 16,734 square-feet on 1.02 acres at 44 High Street. The majority of the project site is currently owned by the Successor Agency to the Redevelopment Agency of the City of Moorpark (Successor Agency). A Development and Disposition Agreement is being negotiated to effectuate the sale of the property to Apricot Lane Market. The project also proposes the use of approximately 8,900 square-feet of Ventura County Transportation Commission (VCTC) 1 Honorable Planning Commission October 25, 2016 Page 2 owned property for parking and landscaping. This property would remain under VCTC ownership and would be used through a revocable license agreement. The applicant will be applying for a Type 47 License (On Sale General — Eating Place) for the restaurant. The microbrewery is proposed to be occupied by a local tenant (Enegren Brewing) and will require a Type 23 License (Small Beer Manufacturer). A Commercial Planned Development (CPD) Permit is required for any new construction of more than 2,500 square-feet of commercial building floor area. A Conditional Use Permit is required for the combination of the microbrewery and restaurant with alcohol beverage sales in the Old Town Commercial (C-OT) Zone. A decision on a CUP is normally made by the Planning Commission; however, because this project involves City Council consideration of the CPD Permit, staff is requesting the Planning Commission's recommendation to the City Council on all permits associated with the project, with the City Council being the final decision maker. DISCUSSION Project Setting Existing Site Conditions: The proposed site is located on two parcels, approximately 1.02 acres owned by the Successor Agency, and approximately 0.20 acres owned by VCTC, totaling approximately 1.23 acres on the south side of High Street, east of Moorpark Avenue and west of Bard Street. The site currently contains Maria's Family Restaurant and two attached vacant wood frame structures (old grain facility with rail station facade), one of which extends beyond the project site. Pepper trees, palm trees, ash trees, and an elderberry tree are located on the property. General Plan and Zoning: GENERAL PLAN/ZONING Direction General Plan Zoning Land Use Site Old Town Old Town Commercial Restaurant and vacant Commercial (C-OT) (C-OT) buildings North Old Town Old Town Commercial Retail, restaurant, and Commercial (C-OT) (C-OT) entertainment uses Old Town Old Town Commercial South Commercial (C-OT)/ (C-OT)/Commercial Planned Railroad right-of-way General Commercial Development(CPD) (C-2) East Old Town Old Town Commercial Vacant buildings, dirt Commercial (C-OT) (C-OT) parking lot West Old Town Old Town Commercial Chamber of Commerce Commercial (C-OT) (C-OT) office \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 2 Honorable Planning Commission October 25, 2016 Page 3 Downtown Specific Plan: On October 7, 1998, the City Council adopted Resolution No. 98-1515, approving Specific Plan No. 1995-01 (Downtown Specific Plan). On November 1, 2006, the City Council adopted Resolution No. 2006-2535 approving Amendment No. 1 to Specific Plan No. 1995-01 Revising Sections 2 and 3 of the Downtown Specific Plan to provide more specific direction regarding development and architectural style in the commercial and residential areas. The Downtown Specific Plan is intended to provide new commercial development and promote the revitalization of the downtown commercial core. The Zoning Ordinance requires Planning Commission approval of a Conditional Use Permit for microbreweries and restaurants with alcoholic beverage sales in the Old Town Commercial (C-OT) Zone. This allows for consideration of the compatibility of the proposed use with surrounding uses in making findings on the application, and adoption of conditions of approval as deemed necessary. A Commercial Planned Development permit is required in all commercial and industrial zones for any new construction of more than 2,500 square-feet of building floor area. In addition, heights, setbacks, sizes, locations, architectural styles and colors of all proposed buildings, structures and other on-site improvements, landscaping design, neighborhood design, and permitted land uses are established as part of the planned development permit review and approval process. Project Summary Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016-04: The proposed building is divided into two sides by a covered outside patio to appear as two separate buildings. Uses proposed for each side, with floor area, are as follows: East Side West Side Restaurant, roof terrace, prep kitchen, office, Bar/tasting room, brewery production, brewery market support, restaurant space, market porch, terrace, and mezzanine canning kitchen, market space, basement work room, and basement storage 13,521 sq.ft. 3,213 sq.ft. Building Design: The proposed building design can be considered traditional industrial. Reclaimed materials are used throughout the exterior to give an aged appearance to the building. Used brick and glazed brick are proposed for the storefronts and vertical corrugated metal and board and batten siding are proposed for the sides and rears of the buildings, giving the appearance of additions that were made over time. A weathered metal awning canopy is proposed above the storefronts. Both sides of the building are attached by a weathered metal porch roof. A 50' high brick chimney is centered on the building, providing an indoor and outdoor fireplace. The project massing and scale is appropriate for a typical railroad industrial building and is compatible with the Downtown \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 3 Honorable Planning Commission October 25, 2016 Page 4 Specific Plan. The architecture is discussed in more detail in the analysis section of this report. Setbacks and Height: The building has a zero foot setback from High Street, which is consistent with the minimum required front setback in the C-OT Zone. Parking and landscaping are proposed on the east, west, and south side of the buildings. All minimum setbacks required by Chapter 17.24 of the Zoning Ordinance are achieved. The building is 35 feet in height, which is allowed in the C-OT zone. The proposed 50-foot high chimney and 41-foot high elevator bulkhead are allowed to exceed this height limit as architectural appurtenances per Section 17.24.040(D) of the Zoning Ordinance, provided architectural compatibility and appropriate building scale are achieved and maintained. Circulation / Parking: The subject property is served by High Street. The roadway provides one travel lane in each direction along with a bike lane. On-street parking is generally permitted along the roadway, except near approaches to Moorpark Avenue and Spring Road. The posted speed limit is 30 miles per hour (mph). On-site parking is proposed on the east, west and south side of the buildings. Entrances and exits to the property will be located on High Street. Parking Requirements: Proposed Use Minimum Parking Required Total Parking Spaces Based on Gross Floor Area of Required and Provided Building Restaurant 1 space/300 sq. ft. 19.5 (includes roof terrace, prep kitchen, porch, restaurant space and room) Market(includes market support 1 space/300 sq. ft. 12.0 and market porch) Office 1 space/300 sq. ft. 1.1 Canning Kitchen and Basement 1 space/500 sq. ft. 11.9 (includes market space and storage) Brewery 1 space/300 sq. ft. 3.8 Bar/Tasting Room (includes 1 space/300 sq. ft. 9.9 brewery terrace, mezzanine) Total Parking Spaces 58.2 Spaces Required and Provided: The parking lot design proposes three driveways on High Street, along with a connection to the existing parking lot to the west that serves the Chamber of Commerce office. This would allow for closing of the driveway apron to the west, should the City \\DC1\Department Share\Community Development DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION docx 4 Honorable Planning Commission October 25, 2016 Page 5 choose to do so at a future time. A condition is recommended for reciprocal access rights to be provided with this property to enable a future driveway closure to the west. It should be noted that by meeting the required parking, all parking spaces can be reserved solely for the uses on site. However, the Zoning Ordinance allows for a 50% reduction in required parking if 75% of the parking spaces are open to the public instead of being reserved for the uses on site. Since 18 of the proposed parking spaces are located on the VCTC property on property that would be the subject of a revocable license agreement, this parking can be lost and the proposed uses could still comply with the Zoning Ordinance by allowing 75% of the parking to be open to the public. The applicant is currently considering options and may seek to expand parking either to the east or west so that all parking may reserved for on-site uses, even if the VCTC parking is lost. A condition of approval is included to address this. Loading Area: Two loading spaces are proposed in the rear yard of the buildings. Each loading space is 50 feet deep by 12 feet wide with no overhead obstruction. The code requires a loading area that is a minimum of 50 feet deep and 12 feet wide with a turning radius of 45 feet. Loading areas must be located in rear or side yard areas outside of required setbacks and must be designed so trucks do not back onto public or private streets or alleys. In addition, loading spaces must be designed to prevent interference with vehicular or pedestrian circulation. The proposed loading areas do not conflict with traffic or circulation and it will only be used during regular business hours. Two loading spaces are sufficient to accommodate the restaurant and brewery. Landscaping / Lighting: The applicant has proposed a landscape theme consistent with the landscape guidelines and compatible with the proposed architecture. Two large ash trees on VCTC property are proposed to be preserved as part of the project. One 10-inch diameter California Pepper street tree would be removed and replaced in kind or relocated as part of the project. It is not a protected tree as identified by the High Street Pepper Tree Maintenance Plan. In addition, a 10-inch diameter California Pepper tree on site, 7 Mexican Fan Palms, and an Elderberry tree will be removed. A total of 49 new trees have been proposed for the site. A few additional trees will be needed in the parking area, but this would only require a minor change to the design. The landscape and irrigation plans will be subject to review by the Parks and Recreation Director to ensure compliance with the city's Landscape Standards and Guidelines. The applicant has provided a conceptual lighting plan that appears to meet the City's lighting standards. A finalized plan will be reviewed for consistency with the City's requirements as part of the condition compliance process. \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 5 Honorable Planning Commission October 25, 2016 Page 6 Site Improvements and National Pollution Discharge Elimination Standards Requirements (NPDES): The project has been designed to provide for all necessary on-site and off-site storm drain improvements including the imposition of National Pollution Discharge Elimination System (NPDES) requirements. Best Management Practices Drainage Facilities are required to be provided so that surface flows are intercepted and treated. These items will be reviewed by the City Engineer/Public Works Director as part of the condition compliance process. ANALYSIS Issues Staff analysis of the proposed project has identified the following areas for Planning Commission consideration in their recommendation to the City Council: • Building Design • Control of Alcoholic Beverage Service • Concentration of Uses Building Design High Street is the original "Main Street" of Moorpark. It has a diverse mix of architectural design and styles. The downtown is characterized by the use of arches, patios, porticos, architectural features such as cornices, decorative plaster and cement ornamentation, and wrought iron. Staff has taken consideration into the design of the new buildings to make sure that the architectural design proposed is compatible with existing adjacent and across the street commercial development. As mentioned earlier in this report, the proposed building design can be considered traditional industrial. The applicant is proposing a project that gives the appearance of two buildings connected by a 1,491 square-foot roof metal porch. The porch will have vertical support steel posts with exposed beams and braces. The idea of the porch is to provide an outdoor dining experience with alcohol service by the restaurant and as a• walkway for the patrons of the brewery. A special condition has been added to assure outdoor fencing meets ABC standards and outdoor furniture is high quality, durable, and compatible with the design of the development. A 35-foot high two story building with a 16-foot one-story terrace is proposed on the east side of the porch. The building exterior is proposed to have reclaimed brick in the front and a combination of vertical metal siding and brick on the side and rear of the building. The goal is to give the building an industrial aesthetic appeal by using recycled material. A 41-foot high elevator "bulkhead" is proposed on the east side of the building. \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 6 Honorable Planning Commission October 25, 2016 Page 7 The "bulkhead" is a boxlike structure on a roof providing access to an elevator shaft. Patrons will have the option of using the elevator, or stairway behind the building to access the 733 square foot terrace. The restaurant will use the terrace as an outdoor dining area overlooking High Street. The applicant is also proposing a 50 foot high brick chimney on the west side of the building. The chimney will function as an exhaust vent for the kitchen and fireplace for the restaurant. Vertical signage is proposed on the fascia of the chimney; however, a different permit process is required for signage. Therefore, staff recommends the following condition, "A separate sign permit application is required for all proposed signs, which are subject to the review and approval of the Community Development Director". A one story building is proposed on the west side of the porch at a height of 30 feet. The building exterior is proposed to have glazed brick in the front and vertical metal siding for the side and rear. As mentioned earlier in this report, the proposed 50-foot high chimney and 41-foot high elevator bulkhead are allowed to exceed the 35-foot height limit of the C-OT zone as architectural appurtenances per Section 17.24.040(D) of the Zoning Ordinance, provided architectural compatibility and appropriate building scale are achieved and maintained. This standard is met by the design. The applicant is proposing traditional multi-paned windows with transom windows above the storefronts. Transom windows will provide horizontal consistency and add interior light throughout the downtown. A proposed steel flat-roof canopy is also proposed above the storefront entrances and side windows. The applicant is also proposing a pre- cast architectural cornice molding on the buildings and chimney to match existing buildings in the downtown area. Conditions of approval are proposed to ensure the colors, materials and textures of the buildings comply with the Moorpark Downtown Specific Plan. Control of Alcoholic Beverage Service A Type 23 and 47 license through the California Alcohol Beverage Control Board (ABC) will be needed for the proposed uses. A Type 23 license (Small Beer Manufacturer) allows use of the site as a "Brew Pub or Micro-Brewery". A brewpub is typically a very small brewery with a restaurant. A micro-brewery is a small-scale brewery operation that typically is dedicated to the production of specialty beers, although some do operate a restaurant or pub in conjunction with the brewing. The license authorizes the sale of beer to any person holding a license authorizing the sale of beer, and to consumers for consumption on or off the manufacturer's licensed premises. Also, the manufacturer may conduct beer tastings under specified conditions, and minors are allowed on the premises. A Type 23 license would prevent the microbrewery from becoming a bar. A special condition of approval is included to maintain this type of license for the facility. A Type 47 License (On Sale General — Eating Place) allows sale of beer, wine, and liquor for on-site consumption. The license authorizes the sale of beer and wine for consumption off the licenses premises. It must also operate and maintain the licensed \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION docx 7 Honorable Planning Commission October 25, 2016 Page 8 premises as a "bona fide" eating place. In addition, the eating place must have a suitable kitchen facility, make and substantial sales of meals for consumption on the premises, and minors are allowed on the premises. Conditions are recommended by staff to address security concerns associated with the service of alcoholic beverages. These conditions are consistent with those recently applied to other restaurants in Moorpark with alcoholic beverage service. The applicant has requested hours of operation for the brewery from 10:00 a.m. to 10:00 p.m. Monday to Thursday and 10:00 a.m. to 12:00 a.m. (midnight) on Friday to Sunday. The restaurant and market would be open Monday to Sunday from 10:00 a.m. to 10:00 p.m. These hours are consistent with the business hours on High Street. Staff is recommending a condition as follows: "Sales, service, or consumption of beer, wine, and liquor is permitted only between the hours of 8:00 a.m. and 12:00 a.m. (midnight) each day of the week." This would allow for flexibility, should the operator in the future wish to have special morning events, as has been requested across the street at the Lucky Fools Pub. The Moorpark Police Department has no concerns with the alcohol license at this location. Concentration of Uses: The State Department of Alcoholic Beverage Control (ABC) will not issue a license unless the applicant has obtained the necessary permit from the City. In its analysis, the ABC measures the number of businesses selling alcoholic beverages by census tract, and compares this number to other census tracts in the area and derives a target number of establishments based on population. If a census tract would exceed the target number of establishments, then findings of public convenience and necessity need to be made for an ABC permit to be issued. ABC relies on localities to determine whether or not findings of public convenience and necessity can be made when there is an overconcentration of establishments in a census tract. The project site is located in the Census Tract 76.13. ABC allows a total of four licenses for on-site consumption in this tract without meeting the definition of over-concentration. Five exist at this time. Although the technical definition of overconcentration is met, this census tract has a high percentage of Moorpark's commercial zoning, within The Village at Moorpark and Moorpark Marketplace shopping centers and the Moorpark's downtown corridor. Because of the high percentage of commercial land in this census tract, it is expected to have more restaurants with alcoholic beverage service than census tracts that do not include as much commercial land. In addition, approximately half of the census tract is open space, which further lowers the population upon which the number of permits is based. A finding of public convenience and necessity is proposed for this use in the attached draft resolution. \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 8 Honorable Planning Commission October 25, 2016 Page 9 Findings The following draft findings are provided for Planning Commission consideration: Commercial Planned Development Permit Findings: A. The site design, including structure location, size, height, setbacks, massing, scale, architectural style and colors, and landscaping, as conditioned, are consistent with the provisions of the General Plan, the Downtown Specific Plan, the Zoning Ordinance, and any other applicable regulations. B. The site design would not create negative impacts on or impair the utility of properties, structures or uses in the surrounding area in that the buildings comply with Zoning regulations and Downtown Specific Plan Design Guidelines and sufficient parking is provided on site. C. The proposed uses are compatible with existing and permitted uses in the surrounding area, which is part of the Old Town Commercial General Plan and Zoning designation and Downtown Specific Plan area. Permitted uses in this area have been coordinated to ensure compatibility. Conditional Use Permit Findings: The proposed use is consistent with the provisions of the City's General Plan, Zoning Ordinance, and other applicable regulations as conditioned in that breweries and restaurants servicing alcoholic beverages for on-site consumption are conditionally permitted within the zone, and conditions of approval have been proposed to mitigate potential problems. B. The proposed use is compatible with both existing and permitted land uses in the surrounding area, in that this is an approved microbrewery and restaurant where alcoholic beverages typically are served for on-site consumption. C. The proposed use is compatible with the scale, visual character, and design of surrounding properties, in that architecture is considered through the application of a Commercial Planned Development and is consistent with the requirements of the Downtown Specific Plan. D. The proposed use would not be obnoxious or harmful, or impair the utility of neighboring property or uses in that conditions are required to ensure proper control of the service of alcoholic beverages for on-site consumption; and E. The proposed use as conditioned would not be detrimental to the public health, safety, convenience, or welfare in that the conditions required to ensure proper control of the service of alcoholic beverages for on-site consumption. ADDITIONAL FINDINGS FOR BREWERIES AND MICROBREWERIES: F. Although Census Tract 76.13 exceeds the ABC target number of establishments \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 9 Honorable Planning Commission October 25, 2016 Page 10 selling alcoholic beverages for on-site consumption, it is a census tract dominated by shopping centers and Moorpark's Downtown corridor, where such uses are expected. There are no similar microbreweries on High Street. G. The use will serve a public convenience in that the sale of beer from this location for on-site or off-site consumption allows the public a local choice for craft beer brewed on site that does not exist on High Street. H. The use will not create the need for increased police services in that conditions are required to ensure proper control of the sale of beer for on-site and off-site consumption. I. The requested use at the proposed location will not adversely affect the economic welfare of the community. J. The exterior appearance of the structure will not be inconsistent with the external appearance of commercial structures already constructed or under construction on surrounding properties, or within the immediate neighborhood so as to cause blight, deterioration or substantially diminish property values within the neighborhood. The proposed structures, as conditioned, are architecturally consistent with the design standards of the Downtown Specific Plan and will enhance the appearance of the site. ADDITIONAL FINDINGS FOR ESTABLISHMENTS SERVING ALCOHOLIC BEVERAGES: K. Although Census Tract 76.13 exceeds the ABC target number of establishments selling alcoholic beverages for on-site consumption, it is a census tract dominated by shopping centers and Moorpark's Downtown corridor, where such uses are expected. The proposed use under this Conditional Use Permit will not result in a detrimental overconcentration of establishments serving alcoholic beverages for on-site consumption in the area, as these sales will be ancillary to the service of food from the restaurant. L. The use will serve a public convenience, in that the service of alcoholic beverages for on-site consumption is an ancillary use to the primary use of the proposed building as a restaurant. M. The use will not create the need for increased police services, in that conditions are required to ensure proper control of the service of alcoholic beverages for on- site consumption. N. The use will not create the need for increased police services in that conditions are required to ensure proper control of the sale of alcoholic beverages for on- site consumption. O. The requested use at the proposed location will not adversely affect the economic welfare of the community in that appropriate controls have been put in \\DC1\Department Share\Community Development\DEV PMTS\C P 00016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION docx 10 Honorable Planning Commission October 25, 2016 Page 11 place through conditions of approval. P. The exterior appearance of the structure will not be inconsistent with the external appearance of commercial structures already constructed or under construction on surrounding properties, or within the immediate neighborhood so as to cause blight, deterioration or substantially diminish property values within the neighborhood. The proposed structures, as conditioned, are architecturally consistent with the design standards of the Downtown Specific Plan and will enhance the appearance of the site. PROCESSING TIME LIMITS Time limits under the Permit Streamlining Act (Government Code Title 7, Division 1, Chapter 4.5), the Subdivision Map Act (Government Code Title 7, Division 2), and the California Environmental Quality Act Statutes and Guidelines (Public Resources Code Division 13, and California Code of Regulations, Title 14, Chapter 3) do not apply to this project as it involves publicly-owned property. ENVIRONMENTAL DETERMINATION In accordance with the City's environmental review procedures adopted by resolution, the Community Development Director determines the level of review necessary for a project to comply with the California Environmental Quality Act (CEQA). Some projects may be exempt from review based upon a specific category listed in CEQA. Other projects may be exempt under a general rule that environmental review is not necessary where it can be determined that there would be no possibility of significant effect upon the environment. A project which does not qualify for an exemption requires the preparation of an Initial Study to assess the level of potential environmental impacts. Based upon the results of an Initial Study, the Director may determine that a project will not have a significant effect upon the environment. In such a case, a Notice of Intent to Adopt a Negative Declaration or a Mitigated Negative Declaration is prepared. For many projects, a Negative Declaration or Mitigated Negative Declaration will prove to be sufficient environmental documentation. If the Director determines that a project has the potential for significant adverse impacts and adequate mitigation cannot be readily identified, an Environmental Impact Report (EIR) is prepared. The Director has reviewed this project and found it to be Categorically Exempt in accordance with Section 15332 (Class 32 — Infill Development Projects) of the California Code of Regulations (CEQA Guidelines). The proposed buildings and uses are consistent with the General Plan, Downtown Specific Plan, and Zoning regulations. In addition, there is no substantial evidence that the project will have a significant effect on the environment. No further environmental documentation is required. \\DC1\Department Share\Community Development DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION docx 11 Honorable Planning Commission October 25, 2016 Page 12 NOTICING Public Notice for this meeting was given consistent with Chapter 17.44.070 of the Zoning Ordinance as follows: 1. Publication. The notice of the public hearing was published in the Ventura County Star on October 15, 2016. 2. Mailing. The notice of the public hearing was mailed on October 14, 2016, to owners of real property, as identified on the latest adjusted Ventura County Tax Assessor Roles, within one-thousand (1,000) feet of the exterior boundaries of the assessor's parcel(s) subject to the hearing. 3. Sign. One 32 square-foot sign was placed on the street frontage on October 6, 2016. STAFF RECOMMENDATION 1. Open the public hearing, accept public testimony and close the public hearing; and 2. Adopt Resolution No. PC-2016- recommending to the City Council conditional approval of Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016-04. ATTACHMENTS: 1. Location Map 2. Aerial Photograph 3. Project Exhibits (UNDER SEPARATE COVER) 4. Draft PC Resolution with Conditions of Approval \\DC1\Department Share\Community Development\DEV PMTS\C P D\2016-01 Apricot Lane Market\Agenda Reports\MOORPARK PLANNING COMMISSION.docx 12 I -I ' I-- 8 i .• c.• >-•.- i I EL' I R el 0 H -E-- 4 _ -...-, co .....„ 4 1 o-, co - ,F-9 in a) -o < - u.l.c.-1.111..;- I.1_ o 4) ---1 I - el = u, a M". -----4 eLiou6N ill_ _ _I E 1.--- .10 ,.. IS VflONOVVII a> CO03 1._ 0 . 00 N 4- L__ = ° LL ° a4 e- r-, cr. 0) N r..1 - r' —I et CP in CO = etN N N c/3 co 4 ..__ 1--- CY '41.) in in ,- 'Ali 0 -t i_... ... r . ,.., " I E.11.01.) u.1.4 ..N- —- 6 w 1 al ...... .1 c ...- f IS V110NOVW .... '4' R0 in IX I -- i -,--.. 2 4 Nir' ,,,,,., 1_ :le,- .. ,,, :.0.-...1- c ap i...) 0 in (..) et N I,- N el , 0. CU , vt sy as - es I NI , , CO N N . D CO o 0 , r, - 0 I co o eN 0 I ..- in in 03 , rsl csl N ..... i 0 a) _ 0) N . a) W _ _- - ._ _.,--- IIS<MVO J.S CI 141/9 c I._ L. m • ..- I-. ii 0 to' _ ..- = £1.1 . kIC) 1••••• 41 3 47. ,.-- 4' C7) pa ..Jco 0 ..- .,- 0 l • r•-• 6 2 i, x os v.- 7 - _ 3); C 333-3 U; 3 t-4 r- Cr. 40 X, C.)' (1) .- - e- . ..-- . el . C CSI cO 47 TD- ; L.t.' r s '," a) .,_ . - , , -___________1 . 0,1 . ,- 3 ' 1 O.1 II 40 1.0 CO .0 LC) le, 8 „._ t-- I - z 1 -c5 C. I 4 ce 1 cu 4 1 tu > 2 I 1 . r) a. D I 0 Lei N e.) 1 (.0 CS3 0 I 1ItCD 0 0 NI i 1 a - - - e5 CNI 0113 co w _ w _ ..- 0 C.1 r- i I-.. 1 _____ in ..- ....., 0 1 1 1 1 ‘S s- (N.1 . 0 .;--.. as ...I ...„, E 0 L. 0 isinNivm -- "r•-• c :;--. .•.. cr. V... v.1 - i CL C$ S 4 I,- ..- cp _ 0.) i M `6 t —., tu cr. .-. 0 ...1- z -- .r- 1 N03 = co .0 tn q " •, el es cs (..) 1.-- 0 C\I IN CL --- '- 03 CD AV 00 _)4NVcil:1101 En En i . -5 I'rs ..... on k_ ...... 0 . c 0 CO up co, ua CD CX) =. ..,, cl.) ..... II 1.... c i as u L______ r- 1 --, ,e-- et 1± cn 1 i , 1 - ' - — 1E cl.) I- 0_ PC ATTACHMENT 1 13 g5.9 L Lii1S dl�t?M1I°3VIN ,.' FR b I CO }, 0 r .} I w- 1 — 0 O Q O M 5TH" I r. - i { O ;.:zr*. y j 4 1 ., -.-_, ::,...a.„, :...44_ ,L;r,. ..,tr, , t.;§,,,,..44,6 I CO4C‘ '.'..e.:- - '''''''',1C7.:',:71;'''''-- .._,, ::::',.. " 1 01*_ ' ..: ' ' ' gr 1 i LA i '., - 1 ,./t-, -,,,cu F _- .'.,, f is['NYSiS Maas• Q: co L _ o curo p ( c()S C t a o 2 Cfl ro ` O 7-6 L o up , •J -'7-2 `*- r a py N `_ if ; ., IV o 0 0 - o Q -'i- 1 - cs- '(. i I o ez 1 O_ _ o , Ln L b r s, t � a ,`.iz _ —4, 0 AVNaVdaOOW pa - GO E- xf {fir I All +a._ v b '-":";0 4 1 II c CUL' 3; 0 tl...r - o LA CO PC ATTACHMENT 2 14 PROJECT EXHIBITS for the Apricot Lane Farms - High Street Market PLANNED DEVELOPMENT APPLICATION SET • G1 .0 Zoning Analysis • A0.2 Site Plan • A1 .0 Basement Floor Plan • A1 .1 1st Floor Plan • A1 .2 2nd Floor Plan • A2.0 Exterior Elevations • A2.1 Exterior Elevations • A2.3 Materials Board (UNDER SEPARATE COVER) COPIES OF THE EXHIBITS ARE AVAILABLE UPON REQUEST OF THE PROJECT PLANNER PC ATTACHMENT 3 15 RESOLUTION NO. PC-2016- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF MOORPARK, CALIFORNIA, RECOMMENDING TO THE CITY COUNCIL APPROVAL OF COMMERCIAL PLANNED DEVELOPMENT PERMIT NO. 2016-01 AND CONDITIONAL USE PERMIT NO. 2016-04 FOR THE CONSTRUCTION AND OPERATION OF A NEW TWO-STORY FOOD MARKET, RESTAURANT WITH ALCOHOLIC BEVERAGE SALES, BANQUET ROOM, COMMERCIAL KITCHEN, AND MICROBREWERY TOTALING 16,734 SQUARE FEET ON 1.02 ACRES AT 44 HIGH STREET, AND MAKING A DETERMINATION OF EXEMPTION UNDER CEQA IN CONNECTION THEREWITH, ON THE APPLICATION OF SEAN RASMUSSEN, WADE WEISSMAN ARCHITECTURE, FOR APRICOT LANE MARKET HOLDINGS LLC WHEREAS, on June 21, 2016, Sean Rasmussen, Wade Weissman Architecture, for Apricot Lane Market Holdings LLC, submitted an application for a Commercial Planned Development (CPD) Permit No. 2016-01 and Conditional Use Permit (CUP) No. 2016-04 for the construction and operation of a new two-story food market, restaurant, commercial kitchen, and microbrewery totaling 16,734 square-feet on 1.02 acres at 44 High Street; and WHEREAS, at a duly noticed public hearing on October 25, 2016 for CPD Permit No. 2016-01 and CUP No. 2016-04, the Planning Commission considered the agenda report and any supplements thereto and written public comments; opened the public hearing and took and considered public testimony both for and against the proposal; closed the public hearing and reached a decision on this matter; and WHEREAS, the Community Development Director has determined that the project CPD Permit No. 2016-01 and CUP No. 2016-04 categorically exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to Section 15332 (Class 32: In-fill Development Projects) of the California Code of Regulations (CEQA Guidelines). The proposed buildings and uses are consistent with the General Plan, Downtown Specific Plan, and Zoning regulations. In addition, there is no substantial evidence that the project will have a significant effect on the environment. No further environmental documentation is needed. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF MOORPARK, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1 . ENVIRONMENTAL DOCUMENTATION: The Planning Commission, based on its own independent analysis and judgment, concurs with the Community Development Director's determination that the project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) PC ATTACHMENT 4 16 Resolution No. 2016- Page 2 pursuant to Section 15332 (Class 32: In-fill Development Projects) of the California Code of Regulations (CEQA Guidelines). The proposed buildings and uses are consistent with the General Plan, Downtown Specific Plan, and Zoning regulations. In addition, there is no substantial evidence that the project will have a significant effect on the environment. No further environmental documentation is needed. SECTION 2. PLANNED DEVELOPMENT PERMIT FINDINGS: Based upon the information set forth in the staff report(s), accompanying studies, and oral and written public testimony, the Planning Commission makes the following findings in accordance with City of Moorpark, Municipal Code Section 17.44.030: A. The site design, including structure location, size, height, setbacks, massing, scale, architectural style and colors, and landscaping, as conditioned, are consistent with the provisions of the General Plan, the Downtown Specific Plan, the Zoning Ordinance, and any other applicable regulations. B. The site design would not create negative impacts on or impair the utility of properties, structures or uses in the surrounding area in that the buildings comply with Zoning regulations and Downtown Specific Plan Design Guidelines and sufficient parking is provided on site. C. The proposed uses are compatible with existing and permitted uses in the surrounding area, which is part of the Old Town Commercial General Plan and Zoning designation and Downtown Specific Plan area. Permitted uses in this area have been coordinated to ensure compatibility. SECTION 3. CONDITIONAL USE PERMIT FINDINGS: Based upon the information set forth in the staff report, accompanying studies, and oral and written public testimony, the Planning Commission makes the following findings in accordance with City of Moorpark, Municipal Code Section 17.44.040(D): A. The proposed use is consistent with the provisions of the City's General Plan, Zoning Ordinance, and other applicable regulations as conditioned in that breweries and restaurants servicing alcoholic beverages for on-site consumption are conditionally permitted within the zone, and conditions of approval have been proposed to mitigate potential problems. B. The proposed use is compatible with both existing and permitted land uses in the surrounding area, in that this is an approved microbrewery and restaurant where alcoholic beverages typically are served for on-site consumption. C. The proposed use is compatible with the scale, visual character, and design of surrounding properties, in that architecture is considered through the application of a Commercial Planned Development and is consistent with the requirements of the Downtown Specific Plan. D. The proposed use would not be obnoxious or harmful, or impair the utility of neighboring property or uses in that conditions are required to ensure proper control of the service of alcoholic beverages for on-site consumption; and 17 Resolution No. 2016- Page 3 E. The proposed use as conditioned would not be detrimental to the public health, safety, convenience, or welfare in that the conditions required to ensure proper control of the service of alcoholic beverages for on-site consumption. ADDITIONAL FINDINGS FOR BREWERIES AND MICROBREWERIES: F. Although Census Tract 76.13 exceeds the ABC target number of establishments selling alcoholic beverages for on-site consumption, it is a census tract dominated by shopping centers and Moorpark's Downtown corridor, where such uses are expected. There are no similar microbreweries on High Street. G. The use will serve a public convenience in that the sale of beer from this location for on-site or off-site consumption allows the public a local choice for craft beer brewed on site that does not exist on High Street. H. The use will not create the need for increased police services in that conditions are required to ensure proper control of the sale of beer for on-site and off-site consumption. I. The requested use at the proposed location will not adversely affect the economic welfare of the community. J. The exterior appearance of the structure will not be inconsistent with the external appearance of commercial structures already constructed or under construction on surrounding properties, or within the immediate neighborhood so as to cause blight, deterioration or substantially diminish property values within the neighborhood. The proposed structures, as conditioned, are architecturally consistent with the design standards of the Downtown Specific Plan and will enhance the appearance of the site. ADDITIONAL FINDINGS FOR ESTABLISHMENTS SERVING ALCOHOLIC BEVERAGES: K. Although Census Tract 76.13 exceeds the ABC target number of establishments selling alcoholic beverages for on-site consumption, it is a census tract dominated by shopping centers and Moorpark's Downtown corridor, where such uses are expected. The proposed use under this Conditional Use Permit will not result in a detrimental overconcentration of establishments serving alcoholic beverages for on-site consumption in the area, as these sales will be ancillary to the service of food from the restaurant. L. The use will serve a public convenience, in that the service of alcoholic beverages for on-site consumption is an ancillary use to the primary use of the proposed building as a restaurant. M. The use will not create the need for increased police services, in that conditions are required to ensure proper control of the service of alcoholic beverages for on- site consumption. 18 Resolution No. 2016- Page 4 N. The use will not create the need for increased police services in that conditions are required to ensure proper control of the sale of alcoholic beverages for on- site consumption. O. The requested use at the proposed location will not adversely affect the economic welfare of the community in that appropriate controls have been put in place through conditions of approval. P. The exterior appearance of the structure will not be inconsistent with the external appearance of commercial structures already constructed or under construction on surrounding properties, or within the immediate neighborhood so as to cause blight, deterioration or substantially diminish property values within the neighborhood. The proposed structures, as conditioned, are architecturally consistent with the design standards of the Downtown Specific Plan and will enhance the appearance of the site. SECTION 4. PLANNING COMMISSION RECOMMENDATION: The Planning Commission recommends to the City Council approval of CPD Permit No. 2016-01 and CUP No. 2016-04 subject to the Special and Standard Conditions of Approval included in Exhibit A (Special and Standard Conditions of Approval), attached hereto and incorporated herein by reference. SECTION 5. FILING OF RESOLUTION: The Community Development Director shall cause a certified resolution to be filed in the book of original resolutions. The action of the foregoing direction was approved by the following vote: AYES: NOES: ABSTAIN: ABSENT: PASSED, AND ADOPTED this 25th day of October, 2016. Mark Di Cecco, Chair David A. Bobardt Community Development Director Exhibit A — Special and Standard Conditions of Approval 19 Resolution No. 2016- Page 5 EXHIBIT A STANDARD AND SPECIAL CONDITIONS OF APPROVAL FOR COMMERCIAL PLANNED DEVELOPMENT PERMIT NO. 2016-01 AND CONDITIONAL USE PERMIT NO. 2016-04 STANDARD CONDITIONS OF APPROVAL The applicant shall comply with Standard Conditions of Approval for Planned Developments and Conditional Use Permits as adopted by City Council Resolution No. 2009-2799 (Exhibits A and B), except as modified by the following Special Conditions of Approval. In the event of conflict between a Standard and Special Condition of Approval, the Special Condition shall apply. SPECIAL CONDITIONS OF APPROVAL 1. The applicant's acceptance of this permit and/or commencement of construction and/or operations under this permit is deemed to be acceptance of all conditions of this permit. 2. The Conditions of Approval of this permit, City of Moorpark Municipal Code and adopted city policies at the time of the permit approval supersede all conflicting notations, specifications, dimensions, typical sections and the like which may be shown on plans. 3. Conditions of this entitlement may not be interpreted as permitting or requiring any violation of law or any unlawful rules or regulations or orders of an authorized governmental agency. 4. The applicant shall defend, indemnify and hold harmless the City and its agents, officers and employees from any claim, action or proceeding against the City or its agents, officers or employees to attack, set aside, void, or annul any approval by the City or any of its agencies, departments, commissions, agents, officers, or employees concerning the permit, which claim, action or proceeding is brought within the time period provided by the California Code of Civil Procedure Section 1094.6 and Government Code Section 65009. The City will promptly notify the applicant of any such claim, action or proceeding, and if the City should fail to do so or should fail to cooperate fully in the defense, the applicant shall not thereafter be responsible to defend, indemnify and hold harmless the City or its agents, officers and employees pursuant to this condition. a. The City may, within its unlimited discretion, participate in the defense of any such claim, action or proceeding, if both of the following occur: The City bears its own attorney fees and costs; and ii. The City defends the claim, action or proceeding in good faith. 20 Resolution No. 2016- Page 6 b. The applicant shall not be required to pay or perform any settlement of such claim, action or proceeding unless the settlement is approved by the applicant. The applicant's obligations under this condition shall apply regardless of whether a building permit is ultimately obtained, or final occupancy is ultimately granted with respect to the permit. 5. If any of the conditions or limitations of this approval are held to be invalid, that holding shall not invalidate any of the remaining conditions or limitations set forth. 6. The development must be in substantial conformance with the plans presented in conjunction with the application for Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016-04, except any modifications as may be required to meet specific Code standards or other conditions stipulated herein. Any future changes to the parking layout shall require review and approval as determined by the Community Development Director consistent with Chapter 17.44 of the Zoning Ordinance. 7. Commercial Planned Development Permit No. 2016-01 and Conditional Use Permit No. 2016-04 may be revoked or its use suspended by the City, if any of the causes listed in Section 17.44.080.B of the Zoning Code are found to apply, including if the use for which the permit was granted has not been exercised for at least twelve (12) consecutive months, has ceased to exist, or has been abandoned. The discontinuance for a period of one hundred eighty (180) or more days of a nonconforming use or a change of nonconforming use to a conforming use constitutes abandonment and termination of the nonconforming status of the use. 8. Conditional Use Permit No. 2016-04 is granted or approved with the City's designated approving body retaining and reserving the right and jurisdiction to review and to modify the permit—including the conditions of approval—based on changed circumstances. Changed circumstances include, but are not limited to, major modification of the business; a change in scope, emphasis, size, or nature of the business; the expansion, alteration, reconfiguration, or change of use; or the fact that the use is negatively impacting surrounding uses by virtue of impacts not identified at the time of application for the conditional use permit or impacts that are much greater than anticipated or disclosed at the time of application for the conditional use permit. The reservation of right to review any permit granted or approved under this chapter by the City's designated approving body is in addition to, and not in lieu of, the right of the City, its Planning Commission, City Council and designated approving body to review and revoke or modify any permit granted or approved under this chapter for any violations of the conditions imposed on such permit. 9. Prior to issuance of a Zoning Clearance for a building permit, the applicant shall submit a color and material board for review and approval of the Community 21 Resolution No. 2016- Page 7 Development Director for consistency with the Moorpark Downtown Specific Plan. 10.Prior to issuance of a Zoning Clearance for a building permit, the applicant shall submit a fencing, lighting, and landscaping plan for review and approval by the Community Development Director, Parks and Recreation Director, and Police Chief that demonstrates compliance with the City's Zoning Ordinance, Landscape Standards and Guidelines, and Water Efficient Landscape Ordinance, and provides a safe and secure environment for the building occupants. Fencing along the south side of the property on or adjacent to property owned by the Ventura County Transportation Commission (VCTC) shall be subject to review and approval by VCTC to prevent unauthorized access to VCTC property. No service of alcoholic beverages will be allowed in the outdoor dining areas without City-approved fencing that meets State standards. 11.Prior to the issuance of a Zoning Clearance for a building permit, the applicant shall submit to the City Engineer/Public Works Director for review and approval public right-of-way improvements plans prepared by a California Registered Civil Engineer for the High Street frontage of the property, and enter into an agreement with the City of Moorpark to complete public improvements, with sufficient surety posted to guarantee the complete construction of all improvements. The improvements shall include concrete curb and gutter, sidewalk, driveways, street lights, striping and signing and paving in accordance with Ventura County Road Standards. Improvements to the sidewalk and parkway in the public right-of-way shall also be reviewed and approved by the Community Development Director and Parks and Recreation Director. 12.None of the prohibited plants indicated in the Provisionally Acceptable Plant List and the Invasive and Prohibited Plant List contained in the City's Landscape Standards and Guidelines shall be used on the development site, with the exception of California Pepper Trees as part of the High Street streetscape. 13.Prior to the issuance of a Zoning Clearance for a building permit, the applicant shall submit a plan for a fully-covered trash enclosure, with materials and colors to match the building, for review and approval by the Community Development Director and City solid waste manager. 14.Prior to the issuance of a Zoning Clearance for occupancy, the applicant shall submit a Developer Waste Reduction and Recycling Plan to the satisfaction of the Administrative Services Manager. 15.All necessary permits must be obtained from the Building and Safety Division and all construction shall be in compliance with the Moorpark Building Code and all other applicable regulations. 22 Resolution No. 2016- Page 8 16.Parking areas must be developed and maintained in compliance with the Moorpark Municipal Code, and surfaced with asphalt, concrete, or other surface acceptable to the Community Development Director, City Engineer/Public Works Director, and must include adequate provisions for drainage, National Pollution Discharge Elimination System (NPDES) compliance, striping and appropriate wheel blocks or curbs in parking areas adjacent to landscaped areas. All parking space striping must be maintained to be clearly visible during the life of the development. 17.The number of parking spaces shall be maintained consistent with Chapter 17.32 of the Zoning Ordinance. Should the applicant no longer have the right to access and use the parking spaces proposed on property owned by VCTC, either the spaces shall meet the shared parking provisions of Section 17.32.025 of the Zoning Ordinance, or additional parking shall be provided to the satisfaction of the Community Development Director. 18.Reciprocal access to adjacent parking lots to the west and east shall be provided and maintained as required by the Development and Disposition Agreement between the City of Moorpark and Developer for this project. 19.A separate sign permit application is required for all proposed signs, which are subject to the review and approval of the Community Development Director. 20.Outdoor furniture shall be subject to review and approval of the Community Development Director to ensure high quality, durability, and compatibility with the building design. 21.No outdoor storage is allowed under this approval. Any request for outdoor storage shall be subject to the application requirements in place at the time of such request. A mobile food truck may be parked on site in a location approved by the Community Development Director only during dining events, and must not obstruct driveway access, nor to serve as signage. 22.Prior to issuance of a Zoning Clearance for a building permit, the applicant shall submit all fees, including, but not limited to Los Angeles Avenue Area of Contribution Fee, Air Quality Fee, Tree and Landscape Fee, Fire Protection Facilities Fee, Police Facilities Fee, and Library Facilities Fee. All entitlement processing fees must be paid up prior to the issuance of a Zoning Clearance for a building permit. 23.Prior to issuance of a Zoning Clearance for a building permit, applicant shall either submit an in-lieu art fee or indicate a location for on-site public art in 23 Resolution No. 2016- Page 9 compliance with Chapter 17.50 of the Zoning Ordinance. If on-site public art is approved, it must be installed and completed prior to issuance of a Certificate of Occupancy. 24.The Developer shall prepare a covenant acceptable to the City Attorney and Community Development Director that the improvements on the site shall not be used for bail bonds, thrift/second hand stores, check cashing, gold purchasing, body piercing/tattoos, or adult businesses as defined in Title 17 of the City of Moorpark Municipal Code. 25.The Developer agrees to support the formation of a Business Improvement District for assessments, for the maintenance of parkway and median landscaping, and street lighting, including but not limited to all water and electricity costs, and any other services, maintenance or improvements authorized by State law for such districts. 26.The Developer agrees to cast affirmative ballots for the formation of one or more assessment districts and levying of assessments and any proposed assessment increases for existing assessment districts for the maintenance of parkway and median landscaping, National Pollution Discharge Elimination System (NPDES) requirements including but not limited to all water and electricity costs, and if requested by the City Council, parks for the provision of special benefits conferred by same upon properties within the Project. In the event that any such Assessment District has insufficient funds for its purposes, then Developer shall pay the funds required to the Assessment District within five (5) business days after written demand from the Assessment District from time to time. 27.The Developer agrees that any fees and payments pursuant to the Development and Disposition Agreement between the City of Moorpark and Developer for this project and the CPD Permit and CUP shall be made without reservation, and Developer expressly waives the right to payment of any such fees under protest pursuant to California Government Code Section 66020 and statutes amendatory or supplementary thereto. The Developer further agrees that the fees it has agreed to pay pursuant to Development and Disposition Agreement between the City of Moorpark and Developer for this project and the CPD Permit and CUP are not public improvement fees collected pursuant to Government Code Section 66006 and statutes amendatory and supplementary thereto. 28.The Developer acknowledges that High Street is home to a historical grove of California Pepper Trees and that the trees are maintained pursuant to an adopted Pepper Tree Maintenance Plan (Maintenance Plan). The Developer agrees to retain historic trees that affect the Project, in accordance with the Maintenance Plan, and as directed by the City. 29.The Developer acknowledges that there are bricks and a gazebo on High Street dedicated to the history of Moorpark. If Developer's Project requires the 24 Resolution No. 2016- Page 10 relocation of those bricks or gazebo to accommodate Developer's Project, Developer agrees to accommodate relocation of the bricks or gazebo to a different location as determined by the City at Developer's cost. 30.Developer acknowledges that the streetlights adjacent to the Project are currently owned by Southern California Edison (SCE), but may be owned by the City in the future. The streetlights may be subject to relocation or removal dependent upon future development or improvement of the High Street streetscape as determined by the City. 31.On site sales, service or consumption of alcoholic beverages allowed by this Conditional Use Permit are permitted only between the hours of 8:00 a.m. and 12:00 a.m. (midnight). 32.The proprietor shall reimburse the City of Moorpark for any additional police or other costs incurred by the City as a result of operations of the facility, including 15% overhead on any such services. 33.Closed-circuit television cameras shall provide monitoring and recording of the sales counter to show employee/customer transactions and floor areas. This system should have the capability to record 24 hours. This system shall be protected from access by employees and customers. 34.Prior to final occupancy, an alarm system shall be installed to the satisfaction of the Police Chief and Community Development Director. 35.No person under the age of eighteen (18) may serve alcoholic beverages to customers. 36.This premise is not licensed by California Department of Alcoholic Beverage Control (ABC) to operate as a bar or a nightclub and must maintain the premises consistent with the terms and conditions of the Type 23 Small Beer Manufacturer and Type 47 On Sale General-Eating Place licenses or subsequent licenses issued by the ABC. 37.Any and all employees directly involved or supervising the sale/service of alcoholic beverages shall provide evidence and the business shall maintain records that employees have: a. Received training from (ABC) "Leadership and Education in Alcohol and Drugs" LEAD program or other Responsible Beverage Service (RBS) program, in the form of an ABC issued certificate. b. The Owner/Manager shall confirm with ABC within fifteen (15) days of hire any new employee has been scheduled with the local ABC office to attend a LEAD or RBS program course. 25 Resolution No. 2016- Page 11 38.Applicant shall provide the Community Development Department with a copy of ABC approvals prior to sale of any alcoholic beverages. 39.No employee shall sell any alcoholic beverages to any person under twenty-one (21) years of age. 40.The manager or his/her designee shall be responsible to supervise the exterior of the business to assure that no beer or other alcoholic beverages are being served or consumed outside the permitted area for consumption. The owner/manager shall not permit any loitering on the property adjacent to the facility. 41.Prior to initiating any dining events involving mobile food service, the applicant shall provide a site plan for review and approval of the Community Development Director showing location of food service and dining and that on-site vehicular or pedestrian circulation is not obstructed. 42.Games or contests requiring or involving the consumption of alcoholic beverages shall not be permitted at any time. 43.During any activity that may require the need for additional security, security personnel must be provided to monitor the parking area(s) designated for use by customers of the facility. The applicant shall work with the Police Department and Community Development Department staff to determine which activities shall require additional security. 44.The owner/manager shall be required to obtain Temporary Use Permit approval from the City of Moorpark when a scheduled activity could create a need for increased police presence. Such application shall be made at least thirty (30) calendar days prior to the commencement of the indoor or outdoor event. As part of the Conditions of Approval, the Community Development Director may require, based upon the scope and size of the event, security guards, traffic control, valet parking and other measures to assure that the event does not disrupt the surrounding area. The only exception shall be for special events held by Moorpark based non-profit groups. 45.All exterior areas of the site, including parking areas under use by the facility, must be maintained free of litter and debris at all times. 46.Music may be played on site between 8:00 a.m. and 10:00 p.m. Amplified music, whether live or pre-recorded, may only take place inside and may not exceed a volume that can be heard from beyond the property. Acoustic music may be played inside or on the outside areas. All activities on the property must comply with the City's noise regulations. Any live music event for which admission is charged shall require a Temporary Use Permit. 26 Resolution No. 2016- Page 12 47.Areas inside the facility open to customers must be illuminated sufficiently to allow the identification of persons. 48.The facility must correct any safety or security problem within three (3) days upon written notice of such a problem from the Moorpark Police Department. 49.The applicant shall comply with Chapter 8.32 PROHIBITING SMOKING IN PUBLIC PLACES at all times and shall provide signs consistent with Section 8.32.040 of the Moorpark Municipal Code to the satisfaction of the Community Development Director, prior to initiation of the uses allowed by this permit. Any smoking area, if desired, shall comply with Section 8.32.030 of the Moorpark Municipal Code. -End- 27 ITEM: 8.B. MOORPARK,CAUP 1A Planning Commission of i(\ 1.5 2 C i L ACTION: Ap prwid I4t-7( ACSolo-hen ki . fi 20i17 -hi+ B ;S. riGr3roil'k- MOORPARK PLANNING COMMISSION AGENDA REPORT TO: Honorable Planning Commission FROM: David A. Bobardt, Community Development Director DATE: October 14, 2016 (PC Meeting of 10/25/2016) SUBJECT: Consider Resolution Recommending to the City Council Approval of General Plan Amendment No. 2016-02 to Include the 2015 Ventura County Multi-Hazard Mitigation Plan as Part of the Safety Element and Finding of Exemption from the California Environmental Quality Act in Connection Therewith BACKGROUND On September 21, 2016, the City Council adopted Resolution No. 2016-3541, directing the Planning Commission to study and provide a recommendation to the City Council on a General Plan Amendment to include the Ventura County Multi-Hazard Mitigation Plan in the Safety Element of the City's General Plan. DISCUSSION On September 13, 2016, the County of Ventura adopted an updated Ventura County Multi-Hazard Mitigation Plan (MHMP), attached, that covers 9 of the 10 cities in the county (Simi Valley did not participate in this plan), as well as the unincorporated area of the county. It has been prepared to address federal requirements under the federal Disaster Mitigation Act of 2000, which encourages close coordination between local, state and federal agencies in disaster mitigation planning This 2015 MHMP is an update of a plan that was originally developed by the County in 2005 and first updated in 2010. The plan addresses hazards in the areas of agriculture/biology, climate change, dam failure, drought, earthquake, flood, landslide, levee failure, post-fire debris flow, tsunami, and wildfire. A total of 22 general potential mitigation actions have been identified that focus on minimizing impacts of hazards Countywide. Of these, 6 are applicable to Moorpark and have been incorporated into Moorpark's Mitigation Action Plan (Appendix J, Pages J-18 to J-19) In addition, 4 local measures have been identified and incorporated into Moorpark's Mitigation Action Plan. The Mitigation Action Plan addresses local equipment needs and seismic upgrades to local facilities, public education, water conservation, flammable vegetation management, electronic communication improvements, and consideration of a new fire station location. 28 Honorable Planning Commission October 25, 2016 Page 2 Section 8685.9 of the Government Code limits State assistance on eligible projects as part of the California Disaster Assistance Act to no more than 75% of total state eligible costs, unless the local city has adopted a local hazard mitigation plan in accordance with the federal Disaster Mitigation Act of 2000 as part of the Safety Element of its General Plan, in which case the Legislature may provide for a state share of local costs that exceeds 75% of total state eligible costs. ENVIRONMENTAL DETERMINATION The Director has reviewed this project and found it to qualify for a General Rule Exemption in accordance with Section 15061(b)(3) of California Code of Regulations (CEQA Guidelines) in that Moorpark's Mitigation Action Plan of the MHMP involves emergency equipment purchases, seismic upgrades to certain existing public facilities if necessary, educational efforts, communication improvements, landscape maintenance, and study of a potential new fire station site. It can be seen with certainty that there is no possibility that these activities may have a significant effect on the environment. No further environmental documentation is required. NOTICING Public Notice for this meeting was given consistent with Chapter 17.44.070 of the Zoning Ordinance by publication in the Ventura County Star with a 1/8 page ad on October 15, 2016. STAFF RECOMMENDATION 1. Open the public hearing, accept public testimony and close the public hearing. 2. Adopt Resolution No. PC-2016- recommending to the City Council conditional approval of General Plan Amendment No. 2016-02. ATTAC H M E NTS: 1. Ventura County Multi-Hazard Mitigation Plan with Appendices F and J 2. Draft Resolution No. PC-2016- S\Community C-2016-S:\Community Development DEV PMTS\G P A\2016N2016-02 Safety Element\20161025 PC Report.docx 29 Exhibit 1 sr � � �� -tea -0;, = __--- • a � ! G},.. IS 2015 Ventura County Multi-Hazard Mitigation Plan Unincorporated Ventura County City of Camarillo City of Fillmore e e City of Moorpark City of Ojai City of Oxnard City of Port Hueneme City of Santa Paula City of Thousand Oaks City of Ventura CalleguasMuniapal MierDistrict Casitas Municipal Water District Channel Islaxls Beath Commurvty Services District Ojai Valley Sanitary District United WaterConsenratiai District Ventura CountyyFireProtectcn District A COM Ventura County Waled-led Pnoterion District PC ATTACHMENT 1 30 This page intentionally left blank 31 Table of Contents Section 1 Introduction 1-1 1.1 Overview 1-1 1.2 Hazard Mitigation Planning 1-1 1.3 Disaster Mitigation Act of 2000 1-1 1.4 Community Rating System—Activity 510 Floodplain Management Planning 1-2 1.5 Local Participants 1-2 1.6 Community Profile 1-3 1.6.1 Unincorporated Ventura County 1-3 1.6.2 Participating Cities 1-3 1.6.3 Participating Special Districts 1-4 1.7 Description of the Multi-Hazard Mitigation Plan 1-6 1.7.1 Section 2: Record of Adoption 1-6 1.7.2 Section 3: Planning Process 1-6 1.7.3 Section 4: Hazard Analysis 1-6 1.7.4 Section 5: Vulnerability Analysis 1-7 1.7.5 Section 6: Capability Assessment 1-7 1.7.6 Section 7: Mitigation Strategy 1-7 1.7.7 Section 8: Plan Maintenance 1-7 1.7.8 Section 9: References 1-7 1.7.9 Appendices 1-7 1.7.10 Annex 1-8 Section 2 Record of Adoption 2-1 2.1 Overview 2-1 2.2 Adoption Documentation 2-1 Section 3 Planning Process 3-1 3.1 Overview 3-1 3.2 MHMP Review and Revision 3-1 3.2.1 MHMP Review and Recommendations 3-1 3.2.2 Floodplain Management Coordination with Communities and Other Agencies 3-3 3.2.3 Land Use and Development Trends 3-4 3.3 MHMP Udpate Process 3-5 3.4 Planning Committees 3-6 3.4.1 MHMP Committee 3-7 3.4.2 FMP Committee 3-10 3.5 Public Outreach and Stakeholder Involvement 3-11 3.5.1 Multi-Media Releases 3-11 3.5.2 MHMP Website 3-11 3.5.3 Online Questionnaire 3-11 3.5.4 Web Portal 3-12 3.5.5 Emergency Planning Council 3-12 3.5.6 Town Hall 3-12 32 Table of Contents 3.5.7 Virtual Town Hall 3-12 3.5.8 Brochure 3-13 Section 4 Hazards Analysis 4-1 4.1 Overview 4-1 4.2 Hazard Identification and Screening 4-1 4.3 Hazard Profiles 4-3 4.3.1 Agricultural Biological 4-4 4.3.2 Climate Change 4-6 4.3.3 Dam Failure Inundation 4-8 4.3.4 Drought 4-11 4.3.5 Earthquake 4-16 4.3.6 Flood 4-20 4.3.7 Landslide 4-26 4.3.8 Levee Failure Inundation 4-28 4.3.9 Post-Fire Debris Flow 4-30 4.3.10 Tsunami 4-32 4.3.11 Wildfire 4-34 4.3.12 Winter Storm 4-37 Section 5 Vulnerability Analysis 5-1 5.1 Overview 5-1 5.2 Asset Inventory 5-1 5.3 Methodology 5-2 5.4 Exposure Analysis and Summary of Impacts 5-3 5.4.1 Summary of Impacts to Climate Change (Rising Tides Inundation Areas—2030) 5-4 5.4.2 Summary of Impacts to Climate Change (Combined Storm Flood Hazard Zones—2030) 5-5 5.4.3 Summary of Impacts to Dam Failure Inundation 5-6 5.4.4 Summary of Impacts to Earthquakes (Severe Ground Shaking) 5-7 5.4.5 Summary of Impacts to Earthquakes (Violent Ground Shaking) 5-8 5.4.6 Summary of Impacts to Earthquakes (Extreme Ground Shaking) 5-9 5.4.7 Summary of Impacts to Earthquakes (Liquefaction) 5-10 5.4.8 Summary of Impacts to Flood (100-Year Flood Zone) 5-11 5.4.9 Summary of Impacts to Flood (500-Year Flood Zone) 5-13 5.4.10 Summary of Impacts to Landslides (Susceptibility Class VIII) 5-14 5.4.11 Summary of Impacts to Landslides (Susceptibility Class IX) 5-15 5.4.12 Summary of Impacts to Landslides (Susceptibility Class X) 5-16 5.4.13 Summary of Impacts to Levee Failure Inundation (Reduced Flood Risks Due to Levees) 5-17 5.4.14 Summary of Impacts to Tsunami Inundation (Phase 3) 5-18 5.4.15 Summary of Impacts to Tsunami Inundation(Maximum Phase) 5-20 5.4.16 Summary of Impacts to Wildfires (High Fire Severity Zone) 5-21 5.4.17 Summary of Impacts to Wildfires (Very High Fire Severity Zone) 5-22 iv 33 Table of Contents 5.5 Repetitive Loss Properties 5-23 Section 6 Capability Assessment 6-1 6.1 Overview 6-1 6.2 Capability Assessment 6-1 Section 7 Mitigation Strategy 7-1 7.1 Overview 7-1 7.2 Update of Local Hazard Mitigation Goals 7-1 7.3 Review of the 2010 MHMP Mitigation Action Plan 7-2 7.4 Identification of New and Updated Potential Mitigation Actions 7-2 7.5 Prioritization of The 2015 MHMP Mitigation actions 7-7 7.5.1 2015 MHMP Local Participant-Specific Mitigation Action Plans 7-8 Section 8 Plan Maintenance 8-1 8.1 Overview 8-1 8.2 Monitoring, Evaluating, and Updating the Plan 8-1 8.3 Implementation Through Existing Planning Mechanisms 8-2 8.4 Continued Public Involvement 8-3 Section 9 References 9-1 List of Tables Table 3-1. 2010 MHMP Review and Recommendations 3-2 Table 3-2. Review and Incorporation of Other Studies and Plans 3-3 Table 3-3. Floodplain Management Coordination with Communities and Other Agencies 3-4 Table 3-4. Plan Update Schedule 3-6 Table 3-5. MHMP Committee 3-7 Table 3-6. MHMP Stakeholders—City/District Contacts 3-8 Table 3-7. FMP Committee 3-10 Table 4-1. Dams Under State Jurisdiction with Inundation Areas within Ventura County* 4-9 Table 4-2. Dam Inundation Areas 4-10 Table 4-3. Recent Droughts in California 4-12 Table 4-4. Magnitude/Intensity/Ground-Shaking Comparisons 4-17 Table 4-5. Likely Maximum Magnitudes and Recurrence Intervals 4-19 Table 4-6. Major Disaster Declarations for Floods, 1995-2015 4-22 Table 4-7. Historical Tsunami Run-Ups in Ventura County 4-32 Table 4-8. Ten Largest Ventura County Fires in the Last 50 years, 1965 through 2015 4-35 Table 5-1. Summary of Total Assets 5-1 Table 5-2. Hazards Included in Exposure Analysis 5-2 Table 5-3. Total: Climate Change Exposure Analysis (Rising Tides Inundation Areas— 2030) 5-4 v 34 Table of Contents Table 5-4. Total: Climate Change Exposure Analysis (Combined Storm Flood Hazard Zones—2030) 5-5 Table 5-5. Total: Dam Failure Inundation Exposure Analysis 5-6 Table 5-6. Total: Earthquake Exposure Analysis (Severe Ground Shaking) 5-7 Table 5-7. Total: Earthquake Exposure Analysis (Violent Ground Shaking) 5-8 Table 5-8. Total: Earthquake Exposure Analysis (Extreme Ground Shaking) 5-9 Table 5-9. Total: Earthquake Exposure Analysis (Liquefaction) 5-10 Table 5-10. Total: Flood Exposure Analysis (100-Year Flood Zone) 5-11 Table 5-11. Total: Flood Exposure Analysis (500-Year Flood Zone) 5-13 Table 5-12. Total: Landslide Exposure Analysis (Susceptibility Class VIII) 5-14 Table 5-13. Total: Landslide Exposure Analysis (Susceptibility Class IX) 5-15 Table 5-14. Total: Landslide Exposure Analysis (Susceptibility Class X) 5-16 Table 5-15. Total: Levee Failure Inundation Exposure Analysis (Reduced Flood Risks Due to Levees) 5-17 Table 5-16. Total: Tsunami Inundation Exposure Analysis (Phase 3) 5-18 Table 5-17. Total: Tsunami Inundation Exposure Analysis (Maximum Phase) 5-20 Table 5-18. Total: Wildfire Exposure Analysis (High FHSZ) 5-21 Table 5-19. Total: Wildfire Exposure Analysis (Very High FHSZ *) 5-22 Table 5-20. Repetitive Loss Properties 5-23 Table 6-1. Date of Initially Mapped FIRM and Emergency/Regular Program Entrance Date into NFIP for Unincorporated Ventura County and Cities 6-2 Table 7-1. Mitigation Goals 7-2 Table 7-2. Potential Overarching Mitigation Actions 7-4 Table 7-3. Priority Project Criteria(HMA Program Requirements) 7-8 List of Appendices Appendix A FEMA Compliance Appendix B Adoption Resolutions Appendix C MHMP Committee Appendix D FMP Committee Appendix E Public Outreach and Stakeholder Involvement Appendix F Figures Appendix G Unincorporated Ventura County Appendix H City of Camarillo Appendix I City of Fillmore Appendix J City of Moorpark Appendix K City of Ojai Appendix L City of Oxnard Appendix M City of Port Hueneme Appendix N City of Santa Paula Appendix 0 City of Thousand Oaks Appendix P City of Ventura Appendix Q Calleguas Municipal Water District Appendix R Casitas Municipal Water District Appendix S Channel Islands Beach Community Services District vi 35 Table of Contents Appendix T United Water Conservation District Appendix U Ventura County Fire Protection District Appendix V Ventura County Office of Education Appendix W Ventura County Watershed Protection District Appendix X Plan Maintenance List of Annexes Annex A Activity 610—Flood Warning Program List of Acronyms and Abbreviations ACP Asian citrus psyllid Cal FIRE California Department of Forestry and Fire Protection Cal OES California Governor's Office of Emergency Services Ca1ARP California Accidental Release Prevention CFR Code of Federal Regulations cfs cubic feet per second CGS California Geological Survey CO2 carbon dioxide CPG 201 Threat and Hazard Identification and Risk Assessment Guide: Comprehensive Preparedness Guide (CPG) 201, Second Edition,August 2013 CRS Community Rating System DFIRM Digital Flood Insurance Rate Map DMA 2000 Disaster Mitigation Act of 2000 DSOD Division of Safety of Dams EnSo El nino-Southern oscillation EO Executive Order EPC Emergency Planning Council FEMA Federal Emergency Management Agency FHSZ Fire Hazard Severity Zones FIRM Flood Insurance Rate Map FMP Floodplain Management Plan GIS Geographic Information System HLB Huanglongbing (disease) HMA Hazard Mitigation Assistance IPCC Intergovernmental Panel on Climate Change LCR Levee Certification Report MHMP Multi-Hazard Mitigation Plan NCDC National Climatic Data Center NFIP National Flood Insurance Program NOAA National Oceanic and Atmospheric Administration NRCS Natural Resources Conservation Service NWS National Weather Service OES Office of Emergency Services vii 36 Table of Contents PAL Provisionally Accredited Levee PGA peak ground acceleration PRR PAL(Provisionally Accredited Levee)-Response Report RL Repetitive Loss SFHA Special Flood Hazard Areas SRL Severe Repetitive Loss Stafford Act Robert T. Stafford Disaster Relief and Emergency Assistance Act of 1988 STAS State Threat Assessment System USACE United States Army Corps of Engineers USGS U.S. Geological Survey VCFPD Ventura County Fire Protection District VCOE Ventura County Office of Education VCWPD Ventura County Watershed Protection District viii 37 Section ONE Introduction 1.1 OVERVIEW This 2015 Multi-Hazard Mitigation Plan(2015 MHMP) is written to (1) address the local mitigation planning requirements of the Disaster Mitigation Act of 2000 (DMA 2000) for Unincorporated Ventura County and other local participants (Section 1.5); and (2) address the 510 Floodplain Management Planning activities of the Community Rating System (CRS) for the Ventura County Watershed Protection District(VCWPD) on behalf of Unincorporated Ventura County and the City of Oxnard. This section provides an introduction to hazard mitigation planning as well as a brief description of DMA 2000 and CRS. This section also identifies the other local participants,provides a brief narrative about Unincorporated Ventura County and the other local participants, and describes the various sections and appendices of the 2015 MHMP. The 2015 MHMP supersedes the 2010 MI-IMP. 1.2 HAZARD MITIGATION PLANNING As defined in Title 44 of the Code of Federal Regulations (CFR), Subpart M, Section 206.401, hazard mitigation is "any action taken to reduce or eliminate the long-term risk to human life and property from natural hazards." As such, hazard mitigation is any work to minimize the impacts of any type of hazard event before it occurs. Hazard mitigation aims to reduce losses from future disasters. It is a process in which hazards are identified and profiled,the people and facilities at risk are analyzed, and mitigation actions to reduce or eliminate hazard risk are developed. The implementation of the mitigation actions, which include short- and long-term strategies that may involve planning, policy changes, programs, projects, and other activities, is the end result of this process. 1.3 DISASTER MITIGATION ACT OF 2000 In recent years, hazard mitigation planning has been driven by a new federal law known as DMA 2000. On October 30, 2000, Congress passed DMA 2000 (Public Law 106-390), which amended the Robert T. Stafford Disaster Relief and Emergency Assistance Act of 1988 (Stafford Act) (Title 42 of the United States Code Section 5121 et seq.) by repealing the act's previous mitigation planning section (409) and replacing it with a new mitigation planning section (322). This new section emphasized the need for state, tribal, and local entities to closely coordinate mitigation planning and implementation efforts. This new section also provided the legal basis for the Federal Emergency Management Agency's (FEMA's) mitigation plan requirements for mitigation grant assistance. To implement these planning requirements, FEMA published an Interim Final Rule in the Federal Register on February 26, 2002 (44 CFR Part 201). The tribal planning requirements were updated in 44 CFR Part 201.7 in 2009. The local mitigation planning requirements are identified in their appropriate sections throughout the 2015 MHMP and also within the FEMA Plan Review Tool included in Appendix A. 1-1 38 Section ONE Introduction 1.4 COMMUNITY RATING SYSTEM - ACTIVITY 510 FLOODPLAIN MANAGEMENT PLANNING CRS is a voluntary incentive program that recognizes and encourages community floodplain management activities that exceed the minimum National Flood Insurance Program (NFIP) requirements. Under CRS, flood insurance premium rates are discounted to reflect the reduced flood risk that results when community actions meet the three goals of CRS: reducing flood damage to insurable property, strengthening and supporting the insurance aspects of the NFIP, and encouraging a comprehensive approach to floodplain management. In 2011, Unincorporated Ventura County joined CRS as a class 6 rating, entitling flood insurance policy holders to receive a 20 percent premium discount annually. In 2013, the City of Oxnard joined CRS as a class 9 rating, entitling flood insurance policy holders to receive a 5 percent discount annually. There are 18 programs or"activities" in CRS that are intended to reduce or eliminate exposure to floods, including Activity 510 Floodplain Management Planning. To implement these activities, FEMA published the 2013 NFIP CRS Coordinators Manual (FIA 15-2013), which spells out the credit and credit criteria for CRS activities. The floodplain management planning activities for Unincorporated Ventura County(administered by the VCWPD) and the City of Oxnard are identified in their appropriate sections throughout the 2015 MHMP and also in the 510 FMP Checklist included in Appendix A. 1.5 LOCAL PARTICIPANTS The participating jurisdictions and special districts, referred to in this plan as local participants, are listed below. • Unincorporated Ventura County • City of Camarillo • City of Fillmore • City of Moorpark • City of Ojai • City of Oxnard • City of Port Hueneme • City of Santa Paula • City of Thousand Oaks • City of Ventura • Calleguas Municipal Water District • Casitas Municipal Water District • Channel Islands Beach Community Services District • Ojai Valley Sanitary District • United Water Conservation District 1-2 39 Section ONE Introduction • Ventura County Fire Protection District(VCFPD) • Ventura County Office of Education (VCOE), on behalf of the following school districts: Briggs Elementary School District, Conejo Valley Unified School District, Fillmore Unified School District, Hueneme School District, Mesa Union School District, Moorpark Unified School District, Moorpark Unified School District, Mupu Elementary School District, Oak Park Unified School District, Ocean View School District, Ojai Unified School District, Oxnard Elementary School District, Pleasant Valley School District, Rio School District, Santa Clara Elementary School District, Santa Paula Union High School, Simi Valley Unified School District, Somis Union School District, Ventura County Community College District, and Ventura Unified School District. • Ventura County Watershed Protection District(VCWPD) 1.6 COMMUNITY PROFILE 1.6.1 Unincorporated Ventura County Ventura County, one of 58 counties in the state, is located on southern California's Pacific coast, just northwest of Los Angeles. Ventura County is bordered by Kern County to the north; Santa Barbara County and the Pacific Ocean to the northwest and southwest, respectively; and Los Angeles County to the east and southeast. Ventura County stretches across 2,208 square miles, of which 1,845 square miles is land and 363 square miles is water. Anacapa Island of the Channel Islands National Park and San Nicholas Island are in Ventura County. Ventura County consists of 10 cities and a number of unincorporated communities. The majority of the county's population resides in the cities. According to the U.S. Census Bureau, and using the Population Estimates Program which produces July 1 estimates for years after the last published decennial census (2010), Ventura County has a population of 846,178 as of July 1, 2014. In Unincorporated Ventura County, the population was 93,770 as of 2010, with 31,670 housing units. 1.6.2 Participating Cities Nine of the 10 Ventura County cities participated in the preparation of the 2015 MHMP. Key information about each city's area (square miles) and population (U.S. Census Bureau 2010) and building stock(Hazus 2.2 data, 2010) is provided below. 1.6.2.1 City of Camarillo The City of Camarillo had an estimated population of 65,235 in 2010, with 21,980 housing units. The city has a total area of 19.75 square miles. 1.6.2.2 City of Fillmore The City of Fillmore had an estimated population of 15,002 in 2010, with 3,959 housing units. The city has a total area of 3.36 square miles. 1-3 40 Section ONE Introduction 1.6.2.3 City of Moorpark The City of Moorpark had an estimated population of 34,421 in 2010, with 9,393 housing units. The city has a total area of 12.47 square miles. 1.6.2.4 City of Ojai The City of Ojai had an estimated population of 7,461 in 2010, with 2,885 housing units. The city has a total area of 4.37 square miles. 1.6.2.5 City of Oxnard The City of Oxnard had an estimated population of 197,911 in 2010, with 40,914 housing units. The city has a total area of 27.08 square miles. 1.6.2.6 City of Port Hueneme The City of Port Hueneme had an estimated population of 21,750 in 2010, with 5,530 housing units. The city has a total area of 4.51 square miles. 1.6.2.7 City of Santa Paula The City of Santa Paula had an estimated population of 29,595 in 2010, with 7,162 housing units. The city has a total area of 5.71 square miles. 1.6.2.8 City of Thousand Oaks The City of Thousand Oaks had an estimated population of 126,693 in 2010, with 39,847 housing units. The city has a total area of 55.41 square miles. 1.6.2.9 City of Ventura The City of San Buenaventura(Ventura) is the county seat of Ventura County. The City had an estimated population of 107,195 in 2010, with 32,961 housing units. The city has a total area of 22.15 square miles. 1.6.3 Participating Special Districts As noted previously, half of the participating communities are special districts. Information about each of the eight districts is provided below. 1.6.3.1 Calleguas Municipal Water District The Calleguas Municipal Water District was formed in 1953. In 1960,the District joined the Metropolitan Water District of Southern California as a way of securing water from the state water system. In 1965, the District completed Lake Bard. The 2005 state-of-the-art treatment plant for Lake Bard treats 65 million gallons of water a day. Communities served include the cities of Oxnard, Port Hueneme, Camarillo, Thousand Oaks, Moorpark, Simi Valley; the unincorporated areas of Oak Park, Santa Rosa Valley, Bell Canyon, Lake Sherwood, Somis, Camarillo Estates, Camarillo Heights, and Naval Base Ventura County. 1-4 41 Section ONE Introduction The district serves an area of approximately 365 square miles and approximately 75 percent of Ventura County's population. 1.6.3.2 Casitas Municipal Water District The Casitas Municipal Water District was formed in 1952. In 1956,the Ventura River Project was authorized by Congress, which included the Robles Diversion facility on the Ventura River, the Robles Canal, and the Casitas Dam. Currently, the district supplies water to 60,000 to 70,000 people in western Ventura County and to hundreds of farms. The district boundaries encompass the City of Ojai, Upper Ojai,the Ventura River Valley area, the City of Ventura to Mills Road and the Rincon and beach area to the ocean and Santa Barbara County line. The district is governed by a five-member board of directors. 1.6.3.3 Channel Islands Beach Community Services District Channel Islands Beach Community Services District was created on December 13, 1982, as a result of the demand of the citizens of the beach community for an independent governmental entity to provide solutions to their need for various services, including but not limited to water, sewer, and trash services. 1.6.3.4 Ojai Valley Sanitary District The Ojai Valley Sanitary District was established in 1985 as the result of a consolidation of the Ventura Avenue, Oak View, and Meiners Oaks sanitary districts and the Sanitation Department of the City of Ojai. The district provides sanitary sewer service for about 20,000 residents of the City of Ojai and the unincorporated Ojai Valley. It collects and transports wastewater for treatment at the Ojai Valley Treatment Plant and disposes of effluent and sludge. The district is a public agency organized under the Sanitary District Act of 1923 and is governed by an elected seven-member board. The district's collection system consists of approximately 120 miles of trunk and main sewer lines. 1.6.3.5 United Water Conservation District Local landowners formed the Santa Clara River Water Conservation District in 1927. As cities and agricultural areas grew, water usage increased rapidly. By 1950,the district was reorganized and renamed the United Water Conservation District. The district constructed the Santa Felicia Dam,three spreading grounds, and distribution facilities, all of which were urgently needed to combat seawater intrusion. The United Water Conservation District is governed by seven directors, one elected from each of the seven district divisions. The district administers a"basin management" program for the Santa Clara Valley and Oxnard Plain, using the surface flow of the Santa Clara River and its tributaries for replenishment of groundwater. Facilities include Santa Felicia Dam; Lake Piru Recreation Area; the Piru, Saticoy, and El Rio spreading grounds; the Pleasant Valley Pipeline and Reservoirs; the Oxnard-Hueneme Pipeline, Pumping Plant, and Pumping Trough Pipeline; and other facilities. 1-5 42 Section ONE Introduction 1.6.3.6 Ventura County Fire Protection District In 1928, the VCFPD was formed to provide fire protection to the county, with the exception of the four established cities. Since that time, six additional cities have become incorporated. Today, the VCFPD acts as the Ventura County Fire Department for Unincorporated Ventura County and as the City fire department for six cities (Camarillo, Moorpark, Ojai, Port Hueneme, Thousand Oaks, and Simi Valley). 1.6.3.7 Ventura County Office of Education Ventura County comprises 20 K-12 school districts. The VCOE provides facility planning, construction, and maintenance to the school districts. VCOE also operates specialized schools in the county. For the 2010 MHMP, the VCOE will represent all of 20 K-12 school districts in Ventura County, as well as the Ventura County Community College District. 1.6.3.8 Ventura County Watershed Protection District The VCWPD, formerly known as the Ventura County Flood Control District, was formed on September 12, 1944, by an act of the California State Legislature. It is governed by the Ventura County Board of Supervisors. The District is the responsible sponsoring local agency for federal flood control projects throughout Ventura County. The entire county, except for the islands of Anacapa and San Nicholas, is within the District's sphere of influence and boundaries. The VCWPD also serves as the principal co-permittee and manages the implementation of the Ventura Countywide Stormwater Quality Management Program under the municipal National Pollutant Discharge Elimination System permit for urban stormwater runoff discharges in Ventura County. The VCWPD also manages FEMA's NFIP and CRS for Unincorporated Ventura County. 1.7 DESCRIPTION OF THE MULTI-HAZARD MITIGATION PLAN The remainder of the 2015 MHMP consists of the sections and appendices described below. 1.7.1 Section 2: Record of Adoption Section 2 addresses the adoption of the 2015 MHMP. The adoption resolution is provided in Appendix B. 1.7.2 Section 3: Planning Process Section 3 describes the planning process. Specifically, this section describes major milestones achieved during the MHMP update process and identifies key stakeholders, including the members of the MHMP Committee and Floodplain Management Plan (FMP) Committee (Appendix C). This section also includes a description of the committee meetings held as part of the plan update process. Additionally, this section documents public outreach activities (Appendix D) and discusses the review and incorporation of relevant plans, reports, and other appropriate information. 1.7.3 Section 4: Hazard Analysis Section 4 describes the process through which the Ventura County Project Management Team reviewed and re-selected the hazards to be profiled in the 2015 MHMP. The hazard analysis 1-6 43 Section ONE Introduction includes the nature, history, location, extent, and probability of future events for each hazard. Location and historical hazard figures are provided in Appendix F. 1.7.4 Section 5: Vulnerability Analysis Section 5 identifies the methodology for analyzing potentially vulnerable assets—population, residential building stock, Repetitive Loss (RL) properties, and critical facilities and infrastructure such as emergency response, government, and education facilities. This information was compiled by assessing the potential impacts from each hazard using Geographic Information System(GIS) data. The resulting information identifies the full range of hazards that Unincorporated Ventura County and the other local participants could face and the potential social impacts, damages, and economic losses. 1.7.5 Section 6: Capability Assessment Section 6 includes the component of a capability assessment. The capability assessment evaluates the human and technical, financial, and legal and regulatory resources available for hazard mitigation. It also describes current, ongoing, and completed mitigation projects and programs. In addition, it includes an overview of local participation in the NFIP. 1.7.6 Section 7: Mitigation Strategy Section 7 provides a blueprint for reducing the potential losses identified in the vulnerability analysis. This process included a review of each local participant's 2010 MI-IMP mitigation action plan; development of a list of potential mitigation actions for each local participant; and selection and prioritization of a new mitigation action plan for each local participant. In addition, Unincorporated Ventura County(as detailed in the VCWPD mitigation strategy) and the City of Oxnard addressed additional CRS activities, including the review of each potential mitigation action. 1.7.7 Section 8: Plan Maintenance Section 8 describes the formal plan maintenance process to ensure that the 2015 MHMP remains an active and applicable document. The plan maintenance process consists of monitoring, evaluating, and updating the plan; monitoring mitigation projects and closeout procedures; implementing the plan through existing planning mechanisms; and achieving continued public involvement. Forms to assist in plan maintenance are found in Appendix X. In addition, Appendix X includes the annual plan maintenance review performed by the VCWPD from 2011 to 2014. 1.7.8 Section 9: References Section 9 includes references used to develop this document. 1.7.9 Appendices The following appendices follow the main body of the plan: • A FEMA Compliance • B Adoption Resolutions 1-7 44 Section ONE Introduction • C MHMP Committee • D FMP Committee • E Public Outreach and Stakeholder Involvement • F Figures • G Unincorporated Ventura County • H City of Camarillo • I City of Fillmore • J City of Moorpark • K City of Ojai • L City of Oxnard • M City of Port Hueneme • N City of Santa Paula • 0 City of Thousand Oaks • P City of Ventura • Q Calleguas Municipal Water District • R Casitas Municipal Water District • S Channel Islands Beach Community Services District • T United Water Conservation District • U Ventura County Fire Protection District • V Ventura County Office of Education • W Ventura County Watershed Protection District • X Plan Maintenance 1.7.10 Annex The following annex follows the appendices: • Annex A: Activity 610—Flood Warning Program 1-8 45 Section TWO Record of Adoption 2.1 OVERVIEW This section describes the adoption requirements for the 2015 MHMP. 2.2 ADOPTION DOCUMENTATION The local hazard mitigation planning requirements and floodplain management planning activities for the adoption of the 2015 MHMP are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element E: Plan Adoption El.Does the Plan include documentation that the Plan has been formally adopted by the governing body of the 'urisdiction requesting approval?(Requirement§201.6(c)(5)) E2.For multi jurisdictional plans,has each jurisdiction requesting approval of the plan documented formal plan adoption?(Requirement§201.6(c)(5)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 9: Adopt the Plan No additional information. Unincorporated Ventura County; the cities of Camarillo, Moorpark, Ojai, Oxnard, Port Hueneme, Santa Paula, Thousand Oaks, and Ventura; and the participating special districts of Calleguas Water District, Casitas Municipal Water District, Channel Islands Beach Community Services District, United Water Conservation District, VCFPD, VCOE, and VCWPD are the local participants represented in this MHMP and meet the requirements of Section 409 of the Stafford Act and Section 322 of the DMA 2000. Each local participant's governing body has adopted this 2015 MHMP by resolution. A scanned copy of each resolution is included in Appendix B. 2-1 46 SECTIONTHREE Planning Process This page intentionally left blank 2-2 47 Section THREE Planning Process 3.1 OVERVIEW This section summarizes: • MHMP review and revision, including the incorporation of existing plans and other relevant information and coordination with other agencies • MHMP update process • Planning committees • Public outreach and stakeholder involvement Supporting information is provided in Appendix E. 3.2 MHMP REVIEW AND REVISION The local hazard mitigation planning and floodplain management planning requirements for the plan review and evaluation as well as coordination with communities and other agencies are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element D: Plan Review, Evaluation,and Implementation Dl. Was the Plan revised to reflect changes in development?(Requirement§ 201.6(d)(3)) Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element A: Planning Process A4.Does the Plan describe the review and incorporation of existing plans, studies,reports,and technical information?(Requirement§ 201.6(b)(3)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 3: Coordinate with Other Agencies A.Review of existing studies and plans. B.Coordinating with other communities and agencies. 3.2.1 MHMP Review and Recommendations This 2015 MHMP is the third iteration of the plan. The MI-IMP was originally developed for Ventura County in 2005, and a second version was developed in 2010. Prior to developing the 2015 version of the plan, the consultant, and the MHMP and FMP committees reviewed the 2010 MHMP to identify the areas that require updating. Key recommendations for the 2015 MHMP are noted in Table 3-1. 3-1 48 Section THREE Planning Process Table 3-1. 2010 MHMP Review and Recommendations Section RCN ed Recommendation (for 2015 MIN lP) Include CRS information per the updated CRS Manual Overall (2013 version),and include call out boxes indicating where CRS 510 steps are met throughout the MHMP. Streamline this section for a more efficient read,and Section 1: Introduction update demographic information using the most recent census report(2010). Section 2:Prerequisites None. Provide more details about who the MHMP Committee Section 3:Planning Process members coordinated with within their jurisdictions. Include a description of the FMP Committee. Section 4:Hazard Analysis Add two hazards to the hazard analysis: Climate Change and Drought. To be developed based on updated critical facilities and the most up-to-date hazard data available. Streamline the Section 5:Vulnerability Analysis section by including Summary of Impact tables for each hazard that very simply but effectively illustrate the impact of each hazard. Section 6:Capability Assessment Update based on any changes that may have occurred since the last MHMP. Incorporate the Hazard Mitigation Assistance Program Section 7:Mitigation Strategy requirements into the prioritization process for choosing mitigation actions. Update the Mitigation Project Progress Report to include Section 8:Plan Maintenance more information about the project's status,including major project milestones,plan goals,project status,and cost status. Section 9:References Update to include new references. During the planning process, the consultant reviewed and incorporated information from existing plans, studies, and reports. Key information sources integrated into this document are listed in Table 3-2; additional references are provided in Section 9. 3-2 49 Section THREE Planning Process Table 3-2. Review and Incorporation of Other Studies and Plans Study/Plan Key Information 2013 California Hazard Mitigation Plan Disaster declaration information Ventura County General Plan: Goals,Policies and Community mitigation-related goals and programs Programs(last amended on March 24,2015) Ventura County General Plan:Hazards Appendix Historical hazard and location information (last amended on October 22,2013) FEMA Flood Insurance Study,Ventura County,CA Historical flood information and Incorporated Areas(Revised January 7,2015) Coastal Resilience Ventura Technical Report for Rising tide inundation and coastal storm flood hazard Coastal Hazards Mapping(July 31,2013) information California Tsunami Evacuation Playbook,City of Tsunami warning and tsunami inundation information Ventura—Ventura County(No. 2014-Vent-01) U.S.Geological Survey(USGS)Emergency Assessment of Post-Fire Debris-Flow Hazards for the Recent post-fire debris flow hazard information 2013 Springs Fire,Ventura County,CA(OFR 2014-1001) Ventura County Resource Conservation District Long Community conservation goals and strategies Range Plan 2012—2017 2013 VCFPD Unit Strategic Fire Plan Fire prevention information,unit goals,and objectives 3.2.2 Floodplain Management Coordination with Communities and Other Agencies Shortly after the plan update kick-off process, the VCWPD reached out to several local, state, and federal floodplain management stakeholders to notify them of the 2015 MHMP process; request additional relevant flood data, mapping, and/or information on flood projects; and invite them to participate in the plan update process. The VCWPD mailed personalized letters to 10 city floodplain managers on April 1, 2015, and an additional seven personalized letters to state and federal partners on April 11, 2015. The agencies contacted are listed in Table 3-3, and a copy of each mailed letter is included in Appendix E. The VCWPD followed up with five city floodplain managers and one federal agency(FEMA) at the Ventura County Floodplain Managers Meeting in Camarillo, California, on May 20, 2015. At this meeting, the consultant presented an overview of the MHMP, including updated flood hazard figures and potential flood mitigation actions; and the group discussed flood hazard data information, including Letter of Map Revisions for levees and The Nature Conservancy's Coastal Resilience project. The meeting agenda and sign-in sheet are included in Appendix E. 3-3 50 Section TNREE Planning Process Table 3-3. Floodplain Management Coordination with Communities and Other Agencies Communities/.agencies Camarillo Floodplain Manager* (City of)Ventura Floodplain Manager* Fillmore Floodplain Manager FEMA* Moorpark Floodplain Manager U.S.Army Corps of Engineers National Oceanic and Atmospheric Administration(NOAA) Ojai Floodplain Manager —National Weather Service(NWS)Forecast Office Los Angeles/Oxnard Oxnard Floodplain Manager* NOAA—California-Nevada River Forecast Center Port Hueneme Floodplain Manager California Department of Water Resources—Division of Integrated Regional Water Management, Southern Region Santa Paula Floodplain Manager* California Department of Water Resources State-Federal Flood Operations Center Simi Valley Floodplain Manager* California Department of Water Resources Flood Operations Branch Thousand Oaks Floodplain Manager *Follow-up on May 20,2015. 3.2.3 Land Use and Development Trends The 1998 General Plan, with multiple amendments through October 2013, is the current long- range planning device for Ventura County. In 1969 Guidelines for Orderly Development were developed. These Guidelines have been adopted by the County, the cities, and LAFCO and provide that urban development will occur,whenever and wherever practical,within incorporated cities rather than in the unincorporated area. Moreover, applicants for land use permits or entitlements for buran uses within a city's Sphere of Influence are encouraged to apply to the city and are discouraged from applying to the County. Urban residential development can occur, therefore, only within cities or in unincorporated areas where are designed by the County General Plan as "Urban' (urban centers within their own Areas of Interest) or"Existing Communities"where zoning is established based on historical community character and consistent with the land use plans of the respective cities. In 1995,the voters within the City of San Buenaventura(City of Ventura)passed an initiative that requires an affirmative vote of the electorate for any General Plan amendment affecting Agricultural designated land. In late-1998 and early 1999, the voters or the city council of the cities of Camarillo, Moorpark, Oxnard, Simi Valley and Thousand Oaks, as well as the unincorporated area of the County, approved similar initiatives/ordinances. The City of Santa Paula followed suit in 2000 and the City of Fillmore in 2002. These initiatives and ordinances became collectively known as Save Open-space and Agricultural Resources (SOAR) ordinances. With the exception of San Buenaventura, which requires a public vote to amend land designated Agricultural, the SOAR ordinances establish urban boundaries around each city, outside of which urban development and/or the extension of urban services can occur only with voter 3-4 51 Section THREE Planning Process approval. Most of the city SOAR ordinances remain in effect until 2020. The ordinances for the Cities of San Buenaventura and Thousand Oaks are in effect until 2030. The County of Ventura has twenty-five zoning designations in which some form of residential use is allowed. The General Plan's Land use Appendix describes the various zones and the residential uses allowed in each zone. The Planning Division processed two changes to the Non-Coastal Zoning Ordinance for second dwelling units concurrent with the 2010 Housing Element revisions. The first change allows second dwelling units of up to 1,800 square feet, (up to four bedroom) on parcels of 40 acres or greater. The second change allows second dwelling units on non-conforming parcels that are 10,000 square feet or more. Prior to the amendment,parcels that were non-conforming as to the minimum parcel size requirements of the zone had to be 20,000 square feet or more in order to be eligible for a second dwelling unit. These changes do not apply to parcels located in the Arroyo Santa Rosa/Tierra Rejada Groundwater Quality Impact Area or the Ojai Traffic Impact Area. The existing, and more restrictive standards defined in Sec. 8107-1.7 of the Non-Coastal Zoning Ordinance, apply to parcels located in these Impact Areas. For the most part development trends for Ventura County have remained consistent from the 2010 MHMP to this 2015 MI-IMP; growth is encouraged within the incorporated cities, and protection of open space and agricultural land is a priority. Therefore, there have been no major changes in development trends since the last plan, the 2010 MHMP. 3.3 MHMP UDPATE PROCESS The local hazard mitigation planning requirements to document the planning process are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element :k: Planning Process Al.Does the Plan document the planning process,including how it was prepared and who was involved in the process for each jurisdiction?(Requirement§201.6(c)(1)) In March 2015, the Ventura County Sheriffs Office of Emergency Services (Ventura County Sheriffs OES) kicked off the 2015 MHMP update process. For the 2015 MHMP update, the Ventura County Project Management Team included Dale Carnathan and Kevin McGowan from the Ventura County Sheriffs OES and Brian Trushinski from the Ventura County Watershed Protection District. The major tasks the Ventura County Project Management Team is responsible for include preparing for the project kick-off, developing the public outreach process, coordinating and developing planning committee meetings, and providing input to and review of plan deliverables. The Ventura County Project Management Team will also be responsible for maintaining the plan. Table 3-4 shows the key planning tasks and the timeline associated with each task. 3-5 52 Section THREE Planning Process Table 3-4. Plan Update Schedule Month—2015 Major.Milestones Stakeholder Outreach Project Management MHMP and FMP Planning Committee Meetings Public Outreach Project kick-off flyer and media release Online Survey Public Presentations Hazard Analysis Draft Hazard Analysis Vulnerability Analysis Draft Vulnerability Analysis Mitigation Strategy 2010 Capability Assessment and Mitigation Action Plan Review 2015 Mitigation Action Plan Final Draft MHMP Administrative Draft MHMP Public Review Draft MHMP Final Draft MHMP California Governor's Office of Emergency Services(Cal OES)/ISO/FEMA Review 3.4 PLANNING COMMITTEES The local hazard mitigation planning and floodplain management requirements for documenting who was involved in the planning process, including planning committee members, are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element:A: Planning Process Al.Does the Plan document the planning process,including how it was prepared and who was involved in the process for each jurisdiction?(Requirement§201.6(c)(1)) 3-6 53 Section THREE Planning Process Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 2: Involvement the Public A.A.Planning process conducted through a planning committee. 3.4.1 MHMP Committee Similar to the past two versions of the plan, a MHMP Committee was formed to help guide development of the 2015 MHMP. The membership of the 2010 MHMP Committee was used as a starting point for the 2015 MHMP Committee. The 2015 MHMP Committee includes staff from relevant County departments and agencies, representatives for each participating city and special district, and other entities including Cal OES. The 2015 MHMP Committee is shown in Table 3-5. Committee meetings (including time, date, location, and agenda) were listed on the 2015 MHMP website and were open to the public for any interested stakeholders to attend. The MHMP Committee met two times during the plan update process to discuss the following: • April 9, 2015: introduction of the project; overview of hazard mitigation planning in general; climate change; 2010 critical facilities and infrastructure review; 2010 capability assessment review • May 19,2015: hazard maps, vulnerability analysis process; 2015 MHMP potential mitigation actions; 2015 MHMP mitigation strategy process Detailed meeting agendas and minutes are provided in Appendix D. Table 3-5. MHMP Committee City/District/Agency Name Title Cal OES Yvette Laduke Emergency Services Coordinator California State University Channel Islands Maggie Tougas Emergency Manager Calleguas Municipal Water District Julio Reyes Operations Supervisor Camrosa Water District Bill Keyes Technical Services Manager Casitas Municipal Water District Neil Cole Civil Engineer Channel Islands Beach Community Jared Bouchard General Manager Services District City of Camarillo Heidi Zahrt Community Emergency Response Team Coordinator City of Camarillo John Fraser Sr.Management Analyst City of Fillmore Rigo Landeros Fire Chief City of Moorpark Teri Davis Senior Management Analyst City of Ojai Steve McClary Deputy City Manager City of Oxnard Robert Hearne Civil Engineer/Floodplain Manager 3-7 54 Section THREE Planning Process Table 3-5. MHMP Committee City/District/Agency Name Title City of Port Hueneme Greg Brown Community Development Director City of Santa Paula Dustin Lazenby Assistant Chief City of Thousand Oaks Jim Taylor Public Works,Senior Civil Engineer City of Thousand Oaks Grahame Watts Special Projects Manager City of Ventura Brian Clark Fire Marshal Ojai Valley Sanitary District Ronald Sheets Operations Superintendent United Water Conservation District Kaili Taniguchi Assistant Engineer Ventura County Fire Protection District Dustin Gardner Division Chief Ventura County School's Self-Funding Russ Olsen Director of Risk Management Authority(Office of Education) Ventura County Sheriffs OES Dale Carnathan— Program Administrator III Committee Chair Ventura County Sheriffs OES Kathy Gibson Program Assistant Ventura County Sheriffs OES Kevin McGowan Assistant Director Ventura County Watershed Protection Bruce Rindahl Manager,Watershed Resources and District Technology Division Ventura County Watershed Protection Brian Trushinski Floodplain Manager District The MHMP Committee members were considered initial points of contact for the jurisdictions and special districts they represented. All MT-IMP Committee members had the responsibility of attending meetings, participating in meeting discussions, providing jurisdiction/special district information, reviewing draft material and serving as a liaison for their jurisdiction/special district. As a liaison, MHMP Committee members were the face of the project for their jurisdiction, but throughout the planning process MHMP Committee members worked with their colleagues from other departments. These additional stakeholders were contacted throughout the planning processes and provided input as appropriate based on their area of expertise. Table 3-6 illustrates these additional contacts. Table 3-6. MHMP Stakeholders—City/District Contacts City/District Additional Participant City of Camarillo,City Manager's Office Kathy Talley City of Fillmore,Administrative Services Department David Rowlands,City Manager City of Fillmore,Building&Safety Department Michal Lapraik,City Engineer City of Fillmore,Building&Safety Department Michael Koroknay,Building&Safety 3-8 55 Section THREE Planning Process Table 3-6. MHMP Stakeholders—City/District Contacts City/District Additional Participant City of Fillmore,Finance Department Gaylynn Brien,Finance Director City of Fillmore,Fire Department Bill Herrera,Assistant Fire Chief City of Fillmore,Fire Department Billy Gabriel,Fire Captain City of Fillmore,Planning Department Kevin McSweeney, City Planner City of Moorpark,City Manager's Office Deborah Traffenstedt,Assistant City Manager City of Moorpark, Community Development Department Dave Bobardt,Community Development Director City of Moorpark,Public Works Department Dave Klotzle,City Engineer/Public Works Director City of Moorpark,Parks,Recreation&Community Jeremy Laurentowski,Parks and Recreation Director Services City of Port Hueneme—Police Pete Freiberg,Sergeant City of Thousand Oaks-Community Development Jeff Spector,Senior Planner Department City of Thousand Oaks-Human Resources Department Kevin Fishman,Health&Safety Specialist Conejo Recreation and Park District Matt Kouba,Park Superintendent Oxnard Union High School District Steve Dickinson,Assistant Superintendent Administrative Services Santa Paula High School District Jeff Argend,District Safety Manager United Water Conservation District James Grisham,Engineering Department United Water Conservation District Craig Morgan,Engineering Department United Water Conservation District Michael Ellis,Operations and Maintenance Department United Water Conservation District John Carmen,Operations and Maintenance Department United Water Conservation District Brian Collins,Operations and Maintenance Department Ventura County Community College District Police Lt. Greg Beckley, Supervisor Ventura County Community College District Police Joel Justice,Chief of Police Ventura County Community College District Police Lt. Cesar Romero,Supervisor Ventura County Division of Building and Safety Matt Wyatt, Supervising Building Inspector Ventura County Public Works Agency Phil Raba, Safety Manager Ventura County Sheriffs OES Bill Boyd,Program Administrator II Ventura County Sheriffs OES Ken Carter,Staff Services Manager II Ventura County Sheriffs OES Ivan Rodriguez,Administrative Aid Ventura County Sheriffs OES Darryl Smith,Emergency Manager Ventura County Sheriffs OES Gil Zavlodaver,Program Administrator II 3-9 56 Section THREE Planning Process 3.4.2 FMP Committee For the 2015 MHMP,the Ventura County Project Management Team formed a separate FMP Committee to focus on CRS 510 Floodplain Management Planning activities. As listed in Table 3-7, committee members consisted of representatives from various Ventura County departments and agencies, including the Ventura County Resource Management Agency's Planning Division and the City of Oxnard. The City of Oxnard and the VCWPD also participated on the MHMP Committee. The FMP Committee met three times during the plan update process to discuss the following: • April 9, 2015: hazard identification; climate change; 2010 critical facilities and infrastructure review; 2010 capability assessment review • April 30, 2015: draft hazard figures; 2010 MHMP mitigation strategy review; CRS 510 Floodplain Management Planning Activity Step 7 overview • June 18, 2015: updated draft hazard figures; RL property dataset; 2015 MHMP potential mitigation actions; 2015 MHMP mitigation strategy ranking process; 2015 VCWPD/Oxnard mitigation action plan selection Similar to the MHMP Committee meetings, all meetings were open to the public, and the details for each meeting(including time, date, location, and agenda) were posted on the MHMP website. Detailed meeting agendas and minutes are provided in Appendix D. Table 3-7. FMP Committee Local Participant Name VCWPD—Advance Planning:Floodplain Manager& CRS Coordinator Brian Trushinski—Committee Chair VCWPD—Advance Planning: Watershed Planning and Permits Sergio Vargas VCWPD—Watershed Resources and Technology Bruce Rindahl VCWPD—Strategic Decision Group Gerard Kapuscik Ventura County Public Works Agency:Development& Inspection Services Jim O'Tousa Ventura County Public Works Agency: Safety Officer Phil Raba Ventura County Public Works Agency:Transportation Howard De Leon Division Ventura County Resource Management Agency:Planning Daniel Klemann Division Ventura County Resource Management Agency:Building Matt Wyatt and Safety Division Ventura County Sheriff's OES Dale Carnathan City of Oxnard Public Works Agency Robert Hearne 3-10 57 Section THREE Planning Process 3.5 PUBLIC OUTREACH AND STAKEHOLDER INVOLVEMENT The local hazard mitigation planning and floodplain management planning requirements for public outreach and stakeholder involvement are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element A: Planning Process A2.Does the Plan document an opportunity for neighboring communities,local and regional agencies involved in hazard mitigation activities,agencies that have the authority to regulate development as well as other interests to be involved in the planning process?(Requirement§201.6(b)(2)) A3.Does the Plan document how the public was involved in the planning process during the drafting stage? (Requirement§201.6(b)(1)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 2: Involve the Public B.Public meetings held at the beginning of the planning process. C.Public meeting held on the draft plan. D.Other public information activities to encourage input. 3.5.1 Multi-Media Releases At the project's initiation, media releases were distributed that announced the project's start, described the purpose of the project, and provided points of contact for anyone who wanted to participate in the planning process or wanted more information about the project. A media release was distributed by the Ventura County Sheriffs Office; information regarding the 2015 MHMP project could also be found on the follow media outlets: Ventura County Sheriff's Office Facebook page, Ventura County Sheriffs Office Nixie account, Ventura County Sheriffs Office Twitter account,Ventura edhat website, and the Ventura County Star(newspaper). Screenshots of the media releases are included in Appendix E. 3.5.2 MHMP Website A website was developed to provide continual public access to information on the 2015 MHMP project: http:,/www.venturacountvmhmp.com . The website provides an overview of the project, points of contact for the consultants and the County project leads, information on all upcoming meetings (including date, time, location, and agenda), and draft pieces of the plan for review. Screenshots of the MHMP website are included in Appendix E. The County's CRS website (www.vcfloodinfo.com) is also linked to the MHMP website. 3.5.3 Online Questionnaire A questionnaire was developed for the public to provide feedback on their concerns about natural and human-caused hazards. The questionnaire could be found on the project website under the tab of"Plan Participation". A copy of the questionnaire is included in Appendix E. 3-11 58 Section TNREE Planning Process 3.5.4 Web Portal At the conclusion of the project, a web portal was implemented that allows the user to view and manipulate the various hazard maps developed for the 2015 MHMP. The web portal uses Google Earth; each hazard map is a separate layer that can be added to the general Google Earth base map. Multiple hazard layers can be viewed at a time to better understand the relationships between hazards, and the search and zoom functions allow users to personalize their views. The web portal will remain accessible after completion of the plan for continued public use. An example of the web portal is included in Appendix E. 3.5.5 Emergency Planning Council As part of the public outreach process, Ventura County Sheriffs OES and the consultant made two presentations about the 2015 MHMP at the Ventura County Emergency Planning Council (EPC). The Ventura County EPC is an advisory body whose mission is to lead a unified effort in improving disaster preparedness, mitigation, response, and recovery countywide. These efforts are achieved through a partnership of cooperation and collaboration with all levels of government, non-government organizations, and the private sector. The 2015 EPC members include representatives from Ventura County Sheriffs OES, VCFPD, American Red Cross of Ventura County, Ventura County Voluntary Organizations Active in Disasters, Ventura County Economic Development Agency, and the California Air National Guard. The Ventura County EPC meetings are open to the public, and the details for each meeting (including time, date, location, and agenda) are posted on the county website. The first presentation (April 30, 2015) was held at the beginning of the planning process. At this presentation, the consultant discussed new information to be included in the 2015 MI-IMP, including climate change and drought, and answered any questions and comments about the update process. At the July 30 presentation, the consultant discussed the Final Draft 2015 MHMP and the Cal OES and FEMA review and upcoming plan adoption process. The EPC and the general public were also given the opportunity to ask questions, and were encouraged to read the Final Draft 2015 MHMP online and submit comments over a 3-week public comment period from July 24 through August 14, 2015. Agenda's from the EPC meetings are included in Appendix E. 3.5.6 Town Hall On July 25, 2015, a town hall was hosted at the Camarillo Police Department. The town hall lasted 2 hours, with a formal presentation scheduled on the hour for each hour. The remainder of each hour was an open forum for attendees to ask questions, view the hazard maps, and interact with the project staff. Attendees were able to provide feedback/comments verbally, by completing a written questionnaire, and through an online web forum that allows anonymous submittals if the participant desires. Images from the town hall are found in Appendix E. 3.5.7 Virtual Town Hall From June 25, 2015, to September 4, 2015, a website was created to provide the public with a platform to review and comment on a digital version of the Public Draft 2015 MHMP and engage with planning team staff. An option to review printed copies of the plan, which were distributed to public facilities around the county, and comment on the plan via the website was also made available. The community was informed about the Virtual Town Hall through various marketing platforms, including printed flyers that were distributed at venues and events such as 3-12 59 Section THREE Planning Process the Ventura County Fair; digital ads displayed on websites, social media sites, and movie theaters; and traditional print media such as the VC Star. 3.5.8 Brochure On June 11, 2015,the VCWPD and County sent a CRS information brochure (Activity 330) by first-class mail to all 4,675 floodplain property owners in Unincorporated Ventura County. The brochure included a 1-page flyer announcing the MHMP update process, and inviting all floodplain property owners to participate the update process. A copy of this brochure is included in Appendix E. 3-13 60 This page intentionally left blank 61 Section FOUR Hazards Analysis 4.1 OVERVIEW A hazards analysis includes identifying, screening, and profiling each hazard. The hazards analysis encompasses natural, human-caused, and technological hazards. Natural hazards result from unexpected or uncontrollable natural events of significant size and destructive power. Human-caused hazards result from human activity and include technological hazards. Technological hazards are generally accidental or result from events with unintended consequences (for example, an accidental hazardous materials release). This hazards analysis consists of the following two steps: • Hazard identification and screening • Hazard profiles 4.2 HAZARD IDENTIFICATION AND SCREENING As the initial step in this hazards analysis,the Ventura County Project Management Team and planning committees reviewed the list of hazards identified in the 2010 MHMP and considered the following factors: • Is the hazard included in the 2010 MHMP? • Is the hazard included in the Ventura County General Plan: Hazard Appendix (2013)? • Is the hazard included in the 2013 State of California MHMP? • Has the hazard occurred in Ventura County and been declared a Presidential or state emergency or disaster in the past 15 years? Based on the above analysis,the Ventura County Project Management Team and planning committees determined that all hazards identified in the 2010 MHMP should be included in the 2015 MHMP. In addition, it was decided that two additional hazards, climate change and drought, should be profiled in the 2015 MHMP, based on recent disaster declarations and hazards addressed in the 2013 State of California Multi-Hazard Mitigation Plan. As such, the following 12 hazards are profiled in the 2015 MHMP. • Agricultural Biological • Landslide • Climate Change • Levee Failure Inundation • Dam Failure Inundation • Post-Fire Debris Flow • Drought • Tsunami • Earthquake • Wildfire • Flood • Winter Storm Hazards that were brought up for discussion, but were not included in the 2015 MHMP should be re-reviewed for possible inclusion in the next(2020) iteration of the plan. Ventura County will continue to assess these hazards and as whether or not they are appropriate to include in the County's hazard mitigation plan. The hazards to be re-reviewed are listed below. 4-1 62 Section FOUR Hazards Analysis Hazards to be Re-Reviewed for the 2020 MHMP IIazard Description Hazardous materials are substances that may have negative effects on health or the Hazardous environment.Exposure to hazardous materials may cause injury,illness,or death. Materials Recent hazardous materials releases in Ventura County include the Mission Incident Release (Santa Paula)and the Cochran Incident(Simi Valley).The California Accidental Release Prevention(Ca1ARP)program is intended to prevent accidental releases of substances and to minimize the damage if releases do occur. An epidemic is when a disease affects a disproportionately large number of individuals Epidemic within a population,community,or region at the same time.The recent measles outbreak(of which a few cases were identified in Ventura County)and Ebola scare heightened awareness of an epidemic. Train derailments are of most concern when there are volatile or flammable substances Train on the train and when the train is in a highly populated area.Recent incidents in Ventura Derailment County include the Metrolink incident in Oxnard and the derailment that occurred in Chatsworth.The concern is also heightened by reports of potential transport of Bakken crude oil on railways within California. A cyber-attack is deliberate exploitation of computer systems,technology-dependent enterprises,and networks. Cyber-attacks use malicious code to alter computer code, Cyber-Attack logic,or data,resulting in disruptive consequences that can compromise data and lead to cybercrimes,such as information and identity theft.Cyber-attack is an ongoing concern that has been increasing in frequency and magnitude. Aircraft incidents include the Alaska Air crash off the coast of Ventura County in 2000. Efforts directed at preparedness,planning,response,and mitigation of an aircraft Aircraft Incident incident is generally coordinated,maintained,and exercised by local area airports,along with area fire departments.The Federal Aviation Administration has authority over events resulting from this hazard. A civil disturbance results from civil unrest,when individuals or groups in the general population feel they are being discriminated against or that their rights are not being Civil upheld.Civil disturbance spans a variety of actions including strikes,demonstrations, Disturbance riots,and rebellion.Recently there was a small-scale protest incident at the base regarding the housing of children who recently entered the U.S.Preparedness,planning, response,and mitigation efforts pertaining to civil disturbance typically are jointly coordinated by area law enforcement agencies. In general,terrorism is violence against civilians to achieve a political or ideological objective through fear.Terrorism can occur in various forms:assassinations; kidnappings;hijackings;bomb scares and bombings;cyber-attacks(computer-based); Terrorism and the use of chemical,biological,nuclear,or radiological weapons.The State of California has a Homeland Security Advisor,who oversees statewide public safety, emergency management,emergency communication,counterterrorism efforts,and the State Threat Assessment System(STAS). Inclusion of non-native biological species that are threatening water supplies in Ventura County.Recently,there was a discovery of quagga mussels in Lake Piru that has Invasive Species resulted in much concern about water supply and infrastructure impacts.The Ventura County Watershed Protection District has implemented procedures to prevent the spread of New Zealand mudsnails from the Santa Clara River. 4-2 63 Section FOUR Nazards Analysis 4.3 HAZARD PROFILES The local hazard mitigation planning and floodplain management planning requirements for hazard profiles are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element B: Hazard Identification and Risk Assessment Bl.Does the Plan include a description of the type,location,and extent of all natural hazards that can affect each 'urisdiction(s)?(Requirement§ 201.6(c)(2)(ii)) B2.Does the Plan include information on previous occurrences of hazard events and on the probability of future hazard events for each jurisdiction?(Requirement§201.6(c)(2)(i)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 4: Assess the Hazard A.Plan includes the assessment of the flood hazard with: (1)A map of known flood hazards. (2)A description of known flood hazards. (3)A discussion of past floods. B.Plan includes an assessment of less frequent floods. C.Plan includes an assessment of areas likely to flood. D.The plan describes other natural hazards. Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 5: Assess the Problem D.Areas that provide natural floodplain functions. The hazards selected were profiled based on existing available information. The hazard profiling consists of describing the nature of the hazard, disaster history, location of hazard, and extent and probability of future events. The sources of information are listed in Section 9 of this document. According to the Threat and Hazard Identification and Risk Assessment Guide: Comprehensive Preparedness Guide (CPG) 201, Second Edition, August 2013 (CPG 201), drought, earthquake, flood, landslide, tsunami, wildfire, and winter storm are classified as natural hazards, and dam failure and levee failure inundation are classified as technological hazards. CPG 201 does not classify agricultural biological, climate change, or post-fire debris flow hazards. Therefore, the hazards profiled for this MHMP are discussed in alphabetical order and not by CPG 201 classification. The order of discussion does not signify level of risk. 4-3 64 Section FOUR Hazards Analysis 4.3.1 Agricultural Biological Nature: Agricultural infestation generally involves the artificial introduction of an insect, disease,vertebrate, or weed pest. These pests are particularly destructive to the local agricultural crops because they have no natural enemies to keep them under control. The type and severity of an agricultural infestation will vary based on many factors, including weather, crop diversity, and proximity to urban areas. The onset for an agricultural infestation can be rapid. Controlling its spread is critical to limiting the impacts of the infestation. Methods for detecting, limiting, and eradicating exotic pests include delimitation trapping, quarantining the area and preventing the shipment of products from the designated area, aerial and ground application of pesticides, and in extreme cases, premature harvest and/or crop destruction. Duration is largely affected by the degree to which the infestation is aggressively controlled, but is commonly more than 1 week. The warning time needed to control infestation is typically more than 24 hours. Maximizing warning time is also critical for reducing damage from this hazard. The County's agriculture industry provides a very significant base to the County's economy. The agricultural output of Ventura County in 2013 reached almost$2.1 billion annually and encompasses more than 92,000 acres of irrigated cropland. Ventura County is one of the top 10 agricultural counties in California. The impact of infestation of a particular pest or disease would include economic losses due to crop losses from pest damage, limitations on the ability to export products from the area, and increased costs for pest control. The diversity and location of crops produced in the County is shown on Figure F-1 (Appendix F). Many of the agricultural areas shown may be affected by the insect pests and agriculture biological diseases described in this section. Many pests not only damage the agricultural economy but also affect residential areas and open space. Damage to landscape plants and vegetable gardens can be significant. Pests such as the gypsy moth damage primarily hardwood trees in open space areas such as Oak Woodlands. History: In 1994, the Mediterranean fruit fly affected 11 counties in California, including Ventura County. The loss in Ventura County was about$22 million. In 2007, four gypsy moths were trapped in Ojai; then in October 2008, a 5-square-mile quarantine area was established in the City of Ojai, centered around two egg mass sites on South Rice Road. Since 2008, no gypsy moths have been detected. In 2007 and 2008, the charcoal rot disease suddenly affected strawberry plants in several fields throughout Ventura County, but the loss of crops was limited. The fungus was limited when growers routinely fumigated fields, but because of restrictions on some fumigation chemicals, many growers have turned to less-potent chemical alternatives. Fields afflicted by charcoal rot have typically been fumigated for several successive seasons with these less-potent chemicals; the effectiveness of the chemicals is still being determined. Research is underway in Ventura County on epidemiology and fungicide treatment. The Asian citrus psyllid (ACP) pest, which carries Huanglongbing(HLB) disease, was identified in San Diego County in 2008, and by 2009 was also found in Imperial, Orange, and Los Angeles counties. All of Ventura County was declared under quarantine for ACP and HLB in December 2010. There have been zero detections of HLB in Ventura County. Location: Ventura County's agricultural areas are most susceptible to insect pests and agriculture biological diseases, such as those described above. The County's farm landscape is 4-4 65 Section FOUR Hazards Analysis illustrated on Figure F-1 (Appendix F). In addition to agricultural areas,the entire county is susceptible to the gypsy moth. In 2008, a quarantine area for the gypsy moth was centered on a 6-square-mile area in Ojai. In the spring of 2009, hundreds of gypsy moth traps were placed in the same area; no adult gypsy moths were detected in 2009. Visual inspection in the quarantined area began in the fall of 2009; the regulatory quarantine enforcement ceased on October 4, 2010 for Ventura County. Extent: Future agricultural infestations in Ventura County are likely based on past occurrences. Based on previous history, infestations causing widespread damage have occurred about once every 10 to 20 years. Another factor increasing the likelihood of future infestations is the mild climate in Ventura County, which increases the ability of pests to proliferate. However,the extent and probability of a devastating event are unknown. Other factors that influence agricultural infestations are described below. Injurious pests commonly enter Ventura County in a number of ways. They may, for example, be inadvertently shipped by a private individual in an infested plant, fruit, or vegetable. When the package is received and the article is found to contain pests,the recipient throws it out and the pests multiply and infest nearby agricultural crops or urban properties. Pests can also travel easily on plants and plant parts shipped from uncertified and unlicensed nurseries; on plants offered for sale at swap meets and other open air markets; or in vehicles or luggage. Inspectors from the Agricultural Commissioner's office inspect incoming plants at nurseries, farmer's markets, and swap meets to check for the presence of pests not occurring in this area. As the state of California experiences budget shortfalls, the usual points of entry at the state border are no longer staffed with inspectors, so this program at the local level becomes one of the main lines of defense against injurious pests. Methyl bromide has been the fumigant of choice for controlling soil-borne insect and disease pests in many of the county's highest value crops, including bell peppers,tomatoes, berries (including strawberries, raspberries, and blueberries), and cut flowers. With the phase out of methyl bromide, control of diseases such as charcoal rot will depend on the availability of alternative methods, including fumigants such as choropicrin, 1,3-dichloropropene, metam/ potassium sodium, and methyl iodide. Probability of Future Events: The probability and extent of a devastating event would depend on many factors, including the specific pest introduced, climactic conditions at the time of introduction, fluctuations in funding for pest detection and eradication, and public pressure regarding aerial and ground applications of pesticides proximate to urban areas. 4-5 66 Section FOUR Hazards Analysis 4.3.2 Climate Change Nature: Climate is defined as the average statistics of weather, which includes temperature, precipitation, and seasonal patterns in a particular region. Climate change refers to a long-term and irrevocable shift in weather-related patterns, either regionally or more globally. The Earth and its natural ecosystem are closely tied to the climate, and any permanent climate change will lead to an imbalance in the existing ecosystem, impacting the way people live, the food they grow, their health, the wildlife,the availability of water, and many other aspects. Research indicates that much of this warming is due to human activities—primarily burning fossil fuels and clearing forests that release carbon dioxide(CO2) and other gases into the atmosphere, trapping heat that would otherwise escape into space. Once in the atmosphere,these heat- trapping emissions remain there for many years—CO2, for example, lasts about 100 years. If left unchecked, by the end of the century CO2 concentrations could reach levels three times higher than the levels in pre-industrial times. According to most climatologists, the planet is starting to experience shifts in climate patterns and an increased frequency of extreme weather events at both the global level and the local level. Over the next century, increasing atmospheric greenhouse gas concentrations are expected to cause a variety of changes to local climate conditions, including sea-level rise and storm surges in coastal areas; reduced mountain snowpack; increased riverine flooding throughout the county; more frequent, higher temperatures (leading to extreme heat events and wildfires), particularly inland; decreasing air quality; and extended periods of drought. These effects of climate change are expected to negatively impact water and electricity demand and supplies in Ventura County. Also, rising sea levels will threaten cities along the Ventura County coast and its rivers, decreasing air quality and extreme heat days will degrade public health,wildfire risk will increase (particularly in the grassland hills and mountainous areas of the County), and the County's over$2 billion agricultural industry could decline significantly. History: The history of the scientific discovery of climate change began in the early nineteenth century,when ice ages and other natural changes in paleoclimate were first suspected and the natural greenhouse effect was first identified. In the late nineteenth century, scientists first argued that human emissions of greenhouse gases could change the climate. Many other theories of climate change were advanced, involving forces from volcanism to solar variation. In the 1960s,the warming effect of CO2 gas became increasingly convincing, although some scientists also pointed out that human activities, in the form of atmospheric aerosols (e.g., "pollution"), could have cooling effects as well. During the 1970s, scientific opinion increasingly favored the warming viewpoint. By the 1990s, as a result of improving fidelity of computer models and observational work confirming the Milankovitch theory of ice ages, a consensus position formed: greenhouse gases were deeply involved in most climate changes, and human emissions were bringing serious global warming. Since the 1990s, scientific research on climate change has included multiple disciplines and has expanded, significantly increasing our understanding of causal relations, links with historical data, and our ability to numerically model climate change. The most recent work has been summarized in the Assessment Reports by the Intergovernmental Panel on Climate Change (IPCC). Climate change is a significant and lasting change in the statistical distribution of weather patterns over periods ranging from decades to millions of years. It may be a change in average weather conditions or in the distribution of weather around the average conditions(i.e., 4-6 67 Section FOUR Hazards Analysis more or fewer extreme weather events). Climate change is caused by factors that include oceanic processes (such as oceanic circulation), biotic processes, variations in solar radiation received by Earth, plate tectonics and volcanic eruptions, and human-induced alterations of the natural world. This last type of effect is currently causing global warming, and "climate change" is often used to describe human-specific impacts. Location: The location of climate change effects in Ventura County is, in general, countywide, with specific effects and their severity focused in particular parts of the County(e.g., coastal inundation from rising tides and storm surge.) Figures F-2 and F-3 (Appendix F) show projected coastal inundation areas in 2030 from rising tides and combined storm floods, which can result in coastal erosion, fluvial storm flooding, wave impacts, and coastal storm floods. The County will also experience increases in wildfire risk in hillside and mountainous areas and an increase in riverine flooding along rivers and creeks. Extent: The extent of climate risk includes Combined Coastal Storm Hazard Zones of 28.43 square miles and a Rise Tide Inundation Area of 6.49 square miles. Under a low emissions scenario, wildfire risk could increase roughly two-to fourfold from its current extent in mountainous and hillside areas of the County, and average temperatures could rise four to six degrees Fahrenheit by 2080, resulting in a 17 percent decrease in mountain snowpack. Countywide, the Mediterranean seasonal precipitation pattern is expected to continue, with most precipitation falling during winter from North Pacific storms. One of the four climate models projects slightly wetter winters, and another projects slightly drier winters with a 10 to 20 percent decrease in total annual precipitation. However, even modest changes would have a significant impact because California ecosystems are conditioned to historical precipitation levels and water resources are nearly fully utilized. Probability of Future Events: The specific probability of the extent and frequency of climate change-induced impacts is uncertain and depends on various climate-modeling assumptions. Although there is some uncertainty about the rate of climate change and the severity and frequency of extreme weather events, the IPCC, in its Fifth Assessment of climate change (2014), concluded that: ...warming of the climate system is unequivocal, and since the 1950s, many of the observed changes are unprecedented over decades to millennia. The atmosphere and ocean have warmed, the amounts of snow and ice have diminished, sea level has risen, and the concentrations of greenhouse gases have increased.... It is extremely likely that human influence has been the dominant cause of the observed warming since the mid- 20th century. California Governor Jerry Brown, in his Executive Order B-30-15, reiterated the 2014 IPCC finding and further stated that: ...climate change poses an ever-growing threat to the well-being, public health, natural resources, economy, and the environment of California, including loss of snowpack, drought, sea level rise, more frequent and intense wildfires, heat waves, more severe smog, and harm to natural and working lands, and these effects are already being felt in the state... The consensus of the scientific community—and the position of the State of California—is that climate change is occurring and will continue to occur, perhaps at an increasing rate. 4-7 68 Section FOUR Hazards Analysis 4.3.3 Dam Failure Inundation Nature: Dam failure involves unintended releases or surges of impounded water, resulting in downstream flooding. The high-velocity, debris-laden wall of water released from dam failure results in the potential for human causalities, economic loss, lifeline disruption, and environmental damage. Although dam failure may involve the total collapse of a dam, this is not always the case, because damaged spillways, overtopping from prolonged rainfall, or other problems—including the unintended consequences from normal operations—can result in the creation of a hazardous situation. Because they occur without advance warning, failures from natural events such as earthquakes or landslides may be particularly severe. Dam failure may be caused by a variety of natural events, human-caused events, or a combination thereof. Dam failure usually occurs when the spillway capacity is inadequate and water overtops the dam, or when internal erosion through the dam foundation occurs (also known as piping). Factors contributing to dam failure events may include structural deficiencies from poor initial design or construction, lack of maintenance or repair, and the gradual weakening of the dam through the normal aging process. History: Although it was located elsewhere,the failure of one dam had catastrophic effects in Ventura County. The St. Francis Dam in the San Francisquitos Canyon in Los Angeles County (within the Santa Clara River watershed)was constructed to provide 38,000 acre-feet of storage for water from the Los Angeles–Owens River Aqueduct. The midnight collapse of the dam in March 1928 occurred after the newly constructed concrete-arch dam was completely filled for the first time. The resulting flood swept through the Santa Clara Valley in Ventura County toward the Pacific Ocean, about 54 miles away. At its peak,the wall of water was reported to be 78 feet high; by the time it hit Santa Paula,42 miles south of the dam,the water was estimated to be 25 feet deep. Almost everything in its path was destroyed, including structures, railways, bridges, livestock, and orchards. By the time the flood subsided, parts of Ventura County lay under 70 feet of mud and debris. Nearly 500 people were killed, and damage estimates exceeded $20 million. The communities of Piru, Fillmore, Santa Paula, Bardsdale, Saticoy, Montalvo, and El Rio sustained extensive life and property loss from the flood. There is no record of a failure of any dam located in Ventura County. Location: Table 4-1 includes the name, year built, capacity, and type for the dams that constitute failure hazards for Ventura County. Figure F-4A(Appendix F) shows the name, location, and extent of the dam failure inundation areas for every dam failure that would affect Ventura County. It is not anticipated that every dam would fail at the same time; this map is designed to simply provide an approximate assessment of total risk for the County. Figure F-4B (Appendix F) illustrates dam failure inundation areas for particular dams. In some instances, if one dam fails there is potential that another dam downstream will also fail (for example if the Pyramid Dam fails, the Santa Felicia Dam will likely fail too). Figure F-4B (Appendix F) does not illustrate cumulative effects.Additional information on specific dam inundation areas may be obtained from the agency that owns the dam. The map shows that dam failures may occur outside Ventura County but still pose a threat of inundation within the County. In particular, if dams in the Santa Clara River watershed in Los Angeles County fail,the resulting flood would affect the Santa Clara River corridor, which 4-8 69 Section FOUR Hazards Analysis includes the cities of Santa Paula and Oxnard, as demonstrated by the 1928 event (mentioned above). Table 4-1. Dams Under State Jurisdiction with Inundation Areas within Ventura County* Dam Year Built Capacity Type Bouquet Canyon 1934 36,505 earth Casitas 1958 254,000 earth Castaic 1973 323,700 earth Ferro Debris 1986 24 earth Lake Eleanor 1763 N/A 128 earth Lake Sherwood 1904 2,694 constant radius arch Lang Ranch Detention Basin 2004 263 earth Las Llajas 1981 1250 earth Matilija 1949 1800 variable radius arch Pyramid 1973 178,700 earth and rock Runkle 1949 100 earth Santa Felicia Dam 1955 100,000 earth Sinaloa Lake 1925 205 earth Stewart Canyon 1963 67 earth Westlake Reservoir 1972 9200 earth Wood Ranch 1965 11,000 earth Source:DSOD 2015. *This table includes federal dams and reservoirs that are in the State of California but are not under state jurisdiction. Extent: FEMA characterizes a dam as a high hazard if it stores more than 1,000 acre-feet of water, is taller than 150 feet, and has the potential to cause downstream property damage. The hazard ratings for dams are set by FEMA and confirmed with site visits by engineers. Most dams in the county are characterized by increased hazard potential because of downstream development and increased risk as a result of structural deterioration or inadequate spillway capacity. The Division of Safety of Dams (DSOD) regulates state-size dams and inspects them annually to ensure that they are in good operating condition. Also, as required by DSOD regulations, the flood inundation limits resulting from a dam breach during the design storm are established for each state-size dam. The resultant maps contain flood-wave arrival time estimates and flood inundation areas. These maps are developed by Cal OES and provided to DSOD and local communities. Inundation areas are shown in Table 4-2. 4-9 70 Section FOUR Hazards Analysis Table 4-2. Dam Inundation Areas Inundation Area Dam (Square Miles) Bouquet Canyon 109.67 Casitas 5.09 Castaic 163.41 Ferro Debris 0.06 Lake Eleanor 0.32 Lake Sherwood 2.01 Lang Ranch Detention Basin 0.48 Las Llajas 8.13 Matilija 3.85 Pyramid 13.94 Runkle 0.65 Santa Felica 121.19 Sinaloa Lake 2.32 Stewart Canyon 0.06 Westlake Reservoir 2.65 Wood Ranch 33.61 Source:DSOD,2015. Probability of Future Events: The probability of dam failure inundation is unknown, but such an event would likely be the result of an extreme storm. 4-10 71 Section FOUR Hazards Analysis 4.3.4 Drought Nature: Drought is a normal, recurrent feature of virtually all climatic zones, including areas of both high and low rainfall, although the characteristics of a drought will vary significantly from one region to another. There is no universally accepted quantitative definition of drought from a scientific or engineering point of view. However, in common terms drought is defined as natural deficit of water supply in a region due to below-average precipitation over a seasonal period or several years, causing a serious hydrological imbalance that results in biological losses and/or economic losses. Drought differs from normal aridity, which is a permanent feature of the climate in areas of low rainfall. Drought is the result of a natural decline in the expected precipitation over an extended period,typically one or more seasons in length. Other climatic characteristics (e.g.,high temperature, high wind, low relative humidity) impact the severity of drought conditions. Four scientific/engineering definitions of drought are listed below: • Meteorological drought is defined solely by the degree of dryness, expressed as a departure of actual precipitation from an expected average or normal amount based on monthly, seasonal, or annual time scales. • Hydrological drought relates to the effects of precipitation shortfalls on stream flows and reservoir, lake, and groundwater levels. • Agricultural drought is defined principally in terms of soil moisture deficiencies relative to the water demands of plant life, usually crops. • Socioeconomic drought associates the supply and demand of economic goods or services with elements of meteorological, hydrologic, and agricultural drought. Socioeconomic drought occurs when the demand for water exceeds the supply as a result of weather- related supply shortfall. A drought's severity depends on numerous factors, including duration, intensity, and geographic extent as well as regional water supply demands by humans and vegetation. Due to its multi- dimensional nature, drought is difficult to define in exact terms and thus poses difficulties in terms of comprehensive risk assessments. Drought differs from other natural hazards in three ways. First, both the onset and the end of a drought are difficult to determine due to the slow accumulation and lingering effects of an event after its apparent end. Second,the lack of an exact and universally accepted definition of drought adds to confusion about its existence and severity. Third, in contrast with other natural hazards, the impact of drought is less obvious and may be spread over a large geographic area. These characteristics have hindered the preparation of drought contingency or mitigation plans by many governments. The effects of drought increase with duration as more moisture-related activities are impacted. Non-irrigated croplands are most susceptible to precipitation shortages. Rangeland and irrigated agricultural crops may not respond to moisture shortage as rapidly, but yields during periods of drought can be substantially affected. During periods of severe drought, lower moisture in plant and forest fuels create an increased potential for devastating wildfires. In addition, lakes, reservoirs, and rivers can be subject to water shortages that impact recreational opportunities, irrigated crops, availability of water supplies for activities such as fire suppression and human 4-11 72 Section FOUR Hazards Analysis consumption, and natural habitats of animals. Insect infestation can also be a particularly damaging impact from severe drought conditions. History: Drought is a cyclic part of the climate of California, occurring in both summer and winter, with an average recurrence interval between 3 and 10 years. Recent droughts in California history are listed in Table 4-3. Table 4-3. Recent Droughts in California Year(s) Areas Affected Disaster Proclamation 1917-1921 Statewide except central Sierra Nevada and north coast No 1922-1926 Statewide except central Sierra Nevada No 1928-1937 Statewide No 1943-1951 Statewide No 1959-1962 Statewide No 1976-1977 Statewide,except for southwestern deserts Statewide disaster proclamation 1987-1992 Statewide No 2007-2009 Statewide,particularly the central coast Statewide disaster proclamation 2012-2015 Statewide Statewide disaster proclamation (2014) Source:Paulson et al 1991;Cal OES,2015. The State of California is in the midst of the fourth year of a drought at the time of the writing of this MHMP. According to University of California, Berkeley, Professor B. Lynn Ingram, California is "on track for having the worst drought in 500 years." Location: The occurrence of drought is regional in nature and scope, which holds true for Ventura County. As illustrated on Figure 4-1, when drought occurs it typically affects the entire county. Drought affects the population of a jurisdiction, as well as the farmland throughout a jurisdiction. As illustrated on Figure 4-1, agricultural crops are dispersed throughout Ventura County. Figure F-16, illustrates the distribution of population throughout Ventura County. 4-12 73 Section FOUR Hazards Analysis U.S, Drought Monitor California June 25, 2013 July 1, 2014 Ma tr 411111mall Aiii —41104.1 114-474m11111,06° 10,10. 11014r14 A jeith, • %,110jillIIIL taillik by. NOD. June 30, 2015 ,: 1 =I°a.Ca A>,aa, 7 bne ICC 04 01 04 MOM IP) twang 014 014 590, 93" 9077"00 W7) » Lar „ .,8.4 90 r59 >100 W 015 9185 611 O4 C6E0 1181rT . cme SUMO nm MOOD 981: 9434 MWela 001 1000010000 00.01 0190 9047 '� >:,` ow looao100001ooaoImor zoo ntBn 790 Y; oo Mmn4o7o -00w...Ouo0 aloe 400)ov/n -0.e.vwm,L wyf 025,.....44 rneOrso,000.Av la'v%a on00a'xak 009000204 (xa;OoaAM»mry vary Se a xcows,,nh>,G urrcnary Author: &un Fu.hs Nations)Crounhl k42208 fon Cooler �' II 0' USDA http:/ldnoughtmonfter u0l.edul Figure 4-1. California Drought Conditions Extent: The National Drought Mitigation Center produces drought monitor maps for the United States. It classifies droughts into five categories: DO is the least severe, with abnormally dry conditions; and D4 is the most severe, with exceptional drought conditions. As of June 30, 2015, Ventura County and roughly half of the State of California remained classified in the highest ranking of D4, exceptional drought conditions. Drought impacts the residents, businesses, agriculture, and environmental resources of Ventura County. The current drought has: • Affected the County's ability to meet drinking water demands. - Groundwater has been limited and wells have run dry in certain areas of the County. As a result water agencies that typically get their water from wells have had to start purchasing Lake Casitas Water. Lake Casitas is an important, but dwindling resource. 4-13 74 Section FOUR Hazards Analysis - Recharge to the Ventura River Basin is almost exclusively from Ventura River flow. The basin is relatively shallow and responds quickly to rainfall or lack thereof. Due to the drought,the City of Ventura has lost 70%of its normal Ventura River supply. - Ventura County typically receives all of its imported water from the State Water Project(SWP). Because the County is at the westernmost extent of Metropolitan Water District's service area,there is very limited infrastructure to deliver Colorado River water to the area. • Prevented the region from meeting existing agricultural demands. - Due to the drought,pumping reductions have been established. Some agricultural users have supplemented reduced supplies by increased purchases of recycled water, but alternate supplies are not available to many farms. For some,this has resulted in fewer crop rotations. There is also a concern,that worst case scenario, some growers may choose to permanently leave the region. • Put the region as risk of not meeting ecosystem water demands. - Endangered species are further stressed by low flow conditions. Downstream of Lake Casitas, the Ventura River and ecological resources are stressed due to low flows. A particularly sensitive resource is the steelhead. • Affected drinking water Maximum Contaminant Levels (MCLs) - The water needed to meet primary MCLs is dwindling. According to the United Water Conservation District, the highest nitrate concentrations are often observed during drought periods when nitrogen inputs continue but the diluting influence of natural and artificial recharge is reduced. - The drought could cause Lake Casitas water quality to exceed secondary drinking water standards related to manganese. As low dissolved oxygen levels affect more of the lake,more manganese will be release from lake sediments. • Exacerbated groundwater overdraft. - Groundwater is the single largest water source for Ventura County,providing about 65%of supplies. Releases from Lake Piru are typically managed to recharge groundwater basins. Lack of surface water and SWP water have dropped Lake Piru below deadpool,and groundwater recharge has been severely curtailed. - The Oxnard Plain Forebay is the primary recharge area for the Oxnard Plain Pressure Basin. Changes in storage in the Forebay change the hydrostatic pressure in the Oxnard Plain Pressure Basin. When groundwater falls below sea level in the Forebay, there is significant seawater movement inland. - The Oxnard Plain Pressure Basin is the largest and most complicated of the basins in Ventura County. Before the drought,this basin was considered to be in overdraft.As a result of the lack of surface water and precipitation to recharge the Forebay, overdraft in the Oxnard Plain Pressure Basin has been severely exacerbated. As groundwater elevations reach historic lows,the risk of subsidence increases. . The southern coastal portion of the Pleasant Valley Basin has been in overdraft for many years. Like in the Oxnard Plain Pressure Basin,as groundwater levels decline, 4-14 75 Section FOUR Hazards Analysis there is greater saline intrusion. The US Geological Survey has also identified the Pleasant Valley Basin as susceptible to subsidence as groundwater pumping increases. Probability of Future Events: The ability to reliably predict drought conditions at seasonal or annual timescales is very limited. According to the California Department of Water Resources, the status of El nino-Southern oscillation (EnSo) conditions is currently the only factor that can offer some predictability to the onset of drought. Strong la nina(warm) conditions of EnSo tend to favor a drier outlook for California. Therefore, based on previous la nifia conditions, drought conditions may exist in Ventura County every 3 to 10 years. 4-15 76 Section FOUR Hazards Analysis 4.3.5 Earthquake Nature: An earthquake is a sudden motion or trembling caused by a release of strain accumulated within or along the edge of the earth's tectonic plates. The effects of an earthquake can be felt far beyond the site of its occurrence. Earthquakes usually occur without warning and can cause massive damage and extensive casualties in a few seconds. Common effects of earthquakes are ground motion and shaking, surface fault ruptures, and ground failure. Ground motion is the vibration or shaking of the ground during an earthquake. When a fault ruptures, seismic waves radiate, causing the ground to vibrate. The severity of the vibration increases with the amount of energy released and decreases with distance from the causative fault or epicenter. Soft soils can amplify ground motions. In addition to ground motion, several secondary natural hazards can occur from earthquakes, such as the following: • Surface Faulting is the differential movement of two sides of a fault at the earth's surface. Displacement along faults—both in terms of length and width—varies but can be significant(e.g., up to 20 feet), as can the length of the surface rupture (e.g., up to 200 miles). Surface faulting can cause severe damage to linear structures, including railways, highways, pipelines,tunnels, and dams. • Liquefaction occurs when seismic waves pass through saturated granular soil, distorting its granular structure, and causing some of the empty spaces between granules to collapse. Pore water pressure may also increase sufficiently to cause the soil to behave like a fluid for a brief period and cause deformations. Liquefaction causes lateral spreads (horizontal movements of commonly 10 to 15 feet, but up to 100 feet), flow failures (massive flows of soil, typically hundreds of feet, but up to 12 miles), and loss of bearing strength(soil deformations causing structures to settle or tip). Liquefaction can cause severe damage to property. The California Geological Survey(CGS) Seismic Hazard Zone Maps illustrate areas prone to liquefaction; as shown in Figure F-5 (Appendix F), 211.39 square miles of liquefaction areas of the saturated sandy soils of the Oxnard Plain and along the Santa Clara River Valley are prone to liquefaction. • Landslides/Debris Flows occur as a result of horizontal seismic inertia forces induced in the slopes by the ground shaking. The most common earthquake-induced landslides include shallow, disrupted landslides such as rock falls,rockslides, and soil slides. Debris flows are created when surface soil on steep slopes becomes totally saturated with water. Once the soil liquefies, it loses the ability to hold together and can flow downhill at very high speeds,taking vegetation and/or structures with it. Slide risks increase after an earthquake during a wet winter. The severity of an earthquake can be expressed in terms of intensity and magnitude. Intensity measures the strength of shaking produced by the earthquake at a certain location. Intensity is determined from effects on people, structures and facilities (roads, bridges,pipelines, etc.), and the natural environment. Magnitude is the measure of the earthquake "strength,"the energy released at the source of the earthquake. The two most common measures of earthquake intensity used in the United States are the Modified Mercalli IntensityScale, which measures felt intensity, andpeakground acceleration Y� (PGA),which measures instrumental intensity by quantifying how hard the earth shakes in a 4-16 77 Section FOUR Hazards Analysis given location. Magnitude is measured by the amplitude of the earthquake waves recorded on a seismograph using a logarithmic scale. The following table presents intensities that are typically observed at locations near the epicenter of earthquakes of different magnitudes, with interpretations of perceived shaking and potential damage to the built environment(Table 4-4). Table 4-4. Magnitude/Intensity/Ground-Shaking Comparisons klagnitude Instrumental Intensity PGA(%g) Perceived Shaking Potential Damage I <0.17 Not Felt 0-4.3 II-III 0.17— 1.4 Weak None IV 1.4—3.9 Light 4.3—4.8 V 3.9—9.2 Moderate Very light VI 9.2—18 Strong Light 4.8—6.2 VII 18—34 Very Strong Moderate VIII 34—65 Violent Moderate to Heavy 6.2—7.3 IX 65— 124 Very Violent Heavy X XI 124+ Extreme Very Heavy 7.3—8.9 XII Source:Wikipedia—Peak Ground Acceleration:http://en.wikipedia.org/viki/Peak_ground_acceleration. History: Although no large (M 5.0>) earthquakes have occurred recently within Ventura County's boundaries, a number of relatively large earthquakes in other areas have caused damage within the county. These earthquakes occurred in 1925 (Santa Barbara), 1927 (Point Arguello), 1933 (Long Beach), 1941 (Santa Barbara), 1952 (Tehachapi), 1971 (San Fernando), and 1994 (Northridge). Additionally, damaging earthquakes occurred in the County in 1950 (north of Ojai), 1957 (Hueneme), 1963 (Camarillo), and 1973 (Point Mugu). The three most recent events (San Fernando, Point Mugu, and Northridge) are discussed below. Figure F-6 (Appendix F) illustrates historic earthquakes in the Ventura County region. • San Fernando,M 6.5,February 9, 1971: This event was caused by oblique-slip reverse faulting in the San Fernando fault zone. The earthquake caused the destruction of freeway interchanges, houses, and buildings and severe damage to three hospitals in the San Fernando Valley. The earthquake claimed 65 lives. Although the epicenter was within 25 miles of Ventura County, damage sustained within the County was minor. • Point Mugu, M 5.3, February 21, 1973: The Point Mugu earthquake was responsible for at least five injuries and more than $1 million damage in the Point Mugu—Oxnard area, though damage was confined mainly to the vicinity of the epicenter. Large boulders fell down onto State Route 1 at Point Mugu, partially blocking the road. More than 7,000 customers lost electricity for several hours. Most reported damage was to windows, ceilings, plaster, chimneys, and shelved goods, though structural damage and broken pipes were also reported. Although much less powerful than the San Fernando earthquake of 1971, the Point Mugu earthquake was similar in focal mechanism. 4-17 78 Section FOUR Hazards Analysis • Northridge,M 6.7,January 17, 1994: This blind thrust earthquake occurred along the Northridge thrust fault. It was the strongest earthquake instrumentally recorded in an urban setting in North America and caused parking structures, apartments, office buildings, and sections of freeways to collapse. Approximately 25,000 dwellings were rendered uninhabitable. Total damage exceeded $44 billion. The incident resulted in 51 deaths. Location: As in most of southern and coastal California,the potential for earthquake damage exists throughout Ventura County because of the number of active faults within and near the county. These faults are shown on the CGS Fault Activity Map of California. Descriptions of the active faults are provided below. The locations of the active and potentially active faults are shown on Figure F-7 (Appendix F) and Figure F-8 (Appendix F). Some of the more significant faults are described below: • Malibu Coast fault system: The Malibu Coast fault system includes the Malibu Coast, Santa Monica, and Hollywood faults. The system begins in the Hollywood area, extends along the southern base of the Santa Monica Mountains, and passes offshore a few miles west of Point Dume. The 1973 Point Mugu earthquake, described in the previous section, is believed to have originated on this fault system. • Oak Ridge fault system: The Oak Ridge fault system is a steep (65 degrees) southerly dipping reverse fault that extends from the Santa Susana Mountains westward along the southerly side of the Santa Clara River Valley and into the Oxnard Plain. The system is more than 50 miles long on the mainland and may extend an equal or greater distance offshore. Several recorded earthquake epicenters on land and offshore may have been associated with the Oak Ridge fault system. Portions of the system are zoned by the state as active. • Pine Mountain thrust fault and Big Pine fault: These two large faults occur in the mountainous portion of Ventura County north of the Santa Ynez fault; the faults are located 9 and 16 miles north of the City of Ojai, respectively. The Pine Mountain thrust fault is reported to have ruptured the ground surface for a distance of 30 miles along its length during the northern Ventura County earthquakes of November 1852. • San Andreas fault: San Andreas is the longest and most significant fault in California. Because of clearly established historical earthquake activity,this fault has been designated as active by the State of California. The last major earthquake on this fault near Ventura County was the Fort Tejon earthquake of 1857, which was estimated at M 8.0 and would have caused considerable damage if there had been structures in the southern part of the county. There is a 59 percent chance that an M 6.7 quake or larger will occur on this fault within the next 30 years. • San Cayetano—Red Mountain—Santa Susana fault system: This fault system consists of a major series of north-dipping reverse faults that extend over 150 miles from Santa Barbara County into Los Angeles County. Within this system, the San Cayetano fault is the greatest hazard to Ventura County; it is a major, north-dipping reverse fault that extends for 25 miles along the northern portion of the Ventura Basin. The San Fernando earthquake of 1971, described in the previous section,was caused by activity along this fault. 4-18 79 Section FOUR Hazards Analysis • Simi—Santa Rosa fault system: This fault system extends from the Santa Susana Mountains westward along the northern margin of the Simi and Tierra Rejada valleys and along the southern slope and crest of the Las Posas Hills to their westerly termination. • Ventura-Pitas Point fault: The western half of this fault is known as the Pitas Point fault, and the eastern half is known as the Ventura fault. The Pitas Point fault extends offshore into the Pacific Ocean and is roughly 14 miles long. The Ventura fault extends into the communities of Ventura and Sea Cliff and runs roughly parallel to portions of U.S. 101 and State Route 126. The fault is roughly 12 miles long. The Ventura-Pitas Point fault is a left-reverse fault. Extent: The strength of an earthquake's ground movement can be measured by PGA. PGA measures the rate in change of motion relative to the established rate of acceleration due to gravity(g= 980 centimeters per second, per second). PGA is used to project the risk of damage from future earthquakes by showing earthquake ground motions that have a specified probability (e.g., 10 percent, 5 percent, or 2 percent) of being exceeded in 50 years. The ground motion values are used for reference in construction design for earthquake resistance and can also be used to assess relative hazard between sites when making economic and safety decisions. In 2008, CGS developed an updated map of earthquake shaking potential for California. The map shows the relative intensity of ground shaking and damage in California from anticipated future earthquakes. Regions near major, active faults are shown in red and pink and experience stronger earthquake shaking more frequently. Regions that are distant from known, active faults are shown in orange and yellow and experience lower levels of shaking less frequently. Figure F-7 (Appendix F) and Figure F-8 (Appendix F) indicate the level of low-frequency shaking potential in Ventura County (in which local soil conditions have greater effect on low frequency), which includes 15.16 square miles of severe low frequency ground shaking potential; 659.67 square miles of extreme low frequency shaking potential; and 1,157.57 square miles of a violent low frequency shaking potential. Probability of Future Events: Ongoing field and laboratory studies suggest the likely maximum magnitudes and recurrence intervals for the major local faults shown in Table 4-5. Table 4-5. Likely Maximum Magnitudes and Recurrence Intervals Fault Likely Maximum Jlagnitudes and Recurrent Intervals Malibu Coast fault system M 6.7,recurrence interval 2,908 years Oak Ridge fault system M 6.9,recurrence interval 299 years Red Mountain fault system M 6.8,recurrence interval 507 years San Andreas fault M 8.0,recurrence interval of 300 years San Cayetano fault system M 6.8,recurrence interval 150 years Santa Susana fault system M 6.6,recurrence interval 138 years Simi—Santa Rosa fault system M 6.7,recurrence interval 933 years Ventura-Pitas Point fault system M 6.9,recurrence interval not available 4-19 80 Section FOUR Nazards Analysis 4.3.6 Flood Nature: A flood occurs when the existing channel of a stream, river, canyon, or other watercourse cannot contain excess runoff from rainfall or snowmelt, resulting in overflow onto adjacent lands. In coastal areas, flooding may occur when high winds or tides result in a surge of seawater into areas that are above the normal high tide line. A floodplain is the area adjacent to a watercourse or other body of water that is subject to recurring floods. Floodplains may change over time as a result of natural processes, changes in the characteristics of a watershed, or human activity such as construction of bridges or channels. In areas where flow contains a high sediment load, such as along the Santa Clara River in Ventura County, the course of a river or stream may shift dramatically during a single flood event. Coastal floodplains may also change over time as waves and currents alter the coastline. Secondary hazards from floods can include: • Erosion or scouring of stream banks, roadway embankments, foundations, footings for bridge piers, and other features. • Impact damage to structures, roads, bridges, culverts, and other features from high- velocity flow and from debris carried by floodwaters. Such debris may also accumulate on bridge piers and in culverts, increasing loads on these features or causing overtopping or backwater effects. • Destruction of crops, erosion of topsoil, and deposition of debris and sediment on croplands. • Release of sewage and hazardous or toxic materials when wastewater treatment plants are inundated, storage tanks are damaged, and pipelines are severed. In areas such as Ventura County that do not have extended periods of below-freezing temperatures or significant snowfall, floods usually occur during the season of highest precipitation or during heavy rainfalls after prolonged dry periods. Ventura County is dry during the late spring, summer, and early fall and receives most of its rain during the winter months. The rainfall season extends from November through April, with approximately 95 percent of the annual rainfall occurring during this period. The average annual rainfall in Ventura County ranges from less than 8 inches in the Cuyama Valley in northwestern Ventura County to 38 inches in the Ventura River watershed west of the City of Ojai. Along the coast near Oxnard, San Buenaventura, Simi Valley, and Thousand Oaks, the average rainfall is approximately 14 inches. The prevailing weather patterns during the winter and the orientation of the mountain ranges in the northern half of the county combine to produce extremely high-intensity rainfall. The peak historic rainfall intensity recorded by a Ventura County rain gage occurred on February 12, 1992. A rainfall intensity of approximately 4 inches per hour was measured during a 15-minute period at the Wheeler Gorge gage, approximately 3 miles northeast of Matilija Dam. Such intensities can produce severe flooding conditions, particularly in small watersheds where flash floods are likely. Flash floods are particularly dangerous. NWS defines a flash flood as one in which the peak flow travels the length of a watershed within a 6-hour period. These floods arise when storms produce a high volume of rainfall in a short period over a watershed where runoff collects quickly. They 4-20 81 Section FOUR Hazards Analysis are likely to occur in areas with steep slopes and sparse vegetation. They often strike with little warning and are accompanied by high-velocity flow. History: Damaging floods in Ventura County were reported as early as 1862. A 1945 report by the Ventura County Flood Control District reported that floods of sufficient magnitude to cause extensive damage occurred in 1862, 1867, 1884, 1911, 1914, 1938, 1941, 1943, and 1944. The largest and most damaging natural floods recorded in the Santa Clara and Ventura watersheds occurred in January and February of 1969. The January flood was a result of the highest monthly precipitation total ever recorded in Ventura County at that time. The February flood was a result of intense rainfall similar in magnitude to the rainfall that caused the record- breaking flood in January. The combined effects of the 1969 floods were disastrous: 13 people lost their lives, and property damage was estimated at$60 million (1969 dollars). Homes in Casitas Springs, Live Oak Acres, and Fillmore were flooded, and 3,000 residents in Santa Paula and several families in Fillmore were evacuated twice. A break in the Santa Clara River levee threatened the City of Oxnard. Agricultural land,primarily citrus groves,was seriously damaged or destroyed. All over the county, transportation facilities, including roads, bridges, and railroad tracks, were damaged. The Fillmore, Oak View, and Ventura sewage treatment plants were severely damaged and dumped raw sewage into the Santa Clara and Ventura rivers. The untreated sewage polluted the rivers and the beaches at their outlets into the ocean. In addition, sewer trunk lines were broken along the Ventura River and its tributary, San Antonio Creek. Suspended sediment concentrations and discharge in many streams greatly exceeded any previously measured levels in the flood-affected areas. Suspended sediment concentrations reached a maximum of about 160,000 milligrams per liter in the Santa Clara River at Saticoy, and the maximum daily sediment discharge was 20 million tons during the storm peak(FEMA 2010a). In 1980, Calleguas Creek breached its levee in the Oxnard Plain and caused approximately $9 million (in 1980 dollars) in damage to the Point Mugu Naval Base from flooding and sediment deposition. In addition, approximately 1,500 acres of farmland were covered by floodwaters. The peak discharge was 9,310 cubic feet per second at the Madera Road Bridge in Simi Valley. In 1983, a federal disaster was declared because of storm damage. Repairs to flood-control facilities have been estimated to cost$15 million(in 1983 dollars). Improved channels in Moorpark and Simi Valley suffered severe damage from erosion during this event, and Calleguas Creek experienced record flooding. Damage to other public and private facilities has been estimated at approximately$39 million, with little more than half of that total due to damage to agricultural lands. Table 4-6 details the major flood events to affect Ventura County over the past 20 years. 4-21 82 Section FOUR Hazards Analysis Table 4-6. Major Disaster Declarations for Floods, 1995-2015 Date De,.cription January 1995 On January 9 and 10,the region was subjected to an intense winter storm that produced more than 6 inches of rain in some areas.A major Disaster Declaration was declared for all but one county throughout California on January 10, 1995. January through A second powerful winter storm brought heavy rain,heavy snow,and strong winds March 1995 throughout much of California from mid-January to mid-March.On January 13,a Major Disaster Declaration was declared for nearly half the counties in California. December 1996 A series of subtropical storms hit California from late December through early January, through January resulting in one of the wettest Decembers on record.On January 4, 1997,a Major Disaster 1997 Declaration was declared for half of the counties in California,including Ventura County. February 1998 El nifio conditions led to extensive flooding throughout California.A Major Disaster Declaration was declared for more than 30 counties,including Ventura County. Countywide damages exceeded$50 million. December 2004 A powerful Pacific storm brought heavy rain,snow,flash flooding,high winds,and through January landslides to Central and Southern California.During the multi-day event,rainfall totals 2005 ranged from 3 to 10 inches over coastal areas,with up to 32 inches in the mountains.A Major Disaster Declaration was declared on February 4,2005,for multiple counties,including Ventura County. Location: Figure F-9 (Appendix F) shows the locations of areas likely to flood and types of flooding in Ventura County, including: • Upland flooding: The mountainous terrain of northern Ventura County and the hills in the central and eastern parts of the county give rise to numerous annual streams, many draining into steep canyons. These streams are subject to floods of relatively short duration, often following high-intensity rainfall. Such floods may occur with little warning and carry large quantities of sediment and debris. Communities adjacent to the upland areas, such as Fillmore, Ojai, Piru, and Santa Paula, are subject to this hazard. Many of the watersheds in question contain dams or basins designed to attenuate flow and trap debris,reducing the effects on downstream communities. • Broad floodplains: The watersheds of the Santa Clara River(watershed area of 1,650 square miles), Ventura River(watershed area of 226 square miles), and Calleguas Creek(watershed area of 325 square miles) drain to the broad coastal plain in the southern part of Ventura County. This plain is subject to inundation during longer intervals of rain, typically as the result of a series of winter storms. These floods typically have longer duration and may be forecast with more warning time. The Santa Clara River Valley,which crosses central Ventura County, is also subject to flooding. Numerous levees have been built to protect the agricultural lands along the river; because of its sediment load, the river has historically migrated across the valley floor during flooding intervals. The levees are typically not sufficient to withstand severe flood events. • Coastal flooding: The County's 43 mile coastline is subject to tidal flooding, storm surge, and wave action, all of which usually occur during winter storms. Areas that are susceptible to severe wave action are generally confined to a narrow area immediately adjacent to the tidal zone, including Sea Cliff Colony, Oxnard Shores, Silver Strand 4-22 83 Section FOUR Hazards Analysis Beach, and several sections of U.S. 101 from Rincon Point to Emma Wood State Park. However,the effects of coastal flooding can be severe—in addition to wave action,beach and bluff erosion can cause significant damage to coast-side homes and infrastructure. Coastal flooding may also occur as the result of tsunamis,which are extreme tidal surges caused by distant earthquakes or massive undersea landslides. In addition to flooding, winter coastal storms can cause minor coastal erosion along the shores of Ventura County. Coastal erosion is a natural process that occurs particularly in the winter, when coastal storms wear away land by wave action,tidal currents, or wave currents. Material deposited on beaches during the mild summer and fall months gets redistributed by the waves. According to City of Ventura engineers,the majority of the sand is pulled just off coast and then comes back to shore over time. Although most receding sand stays fairly close to shore, some sand is driven south by currents until it reaches Hueneme Canyon, a large deep-water depression near the Port of Hueneme. Unmapped flood hazard areas include numerous small channels. Agricultural drainage ditches and urban drains cover much of the flatter parts and urban areas of Ventura County. Flooding in these areas is due to high-intensity rainfall occurring over a very short period. The flooding is usually shallow and mainly affects roadways and other low-lying areas. In particular,the Hollywood Beach and Silver'Strand residential coastal communities have historically experienced localized flooding conditions primarily due to inadequate storm drainage infrastructure and topography(hence,the"Zone B"/"Zone X-Shaded" FEMA designations on the Flood Insurance Rate Maps [FIRMS] /Digital Flood Insurance Rate Map [DFIRMs]). These residential coastal communities (largely built out) are not currently mapped by FEMA in the "Zone VE"coastal high hazard Special Flood Hazard Area(SFHA). These communities have historically been mapped by FEMA as a Zone B and most recently under the DFRIRMs as a Zone X-Shaded (500-year floodplain). Repetitive flood hazard areas are discussed in Section 5.5. Natural and Beneficial Floodplain Functions: The county's floodplains drain into five wetlands, described below. A wetland is an area of land whose soil is saturated with moisture either permanently or seasonally. Such areas may also be covered partially or completely by shallow pools of water. Wetlands include swamps, marshes, and bogs; the water found in wetlands can be saltwater, freshwater, or a mixture of both. • McGrath Lake Wetlands: Located on the western city limits of Oxnard,the McGrath Lake wetlands extend south from the Santa Clara River. A small lake within the wetlands helps to attract more than two hundred species of birds, including black-shouldered kites, northern harriers, owls, and herons; and special-status birds, including ospreys, white wagtails, black skimmers, and peregrine falcons. The Santa Clara Estuary Natural Preserve on the northern boundary of McGrath Lake Park offers a refuge for birds, and habitat for various burrowing animals. In April 2010, the Nature Conservancy, the State of California, and the U.S. Fish and Wildlife Service purchased 141 acres of prime riparian habitat, agriculture fields, and floodplains within the McGrath Lake Wetlands to become part of the Santa Clara River Parkway. The parkway was established to protect and restore the river's floodplain and functions, and to provide recreational opportunities such as hiking and bird watching. 4-23 84 Section FOUR Hazards Analysis • Mugu Lagoon: The Mugu Lagoon is located within Point Mugu Naval Base, 8 miles southeast of the City of Oxnard. The lagoon consists of 1,474 acres of wetlands. Calleguas Creek flows into the lagoon. In addition,there is a tidal connection through an inlet in the barrier beach. There are high concentrations of banned pesticides found in lagoon's sediment. Consequently,the Navy has undertaken several wetland restoration projects since the mid-1990s,resulting in the restoration of several acres of tidal mudflats, sandflats, channels,ponds, salt marsh, and sand islands. There are a number of special-status species that inhabit the lagoon, including Pacific loon, ashy and black storm petrels, American white and California brown pelicans, double-crested cormorant, least bittern,white-faced ibis, fulvous whistling duck, harlequin duck, Barrow's goldeneye, osprey, bald eagle, Swainson's hawk,peregrine falcon, sandhill crane, long- billed curlew, laughing gull, California gull, elegant tern, black tern, black skimmer, rhinoceros auklet, long-billed savannah sparrow, and tricolored blackbird. • Ormond Beach Wetlands: The Ormond Beach wetlands, located in the City of Oxnard between the Port of Hueneme and the Point Mugu Naval Base, support many rare plants and hundreds of species of migratory birds, including the endangered California least tern and Western snowy plover. However, a secondary metal smelter, operating at Ormond Beach over the past 40 years, created such a large amount toxic pollution that the site is now a U.S. Environmental Protection Agency Superfund Site. The California State Coastal Conservancy is spearheading efforts to permanently protect habitat and expand and restore the wetlands and, as of June 2010, had acquired 265 acres of the wetlands. • Santa Clara River Estuary: The 49-acre Santa Clara River Estuary is located at the mouth of the Santa Clara River and the Pacific Ocean near the City of Ventura. The river drains a watershed of approximately 1,600 square miles. The City of Ventura's sewage treatment plant currently discharges up to 9 million gallons per day of tertiary treated wastewater into the Santa Clara River Estuary. This is one of the last remaining estuary discharges in California. The discharge is in conflict with the State Water Resources Control Board's Water Quality Control Policy for the Enclosed Bays and Estuaries of California(Resolution No. 74-43, 1974), which mandates that the discharge of municipal and industrial wastewaters to enclosed bays and estuaries be phased out. Exceptions to this policy are limited to circumstances in which the regional water quality control board finds that the treated wastewater enhances the quality of receiving waters above that which would occur in the absence of the discharge. The City of Ventura has been granted an exception since 1977 on the basis that the treatment plant's discharge enhanced fish and wildlife habitat and non-contact water recreation. However, more recent information regarding the relationship of the discharge to the ecological function of the estuary is considered to be lacking, and the issues associated with the treatment plant's discharge include impacts of nutrient-rich water in the estuary and the artificial hydrology created by this volume of water. In addition,with this discharge,the lagoon fills up and breaches on a more frequent basis than it would under natural conditions. In 2008,the Los Angeles Regional Water Quality Control Board required the City of Ventura, as a condition to continue the current discharge practice,to perform three special studies to evaluate a variety of environmental solutions and estimate the needed financial investment for each solution. The studies have been completed and submitted to the Board for review. 4-24 85 Section FOUR Hazards Analysis • Ventura River Estuary: The 110-acre Ventura River Estuary lies directly west of the City of Ventura. It drains a watershed of approximately 226 square miles. The estuary is home to several special-status species, including California brown pelican, western snowy plover, California least tern, Belding's Savannah sparrow, yellow warbler, yellow- breasted chat,tidewater goby, arroyo chub, steelhead trout, and pallid bat. In 1996, the Ventura River Estuary Enhancement Plan was implemented to restore and enhance the estuary. Measures within the plan included riparian restoration along the river, its floodplain, and the surrounding dunes; recreation of habitat types; habitat protective fencing; and trail soil stabilization. Extent: The magnitude of flooding that is used as the standard for floodplain management in the United States is a flood with a probability of occurrence of 1 percent in any given year. This flood is also known as the 100-year flood or the base flood. The most readily available source of information regarding the 100-year flood, as well as the 500-year flood, is on the FIRMs prepared by FEMA. These maps are used to support the NFIP. FEMA has prepared a countywide DFIRM for the unincorporated areas of Ventura County and for each incorporated city in the county, effective January 20, 2010. Figure F-9 (Appendix F) shows the SFHAs identified in the Ventura County DFIRM. The Ventura County DFIRM identifies the following SFHAs: 7.79 miles in the 100-year"coastal high hazard" flood zone; 78.37 square miles in the 100-year flood zone; and 51.65 square miles in the 500-year flood zone. Probability of Future Events: On average, floods causing major damage within Ventura County occur every 5 years. 4-25 86 Section FOUR Hazards Analysis 4.3.7 Landslide Nature: Landslide is a general term for the dislodging and fall of a mass of soil or rocks along a sloped surface, or for the dislodged mass itself. The term is used for varying phenomena, including mudflows, mudslides, debris flows, rock falls, rock slides, debris avalanches, debris slides, and slump-earth flows. Landslides may result from a wide range of combinations of natural rock, soil, or artificial fill. The susceptibility of hillside and mountainous areas to landslides depends on variations in geology, topography, vegetation, and weather. Landslides may also occur because of indiscriminate development of sloping ground or the creation of cut- and-fill slopes in areas of unstable or inadequately stable geologic conditions. Additionally, landslides often occur together with other natural hazards, thereby exacerbating conditions, as described below: • Shaking due to earthquakes can trigger events ranging from rock falls and topples to massive slides. • Intense or prolonged precipitation that causes flooding can also saturate slopes and cause failures leading to landslides. • Wildfires can remove vegetation from hillsides, significantly increasing runoff and landslide potential. • Landslides into a reservoir can indirectly compromise dam safety; a landslide can even affect the dam itself. Another type of landslide occurs in areas cut by perennial streams. As floodwaters erode channel banks, rivers have undercut clay-rich sedimentary rocks along their south bank, thereby destabilizing the ground and causing the ground above it to slide. History: Landslides have occurred in areas along the Rincon Fault, hillsides south of the Santa Clara River, and the east side of the Ventura River. In recent years, the most damaging landslides in Ventura County have occurred in the coastal community of La Conchita,just southeast of the Santa Barbara county line. La Conchita has been the site of multiple non-earthquake-induced landslides. La Conchita was built on ground that had been graded by the Southern Pacific Railroad after a 1909 landslide slid into the railroad tracks. The land was intended to be a buffer zone between the retreating and eroding cliff and the Pacific Ocean. However, it was subdivided into smaller residential lots in 1924. Along the bluff face above La Conchita, the upper portion of the bluff is underlain by two rock formations separated by the Red Mountain fault. The bluff above La Conchita has been associated with a variety of landslide activity, with historical accounts dating back to 1865. More recently, two small slides occurred in 1988 and 1991, followed by large movements of the same landslide mass in 1995 and 2005. The 1995 landslide, which occurred one month after the heaviest rainfall of an extraordinarily wet year, was considered to be a deep, slow-moving landslide. This landslide destroyed nine houses. The January 2005 event was a shallow and highly fluid remobilization of the same material that carried a thick layer of dry, viscous material. This landslide,which occurred at the peak of an extremely wet 2-week period, killed l 0 people and destroyed 13 homes. Approximately 400,000 tons of debris cascaded down the slope behind the La Conchita housing development. 4-26 87 Section FOUR Hazards Analysis Location: In 2011, CGS created the Susceptibility to Deep-Seated Landslides grip map, covering the entire state of California. The map shows the relative likelihood of deep landsliding based on a methodology developed by Wilson and Keefer(1985), and uses detailed information on: • Landslide inventory, including all previously mapped deep-seated landslides in California (approximately 57,000)that were assigned the lowest value of rock strength. • Geology from a general geologic statewide map and a detailed geologic map over the most populated areas. • Rock strength to measure the resistance to landsliding, developed from geologic and landslide inventory maps. Geologic units were classified into three rock strength units: (1) highest rock strength unit, which includes crystalline rocks and well-cemented sandstones; (2) intermediate rock strength unit, including weakly cemented sandstones; and (3)weakest rock strength unit, including shale, claystone,pre-existing landslides, and unconsolidated surficial units. • Slope, including eight slope classes ranging from nearly flat(less than 3 degrees) to very steep (greater than 40 degrees). • Average annual rainfall in inches. • Earthquake shaking potential. As shown on Figure F-10 (Appendix F),the factors listed above were combined to create classes of landslide susceptibility. These classes express the generalization that on very low slopes, landslide susceptibility is low even in weak materials, and that landslide susceptibility increases with slope and in weaker rocks. Very high landslide susceptibility—classes VIII, IX, and X—includes very steep slopes in hard rocks and moderate to very steep slopes in weak rocks. In Ventura County, areas most susceptible to landslide are generally located on the edge of cities, outside of the cities, and in the northern portion of the county. Each city in the county, with the exception of Port Hueneme, has some land mass in the class VII, IX, and X landslide susceptibility zones. Extent: According to the 2011 Susceptibility to Deep-Seated Landslides grip map, there are 1,111.52 square miles of Ventura County located in the Very High Landslide Susceptibility area, including 174.51 square miles in class VIII, 668.71 square miles in class IX, and 268.30 square miles in class X. Probability of Future Events: Based on the history of landslide occurrences and the potential for landslides as a result of the conditions in the county, future events are likely to occur about once every 10 years. The extent of future events is unknown, but could be similar to historic events: up to 400,000 tons or more of debris could be involved in one event. 4-27 88 Section FOUR Hazards Analysis 4.3.8 Levee Failure Inundation Nature: Levees are typically earthen embankments designed to contain, control, or divert the flow of water to provide some level of protection from flooding. Some levee systems are built for agricultural purposes and provide flood protection and flood loss reduction for farm fields and other land used for agricultural purposes. Urban levee systems are built to provide flood protection and flood loss reduction for population centers and the industrial, commercial, and residential facilities within them. Levees are designed to provide a specific level of flood protection. Agricultural levee systems provide a level of protection that is appropriate based on the value of the assets being protected. Because urban levee systems are designated to protect urban areas, they are generally built to higher standards. Urban levee systems that are shown to provide protection from a 1%annual chance flood occurrence event on a FEMA FIRM must document ongoing compliance with the Federal Levee Certification requirements found in Section 65.10 of the NFIP regulations (i.e., 44 CFR 65.10). No levee system provides full protection from all flooding events to the people and structures located behind it. Some level of flood risk exists in the levee-affected areas. Levee failure is the overtopping, breach, or collapse of a levee wall. Levees can fail because of an earthquake, internal erosion, poor engineering/construction or maintenance, or landslides, but levees most commonly fail as a result of significant flows. During heavy precipitation periods or sudden melting of accumulated snow, excessively large flows may overtop levee sections and cause failure. The overflow of water washes away the top portion of the levee, creating deep grooves. Eventually, the levee weakens, resulting in a breach or collapse of the levee wall and the release of uncontrollable amounts of water. History: The floods of January and February 1969 were the most damaging floods along the Santa Clara River in Ventura County. The estimated peak discharge of the 1969 flood was 165,000 cubic feet per second (cfs), before the gage data adjustment referenced in the Ventura County hydrology report titled Santa Clara River 2006 Hydrology Update: Phase I, From Ocean to County Line (VCWPD 2006)was performed. The following excerpts taken from the United States Army Corps of Engineers (USACE)report entitled Floods in Southern California during January and February, 1969 (USACE 1969) document the significant damage that occurred to the SCR-1 Levee protecting Oxnard, specifically within the reach from Highway 118 to Highway 101. "The only significant damage that occurred during this reach during the January (1969) flood was damage to the revetment of an existing levee constructed by the Corps of Engineers. February flood flows washed out about 500 feet of State Route 118 Bridge, damaged agricultural properties constructed by the Corps of Engineers. ... The flood eroded the south bank(of the Santa Clara River) near the existing Corps levee, damaging some groins; then deflected, ricocheted from the State Route 118 bridge, and returned to the south bank —where the flood flows cut in close to the Corps levee, bounced off the north bank, and carved a long arch.... The flood flows then deflected to south bank where they undercut the toe protection on the Corps levee, causing the failure of about 2,000 feet of levee and eroding the ground behind the levee for a distance of about 100 feet." 4-28 89 Section FOUR Hazards Analysis After the 1969 flood damage, USACE repaired 7 of the original 40 groins (station 330+00 to station 344+50), restored 2,100 linear feet of levee embankment with deeper rock revetment (station 311+00 to station 332+00), and added 35 additional groins (station 246+00 to station 330+00 and station 421+80 to station 436+80),which were completed in 1971. A total of 75 groins are now in place along the reach of the SCR-1 Levee from station 246+00 to station 470+00. In December 1985, the VCWPD restored five groins (between as-built station 316+45 and station 356+45) in the vicinity of the 1969 levee failure location. The damages may have been due to the 1983 flood, with a peak discharge of 100,000 cfs. The damage to the groins was likely due to the low-flow channel encroaching and washing out the top portion of the groin tips. After the 1983 floods,the riverward tips of five groins extending between 40 to 100 feet along the groins were damaged. VCWPD repaired these five groins,which included one of the original 1961 groins constructed by the USACE, and four of those added by VCWPD in 1971 (station 321+00 to station 333+07). The repair included removal of approximately 2 feet of existing rock and placement of 2 tons of rock riprap back to the original design dimensions and backfilling the uncompacted fill. This is the only known non-Corps stone that has been added to the SCR-1 Levee. Location: In November 2009,the VCWPD completed federally mandated engineering evaluations of nine provisionally accredited levees (PALs)within the Calleguas Creek, Santa Clara River, and Ventura River watersheds. At that time,VCWPD submitted Levee Certification Report(LCR) compliance documentation packages to FEMA for three of the nine PAL- designated levees.As shown on Figure F-11 (Appendix F), these levees include the ASR-2 Levee Floodwall along Arroyo Santa Rosa in the unincorporated community of Santa Rosa Valley, the AS-6 Levee along Arroyo Simi in Simi Valley, and the SC-1 Levee along Sespe Creek in Fillmore. At that same time, PAL-Response Reports (PRRs) were also submitted to FEMA for the remaining six PAL-designated levees also shown on Figure F-11 (Appendix F). These are AS-7 along Arroyo Simi in Simi Valley, CC-2 and CC-3 along Calleguas Creek in Camarillo, SCR-1 along the Santa Clara River in Oxnard, VR-1 along the Ventura River in Ventura, and VR-3 in the unincorporated areas of the Ventura River Valley. The PRRs indicated that in their current condition,those six levees could not be certified by the VCWPD before FEMA's November 30, 2009, compliance submittal deadline date. Subsequently,two additional levee systems, SC-2 (the south half of the Sespe Creek levee in Fillmore) and SCR-3 (along the Santa Clara River in Oxnard)were added to the above list of six VCWPD levees requiring rehabilitation work to be fully compliant with Federal levee certification regulations (i.e., 44 CFR 65.10). Also,the VR-2 levee system, along the west bank of the Ventura River,which was originally constructed by the Natural Resources Conservation Service (NRCS) in 1979 to provide flood protection for the unincorporated community of Casitas Springs, was added to the list of VCWPD levees requiring rehabilitation and/or improvement work. Extent: There are 5.17 square miles in Ventura County protected by VCWPD PALs from the 100-year flood. Probability of Future Events: The probability of future levee failures in Ventura County is unknown, but may result from a large winter storm or seismic event. 4-29 90 Section FOUR Hazards Analysis 4.3.9 Post-Fire Debris Flow Nature: Wildfires are a common occurrence in the hills and mountainous regions of Ventura County. By reducing or destroying vegetative cover and altering soil characteristics, fires often result in conditions that can significantly increase runoff and erosion when winter rains begin to fall. These conditions may result in a debris flow(also referred to as mud flow),which is a slurry of water, sediment, and rock that converges in a stream channel. The threats of erosion, flooding, and debris flows are significantly increased by the following processes: • Reduced infiltration and increased runoff: A fire's consumption of vegetative cover increases exposure of the soil surface to raindrop impact. Soil heating destroys organic matter that binds the soil together. Extreme heating may also cause the development of water-repellant, or"hydrophobic," soil conditions that further reduce infiltration. • Changes in hill slope conditions: Fires remove obstructions to overland flow, such as trees, downed timber, and plants, increasing flow velocity and therefore erosive power. Increased sediment movement also fills depressions, reducing storage capacity and further contributing to increased velocity and volume of flow. These factors combine to allow more of the watershed to contribute flow to the flood at the same time, increasing the volume of the flood. • Changes in channel conditions: Increased overland flow and sediment transport result in increased velocity and volume of flow in defined channels. Channel erosion increases, as do peak discharges. The occurrence of erosion, floods, and debris flows in burned areas is also dependent on precipitation intensity—storms with high intensity are more likely to initiate the processes described above and result in flood events. Additionally, easily eroded soils facilitate changes in hill slope conditions and increase the volume of runoff. Both of these conditions are likely to occur in Ventura County. In extreme situations, the conditions described above combine to form a debris flow. These flows are often the most destructive events resulting from heavy rainfall in fire-affected areas. They occur with little warning, carry vast quantities of rock and other material, and strike objects with extreme force. Because of their viscosity and density, debris flows can move or carry away objects as large as vehicles and bridges, and they may travel great distances down canyons and stream valleys. Debris flow fronts may also travel at high speeds, exceeding 50 miles per hour. History: Evidence of debris-flow movement was widespread following the 1969 storms throughout the mountain ranges in Ventura County. Debris flows occurred in numerous watersheds, including Cozy Dell Canyon, Stewart Canyon, Senior Canyon, Orcutt Canyon, Jepson Wash, and others. Mudflows also occurred in 1969 and 1971 in watersheds that were underlain by fine-grained sedimentary rocks and had been more recently burned by wildfires near Ojai. Witnesses to the mudflows described surges of what appeared to be mud covered with water behind a moving boulder. In 2014, two post-fire debris flows occurred in the Camarillo Springs. Around midnight on November 1, 2014, a heavy rain totaling 0.5 inch—the first in Ventura County in many months—unlodged debris and created thick mud from the hills recently burned by the Springs 4-30 91 Section FOUR Hazards Analysis Fire in May 2013. Twenty homes were evacuated, including two homes that were severely damaged. According to the Ventura County Fire Department, a storm drain system that should have prevented the mud and debris from flooding the area apparently filled to capacity, in part because of additional amounts of debris left on the hillside due to Springs Fire. On December 12, 2014, a second debris flow affected Camarillo Springs when a storm dumped 1.8 inches of rainfall over the region. According to the Ventura County Fire Department, 16 homes were damaged, including 10 homes that were red-tagged. Hours before the storm was expected, mandatory evacuations were ordered for 124 homes. County crews had also worked to clear drainage areas before the storm hit and had put up K-rails to direct water and mud away from homes in the projected debris flow area. Location: Areas of Ventura County that have been subject to recent wildfires are susceptible to potentially hazardous debris flows. Areas susceptible to debris flow include localities that are adjacent to and downslope of these burn areas, especially in locations that are in ravines and canyons, and at the mouths of canyons. Figure F-12 (Appendix F) shows wildfire perimeters of concern; this includes wildfires within the last 3 years (Grand and Springs fires), and burnt areas that are recovering slowly(Day fire). Extent and Probability of Future Events: Ventura County has a long history of flooding and wildfires, which are two major factors in the occurrence of post-fire debris flow. However, because a number of complex factors lead to debris flow(basin morphometry, burn severity, soil properties, and rainfall characteristics), the probability and estimate of the volume of post-fire debris flow in Ventura County is unknown. The USGS has developed model predictions that can be calculated at specific basin outlets, and along the draining network within and immediately downstream of a burn area. These models can be applied post- fires to predict the probabilities of debris flows and estimate debris-flow volumes throughout a burn area in response to a specific rainstorm event. 4-31 92 Section FOUR Hazards Analysis 4.3.10 Tsunami Nature: A tsunami is a series of traveling ocean waves of extremely long length, generated by disturbances associated primarily with earthquakes occurring below or near the ocean floor. Subduction zone earthquakes at plate boundaries often cause tsunamis. However,tsunamis can also be generated by submarine landslides, submarine volcanic eruptions, the collapse of volcanic edifices, and—in very rare instances—large meteorite impacts in the ocean. In the deep ocean, a tsunami may have a length from wave crest to wave crest of 100 miles or more but a wave height of only a few feet or less. Thus,the wave period can be up to several hours, and wavelengths can exceed several hundred miles. Therefore, tsunamis are unlike typical wind-generated swells on the ocean, which might have a period of about 10 seconds and a wavelength of up to 300 feet. Tsunamis cannot be felt aboard ships and they cannot be seen from the air in the open ocean. In deep water, the waves may reach speeds exceeding 700 miles per hour. Tsunamis can originate hundreds or even thousands of miles away from coastal areas. Local geography may intensify the effect of a tsunami. Areas at greatest risk are less than 50 feet above sea level and within 1 mile of the shoreline. Tsunamis arrive as a series of successive crests (high water levels) and troughs (low water levels). These successive crests and troughs can occur anywhere from 5 to 90 minutes apart. They usually occur 10 to 45 minutes apart. Tsunamis not only affect beaches that are open to the ocean, but also bay mouths, tidal flats, and the shores of large coastal rivers. Tsunami waves can also diffract around land masses. Because tsunamis are not symmetrical, the waves may be much stronger in one direction than another, depending on the nature of the source and the surrounding geography. However, tsunamis do propagate outward from their source, so coasts in the shadow of affected land masses are usually fairly safe. History: According to the California Tsunami Evacuation Playbook, City of Ventura–Ventura County(No. 2014-Vent-01), and as shown in Table 4-7, there have been eight notable tsunami events run-ups recorded in Ventura County. Table 4-7. Historical Tsunami Run-Ups in Ventura County Year Source/Source Location Tsunami Location Remarks 12/21/1812 Earthquake and Landslide City of Ventura 6.5-foot run-up 4/01/1946 Earthquake—Aleutian Islands,Alaska Port Hueneme 3-foot run-up Ormond Beach 5-foot run-up 11/4/1952 Earthquake -Kamchatka Peninsula Port Hueneme 2-foot run-up 3/09/1957 Earthquake—Aleutian Islands,Alaska Port Hueneme 2-foot run-up 3/28/1964 Earthquake and Landslide—Alaska City of Ventura Tide dropped 8.0 feet Oxnard Large swells 9/29/2009 Earthquake—Samoa Ventura Buoys moved near mouth of harbor 2/27/2010 Earthquake—Chile Ventura,Oxnard,Port Hueneme 3-foot run-up 4-32 93 Section FOUR Hazards Analysis Table 4-7. Historical Tsunami Run-Ups in Ventura County fear Source/Source Location Tsunami Location Remarks Ventura,Oxnard 4-foot run-u 3/11/2011 Earthquake—Japan . Port Hueneme 5-foot run-u. Source:CGS 2014. Run-up=the large amount of water that a tsunami pushes onto the shore above the regular sea level,that is the maximum vertical height onshore above sea level reached by a tsunami Location: Figure F-13 (Appendix F) shows tsunami evacuation areas based on two scenarios— Phase 3 and Maximum Phase—as described in the California Tsunami Evacuation Playbook, City of Ventura–Ventura County. This map illustrates coastal land areas, including areas in the cities of Oxnard, Port Hueneme, and Ventura, that can become submerged due to tsunami run- up. The area of land subject to inundation is a factor of: • Distance of shoreline from the tsunami-generating event • Magnitude of the earthquake causing the event; duration and period of waves • Run-up elevations • Tidal level at time of occurrence • Location along shore and direction of shore in respect to propagated waves • Topography of the seabed Extent: Figure F-13 (Appendix F) shows the Phase 3 Evacuation and Maximum Evacuation Phase, based on models of maximum local and distance tsunamis and for tsunamis coming from the Cascadia Subduction Zone. The Phase 3 Evacuation estimates a tsunami flood level of 1.7 to 5.0 feet above the high tide line, and a tsunami flood level of 7.7 to 11.0 feet above low tide conditions. The Maximum Evacuation Phase estimates a tsunami flood level of more than 5.0 feet above the high tide line, and a tsunami flood level of more than 11.0 feet above low tide conditions. Probability of Future Events: Based on the history of tsunami run-ups in the region and the history of earthquakes in the Pacific Rim, another tsunami event is likely to occur, although the extent and probability is unknown. 4-33 94 Section FOUR Hazards Analysis 4.3.11 Wildfire Nature: A wildfire is an uncontrolled fire that spreads through vegetative fuels, exploding and possibly consuming structures. Wildfires often begin unnoticed, spread quickly, and are usually signaled by dense smoke that may be visible from miles around. Wildfires can be human-caused by arson or campfires, or can be caused by natural events such as lightning. Wildfires can be categorized into four types: • Wildland fires occur mainly in areas under federal control, such as national forests and parks, and are fueled primarily by natural vegetation. • Interface or intermix fires occur in areas where both vegetation and structures provide fuel. These are also referred to as urban-wildland interface fires. • Firestorms occur during extreme weather(typically high temperatures, low humidity, and high winds) with such intensity that fire suppression is virtually impossible. These events typically burn until the conditions change or the fuel is exhausted. • Prescribed fires and prescribed natural fires are intentionally set or natural fires that are allowed to burn for beneficial purposes. The following three factors contribute significantly to wildfire behavior; as described more fully below, these factors can be used to identify wildfire hazard areas: • Topography: As slope increases, the rate of wildfire spread increases. South-facing slopes are also subject to greater solar radiation, making them drier and thereby intensifying wildfire behavior. However, ridgetops may mark the end of wildfire spread because fire spreads more slowly or may even be unable to spread downhill. • Fuel: The type and condition of vegetation plays a significant role in the occurrence and spread of wildfires. Certain types of plants are more susceptible to burning or burn with greater intensity. Dense or overgrown vegetation increases the amount of combustible material available to fuel the fire (referred to as the "fuel load"); the ratio of living to dead plant matter is also important. The risk of fire is increased significantly during periods of prolonged drought as the moisture content of both living and dead plant matter decreases. The fuel's continuity is also an important factor, both horizontally and vertically. • Weather: The most variable factor affecting wildfire behavior is weather. Variables such as temperature, humidity, wind, and lightning can affect chances for ignition and spread of fire. Extreme weather, such as high temperatures and low humidity, can lead to extreme wildfire activity. By contrast, cooling and higher humidity often signals reduced wildfire occurrence and easier containment. Years of precipitation followed by warmer years tend to encourage more widespread fires and longer burn periods. Also, since the mid-1980s, earlier snowmelt and associated warming due to global climate change has been associated with longer and more severe wildfire seasons in the western United States. If not promptly controlled, wildfire may grow into an emergency or disaster. Even small fires can threaten lives and resources and destroy improved properties. It is also important to note that in addition to affecting people, wildfire may severely affect livestock and pets. Such events may require the emergency watering/feeding, shelter, evacuation, and even burying of animals. 4-34 95 Section FOUR Hazards Analysis Wildfires can have serious effects on the local environment. In addition to stripping the land of vegetation and destroying forest resources, large, intense fires can harm the soil, waterways, and the land itself. Soil exposed to intense heat may lose its capacity to absorb moisture and support life. Exposed soils erode quickly and enhance siltation of rivers and streams,thereby enhancing flood potential, harming aquatic life, and degrading water quality. Lands stripped of vegetation are also subject to increased debris flow hazards, as described above. Wildfires can also greatly affect the air quality of the surrounding area. History: Wildfires are a common occurrence in Ventura County. In the last 50 years (1965 through 2015), 23 wildfires, with an extent greater than 10,000 acres, have occurred. Table 4-8 illustrates the 10 largest fires over the last 50 years. Most recently, in May 2013,the Springs fire burned 24,251 acres; 10 structures were destroyed and 12 were damaged, and 10 injuries were recorded. Table 4-8. Ten Largest Ventura County Fires in the Last 50 years, 1965 through 2015 Name Date Acres Affected- Day September 2006 162,702 Simi Valley October 2003 108,204 Piru October 2003 63,991 Ranch** October 2007 58,401 Ferndale October 1985 47,064 Green Meadow October 1993 38,477 Creek Road September 1979 32,000 Steckel October 1993 27,088 Parker Ranch October 1967 25,000 Hopper August 1997 24,793 Source:Cal FIRE 2015 *Acres affected—total acreage. ** Fire occurred in both Ventura and Los Angeles counties. Location: Public Resources Code 4201-4204 and Government Code 51175-89 directed the California Department of Forestry and Fire Protection(Cal FIRE)to map areas of significant fire hazards based on fuels,terrain, weather, and other relevant factors. These zones, referred to as Fire Hazard Severity Zones (FHSZs), are represented as very high, high, or moderate. Specifically, the maps were created using data and models describing development patterns, potential fuels over a 30-to 50-year time horizon, expected fire behavior, and expected burn probabilities. The maps are divided into local responsibility areas and state responsibility areas. Local responsibility areas generally include cities, cultivated agriculture lands, and portions of the desert. Local responsibility area fire protection is typically provided by city fire departments, fire protection districts, counties, and by Cal FIRE under contract to the local government. State responsibility area is a legal term defining the area where the state has financial responsibility for wildfire protection. Incorporated cities and federal ownership are not included. The prevention 4-35 96 Section FOUR Hazards Analysis and suppression of fires in all areas that are not state responsibility areas are primarily the responsibility of federal or local agencies. Figure F-14 (Appendix F) displays the areas of Ventura County most susceptible to wildfires. Within the County, very high FHSZs are located in mountainous or hillside areas (west of Lake Casitas, northeast of Ojai, north of Fillmore, and surrounding Thousand Oaks and Simi Valley), where the greatest fuel density exists; as well as throughout much of the county's large agricultural and cattle-grazing areas. Although these areas are not heavily populated,they are near populated communities. Extent As shown on Figure F-15 (Appendix F), in Ventura County there are 81.87 square miles in the high FHSZ and 504.42 square miles in the very high FHSZ. Probability of Future Events: The climate in Ventura County is characterized as Mediterranean dry-summer featuring cool, wet winters and warm, dry summers. High moisture levels during the winter rainy season significantly increase the growth of plants. However,the vegetation is dried during the long, hot summers, decreasing plant moisture content and increasing the ratio of dead fuel to living fuel. As a result, fire susceptibility increases dramatically, particularly in late summer and early autumn. In addition,the presence of chaparral, a drought-resistant variety of vegetation that is dependent on occasional wildfires, is expected in Mediterranean dry-summer climates. Also, the history of plant succession in Ventura County is important in predicting fire susceptibility. For several years after a fire has occurred, easily flammable herbaceous species predominate and increase the likelihood of new fires. When woody species become re- established, they contribute to a lower overall level of fire susceptibility for approximately 10 years. However, after this period,the slow aging plant community becomes ever more likely to burn because of increased levels of dead plant material and lowered plant moisture levels. In addition,the local meteorological phenomenon known as the Santa Ana winds contributes to the high incidence of wildfires in Ventura County. These winds originate during the autumn months in the hot, dry interior deserts to the north and east of Ventura County. They often sweep west into the county, bringing extremely dry air and high wind speeds that further desiccate plant communities during the period of the year when the constituent species have very low moisture content. The effect of these winds on existing fires is particularly dangerous; the winds can greatly increase the rate at which fires spread. Based on the conditions described above and the history of occurrence in the past, future events are very likely to occur. In the past, fires burning more than 1,000 acres have occurred about every 1 to 3 years. The extent of future events will depend on specific conditions at the time of the fire. 4-36 97 Section FOUR Hazards Analysis 4.3.12 Winter Storm Nature: The climate on California's southern coast is hot Mediterranean, in which summers are hot and dry and winters are cool and damp. A dominating factor in the weather of California is the semi-permanent high pressure area of the North Pacific Ocean, sometimes called the Pacific High. This pressure center moves northward in summer, holding storm tracks well to the north; as a result, California receives little or no precipitation during that period. The Pacific High decreases in intensity in winter and moves farther south, permitting storms to move into and across the state and producing high winds,widespread rain at low elevations, and snow at high elevations. Occasionally the state's circulation pattern permits a series of storm centers to move into California from the southwest. This type of storm pattern is responsible for occasional heavy rains that can cause serious winter flooding. The rainy season is from mid-autumn to mid-spring. During these months, winter storms may occur. In addition to high winds and flooding, winter storms may bring hail, lightning, and extended periods of freezing temperatures to all areas of the county. History: Ventura County was included in the Presidential Disaster Declarations for freezing/ severe winter storms that occurred in December 1998 and January 2007. The 1998 freeze was particularly damaging to citrus crops. According to NOAA's National Climatic Data Center(NCDC) database, 105 storms causing high winds occurred in Ventura County over the last 10 years. These storms included wind speeds of up to 76 miles per hour; in one case, the storm caused a death. Storms with high winds also knocked down trees and power lines. Also according to the NCDC database, 31 winter storms causing snow and ice have occurred in Ventura County over the last 10 years. Some of the storms also caused hail; in addition, two hailstorms have been recorded in Ventura County since 2005,with reported hail of up to 1.5 inches in diameter. Location: Many events described above affected all of Ventura County. The entire county is susceptible to winter storms and damage from wind. However, only the higher elevation areas (typically at or above 4,000 to 5,000 feet) experience snowfall, while lower elevation areas experience heavy rains. Hail has occurred throughout the county. Extent: A winter storm can cause high rains, flooding, up to 18 inches of snow at the highest elevations in the county(e.g., Mount Pinos), and wind speeds of up to 70 miles per hour. Hail of up to 1.5 inches in diameter has been recorded. Probability of Future Events: Based on recent history, a winter storm can occur every year, but those causing injury or damage occur about once every 10 years. 4-37 98 This page intentionally left blank 99 Section FIVE Vulnerability Analysis 5.1 OVERVIEW A vulnerability analysis predicts the extent of exposure that may result from a hazard event of a given intensity in a given area. The analysis provides quantitative data that may be used to identify and prioritize potential mitigation measures by allowing communities to focus attention on areas with the greatest risk of damage. This vulnerability analysis consists of the following steps: • Asset inventory • Methodology • Exposure analysis and summary of impacts • RL properties 5.2 ASSET INVENTORY Land, population, and residential buildings are listed in Table 5-1 for all of Ventura County, including its 10 cities. The critical facilities and infrastructure of local participants (Unincorporated Ventura County, eight cities and nine special districts) are listed in Table 5-1, including the total number of each category of facility or infrastructure. In addition, local participant-specific assets are listed in each local participant-specific appendix. Table 5-1. Summary of Total Assets Land(square miles) 1,832.43 Population 823,262 Residential Buildings 232,414 Commercial fuel distribution facilities 1 Community facilities,including libraries,community centers,and parks 332 Educational facilities, including school buildings and district offices 359 Emergency response facilities,including fire and police stations 89 Government facilities 50 Critical Facilities and Infrastructure Medical and residential care facilities 77 Public utilities, including pump stations,electric substations,potable water facilities,wastewater facilities,wells,dams,reservoirs,debris 515 basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the 158 County of Ventura,airports,and transit stations TOTAL 1,581 5-1 100 Section FIVE Vulnerability Analysis 5.3 METHODOLOGY A conservative exposure-level analysis was conducted to assess the risks associated with the identified hazards. This analysis is a simplified assessment of the potential effects of the hazards on values at risk, without consideration of the probability or level of damage. Due to a combination of a lack of adequate information,the lack of a standard methodology for a quantitative exposure analysis, and limited GIS capabilities, a quantitative exposure analysis has been prepared for the hazards listed in Table 5-2. Table 5-2. Hazards Included in Exposure Analysis Hazards Climate Change(Sea-Level Rise and Combined Storm Landslide Flood Hazard Zones) Dam Failure Inundation Levee Failure Inundation Earthquake(Ground Shaking and Liquefaction) Tsunami Flood Wildfire Population was derived from 2010 Census information, then a combination of spatial overlay and proportional analysis was used to determine the number of people in areas where hazards are likely to occur. Using block-level residential building information from the 2010 Census, a combination of spatial overlay and proportional analysis was used to determine the number of residential buildings located where hazards are likely to occur. Point locations for each critical facility and infrastructure were compared to locations where hazards are likely to occur. For each critical facility/infrastructure in a hazard area, exposure was calculated by assuming the worst-case scenario (that is,the asset would be completely destroyed and would have to be replaced). A similar analysis was used to evaluate the proportion of the population at risk. However, the analysis simply represents the number of people at risk; no estimate of the number of potential injuries or deaths was prepared. Additionally, replacement values and/or insured values are not included for residential buildings due to incomplete data, and are only included for critical facilities/facilities if available. 5-2 101 Section FIVE Vulnerability Analysis 5.4 EXPOSURE ANALYSIS AND SUMMARY OF IMPACTS The local hazard mitigation planning and floodplain management requirements for an MHMP's exposure analysis and corresponding summary of impacts are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element B: Hazard Identification and Risk Assessment B3.Is there a description of each identified hazard's impact on the community as well as an overall summary of the community's vulnerability for each jurisdiction?(Requirement§201.6(c)(2)(ii)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 5: Assess the Problem. A.Summary of each hazard identified in the hazard assessment and their community impact. B.Description of the impacts of hazards on: (1)Life,safety,health,procedures for warning and evacuations (3)Critical facilities and infrastructure (5)The number and type of affected buildings Tables 5-3 through 5-19 include the total exposure analysis by hazard. The exposure analysis details the number and percent of land,population, residential buildings, and critical facilities and infrastructure at risk to a hazard. This information is summarized in the summary of impact statement, which follows each exposure analysis table. In addition, local participant-specific exposure analyses are listed in each local participant-specific appendix. Finally, flood insurance information is provided for Unincorporated Ventura County buildings located in the 1% annual chance (100-year) flood. The impacts of flood hazards on life/safety procedures for warnings and evacuations are also discussed for flood and tsunami. 5-3 102 Section FIVE Vulnerability Analysis 5.4.1 Summary of Impacts to Climate Change (Rising Tides Inundation Areas—2030) While the entire County, including all cities, is vulnerable to climate change, only the areas on the coast are susceptible to effects of rising tides due to climate change. The cities of Oxnard and Ventura as well as Unincorporated Ventura County- are all vulnerable to inundation due to rising tides. As predicted for the year 2030, the following percentages of the population live in a rising tides inundation area: Oxnard, 0.2 percent; Ventura, 0.09 percent; and Unincorporated Ventura County, 0.22 percent. Table 5-3 below illustrates the summary of impacts from rising tides due to climate change on the entire County. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-3. Total: Climate Change Exposure Analysis (Rising Tides Inundation Areas—2030) Category Number %of Total Land(square miles) 6.49 0.35% Population 724 0.09% Residential Buildings 449 0.19% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 7 2.11% centers,and parks Educational facilities, including school buildings and 0 0.00% district offices Emergency response facilities, including fire and police 0 0.00% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 0 0.00% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 10 6.33% stations TOTAL 17 1.08% 5-4 103 Section FIVE Vulnerability Analysis 5.4.2 Summary of Impacts to Climate Change (Combined Storm Flood Hazard Zones— 2030) While the entire County, including all cities, is vulnerable to climate change, only the areas on the coast are susceptible to effects of storm flood hazard zones due to climate change. Combined storm flood zones take into account future coastal erosion, fluvial 100-year storm floodplains, coastal storm wave impact areas, and future sea-level rise. The cities of Oxnard, Port Hueneme, Ventura and Unincorporated Ventura County are all vulnerable to combined storm flooding. As predicted for the year 2030,the following percentages of the population will be located in combined storm flood zone: Oxnard, 5.03 percent; Port Hueneme, 0.16 percent; Ventura, 2.54 percent; and Unincorporated Ventura County, 2.37 percent. Table 5-4 below illustrates the summary of impacts from a combined storm flood event on the entire County. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-4. Total: Climate Change Exposure Analysis (Combined Storm Flood Hazard Zones—2030) Category Number %of Total Land(square miles) 28.43 1.55% Population 14,927 181% Residential Buildings 5,633 2.42% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 22 6.63% centers,and parks Educational facilities,including school buildings and 5 1.39% district offices Emergency response facilities,including fire and police 0 0.00% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 26 5.05% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 15 9.49°%o stations TOTAL 68 4.30% 5-5 104 Section FIVE Vulnerability Analysis 5.4.3 Summary of Impacts to Dam Failure Inundation There are 16 state regulated dams within Ventura County as well as 5 state regulated dams outside of the County that can lead to inundation of Ventura County. The entire County is vulnerable to inundation from dam failure(s), but the area's most susceptible to dam failure inundation include those locations along the Santa Clara River, including Fillmore and Santa Paula, and the cities of Oxnard, and Port Hueneme. Accordingly, the following percentages of the population are located within dam failure inundation zones: Camarillo, 37.02 percent; Fillmore, 85.65 percent; Moorpark, 39.94 percent; Ojai, 2.86 percent; Oxnard, 100 percent; Port Hueneme, 100 percent; Santa Paula, 85.88 percent; Simi Valley, 30.77 percent; Thousand Oaks; 3.81 percent; Ventura, 27.77 percent; and Unincorporated Ventura County, 27.35 percent. Table 5-5 below illustrates the summary of impacts from dam failure inundation on the entire County. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. It is important to note that this summary reflects the impacts due to failure of all dams with inundations areas in Ventura County, which is not ever anticipated to occur. Table 5-5. Total: Dam Failure Inundation Exposure Analysis Category Number % of Total Land(square miles) 189.17 10.32% Population 394,416 47.91% Residential Buildings 94,511 40.66% Commercial fuel distribution facilities 1 100.00% Community facilities,including libraries,community 147 44.28% centers,and parks Educational facilities, including school buildings and 174 48.47% district offices Emergency response facilities,including fire and police 53 59.550/0 stations Critical Facilities and Government facilities 33 66.00% Infrastructure Medical and residential care facilities 31 40.26% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 166 32.23% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 98 62.03% stations TOTAL 703 44.47% 5-6 105 Section FIVE Vulnerability Analysis 5.4.4 Summary of Impacts to Earthquakes (Severe Ground Shaking) All of Ventura County is vulnerable to ground shaking from an earthquake and the entire County is in the severe, violent or extreme ground shaking potential categories. Areas of severe ground shaking are found in the south eastern corner of the County and the northern portion of the County, which is sparsely populated. Severe ground33 shaking is anticipated for 0.02 percent of Simi Valley's population, 0.66 percent of Thousand Oak's population and 2.88 percent of Unincorporated Ventura County's population. Table 5-6 below illustrates the summary of impacts from earthquake shaking on the entire County, when looking at areas of severe ground shaking. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-6. Total: Earthquake Exposure Analysis (Severe Ground Shaking) Category Number %of Total Land(square miles) 15.16 0.83% Population 3,563 0.43% Residential Buildings 1,099 0.47% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 3 0.90% centers,and parks Educational facilities,including school buildings and 0 0.000/0 district offices Emergency response facilities,including fire and police 0 0.00% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities, including pump stations,electric substations,potable water facilities,wastewater facilities, 0 0.00% wells,dams,reservoirs,debris basins hydrostations, meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 0 0.00% stations TOTAL 3 0.19% 5-7 106 Section FIVE Vulnerability Analysis 5.4.5 Summary of Impacts to Earthquakes (Violent Ground Shaking) All of Ventura County is vulnerable to ground shaking from an earthquake and the entire County is in the severe, violent or extreme ground shaking potential categories. Areas of violent ground shaking are found throughout the County, but the cities of Camarillo, Moorpark, Ojai and Thousand Oaks are almost entirely or entirely in the violent ground shaking zone. Violent ground shaking is anticipated for 97.40 percent of Camarillo's population; 89.18 percent of Moorpark's population; 100 percent of Ojai's population; 20.40 percent of Oxnard's population; 0.12 percent of Santa Paula's population; 49.64 percent of Simi Valley's population; 99.34 percent of Thousand Oak's population; 25.34 percent of Ventura's population; and 70.92 percent of Unincorporated Ventura County's population. Table 5-7 below illustrates the summary of impacts from earthquake shaking on the entire County, when looking at areas of violent ground shaking. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure Table 5-7. Total: Earthquake Exposure Analysis (Violent Ground Shaking) Category Number '%,of Total Land(square miles) 1,157.57 63.17% Population 437,604 53.15% Residential Buildings 133,671 57.51% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 210 63.25% centers,and parks Educational facilities,including school buildings and 191 53.20% district offices Emergency response facilities,including fire and police 46 51.69% stations Critical Facilities and Government facilities 21 42.00% Infrastructure Medical and residential care facilities 41 53.25% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 338 65.63% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 87 55.06% stations TOTAL 934 59.08% 5-8 107 Section FIVE Vulnerability Analysis 5.4.6 Summary of Impacts to Earthquakes (Extreme Ground Shaking) All of Ventura County is vulnerable to ground shaking from an earthquake and the entire County is in the severe, violent or extreme ground shaking potential categories. Areas of extreme ground shaking are found throughout the County, but the cities of Fillmore, Oxnard, Santa Paula, and Ventura are almost entirely or entirely in the extreme ground shaking zone. Extreme ground shaking is anticipated for 2.60 percent of Camarillo's population; 100 percent of Fillmore's population; 10.82 percent of Moorpark's population; 79.60 percent of Oxnard's population; 65.87 percent of Port Hueneme's population; 99.88 percent of Santa Paula's population; 50.34 percent of Simi Valley's population; 74.35 percent of Ventura's population; and 26.01 percent of Unincorporated Ventura County's population. Table 5-8 below illustrates the summary of impacts from earthquake shaking on the entire County, when looking at areas of extreme ground shaking. This includes the level of impact to the County's landmass,population, residential structures, and the critical facilities and infrastructure. Table 5-8. Total: Earthquake Exposure Analysis (Extreme Ground Shaking) Category Number %of Total Land(square miles) 659.67 36.00% Population 381,564 46.35% Residential Buildings 97,306 41.87% Commercial fuel distribution facilities 1 100.00% Community facilities,including libraries,community 115 34.64% centers,and parks Educational facilities,including school buildings and 168 46.80% district offices Emergency response facilities, including fire and police 43 48.31% stations Critical Facilities and Government facilities 29 58.00% Infrastructure Medical and residential care facilities 42 54.55% Public utilities, including pump stations,electric substations,potable water facilities,wastewater facilities, 167 32.43% wells, dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports.and transit 71 44.94% stations TOTAL 636 40.23% 5-9 108 Section FIVE Vulnerability Analysis 5.4.7 Summary of Impacts to Earthquakes (Liquefaction) The entire County of Ventura, including all cities, is susceptible to liquefaction, but those most vulnerable are those locations along the Santa Clara river and those in the valley area which extends from Camarillo to Port Hueneme. All or almost all residents of Fillmore, Oxnard and Port Hueneme are in the liquefaction susceptibility areas. The following percentages of the population live in liquefaction susceptible areas: Camarillo, 23.10 percent; Fillmore, 97.81 percent; Moorpark, 48.64 percent; Ojai, 11.48 percent; Oxnard, 99.99 percent; Port Hueneme, 100 percent; Santa Paula, 34.74 percent; Simi Valley, 42.10 percent; Thousand Oaks; 2.79 percent; Ventura, 40.26 percent; and Unincorporated Ventura County, 32.23 percent. Table 5-9 below illustrates the summary of impacts from liquefaction on the entire County. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-9. Total: Earthquake Exposure Analysis (Liquefaction) Category Number '%.of Total Land(square miles) 211.39 11.54% Population 406,454 49.37% Residential Buildings 99,538 42.83% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 145 43.67% centers,and parks Educational facilities,including school buildings and 170 47.35% district offices Emergency response facilities, including fire and police 49 55.06% stations Critical Facilities and Government facilities 37 74.00% Infrastructure Medical and residential care facilities 46 59.74% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 187 36.31% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 118 74.68% stations TOTAL 752 47.56% 5-10 109 Section FIVE Vulnerability Analysis 5.4.8 Summary of Impacts to Flood (100-Year Flood Zone) Flooding affects areas all throughout Ventura County. Areas of likely flooding are defined by a 100-year and a 500-year flood zone. While the entire County has population in the 100-year flood zone,the cities of Camarillo, Santa Paula and Simi Valley are most vulnerable. The following percentages of the population live in the 100-year flood zone: Camarillo, 8.33 percent; Fillmore, 2.73 percent; Moorpark, 5.95 percent; Ojai, 3.24 percent; Oxnard, 0.31 percent; Port Hueneme, 0.45 percent; Santa Paula, 37.53 percent; Simi Valley, 11.79 percent; Thousand Oaks, 1.45 percent; Ventura, 0.5 percent; and Unincorporated Ventura County, 6.76 percent. Table 5-10 below illustrates the summary of impacts of flooding on the entire County,when looking at the 100-year flood zones. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-10. Total: Flood Exposure Analysis (100-Year Flood Zone) Category Number %of Total Land(square miles) 78.37 4.28% Population 43,311 5.26% Residential Buildings 12,801 5.51% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 30 9.04% centers,and parks Educational facilities,including school buildings and 19 5.29% district offices Emergency response facilities, including fire and police 3 3.37% stations Critical Facilities and Government facilities 1 2.00% Infrastructure Medical and residential care facilities 3 3.90% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 82 15.92% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 107 67.72% stations TOTAL 245 15.50% Additional Flood Insurance Information: Not including public utilities (basins, wells, gages and dams) and bridges, there are four facilities owned by Unincorporated Ventura County that are located within the 100-year floodplain, including: Todd Road Jail; Piru Family Medical Center, Santa Paula Medical Center and the Ventura County Airport. In addition, there are two Ventura County Fire District facilities (stations #22 and#25) located in this hazard area. All of the facilities mentioned above have flood insurance. Not including bridges, there is only one 5-11 110 Section FIVE Vulnerability Analysis facility(La Jenelle Park) owned by Oxnard that is located within the 100-year floodplain. Since the park is not an actual facility, it does not have flood insurance. Additional Life/Safety Information: As described in CRS Activity 610, the VCWPD operates and maintains a Flood Threat Recognition System also known as the Flood Warning System (Annex A). The Flood Warning System is made of self-reporting rain and stream gages placed in strategic locations to provide real-time data for monitoring storms and flooding conditions. The gages provide warnings for each water course and basin across Ventura County, including each city. Each stream gage has an Advance Hydrologic Prediction System display to show the current stream level, predicted level(s), and warning levels. Alarm criteria are set by specific thresholds for each gage on rainfall intensity and stream/river flows. Once an alarm is triggered, the alarm message is sent via e-mail,pager text, SMS cell text, and Twitter message to emergency personnel in the Ventura County Storm Operation Centers and the Emergency Operation Center. The staff at the operation centers can provide hydrologic knowledge on how the channels are responding to the storm and can clarify any discrepancies between observed peaks and forecasted peaks for the Ventura County Sheriffs (OES) and other local agencies that execute warnings and evacuations. The Twitter message is sent to a public account and can be monitored by the public, emergency personnel, and NWS. 5-12 111 Section FIVE Vulnerability Analysis 5.4.9 Summary of Impacts to Flood (500-Year Flood Zone) While the entire County has people that reside in the 500-year flood zone,the people living in the cities of Camarillo, Moorpark, Ojai, Oxnard, Port Hueneme, and Santa Paula are most vulnerable. The following percentages of the population live in the 500-year flood zone: Camarillo, 28.62 percent; Fillmore, 0.02 percent; Moorpark, 24.39 percent; Ojai, 27.05 percent; Oxnard, 34.96 percent; Port Hueneme, 94.24 percent; Santa Paula, 24.52 percent; Simi Valley, 4.1 percent; Thousand Oaks, 0.77 percent; Ventura, 3.19 percent; and Unincorporated Ventura County, 12.11 percent. Table 5-11 below illustrates the summary of impacts of flooding on the entire County, when looking at the 500-year flood zones. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-11. Total: Flood Exposure Analysis (500-Year Flood Zone) Category Number %of Total Land(square miles) 51.65 2.82% Population 146,882 17.84% Residential Buildings 34,996 15.06% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 51 15.36% centers,and parks Educational facilities,including school buildings and 64 17.83% district offices Emergency response facilities, including fire and police 27 30.34% stations Critical Facilities and Government facilities 11 22.00% Infrastructure Medical and residential care facilities 17 22.08% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 49 9.51% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 23 14.56% stations TOTAL 242 15.31% 5-13 112 Section FIVE Vulnerability Analysis 5.4.10 Summary of Impacts to Landslides (Susceptibility Class VIII) The entire County is susceptible to landslide, but most of the areas susceptible to landslide are not highly populated. High landslide susceptibility is broken up into three classes, VIII, IX and X. The following percentages of the population live in landslide susceptibility Class VIII areas: Camarillo, 0.5 percent; Fillmore, 0.23 percent; Moorpark, 4.55 percent; Ojai, 0.74 percent; Simi Valley, 3.29 percent; Thousand Oaks; 4.07 percent; Ventura, 0.04 percent; and Unincorporated Ventura County, 2.71 percent. Table 5-12 below illustrates the summary of impacts from landslides on the entire County,when looking at susceptibility Class VIII areas. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-12. Total: Landslide Exposure Analysis (Susceptibility Class VIII) Category Number %of Total Land(square miles) 174.51 9.52% Population 13,803 1.68% Residential Buildings 4,534 1.95% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 6 1.81% centers,and parks Educational facilities,including school buildings and 2 0.56% district offices Emergency response facilities,including fire and police 1 1.12% stations Critical Facilities and Government facilities 1 2.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 27 5.24% wells,dams,reservoirs,debris basins hydrostations, meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 0 0.00% stations TOTAL 37 2.34% 5-14 113 Section FIVE Vulnerability Analysis 5.4.11 Summary of Impacts to Landslides (Susceptibility Class IX) As noted in the section above, most of the areas in the County that are susceptible to landslide are not highly populated. High landslide susceptibility is broken up into three classes, VIII, IX and X. The following percentages of the population live in landslide susceptibility Class IX areas: Camarillo, 2.5 percent; Fillmore, 1.07 percent; Moorpark, 6.65 percent; Ojai, 1.34 percent; Oxnard, 0.01 percent; Santa Paula, 1.61 percent; Simi Valley, 3.79 percent; Thousand Oaks; 7.26 percent, Ventura, 2.47 percent; and Unincorporated Ventura County, 6.63 percent. Table 5-13 below illustrates the summary of impacts from landslides on the entire County, when looking at susceptibility Class IX areas. This includes the level of impact to the County's landmass,population, residential structures, and the critical facilities and infrastructure. Table 5-13. Total: Landslide Exposure Analysis(Susceptibility Class IX) Category Number %of Total Land(square miles) 668.71 36.49% Population 27,445 3.33% Residential Buildings 9,428 4.06% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 19 5.77% centers,and parks Educational facilities,including school buildings and 1 0 28% district offices Emergency response facilities, including fire and police 1 1.12% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 52 10.10% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 4 2.53% stations TOTAL 77 4.87% 5-15 114 Section FIVE Vulnerability Analysis 5.4.12 Summary of Impacts to Landslides (Susceptibility Class X) The following percentages of the population live in landslide susceptibility Class X areas: Camarillo, 1.67 percent; Fillmore, 1.04 percent; Moorpark, 1.51 percent; Ojai, 0.13 percent; Santa Paula, 0.97 percent; Simi Valley, 0.55 percent; Thousand Oaks; 1.93 percent; Ventura, 3.13 percent; and Unincorporated Ventura County, 2.88 percent. Table 5-14 below illustrates the summary of impacts from landslides on the entire County,when looking at susceptibility Class X areas. This includes the level of impact to the County's landmass,population, residential structures, and the critical facilities and infrastructure. Table 5-14. Total: Landslide Exposure Analysis (Susceptibility Class X) Category Number %of Total Land(square miles) 268.30 14.64% Population 11,248 1.37% Residential Buildings 3,951 1.70% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 8 2.41% centers,and parks Educational facilities,including school buildings and 3 0.84% district offices Emergency response facilities, including fire and police 0 0.00% stations Critical Facilities and Government facilities 3 6.00% Infrastructure Medical and residential care facilities 1 1.30% Public utilities, including pump stations,electric substations,potable water facilities,wastewater facilities, 41 7.96% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 4 2.53% stations TOTAL 60 3.80% 5-16 115 Section FIVE Vulnerability Analysis 5.4.13 Summary of Impacts to Levee Failure Inundation (Reduced Flood Risks Due to Levees) The hazard of levee failure inundation is discussed in Section 4.3.8. There are 5.31 square miles in Ventura County protected by VCWPD provisionally-accredited levees from the 100-year flood. Levees are located throughout the County, but the City of Fillmore receives the most benefit from levees. The following percentages of the population have a reduced flood risk due to levees: Fillmore, 47.39 percent; Oxnard, 3.61 percent; Simi Valley, 1.76 percent; Ventura, 4.25 percent; and Unincorporated Ventura County, 0.55 percent. Table 5-15 below illustrates the summary of impacts of a reduced flood risk due to VCWPD provisionally-accredited levees. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-15. Total: Levee Failure Inundation Exposure Analysis (Reduced Flood Risks Due to Levees) Category Number %of Total Land(square miles) 5.17 0.29% Population 21,514 2.61% Residential Buildings 5,217 2.24% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 8 2.41% centers,and parks Educational facilities,including school buildings and 8 2.231)/0 district offices Emergency response facilities, including fire and police 5 5.62% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 5 6.49% Public utilities, including pump stations,electric substations,potable water facilities,wastewater facilities, 7 1.36% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 0 0.00% stations TOTAL 33 2.09% 5-17 116 Section FIVE Vulnerability Analysis 5.4.14 Summary of Impacts to Tsunami Inundation (Phase 3) In general the entire coastal area of Ventura County is vulnerable to run-up from a tsunami. In particular, the areas along the coast of the cities of Ventura, Oxnard, and Port Hueneme and select areas of Unincorporated Ventura County are of most concern. The County has established two tsunami evacuation zones, one for a Phase 3 Evacuation and one for a Maximum Evacuation Phase. The following percentages of the population live in the evacuation zone for a Phase 3 Evacuation: Oxnard, 1.21 percent; Port Hueneme, 4.46 percent; Ventura, 1.88 percent; and Unincorporated Ventura County, 3.0 percent. Table 5-16 below illustrates the summary of impacts of a tsunami on the entire County, when looking at a Phase 3 Evacuation. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-16. Total: Tsunami Inundation Exposure Analysis (Phase 3) Category Number %of Total Land(square miles) 9.85 0.54% Population 8,199 0.99% Residential Buildings 3,852 1.66% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 12 3.61% centers,and parks Educational facilities,including school buildings and 0 0.00% district offices Emergency response facilities,including fire and police 1 1.12% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 18 3.50% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 9 5.70% stations TOTAL 40 2.53% Additional Life/Safety Information: As outlined in the Draft 2014 California Tsunami Evacuation Playbook, City of Ventura—Ventura County, a tsunami warning will be issued for a Phase 3 Evacuation (5.0 feet to 8.2 feet). For a Phase 3 Evacuation, evacuations will generally include beaches, piers, and harbor docks and boats. Warning messages will be transmitted by Warning Centers over the NOAA Weather Wire system directly to other Warning Centers, and to the Coastal NWS Forecast Offices and their Area of Responsibility's State Warning Centers. The local NWS Office is in Oxnard and serves Ventura County. Cal OES operates California's 5-18 117 Section FIVE Vulnerability Analysis State Warning Center in Sacramento. Some messages will be transmitted automatically based on seismic event magnitude and location, and followed shortly by more detailed information (after review by scientists at the Tsunami Warning Centers). Generally, a message will be generated within 5 minutes of the seismic event. Messages will be recorded for transmission of the Emergency Alert System and local National Weather Radio sites. There is no fixed, audible warning system that covers the entire 42 miles of the county's coastline. Emergency vehicle (and helicopter)public address systems and sirens may be used to alert residents of the need to evacuate. Warnings may not be possible in the event of a tsunami generated by a local seismic event, and will not be available if a tsunami is generated by a local nonseismic event(subaerial or subsea landslide). 5-19 118 Section FIVE Vulnerability Analysis 5.4.15 Summary of Impacts to Tsunami Inundation (Maximum Phase) In general the entire coastal area of Ventura County is vulnerable to run-up from a tsunami. In particular, the areas along the coast of the cities of Ventura, Oxnard, and Port Hueneme and select areas of Unincorporated Ventura County are of most concern. The County has established two tsunami evacuation zones, one for a Phase 3 event and one for a Maximum Evacuation Phase. The following percentages of the population live in the evacuation zone for a Maximum Evacuation Phase: Oxnard, 3.66 percent; Port Hueneme, 6.99 percent; Ventura, 4.59 percent; and Unincorporated Ventura County, 3.83 percent. Table 5-17 below illustrates the summary of impacts of a tsunami on the entire County, when looking at a Maximum Evacuation Phase. This includes the level of impact to the County's landmass,population, residential structures, and the critical facilities and infrastructure. Table 5-17. Total: Tsunami Inundation Exposure Analysis (Maximum Phase) Category Number % of Total Land(square miles) 13.84 0.76% Population 17,266 2.10% Residential Buildings 8,225 3.54% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 25 7.53% centers,and parks Educational facilities, including school buildings and 2 0.56% district offices Emergency response facilities,including fire and police 1 1.12% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 27 5.24% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 11 6.96% stations TOTAL 66 4.17% Similar to a Phase 3 Event, a tsunami warning will be issued for a Maximum Evacuation Phase (8.2 ft. or greater). For a Maximum Evacuation Phase, evacuations will also generally include beaches, piers, and harbor docks and boats. Warning messages will follow the same protocol outlined in Section 5.4.14. Limitations of the system, including impacts of local-sourced tsunamis, are also described in Section 5.4.14. 5-20 119 Section FIVE Vulnerability Analysis 5.4.16 Summary of Impacts to Wildfires (High Fire Severity Zone) The entire County is vulnerable to wildfire, however the area of most concern are along the wildland-urban interface (the zone of transition between unoccupied land and human development). Cal FIRE has developed three FHSZ, including moderate, high and very high. Very little of the County's population falls within the high FHSZ. Accordingly, 0.04 percent of Ojai's population; 0.03 percent of Santa Paula's population; and 3.89 percent of Unincorporated Ventura County's population reside in the high fire severity zone. Table 5-18 below illustrates the summary of impacts that wildfire has on the entire County, within the high FHSZ. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-18. Total: Wildfire Exposure Analysis (High FHSZ) Category Number %of Total Land(square miles) 81.87 4.47% Population 3,682 0.45% Residential Buildings 1,410 0.61% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 3 0.90% centers,and parks Educational facilities,including school buildings and 4 1.11% district offices Emergency response facilities,including fire and police 0 0.00% stations Critical Facilities and Government facilities 0 0.00% Infrastructure Medical and residential care facilities 0 0.00% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 16 3.11% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 7 4.43% stations TOTAL 30 1.90% 5-21 120 Section FIVE Vulnerability Analysis 5.4.17 Summary of Impacts to Wildfires (Very High Fire Severity Zone) The populations that live in the very high FHSZ are mainly located in the cities of Moorpark, Simi Valley, Thousand Oaks, as well as Unincorporated Ventura County. The following percentages of the population live in the very high FHSZ: Camarillo, 4.99 percent; Fillmore, 9.74 percent; Moorpark, 44.0 percent; Ojai, 11.26 percent; Santa Paula, 4.49 percent; Simi Valley, 27.67 percent; Thousand Oaks, 43.06 percent; Ventura, 11.38 percent; and Unincorporated Ventura County, 37.08 percent. Table 5-19 below illustrates the summary of impacts that wildfire has on the entire County within the very high FHSZ. This includes the level of impact to the County's landmass, population, residential structures, and the critical facilities and infrastructure. Table 5-19. Total: Wildfire Exposure Analysis (Very High FHSZ *) Category Number %of Total Land(square miles) 504.42 27.53% Population 157,918 19.18% Residential Buildings 51,867 22.32% Commercial fuel distribution facilities 0 0.00% Community facilities,including libraries,community 81 24.40% centers,and parks Educational facilities,including school buildings and 42 11.70% district offices Emergency response facilities, including fire and police 16 17.98% stations Critical Facilities and Government facilities 8 16.00% Infrastructure Medical and residential care facilities 7 9.09% Public utilities,including pump stations,electric substations,potable water facilities,wastewater facilities, 211 40.97% wells,dams,reservoirs,debris basins hydrostations,meter stations,and stream and river gages Transportation infrastructure,including bridges maintained by the County of Ventura,airports,and transit 23 14.56% stations TOTAL 388 24.54% * Very high FHSZ include both Local Responsibility Areas and State Responsibility Areas. 5-22 121 Section FIVE Vulnerability Analysis 5.5 REPETITIVE LOSS PROPERTIES The local hazard mitigation planning requirements for RL properties are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans [lenient B: Hazard Identification and Risk Assessment B4.Does the Plan address NFIP insured structures within the jurisdiction that have been repetitively damaged by floods?(Requirement§201.6(c)(2)(ii)) A RL property is a NFIP-insured structure that has had at least two paid flood losses of more than$1,000 each in any 10-year period since 1978. A Severe RL(SRL)property consists of any NFIP-insured property that has met at least one of the following paid flood loss criteria since 1978, regardless of ownership: (1) four or more separate claim payments of more than $5,000 each (including building and contents payments); or(2)two or more separate claim payments (building payments only)where the total of the payments exceeds the current market value of the property. In either case,two of the claim payments must have occurred within 10 years of each other. Table 5-20 shows the number of RL and SRL properties by jurisdiction and Figure F-19 (Appendix F) shows the approximate location of RL and SRL properties as of June 20, 2015. The VCWPD has identified 12 repetitive flood areas throughout the Unincorporated Ventura County. These areas correspond with the RL and SRL properties identified in Figure F-19 (Appendix F). The repetitive flood areas are as follows: areas 1-4 are along the Ventura River; areas 5-6 are located along the coast(Rincon Beach/Solimar Beach) near Santa Barbara County; area 7 is located along the Santa Clara River/City of Santa Paula; area 8 is located outside of the City of Oxnard in the Nyeland Acres community; area 9 is located along the coast bordering Los Angeles County; area 10 by Lake Sherwood; area 11 is located outside of Simi Valley next to Los Angeles County; and area 12 is located outside of the City of Camarillo along the Arroyo Las Posas. Table 5-20. Repetitive Loss Properties National Count/Severe Community Name RL Properties Total RL Properties Ventura County 59 4 63 City of Camarillo 0 0 0 City of Fillmore 0 0 0 City of Moorpark 0 0 0 City of Ojai 0 1 1 City of Oxnard 0 0 0 City of Port Hueneme 0 0 0 City of Santa Paula 3 0 3 City of Simi Valley N/A N/A N/A City of Thousand Oaks 5 0 5 5-23 122 Section FIVE Vulnerability Analysis Table 5-20. Repetitive Loss Properties National Count/Severe Community Name RL Properties Total RL Properties City of Ventura 7 1 8 TOTAL 74 6 80 Source:FEMA Region IX:May 2015. N/A=Not Available 5-24 123 Section SIX Capability Assessment 6.1 OVERVIEW A capability assessment identifies and evaluates the human and technical, financial, and legal and regulatory resources available for hazard mitigation; and describes the current, ongoing, and recently completed mitigation projects. 6.2 CAPABILITY ASSESSMENT The local hazard mitigation planning and floodplain management requirements for a capability assessment are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element C: Mitigation Strategy Cl.Does the Plan document each jurisdiction's existing authorities,policies,programs and resources and its ability to expand on and improve these existing policies and programs?(Requirement§201.6(c)(3)) C2.Does the Plan address each jurisdiction's participation in the NFIP and continued compliance with NFIP requirements, as appropriate?(Requirement§ 201.6(c)(3)(i)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 5: Assess the Problem C.Review of all damaged buildings/flood insurance claims Capability assessment tables for each local participant, including human and technical, financial, and legal and regulatory resources, are provided in the participant-specific appendix of this plan (Appendices G—W). Additional information about the expansion and improvement of an existing policy or program is also included in the legal and regulatory resource tables. Finally, each appendix lists current and recently completed mitigation projects and programs. As noted in Section 1, Unincorporated Ventura County and its cities participate in the NFIP. The NFIP makes federally backed flood insurance available to homeowners, renters, and business owners in communities that adopt and enforce floodplain management ordinances to reduce future flood damage. As participants of the NFIP, Unincorporated Ventura County and each of its cities enforce a floodplain management ordinance and participate in FEMA's Community Assisted Visits, which occur on a 3-to 5-year cycle. Specifics regarding the floodplain manager and floodplain management ordinance for Unincorporated Ventura County and each city are contained in the capability assessment tables provided in each participant-specific appendix of this plan. Table 6-1 lists the date of the initially mapped FIRM,the emergency/regular program entrance date into the NFIP, and the number of policies in force as of March 31, 2015. A review of all flood insurance claims for Unincorporated Ventura County and the City of Oxnard is listed below as well. 6-1 124 Section SIX Capability Assessment Table 6-1. Date of Initially Mapped FIRM and Emergency/Regular Program Entrance Date into NFIP for Unincorporated Ventura County and Cities Emergency/Regular Date of lnitialh Mapped Program Entrance Date into Community Name FIRM NFIP #of Policies in Force Unincorporated Ventura October 31, 1985 October 31, 1985 1,405 County City of Camarillo September 29, 1986 September 29, 1986 1,192 City of Fillmore October 17, 1978 October 17, 1986 104 City of Moorpark September 29, 1986 September 29, 1986 220 City of Ojai October 17, 1978 October 17, 1978 63 City of Oxnard March/1, 1979 March 1, 1979 432 City of Port Hueneme September 24, 1984 September 24, 1984 46 City of Santa Paula April 15, 1980 April 15, 1980 1070 City of Simi Valley September 27, 1991 September 27, 1991 1,756 City of Thousand Oaks September 29, 1978 September 29, 1978 295 City of Ventura September 29, 1986 September 29, 1986 294 Source:FEMA n.d.(Frank Mansell) There are 1,405 policies and $374,637,100 of insurance in force in Unincorporated Ventura County as of March 31, 2015. The 1,405 insurance policies are broken out as follows: 1,234 single-family units; 33 2-to 4-family units; 25 all other residential units, and 113 nonresidential units. Since Unincorporated Ventura County joined the NFIP in 1985, 476 paid losses have been made for a total of$9,345,209. The 476 losses are broken out as follows: 404 single-family units; 22 2-to 4-family units; 3 all other residential units; and 47 nonresidential units. In the City of Oxnard, there are 432 policies and $139,506,600 of insurance in force as of March 31, 2014. The 432 insurance policies are broken out as follows: 386 single-family units; 14 2- to 4-family units; 18 all other residential units, and 14 nonresidential units. Since the City of Oxnard joined the NFIP in 1979, 44 paid losses have been made for a total of$235,777. The 44 losses are broken out as follows: 35 single-family units; 2 2-to 4-family units; 0 all other residential units; and 7 nonresidential units. 6-2 125 Section SEVEN Mitigation Strategy 7.1 OVERVIEW A mitigation strategy includes the identification of mitigation goals and actions that will reduce the risks of each hazard and vulnerability to the local population and built environment for each local participant. In accordance with local mitigation planning requirements, this mitigation strategy consists of the following steps: • Update of local hazard mitigation goals • Review of the 2010 MI-IMP's local participants' mitigation action plans • Identification of new and updated mitigation actions • Prioritization of the 2015 MHMP's local participants' mitigation actions • Implementation of the 2015 MHMP's local participants' mitigation action plans In addition, this section addresses the following floodplain management planning activities for the VCWPD: • Set Goals • Review possible activities • Draft an action plan 7.2 UPDATE OF LOCAL HAZARD MITIGATION GOALS The local hazard mitigation planning requirements and floodplain management planning activities for updating local hazard mitigation goals are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element C: Mitigation Strategy C3.Does the Plan include goals to reduce/avoid long-term vulnerabilities to the identified hazards? (Requirement§ 201.6(c)(3)(i)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 6: Set Goals Goals Should address all the major hazards that face the community as well as all flood-related problems identified in Step 5 (Assess the Problem). Mitigation goals are defined as general guidelines that explain what a community wants to achieve in terms of hazard and loss prevention. Goal statements are typically long-range, policy- oriented statements representing community-wide vision. Table 7-1 shows the updated mitigation goals that were developed to reduce or avoid long-term vulnerability to hazards. 7-1 126 Section SEVEN Mitigation Strategy Table 7-1. Mitigation Goals Goal Number Goal Description 1 Minimize loss of life,injury,and damage to property,the economy,and the environment from the hazards identified in the 2015 MHMP through emergency preparedness,response,and recovery actions. 2 Build and enhance local mitigation capabilities to reduce the hazards identified in the 2015 MHMP.This will help ensure individual safety,reduce damage to public buildings,increase awareness/participation in the NFIP,and guarantee continuity of emergency services. 7.3 REVIEW OF THE 2010 MHMP MITIGATION ACTION PLAN The local hazard mitigation planning requirements for reviewing the 2010 MHMP's mitigation action plans are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element D: Plan Review, Evaluation,and Implementation D2.Was the Plan revised to reflect progress in local mitigation efforts?(Requirement§201.6(d)(3)) During the 2015 MHMP update process, each local participant reviewed its 2010 mitigation action plan to determine which mitigation actions had been completed, deleted, deferred, or are ongoing. Mitigation actions are activities, measures, and/or projects that help achieve the goals of a mitigation plan. The results of this review, shown in each participant-specific capability assessment, illustrate the progress of participants in their local mitigation efforts over the 5 years. For the VCWPD, an annual review of its mitigation action plan and that of Unincorporated Ventura County since the 2010 MHMP was adopted by the Ventura County Board of Supervisors; the review is provided in Appendix X. 7.4 IDENTIFICATION OF NEW AND UPDATED POTENTIAL MITIGATION ACTIONS The local hazard mitigation planning requirements and floodplain management planning activities for identifying and updating the 2010 MHMP's potential mitigation actions are as follows: Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element C: Mitigation Strategy C4.Does the Plan identify and analyze a comprehensive range of specific mitigation actions and projects for each jurisdiction being considered to reduce the effects of hazards,with emphasis on new and existing buildings and infrastructure?(Requirement§201.6(c)(3)(ii)) 7-2 127 Section SEVEN Mitigation Strategy Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 7: Review Possible Activities A.Preventative activities. B.Floodplain management regulatory/current and future conditions. C.Property protection activities. D.Natural resource protection activities. E.Emergency services activities. F.Structural projects. G.Public information activities. Similar to the 2005 and 2010 MHMP planning process, the MHMP Planning Committee developed overarching potential mitigation actions for all local participants. These potential mitigation actions are listed in Table 7-2. In addition, each local participant identified other participant-specific potential mitigation actions through the review of existing resources; identification of past success stories and best management practices; and solicitation of input from pertinent departments, including planning, public works, building and safety, code enforcement, watershed protection, and emergency management staff. Additional local participant-specific potential mitigation actions are provided in each local participant-specific appendix. As shown in Table 7-2, for each potential mitigation action,the following information is listed: mitigation action description; mitigation action category(which includes local plans and regulations, structure and infrastructure projects, natural systems protection, and education and awareness programs); hazard(s)addressed; and type of development affected by mitigation action. For the VCWPD (on behalf of Unincorporated Ventura County) and the City of Oxnard, the following information is listed for each potential mitigation action: mitigation action description; floodplain management activity(which includes preventive, property protection, natural resource protection, emergency services, structural projects, and public information); hazards(s) addressed; and a review of each mitigation action (which includes: pros/cons, capability to fund and implement, and implementation status). 7-3 128 Mit v N - CO u_ i 6.C/2 C= 0 O U w tip O = Of = 0 a) a> x „o a -0 co OD on tO E WC 0C E O C iU U U fs. G. 0. bD k tIA )G •k• •k 0.0 a i 041 01 04 C¢ ¢ ¢ W C W C z z z w z w z z z CAw U U O a) a) O O b a a V, 0 a) 0 a) aa> b 0 as -0 0) -0 0 I. o o o o onc CO 0 � 0 o o 0 0 ai C C O. ' .p Y 4. 0 os ▪ 0 CI 0 co o ° °� o b 3 o ca -0 3 -ts >, o a) P. c ars: za w ¢ za za w ¢ w ¢ �..acC v) S r`n - 00 0 C C a) a)ediI on a) 'O .� > a rn - ..0 0 c�C) x a ice, = = o y C) 0 C a :a- 0 0 Cr Cr i). ° � •� c2i a •0 ccs c� . tv _ c m a) ttl y a) . .c es ^ o o C at ¢ ¢ a; v ¢ A; v U Aw A A w w C • -0 4r f0 (ri to y y `� Y a) ? cn WI a) lin CI - a _y o15 LL - L -• 0 �, •a U `� = ° .- :� >•, 0 30 -c - - sem S 0 VS 0 .47 .• � — s U ..., 0 cn lap 5 c X I: -� 0 b cal) a. k W Z ,do y d 3 3 w Z gs = •w w z Z Z Y v) O a) a) Z„+ OAp •.. o a) mo" � ) b a) ° =C � >_c >. yamo y • U La s.. U bA = •O ++ O ,-awQW d c/a v� �. -a a4 up ... ac/D Za 0 OA o w cn u • ':~ N N q = as a) 2 c'3 .d L ca -0 ^4 .0 -0 u, it o 'O CP 0 o° °o o° o w w w w w ,-a a - ^0 vi 4•. •i+ U 0 s0. 0 ° A vi 0ci) •O .4 0 r . >+ O '0. a) ami O N s, '� v, O s. 0 a fa. 8 C20a to 2 0 v; a. ° ° � U §„ � \N . O a3 E, O o {. i•-)” U .r4.. " O N" Us 0 0 + el 21, cei.. O � . ro a- � 'C + y .ry 0h CA CA C . ., 0 v n , mil q U cl bA 7' O = „ .0 0 ".+ a0. v) 0 C 'II 0 0 .7 C.a O •^ a ' ... a) a, = 0 3a �, c � �.� o bAs � , os ,4 � � Ua o E 0 = vs a � � o, T V. to L` �_ w a 0 o cn > a) ani a) 0 0 E 0 -0 al c 3 0 u, e a) 3 b0 c ❑ r/›] 0 :c a71 o •= 4, -0 a ce U 0 0 •C.”' 0 aa) ate) s. y "p ^) .ice' "6 F+ �N f�i d " cg ° CC a y y .'� v0i 0 V 0 0 �' _ bA 0 a) d z CY al r� wtr. v.% (.1.., 'CI �.� a .5 .2 y Soo °= � 0 -0 d) = •° Q � =0 0 0� 04.0 f1 a, U a) 'ca •.• U v:- °� C `1 .5 0 al O a) 0 ci,C 0 C c� W p rn = sC) - .I - . CI 0 E 0 8 03a-c = = — ma a s n CO a� o o 0 0 0 0 3 ° v o o, o cd ° - +-e c.. 0 o _ a) Q) = A o o 0 ,... U = o ace . r d o. 3 3 vA � v� oma . 0 -o O i- * * * ela z O O O O O O O COD 130 m N p W u i61) 3 Orn _ - ^• er4) ai0y . O= O op p C N p v 'O as C Y N O N o 0 OD OD ci W d 4) sem. -d C Ecn ? 0.0a/ 44 ^ >G X 4 53 — a, 3 z o x � � a) Z w .0 z 2 Z Z 0 b Y •U O 'o N = v et 03zo 1 Z o on o `c2 0-P.,- 0 0 WI 0 V) oa ni 6.)0 -a, aai P... et � � ° j5 © -. dw . d, I- Za Q3' wci tt • 3 - E o o MI _ .E a: a) a s_' c z.. 0 "0 --0 -0 ae 3 3 3 3 Y as ct 0 «f ) boOp U wO UN OA .+ 0O c 3 o0 2 ° E . . 00 p •e., s el ' 1 aL .-. n • w n 0 nd •^ 00 0 ay., 0 0 t• -o E0 3O pp "' y 0 s. Ycd . -ID y tiVoto w0 . -p OCI 0 0 Mt 2 = 0 iNtri 0 ow o w a^ E °- cil 0 +- .o l ao „ . o 3o ' �moo � � 000 > 003 . 2 • ca ^ ✓ c .r ° y cd 3 .° aso 0w°. a to °° � � a ° 3o id LE k E E 70 ,E 3c40o � c a LU nwb-6.4' ) 0 > N O V .... 4 N b O O ti O U. v ° � 0 a] cd O Ct. o 'E s Mb3' -o a) -o 0 o 3 3 0 • oD o 0 oa= pi) .•. , - sr � � o .' = -azDo i . ¢ >- > ,, to w0R. 'ow p9 0 0a35 0 03 a) : QC C a > obDN- c . w � ° ., > 0 = -o5 0 . oN 0 'G 'O Uo Z a) et p o . 2 a C C 0 0 w cd W Lli otooaE 000 a :� � � > w 0111 'v �aiei0 , 03to 2 ga0y 46uUW p L O N > V a 0s E g y °aiE •,yu> oC g Y U U o U .5 = . waa : A cd ov 3= 0 V. p > v * 0 O a, * N N N N II lOOOH 0 0 * O 131 Section SEVEN Mitigation Strategy 7.5 PRIORITIZATION OF THE 2015 MHMP MITIGATION ACTIONS The requirements for the prioritization of mitigation actions, as stipulated in DMA 2000 and its implementing regulations, are described below. Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element D: Plan Review, Evaluation,and Implementation D3.Was the plan revised to reflect changes in priorities?(Requirement§201.6(d)(3)) Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element C: Mitigation Strategy C5.Does the Plan contain an action plan that describes how the actions identified will be prioritized(including cost benefit review),implemented,and administered by each jurisdiction?(Requirement§ 201.6(c)(3)(iv)); (Requirement§ 201.6(c)(3)(iii)) After the list of potential mitigation actions had been developed,the local participants determined which potential mitigation actions should be included in their local plan participant- specific mitigation action plans. This process included the following steps: • Local participants began by reviewing the list of overarching potential mitigation actions; overarching mitigation actions could be applicable to the County and a variety of cities/special districts. • Local participants then determined if there were mitigation actions specific to their city or special district that they would also like to consider. If so,these mitigation actions were added to that jurisdictions list of potential mitigation actions. • Then local participants were asked to narrow the list down to a manageable number of mitigation actions,mitigation actions that have a decent chance of being pursued in the next five years. This narrowed down list would be comprised of the high-priority projects and would become each local participant's "Mitigation Action Plan." - To narrow down the list local participants were asked to consider the information obtained in their capability assessment(their human/technical resources, financial resources, and legal/regulatory resources), as well as the Hazard Mitigation Assistance (HMA)Program requirements (Table 7-3). - It was encouraged to consider the HMA Program requirements because mitigation actions/projects that meet the HMA Program requirements have the greatest chance of leading to enhanced project scoping and the lowest probability of experiencing HMA funding delays. - The narrowed down list of selected mitigation actions is considered each local participant's list of high-priority projects. Projects not selected as high-priority projects may be considered at a later date for implementation if the priority projects have been completed or deferred or additional funding sources have become available. 7-7 132 Section SEVEN Mitigation Strategy Table 7-3. Priority Project Criteria (HMA Program Requirements) Requirement Description Mitigation Planning Links the existing mitigation plan,particularly the vulnerability analysis and capability assessment,to project scoping. Technical Feasibility and Conforms with accepted engineering practices,established codes,standards, Effectiveness modeling techniques,or best practices.Effective mitigation measures funded under HMA should provide a long-term or permanent solution. Floodplain Management and Conforms to 44 CFR Part 9,which incorporates the requirements of Executive Order Protection of Wetlands (EO) 11988(Floodplain Management)and EO 11990(Protection of Wetlands). Environmental Planning and Complies with all environmental and historic preservation laws and with 44 CFR Historic Review and Part 10. Compliance Cost-Effectiveness Is cost-effective or would be in the interest of the NFIP. Cost Review Is reasonable in costs compared to the probable benefits. General Program Is an eligible activity,including property acquisition and structure demolition, Requirements property demolition and structure relocation,structure elevation,mitigation reconstruction,dry floodproofing of historic residential structures,dry floodproofing of nonresidential structures,minor localized flood reduction projects,structural retrofitting of existing buildings,non-structural retrofitting of existing buildings and facilities,infrastructure retrofit,soil stabilization,wildfire mitigation,and post- disaster code enforcement. 7.5.1 2015 MHMP Local Participant-Specific Mitigation Action Plans Each local participant selected priority projects to include in its mitigation action plan(provided in each local-participant-specific appendix, Appendix G—W). As noted above, priority projects are projects that meet the HMA guidance program requirements identified in Table 7-3. Emphasis in this process was placed on cost-effectiveness and technical feasibility and effectiveness. The following information has been included for local-participant-specific mitigation action plans: mitigation action number and description, facility to be mitigated (if known and/or applicable), department/agency to oversee the implementation of the mitigation action,potential funding source, and implementation timeframe. Also, for the VCWPD and City of Oxnard,the mitigation action plan identifies the mitigation goal associated with each priority project. 7-8 133 Section EIGHT Plan Maintenance 8.1 OVERVIEW This section describes a formal plan maintenance process to ensure that the 2015 MI-IMP remains an active and applicable document. It includes an explanation of how the Ventura County Project Management Team intend to organize its efforts to ensure that improvements and revisions to the 2015 MHMP occur in a well-managed, efficient, and coordinated manner. The following three process steps are addressed in detail below: • Monitoring, evaluating, and updating the MHMP • Implementation through existing planning mechanisms • Continued public involvement In addition, revisions made from the 2010 MHMP plan maintenance section to the 2015 MHMP plan maintenance section are discussed below. 8.2 MONITORING, EVALUATING, AND UPDATING THE PLAN The local hazard mitigation planning and floodplain management planning requirements for monitoring, evaluating, and updating the MHMP are as follows. Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element.a: Planning Process A6.Is there a description of the method and schedule for keeping the plan current(monitoring,evaluating,and updating the mitigation plan within a 5-year cycle?(Requirement§201.6(c)(4)(1)) Regulation Checklist—CRS 510 Floodplain Management Planning CRS Step 10: Implement. EN aluate and Revise. A.Procedures to monitor and recommend revisions. B. Same planning committee or successor committee that qualifies under Section 511.a.2(a)does the evaluation. The Ventura County Project Management Team will take the lead on monitoring, evaluating, and updating the 2015 MHMP through the following activities (the Ventura County Sheriff's OES Assistant Director will lead these efforts for the MI-MP Committee, and VCWPD Floodplain Manager& CRS Coordinator will lead these efforts for the FMP Committee). • Monitoring: Every 12 months from plan adoption, the Ventura County Project Management Team will email each member of both planning committees an Annual Review Questionnaire to complete. As shown in Appendix X, the Annual Review Questionnaire evaluation of the following: planning process, hazard analysis, vulnerability analysis, capability assessment, and mitigation strategy. • Additionally, mitigation actions will be monitored and updated through the use of the Mitigation Project Progress Report. During each annual review, each department or agency currently administering a mitigation project will submit a progress report to the 8-1 134 Section EIGHT Plan Maintenance Ventura County Project Management Team to review and evaluate. For projects that are being funded by a FEMA mitigation grant, FEMA quarterly reports may be used as the preferred reporting tool. As shown in Appendix X, the progress report will discuss the current status of the mitigation project, including any changes made to the project, identify implementation problems, and describe appropriate strategies to overcome them. • Evaluating: The Ventura County Project Management Team will collect all completed questionnaires and determine if the 2015 MHMP needs to be updated to address new or more threatening hazards, new technical reports or findings, and new or better-defined mitigation projects. The Ventura County Project Management Team will summarize these findings and email them out to both planning committees. As done with the 2010 MHMP, the Project Management Team will submit this annual report to the Ventura County Board of Supervisors as part of the CRS recertification process (See Appendix X, for the 2011, 2012, 2013 and 2014 annual reports). In addition, for the annual review of the 2015 MHMP, the report will be posted to the MHMP website for public review. If the Ventura County Project Management Team believes that the 2015 MHMP needs to be updated based on the findings, then a request will be made to the planning committees to attend a formal MHMP update meeting. A media release will be issued that the update process has begun. • Updating: To ensure that this update occurs, on the fourth year following plan adoption, the Ventura County Project Management Team will apply for funding or secure local funding to assist in the next MHMP update. Six months prior to the five year adoption date, the Ventura County Project Management Team will organize both planning committees to kick-off the next MHMP update. The process for the update will follow the process identified in Section 3. 8.3 IMPLEMENTATION THROUGH EXISTING PLANNING MECHANISMS The local hazard mitigation planning requirements for integrating the MHMP into other planning mechanisms are as follow. Regulation Checklist—44 CFR 201.6 Local Mitigation Plans [lenient C: \litigation Strategy C6.Does the Plan describe a process by which local governments will integrate the requirements of the mitigation plan into other planning mechanisms, such as comprehensive or capital improvement plans,when appropriate? (Requirement§201.6(c)(4)(iii)) After the adoption of the 2015 MHMP, the Ventura County Project Management Team and planning committees will work to incorporate applicable elements of the 2015 MHMP into other existing planning mechanisms. The processes for incorporating the 2015 MHMP into various planning documents will occur as (1) other plans and policies are updated and(2) new plans and policies are developed. Therefore, Unincorporated Ventura County and the other local participants will undertake and/or continue to undertake the following activities: 8-2 135 Section EIGHT Plan Maintenance • Incorporate information from the hazard analysis and mitigation strategy sections in the 2015 MHMP into the update of the safety element in their respective general plans.As noted in Section 3, the 2015 MHMP is concurrently being updated with the Ventura County General Plan: Hazards Appendix. • Use information from the hazard analysis and vulnerability analysis sections in 2015 MHMP for the update of their respective emergency operation or emergency response plans. • Use information from the vulnerability analysis section in 2015 MHMP to develop and/or continue to develop emergency preparedness public information and related outreach efforts. • Use information from the vulnerability analysis (specifically the RL properties analysis) in the 2015 MHMP to develop CRS-eligible activities and reduce the number of RL properties throughout the county. • Refer to their respective mitigation action plans when updating their respective capital improvement plans/programs. 8.4 CONTINUED PUBLIC INVOLVEMENT The requirements for continued public involvement, as stipulated in the DMA 2000 and its implementing regulations, are described below. Regulation Checklist—44 CFR 201.6 Local Mitigation Plans Element A: Planning Process A5.Is there discussion of how the community(ies)will continue public participation in the plan maintenance process?(Requirement§ 201.6(c)(4)) The Ventura County Project Management Team and the planning committees are dedicated to involving the public directly in the continual reshaping and updating of the 2015 MHMP. A downloadable copy of the 2015 MHMP and any proposed changes or updates will be posted on the 2015 MHMP website (hap:,/www.venturacountymhmp.com). The 2015 MHMP website will also contain an e-mail address and phone number to which people can direct their comments or concerns. Additionally,the County's CRS website (CRS Activity 330—www.vcfloodinfo.com) is linked to the 2015 MHMP website. As noted above, the Ventura County Project Management Team will continue to oversee implementation, examine the annual review questionnaires and project progress reports, modify the implementation strategy and process as needed, and update the MI-IMP as required. The Ventura County Project Management Team will also identify opportunities to raise community awareness about the 2015 MHMP and the hazards that affect the county. This effort could include attendance and provision of materials at county and city-sponsored events, programs and public mailings. Any public comments received regarding the 2015 MHMP will be collected by the Ventura County Project Management Team included in the annual report, and considered during future MHMP updates. 8-3 136 This page intentionally left blank 8-2 137 Section NINE References Association of Bay Area Governments. 2003.Modified Mercalli Intensity Scale. http://www.abag.ca.gov/bayarea/egmaps/doc/mmi.html (accessed September 2010). Barnes, Lynn. 2003. Geologists Identify Areas of Ventura at Risk Following Major Quakes. Los Angeles Times. http://articles.latimes.com/2003/jul/12/local/me-seismic12 Biasotti, Tony. 2010.Storm damages Ventura Pier; county braces for more rain. Ventura County Star. Available at: http://www.vcstar.com/news/2010/jan/19/new-storm-arrives- this-morning/ Cal-Adapt. 2013.What is Climate Change? http://cal-adapt.org/blog/2011/apr/13/what-is- climate-change/ Cal-Adapt. 2015.Wildfire: Fire Risk Map. http://cal-adapt.org/fire/(accessed July 2015). Cal-Adapt.2015. Temperature: Extreme Heat Tool. http://cal-adapt.org/temperature/heat/ (accessed July 2015). Cal-Adapt.2015. Precipitation: Decadal Averages Map. http://cal-adapt.org/precip/decadal/ (accessed July 2015). California Department of Conservation. 2008.New Seismic Hazard Zone Map for Ventura County. Department of Conservation NR 2003-18. http://www.conservation.ca.gov/index/news/2003%20News%20Releases,Pages/NR2003- 18 Ventura Seismic Hazard Zone Map.aspx California Department of Food and Agriculture. 2007. Program Highlights Report. California Department of Forestry and Fire Protection (Cal FIRE), Fire and Resource Assessment Program (FRAP). Ventura County Fire Hazard Severity Zone (FHSZ) Maps. http://www.fire.ca.gov/fire prevention/fire prevention wildland zones maps.php California Division of Safety of Dams. 2010. Listing of Dams. http://www.water.ca.gov/damsafetyiindex.cfm (accessed September 2010). California Geological Survey(CGS). 2003. Seismic Hazard Zones, Seismic Hazard Zonation Program. July 2003. http://www.conservation.ca.gov/cgs/shzp/Documents/SHZ FactSheet.pdf CGS. 2008. Earthquake Shaking Potential for California, Map Sheet 48. Revised 2008. http://www.consrv.ca.gov/cgs/information/publications/ms/Documents/MS48_revised.pd f CGS. 2010. 2010 Fault Activity Map of California. Sacramento: California Geological Survey. http://www.quake.ca.gov/gmaps/FAM/faultactivitymap.html CGS. 2011. Susceptibility to Deep-Seated Landslides in California, Map Sheet 58. 2011. http:iiwww.conservation.ca.gov/cgslinformation/publications/ms%documents/ms58.pdf CGS. 2012. Update for Ventura County, Release of Official Maps of New and Revised Earthquake Fault Zones. September 21, 2012. CGS. Magnitude 4 and greater Earthquakes (1769—2000). CGS. Digital Database of Quaternary and Younger Faults, Version 2.0 9-1 138 Section NINE References California Governor's Office of Emergency Services (Cal OES). 2013. California State Enhanced Multi-Hazard Mitigation Plan (SHMP). http://www.caloes.ca.gov/cal-oes- I divisions/hazard-mitigation/hazard-mitigation-planning/state-hazard-mitigation-plan Cal OES. 2015. Dam Inundation Distribution DVD, Version 11-3. Obtained May 6, 2015. Carlson, Cheri, and Adam Foxman. 2010.Small Tornado Hits East Ventura. Ventura County Star. http://www.vcstar.com/news/2010%an/21/authorities-brace-for-another-day-of- storms/ Federal Emergency Management Agency. 2010(a). Flood Insurance Study and Flood Insurance Rate Maps, Ventura County, California and Incorporated Areas. Federal Emergency Management Agency. 2010(b).Flood Insurance Study and Flood Insurance Rate Maps, Ventura County, California and Incorporated Areas Debris and Detention Basins, September 2005. Ventura County Watershed Protection District. Federal Emergency Management Agency. 2010(c). Levee System Information for Stakeholders. Federal Emergency Management Agency(FEMA), Region IX. Ventura County Digital Flood Insurance Rate Map (DFIRM), Version 20150319. Federal Emergency Management Agency(FEMA). Hazus-MH 2.2, January 12, 2015. Federal Emergency Management Agency.No date. Community Status Book Report: California, Communities Participating in the National Flood Program. http://www.femagov/cis/CA.html (accessed June 2015). Foxman, Adam. 2010.Heaviest Rainfall in Years Predicted. Ventura County Star. http://www.vcstar.com/news/2010/j an/15/big-rains-coming-sunday-night-forecasters-say/ Holland, Don. 1998. Floods Nothing New to Ventura County;Storms Slug Area, But It's Been Worse. Los Angeles Daily News. http://www.thefreelibrary.com/FLOODS+NOTHING+NEW+TO+VENTURA+COUNT Y%3B+STORMS+SLUG+AREA,+BUT+IT'S+BEEN...-a083 812654 Jibson, Randall. 2005. Landslide Hazards at La Conchita, California. U.S. Geological Survey Open-File Report 2005-1067. Kelley, Daryl. 1998. Storm Damage in County Tops$50 Million. Los Angeles Times. http://articles.latimes.com/1998/feb/25/news/mn-22805 Lloyd, Jonathan. 2010. City-by-City Storm Roundup.NBC Los Angeles. http://www.nbclosangeles.com/weather/stories/Storm-Roundup-82174627.html National Climatic Data Center. 2015. Storm Events Database http://www.ncdc.noaa.gov/stormevents/(accessed June 2015). National Oceanic and Atmospheric Administration(NOAA)National Geophysical Data Center (NGDC). 2010.NOAA/WDC Historical Tsunami Database at NGDC. http://www.ngdc.noaa.gov/hazard/tsu db.shtml (accessed June 2010). National Oceanic and Atmospheric Administration(NOAA).No date(b). Heavy Precipitation Event, Southern California, January 7-11, 2005. NOAA National Weather Service. http://www.cnrfc.noaa.gov/storm_summaries/jan2005storms.php (accessed June 2010). 9-2 139 Section NINE References National Weather Service. 2010. Office of Climate, Weather, and Water Services. Tsunami: The Great Waves. Brochure. http://itic.ioc- unesco.org/index.php?option=com content&view=article&id=1169&Itemid=20 17 (accessed June 2010). North, John. 2010. Storm's Fierce, Rogue Waves Rock Ventura Pier.ABC Local News—Los Angeles. http://abclocal.go.com/kabc/story?section=weather&id=7229535 Ojai Valley Fire Safe Council. 2010. Ventura County Community Wildfire Protection Plan (accessed May 2010). Pachauri, R.K., and Reisinger, A. 2007. Climate Change 2007: Synthesis Report. Fourth Assessment Report on the Intergovernmental Panel on Climate Change. http://www.ipcc.ch/publications and data/publications ipcc fourth assessment report s ynthesis report.htm Paulson, R.W., E.B. Chase,R.S. Roberts, and D.W. Moody, Compilers. 1991.National Water Summary 1988-89 Hydrologic Events and Floods and Droughts: U.S. Geological Survey Water-Supply Paper 2375. Seib,Al. 2010. Latest Storm Brings Tornado-Like Winds, Floods Roads and Causes Small Mudslides in Foothill Communities. Los Angeles Times. hap://latimesblogs.latimes.com/lanow/2010/01/new-storm-brings-twisters-floodings- modest-mudslides.html Southern California Earthquake Data Center(SCEDC).Historical Earthquakes &Significant Faults of Southern California. http://scedc.caltech.edu/significant/(accessed June 2015). SCEDC. Southern California Seismic Network(SCSN) Catalog Search(1932—Present). Su, Vincent. 2008. FEMA Flood Insurance Rate Map Updates in the Santa Clara River. Watershed. Santa Clara River Watershed Times. County of Ventura. W ar I�I http://portal.countyofventura.org/portal/page/portal/ceo/divisionshra/ C/Libr y/IRWM Planning/SCRW Docs (accessed June 2010). The Nature Conservancy. 2014. Coastal Resilience, Coastal Hazards Mapping. July 2014. http://maps.coastalresilience.org/california/# Uniform California Earthquake Rupture Forecast. 2007. U.S. Census Bureau. 2010. Ventura County Census Block, 2010 Census Population Count. USACE(United States Army Corps of Engineers). 1969. Floods in Ventura Southern California during January and February, 1969. U.S. Department of Agriculture. 2006.National Agricultural Statistics Service. U.S. Geological Survey. 2002.National Seismic Hazard Maps. U.S. Geological Survey. 2008(a). California Landslide Damage Sites. http://landslides.usgs.gov/recentiarchives/elnino/map.php (accessed June 2010). U.S. Geological Survey. 2009. The Modified Mercalli Intensity Scale. http://earthquake.usgs.gov/learn/topics/mercalli.php (accessed September 2010). 9-3 140 Section NINE References U.S. Geological Survey. 2010.Life of a Tsunami. http://walrus.wr.usgs.gov/tsunami/basics.html (accessed June 2010). Ventura County. 2005. 2005 Ventura County General Plan. http://www.ventura.org/rma/planning/General Plan/general plan.html Ventura County. 2013. Ventura County General Plan Hazard Appendix. http://www.ventura.org/rma/planning/pdf/plans/General Plan Hazards Appendix Octob er 22 2013.pdf Ventura County Fire Protection District. 2015. Fire History Geodatabase. Obtained June 3, 2015 Ventura County, Office of Agricultural Commissioner. 2013. Ventura County's Crop & Livestock Report 2013. http://vcportal.ventura.org/AgComm/docs/crop- reports/2013 CropReport.pd f Ventura County Sheriff, Office of Emergency Services. 2010. Ventura County Operational Area Tsunami Evacuation Plan. Ventura County Watershed Protection District. 2005. Debris and Detention Basins. September 2005. VCWPD (Ventura County Watershed Protection District). 2006. Santa Clara River 2006 Hydrology Update: Phase I, From Ocean to County Line. VCWPD, December 2006. Ventura County Watershed Protection District. 2010. VCWPD Hydrologic Data Server. http://portal.countyofventura.org/portal/page/portal/PUBLIC_WORKS/Watershed_Prote ction District Watersheds Coalition of Ventura County. 2014. 2014 Drought Grant Proposal. Attachment 2: Drought Impacts. http://www.water.ca.gov/irwm/grants/docs/Archives/Prop84/Submitted Applications/P8 4 2014Drought/County%20of%20Ventura%20(201498760015)/Attachment%202%20- %20Att2 DG Impact 1 of2.pdf Wilson, Jeff. 2005. Huge Mudslide Fatal in Ventura County. The San Diego Union Tribune. http://www.signonsandiego.com/uniontrib/200501 1 1/news 7n11 storm.html 9-4 141 Appendix F Figures 142 This page intentionally left blank 143 H CD Him lie i ,,,,, °` o = _.. - ,a s 9 ray fig `-. 1. ` .,::.7.! �`.; R o r ! .. tz"TMS.. • uP , _a. ,,, ,y ' 0i '. MP` . a � i ti 3 r.. '. --.,L '''sr,e' , „isis.,4:. . ... .: . . . , , .. : , ... , . :..., 1._ .. ..,. " c_ „, ,, .. . , s, . . , , ,...4,..... r. ,_. , , ...,„+. ,,,,,,,,t,,,,. -- 4*,,,,,,,, _:-.4 -:--7,,,,,iri- ----,,-, _ . _0/ 77 da to 3/ y ` 4'+ .• �, moi : t .r .( u = ; G _ C. VielfaNgEtiS CEJI • r mc Y9' i! v: +vim i. L ' f _ _ f 7 ,t G I= i ( C r ( C nauno� eJeQze9 ueS s _ ( , i t L ® fl n C1 '— C a 144 JI— am- zjy lam GO �f �1� � � ��� CI fa i'•�,% � },:,�• -5 Q1 If - fin o.,7?, .... ,,,,,,..,.....'. ,.., 11,-.7-,-... .! ---, \ -v-5,;),,,/,, I r V ' y_ 41:::::...:-::',"1-:1;;;1 _ z Z ' c; '''''4z:ka,... ----' i'",,,". 4i.-...,4„. 3...., . . ,, te t + 10P. . �. w • - ://.1.4t.1 Pi Mp ii U kf I 0 a � r C tt G 'f V fIH - _ CO � a� � 4� ��� a C]/: ( " r , , 1. N rr w 145 M ria L=r hg -0Y, ;ya '1 W JY c um ai. ,{k X a ',. . ' ' '':-..' -.- '' '''' ' ','-'''' '7--7-.4..'„,..,,, :•':.e.-t, * ,,A,-,..-:-1-; . 4:, , ,,,..;0„.,,,,:k. „,,, iy gg a; ` LL ti 1. .,_,c,„ d"f 1 4 , _..... .... . . ., : ,... .... „ , .. ,,,, , ,.., ..... ,....... .,.... . • .. 2. a' { ^^V �, 7,2 vl Eyt � .; t - o - / r 'OJ ,✓ 77 7 77 _ .1 fir.. 4Ifii 7.' .,1i2 ,.%;,--7. t fy J G o c / ri • -. ;c!..::- if 3'4 ' .1 - _ ,, mai o CI CC 146 W __� .ame ` trn i V ,1Ui `m 3 _moi 1 , a. La I G ii .` 6,p , /' CO b ►� c 1+ Y. - LL a y t1) = v �013 � Ems„ w ": tiJ Iii } C..y r.• c o '4 s t4._ O ,0 a..i' - moi' C.� Q V ah b a /r m �a 1,:•41.:, $ m m" : 1 a z es :P p - ,$ ` • ii ae o a tri al m t r a13 __ _ O.. C1 � ,-` # l } =• ��/ / .1 ' -?': ' btil 'Z 1 .2.- l''S : 11. '. •- ,' ', 't: , ,_. ce.,,,ze il • _ ' .- .,. --..', 1:., 7 ' — ° 4 i 441 , 1 b' tk" N ' �] V -Tu ' + ' — cc3 ' 1. . L �, iIz. a 2 ,t'. # _ ¢m t u3 ?I g► CC. .� v - i°A ---4, O' il _ t 1 c I{-P. -i 1 -.: t 5. y si . 111 ` • _ s if f• CI s II Nj <� ▪ _ • c a - q z 1- -;- S ,� a _ G; I! CCI)D ° .�44unop rarq.ira e;ue5 u s = CD Lim Li-, 147 Appendix F Figures Bouquet Canyon -�i (Caritas Castaic I i v ' 1 • � 1 i Ii x11' 1_1 { I i Ferro Debris ti i Lake Eleanor ��l~�`+'i. -Lake Sherwood F 1r i y fi k 1 2• '7I.,st'G"'-�e�, 1 • 0' ,..!',-;e \-'7,-,--,4114 ` ��Sherwood � g� rrw n, J � ',Petro Debris � - z j cl Fcl Lang Ranch — t_d. Las Llajas ,� j s r! R ', \.I ' r y • I T i h I ,i � I Eli t(XI I , ' 'MF N 1, t «f I Runkle t jIII . i Santa Feliea T 1 rr� y x 1 . f il ii ! I• Sinaloa Lake s Stewart Canyon ' 1 Westlake Reservoir , IR . e t j r......2... ...� o i ;«Ren.-. -, om { ''',$!,-,..,-..—....w..-4.;-..,...7‘...,7,;:.?,,,....„-ra:, I take �, H'-.em. 1 "�. _ , I SY i' y in '''''T.,:''.4.. t' .sAI. r x"'d Wood Ranch y. Waivered Dams Q[ 1 ■ s� ; .nor J aI a ` , 9 �, ct - 1IrI nls�rw.•�I SDAn..,rr<� 1 yf `-,- i _ '4-.;•••,•''''•,(4-'::',. .7'.4f41«' ra„E . I I 1 I I : : I�j .. y. r sr� I " �� j ELCOM 4 "� aU ..1,-; `t I- Figure F-4B.Individual Dam Failure :, Inundation Areas .1 „�� - Dl s f rr ur�r�n,mn' j ' 41 v I ! 9 It 1/n_ur,l.11rn•ulrnn Plnr = .Pn. -e,..... ,., oa.-,_n.,, �_ �_ .4 . ,___ .,.,,.. �._ ,a =,=.�-�,c _ -�-,�- s..-.�-.re.,,tea...-_—__ F-5 148 lam mg ''fie I 01. • J ; L• jtJ ? 'Ct Ki,: t. 'momx y r1 ~ , CD 3 t. f '. L - i y . • , . ' ,,:,,A: ' • -, I - . u /} .4,:,., Is 1 ej anzy IRE u Q g v = I 'i• C, `• y`! t , .C. CYS t ;---'...• ,l,, i• _ ii I ..� 'i. Er C F - _ t G r ,�: COD - , 1 1 CIJ0 d;ttrc3� raeq efl ea��� - __ r _ _ _... ..__ OD I . w 149 - . '1 Fig. ua res Appendix F 0 I� .zWn Q 4aisa • • fi► -t ' eEN�� E it rJ _80 c( v • Cr", t(' Jr} c v RtO; R 050 X660,J _ .§l N„, a ,n I1f � rt o bit, c.--,1/4. `. t • °e21/195?, a, , SA1 }: {� im ,t„y: NE c• 00 . 41': '*i '...:.::.,;4": yut Hc 1fiL ltT !".4; _ `� ntPuO1 r, \1� t L♦ 44— •• Ips„, 0Ct / S' E, h '!s � • ''�RnFau:a , P - �Faci ...kJ. Sinta Barba ra ; _•County e ifuYa 4olnfy _ F fEq �`'�.NE t Lu,, , 41111 tikt Angeles E I Hilt; /0f ' .',AN'A ANA,AU-- 'SSIJh Rl n I;F.ARRDYO PgRtri4`AUL •... _•..'r� * SAN CAVE rANO iAU-' ��/ LIO,1 CAt:YOR Jv ME5''''''"°''' A RING OWN GREEN fAU��,��,�.yyyy����''''' �� f-'YP SM EPARJ MESA FAu_"J y , • if Y+"� • • i FED MOUN'AI�. �/ "3 . /!•• r �. 0 rAUL. // . t ♦..... / • .�.- -� f Vrh A :� r isE"" r. ti Vr7/1Q94,e.7. „_•:-.) i M-' TGO Av U`til ( r'• � 1,itt 24.11.4$ r.„-,L4sr.....„ , ... . . A.: COM soNErta a, .aota i rtr]Island ..- - l'GLfUU 5 OLpr CF iI r- v'�ERCO C An acaoe in) 0 -. . _.......:' Pacific O C C Q t1 �'s r SANTA raowi FAu.r-(orr• Nor r,•+ ,, il • I-, aid rare,.,u. t--110 List ut lOda Sot r L's:d`r t}tus. LFAp s •F 1:C' ['ft 11 Hi.tr:riral r1—nler4 Q,Nternarl-and jQ�J Q144:34M— 410 _) 4&;,.. li ° COurth•60mtdare 11112 done 2111E lnnnpet Fanits �- Richter Magnitude r in .t t ® Cdr Le mit; Greater than 4.0 Inter, + k: 1.t,,,,l =:. 1 figure F-6. Region&t autts and Historical Q NtAtottol 101001 t nry u • :n.:„1 ,..„ Earthquakes , liaactluip ,au 0 w s 1 �' - `'ilP_'-01 1 I Sinatvi•rl LfSD.A-FSA IPPCi e.f Sii01 U n tirn,cec i i Jill/my,'C ouni='. E Q� orniCt f ..oto 7.s ail,ltt ii osdi nova/Htr aici Mitigation PI tri Update F-7 150 Y. PIC C [ •I. 4Q •v r ti a 1. .... < ,...,,, > zL7 LiuCa. C • • 1 .E r 1 1= .:„.:- ._ 1 t9 o- P � Z & j a ati • I. o a z a tt f a o �.. i 17. 17 J G t.,1r...... zi \ \\,......\,,,.. .„.1 • r \ 117 > m Y 0: r� _ p G \ — Y. Z \4� �W 7 •♦ ,� G • \\ 6 111 Z I{t 1 j ipi i. y .e 7 '7.,...,- ''� 'A.; J ¢ L�f.` G f 1 : + �. r Y m Ql1 E. �. - � 3 s, ' '„x rr_r """. df =(1111 53 ...Sly ea1 A " cr = n i •• '- ' Y � Q� qq . � / e 1 Vc � nnrrL®® a • i. ' d1 r • L z.,Jj O fl I rJl fir-O. e r % W J 3 g` 'LI �v 14 z�1 g z -. G .) J C_ Q O jf y s, •G o I m sc u « c i � _ a c C. ao .'Sr � _ a ; _ jm t o = e S ca f .-._r 151 Appendix F Figures Obispo \ / .R* r ..• t,s F i� \ �— ' C:ttunty v.��` �Lz le Ktrn (nutt L. ll� -�- '`_, Pt.C1TC 4P V0. •; s." y A-0.O.. ..OAK HIL FAL'.._' „r^- r.,. O, A, / TRILIER ,, ,, SJB MOIIN'A�_f '.:•:-2E.,,,, { •C i Req ALft R•$- \\ 1 3 F .+ J 1' ` \ VS \ '~I �f L'ntura 1."u ai.S' A L40-i HRU` `\\ Nom" \ \. :(CAFt:AT I FRT^r�i; 33 GINE MOUN'AtN FLU 3.l I I Loc SANTA Y1:EZ FAULT \\ An','icY I ' n Couty \ �i�'AN-A YNE.•.TAU.T - 1 ij SAN-A ANA FAU.T / }-`•• 415 S16N ,�.. HO..SER FAUL- S`.t. f 1 ••.r`� RIDCE-ARR'�•CP A AUIT-q SAN CA}ETANO FAT_- �� �•99 f ` A41 F _ ESA'.RINCCN CREEK FA€:C. LION CAN"Oy e:111 S t AN AYE-ANO TAU- `-�-�'E i AUL-••.:. '9,,, `� 1 _ - SH EI ARU MESA FAULT./ _ _ ......a ` „G t56 lib RED NOUN iAiN ./T ' 0 noir .- 11 ! TS 31' � � OIG MOUNTAIN ram.- ,••�\"~/y y-'<� I ElfZEWOIMICON _a .' t i f !� YENT(1RA FAULT / _1w ��04 FPUtTS .fin ♦ThRiO f�, iV a,SIM `1,-..,',. . .1 w Mf_u os + y tlf�cAU ; ILLMIIuiviv94C'.1T111 i` / tT ` yv�T k I. 1 II p III] 11.1S0,11, 1 I,[ .. ••' Nvg.nd d, p :.hl m t WSIwI flRm 105 SARINGYILE FAV_ • ..' 1°'• ' and QML*. r,rta flJ:.: 1I 11 fill pel ul .1 4 d i..aTa ,.. — {` Pp mS 1.1 .tb.n r.. I.+tn.u.,tr.4yc.ccuid of CANAPI_.O FAL,- . 7)% lasit aAI.EYPAUUT ''-dr-S. II t he l c c .....i.1 c w.i:l=11. .<.: 1,n nt pul A.IFn1L I Ii.ec Tnn p:Ti+f Jilt L 11 rrLuv r1c Gott t IIr -, t_♦ I J Ihl bull„In JO ot {'Ir 1t will, r I1 cu0 ywlF.:- rt,tememe *w j�M¢trmisi{t t• J I g t 1 h II US zt ICI .+ . i#I j Y 1 .I I p I c 17 . t:I,c yam _ I J I W i.. p f' CONEY NOUN-AIN:.AI/. ' I of lnpJlu au-d.I II. u.I tvh Mop Sl cu 4 F-Pc..en_(IIN1 I ti"W7 aSaaPAii.11 4t ` en'a Cruz Island NAIISIr COAST DO,E TlCE- - -RUERCO CANTON f AULT AnacaUca pianoOcean - SII '•" Pacific SAN*A MONICA FAUL•' OFFSHORE; EVINIGIZIVEIVIDIMIT QAAA��y!�� ESCONDIDO-EMUS- "TY t arth«uakt Low Frequency Shaking Potential t 1.0 Swint!Period I i 1..,�i; cna:ra 1�8 rt ( ' ..soil' w will c;lpc 10 4) al r.c n Ir a,I c S. 511A1 my 1 rup.te- I IIis 4t'1•� III€r.,,.,i1. (C.Y•d30 I €..Dani,n ca•r.L balimmis 1 t I i I e t ].�[3"�t�'Tl31gL4- w..�.`._._,'llIt> r'd„€:,::,:.et:;;_. -'_U. i:+I;,f0C.,i,•n r:;•.l',u,it,I i;'€r:e, i '_ - C t'ountl Ldoundan 7 1 l=Cita t inliti- , jFigure F-8. Regional Faults and Earthquake Groundshaking Potential I r I --I L- r v :1 wilt Quaternary and 1"alutea faults p ,n I I r l-JA:i.1,1 r y r mar n Nm, -De-:we I .....,..,.......�.,..._.......--........�. - ,,.-- ,:a51,...we:, I. clue T u I iml t -i nnlr€ne lt:fnJgc1 mim ) I'f'R IIiY[(C Comm.,st ?TIC I1f7�077Aa L er rt uuncai,.L 114,1 r..cntaL SUN c plea,non" It Ill Icnan,Poe LODE-223 3ltthi-Jurisdictional Ih7_rnz(_l/iliration Platt Update I F-9 152 W Mg y A N I 4Qo 4 y +' +tjtit, �t (ID 6. '!..! - .'.4.,.*..:,1,:- IFT:: ip. '',' I.,r '1'7'17:1, .r. • 7 ' by y ' ,_ , '1.:,"!5&'..''' '''' A / i i L, rli L'; ''',1 g . -:':115—'• -'. ..'-' :1-1"4:1,- . ' ' ; a S�. ,--:- ..,,,-....... --„,..77,,,-- --,-...,,,!„- . ..,,...,etol,,,,,, ,,,.._,, :2 1 • , j. Al { +.. '4. .,.-. , v�.+rr�, uife ' Lam. • \ '17' + _ 0 1.6.7 ;,_ ,,..,,,. .. ,,, lc.2,. -.. .,. . ii— '-7- .-1- k_ ,---- .,3 t •'- - �' r 7 +.. �= c� f1,4-,• r.,... : .. ,..,---- �.qr ey Mme` c w. g.*�� 4 G I. t1 – i IBI ✓• I l- l r"t— - .1 T Ca — _ _ _ .0 v00,9_ 1-. ;_:, 1/ i - na�rnoD earq.reg rbc r5 , T— ` 7 — 000 � 1 LI 153 CO --------ell ' /____N,_____,__,___; fli CI .. J 11 �� { Y. �� ^ ff i1 5 a s .4. . .4 fir ',4. -,t .,„ ' ,-,,re r i a ' l''+'" 4. 4 3 t3 3 , * t V gyp{ _ ' a -- .� -g_ ; , °rE t °b y`�. �� ..✓ t 0 , „ i �i k I 0 i „,,,... i j3. �, p.+iz tr,, . 1, . y. 14 'm i ;A. 7.1r''' W. ‘4'' - :. ,,, ; ” ,'-' A'.t 4,' .. , 1101PWA 44 ,,,k.t . 4 .r... i ii,,,:-..-- 11..) ,'. , 44, 1 ,_., 4-.4, - ' ''';' kiliklArr .."t„,7'to,its,0,1, f'* f 14', 1 LIL [[.1 di , " ‘4,:t , to tie 3�; a !ate ! x nt - } v,' rads ._ 4 Gti, 4 .e > , .0 _ [n ! iii1� h G 51 A L . I t am-�r3 jr �F u u = s - i a,... Ail , 0 �� O y - J. vg _ Aaunoj eaeazeg eaueS ' `, Y ` =� 1-4 0 r c 154 Pe ..Y iE Gr� SI ,,ie` ' ...vto cc ril, �,t" 34 t 4 o .a u..` 0- Oi ' ( :� f Iti ti rn • .s.-ti'S+ .. p J ",' - LE 4 0...y...vt. _ ,....„ . _ ,.. _,,,, , a Z. y r C L`„.1 w ;t: M _ v( - N� L C __. ......-. �. r U - i _ = , '..i.: -t COI CD ;ttao ezegirg mutt _1 � , . II I 2E0 =11 155 Appendix F Figures , 1\ 1,,,, -• , ______ Kuru County 11P yfSic3 \33 S, i i "." GRAND`FIRE ----- ill qF 4,345)ac si �v�`,kd:; 2013 p es i c \ Angelus County j Iv 611;13 ., . I to 161,7.2 Ems=-- 7.2 200641 m 33 ra u ,.� �.,t.z; •.�z.�y„, 'fit 4 t'In1, Padres �` 1 National NI Fort-1 tk1 i r r F -yy .. - ,� ; i { .. i s: a l, � ` i _It* *c f • it.+F �.--./ Cl"1 rt Ca ..._•t •Ft ( r_.-.1 J"1 sr . ''' *din LA '„014N. ' r-.,/,... .. .,11,.,..'—'4'`' . .ii '- ' - H %''' ''''F4:. .: ',-L'n''' ''''-- ' Pacific Ocean \ .II Fr $ i r....!:Frrrrrmr v + M1. L`.._ - x01 S • I SPRINGS FIRE 1, -------„, —, ,fir- 11 Legend i 24,060 ac A COM ('! '? ii F' ®2 EE 9'r:imeter' 2013 '� M! jr-11 Coni}•Buunde:j. i .,. _ .���.-.�».7 - _ _ ,...«...,.».-.. ,' cit,LimitsF 12 Recent Wildfire Perimeters of Concern ' i, 20/5 Ventura t,1tP 2411+(Summer)I SD•i-FSA,`,PFI) r f-20 1.,,t,, ck 1 N . D.,,, � „«.. •ftrlfi-IIu trttl Mitigation Plan F-13 156 1 -bin � Q - 41 Ca ini 'x I,_ ps��J A _7.teda ) YQ '''s 1,,,, -' ...' '- - ,„,.i.., " • V �.y�- " ""'_ ' .v,' - r / G 1 11- g az " — I. yv 4d I ^r".•., .. .,, 1F,+, C ;TfE ({ tl 11 I T_H `Sr it �if ry JK- V - N 1 t A 40 . 7 /''"[;4[['?:: \ =v E. '[ ..,:',,[..4*".:":41)i"'. / . t' •,w -teabaZ X54$J a 4. V r 1 § a � yi i .� • � L ,=Y caV F = =1 .... i r.. w 157 Appendix F Figures ... ...... . . Kern County NTiea `r i K, , . 't7. r,, , \1 e ----1 , , .0„.&,--- . , - - -- - , , „ . , Y O • �+i `' ` ,;�.,, Er,, -q.,‘ rs t t T C i.C)S g 1.. t� �� -;` '"�_ H„; \ Andes • � Country J _ Y '... ..... CI • .mss Day I. r :w wr 92 a ! •"4 Wolf Incidents 4 (1 7 c) } �y I 3a .(211538 ac), 1 •� 1 .ate. ..'.. ;,t!•a:'3 ...1Uf �' Xis," J. • • , 4 1_ v Y 'Ta Parirrs ' z8 402 Ranch k :' . . 58.402 . i ... Wheeler:#2 ' �, { (122`fi69 ac) � .r'-forest== (637122 ac) t � . 1✓ Hopper „ t E! r 114111400 el -,. - ,, �� 1 (27. 2 aarc • fi- Creek Road , i,, f* .7" r 1,;..0654,. .7,-- simi ? '\. (32,703 ac) s w -517',"..'-'. �; �. „;r , (k107 559 ac) 1 _ + ;F., 43, "3 „ ' •_„&" .•-••...'", ,4- „, . - ,...--,--,,, ,-..... .. t:„.— -:..„:14444. ...i..-,-..---7- i ,fi,,I,;,,_,.,,., ,. ft.. ,,,,,,,rt: ,,,,,,, , ,::,:,..7..., .-'?::`,':j,..44,c.iiimilt. L.fitt,,,,ifil A :77r:\I-,-y...,::...,121E,4;,±44...:"iFiltit....,46.40. "fetr,,_:;.. ,. 1 Gen ral . o Vetae } ✓y -t Clam ` ,� r \ t , Stun t alit 1t q` �b:'Alic Awe . + 111/44,1., (,116,781 acl 2 11 N- r W °°- f f --',TI To----- Incident m,i 41 P a c i i s Ocean c 4H' � t � .. � �" YPaImer/Parker ! 4 IA".„-:;) „ t" F."r-P ff 1 .:.ai Hna""}t( raci ' t : {, ,092-ac) 1 �' ! 1 Narl him-n,7nr. , RQ ` `- ' mi • Legend , 5 Historical Fire Perimeter.,1965 to 2013 `rb{ r spings .• Dayton/a„•) 2(r.,:ece ale20m00, ,e, .' (2445 ac) .• 43,48: at i totx:.EL , $ I (color Nl d b4'LiLvaLle.[Sarin mul aercu.v2 1:Ibeictl} / 1 1960 [�a990 Karan r ' 1 (�19 0 Q2o(w (25 568 EGO Meadows + 14 COM `" *liar 110 Q2010 (38,478 F)4 ''4-- - (u!cbu,,t 1-1„„,,,1a,„, cm <-ay 1.mi . F-14. Historicai Wildfires.1965-2015 I,.. Q Natio,:::i Forest 1 Hasonap • 2015 Ventura Counts• N.vJP 2104?Summer(l SDA-FCA APE() .r^<; i :,,n.:,..,,,,,��.(;._. ,�•urC<. 2fulti-IIa_u,d a-litigation Plan F-15 158 Lie se __ _ , ,,,,,,„„L • , Na : 4 IEgm INC Ilk ii;,..' i_.,!.,.-,,k,..1 aL ) cx ii p.si ,.. sz.,.. li !3 r�T , 1 {g .�C'�'� R it �, CD ` v I '' Si�z':47 l Ci • f V. f ► 4 it y _...,....:.:4:4,,,-.:.,.' iy f k' �; twat_t B c r yt,, q ,tom$ 4 i– 1 —v ill , 441 1 3 .` z. may, 3 . 14 , K t ' 1 Li _ •Wif * f e i. ' 'T • t°,,,�k' v�a u • Cl., [ = ,_ F. ` .... . t r 1 Z. ..i.'': 'Illw'llik„tt ir: zz� _ .A. ,, ' 1 _J �y �;un >} eiegieg +u ,i ,,c,= f- iW 159 COP CD ,....- C17•h„ m.,...'N 1' : \((e..'s'.=--itk:' 1 i b [ r 0 i e ,..c tr.: = .,,• _- . 1 *"` V ' S • _ • t: 4 y a _ , . ., • .,...., . 4 2 ' .. 11 <; • . u yo n 1,.. c _, ,__.„. ,•.::,..,. .., ..., ,.. 1... / ii es r „ 'al � � % �- -4.1 r gi} _ II CL+�S �' it heeli c p ...4 ^fie. f — e T , .JOS 0 -I— - - i. e ^, a i,uno3 rxegzeg e;uey _ - 1 u Q - x C . - _1._a.. In Q 160 Lim ..��, f \ � t G ...Ilia!'` keV - . j = 3i .. . 1. - ..,-;',."'4,.. _ .x x "i j. J ,F I+ y y Pilo , . ,t, ,..- •. m al .. 1 ,-,„ Ilia . ,• `: iu L.:,!. .. v . 7«. IC r' • 7I .y !p - V-' &1 lea di �, 4 f • r r '1'.`� , v i w i + p.. < c . "d -y '' A� .�, fj,f/ A part. Obill001* . : d " �c minPt ' „,f,t,; "rr -,, -Za .1"-' ! ,art,1,3*........ 61 4 E. - _ jls .a, t _ r, _ t , J S - = Ca CD Riunoj eiegze9 e4ne�; _ i y — ilim W w 161 H CO in w ..-.',--1 --"' -''''-rtek 4-N'''' i r .au ,;F bb s+'� J ,-.,5--.1,0-, :71k-,...r.",'--- :, V I Il 5...4 i! c.! ..;,,,,, ' - - ... Itf,,iial,•,.--- •'-%7-„i.,. ,; '-',:, '1)-XL2..:-..: ii.! riv.44t.:„ _ ,i,:., 2•1".'.41 i : .e.... , ..... Z - ' . di Es JXu .t.iii r4 lkt ,x � l : (e' : • rr N\7•01k,t.'„U i Itrl•F;;I IL';'.. :L.' LP .rr' :r ,-4 -- . 4--t'll'''.-- VI , ts 1l ; �, • >� « x e • -'''°-,-; of ..4,',1w.:"-, �!$ -F� L 4 _ j t ;w . r '{ L f fes) irELLL r ` 1 X 't• v "/ -' F : • e• I Q :egz nt; J00 , � a 162 Y. x UMW �...... f= �` t 1.`.' .tom � + t ti s I .. I g. u of .'y,` �E �� Cif rn .. L. ir ,, i,-; , H „mewl"' .N.4-- - L.. ;---"k,.L.-- S' - , -' __€-='• .; `T tr ti A s y J.. 4 * ;, ' - ti ,4 _ dP. ^^ e . .. • —tlit 0.7.1.4•_.. ,,_ c,, , : • 15 - C'*. LImeq, „fil -.- r, '-,,,,-)4,44.,--..„1.-- . -7. • , , _ • • * i• m . s r i €u N c Qre v - 6_I r . t— 7.t <f: 7. O CO Xauno7 rIPq.ieg e.aueS A! ' LL° _ ! 1 Li® i! MrZ' 111.7LT, 163 Cal --. cNi CD , E... Li. 0 , _ 4 . ‘_. 7., =r.r., -... ..1.r ,,-• - -1 :,•:„ ,c rq v., •=-: ?'• . 7, -..•: .0 .7'-,•,' e- 7> ea =.,. :_... ..c., 0 ,.= :.. - _,.• - ,.,. cc - ..) -- - a b. '- °•4 E"Z) rZ - 7, .. '.- Cl " ?----, e--i .....? r i --.. -- ..... 1., } yr, ,r ..-. 0 MI Y r, .•-. -,•3 i,.3 u 4.) .,-,, 1., 3 9 , .r,„a.), r. 9. ... E '.c....' e.:y E C-65 Go CZ 01 ..? L.r. V ..., < * c ..., -o ›... "E.. 11-; - _c ._, - .. 7-.2 • . '.•'-. .c H .z_. ,... ••••• "":; - cf) > 1 - ..c 4 ••-•Z=.x , -1- 'Cr .y.1 0, A --, 1.-, - . c_ .,.. e 4 c E Es- 5 c 1 - c - cr '5 g.e---.1:4,..,.. u ,,,i4 • .0 • . - .. E ',-": N 4 p!•-.) 0 lc - -:,... c • .-, -• . 1., 0 .-:. ..3'.; - - 0 -E-:. a'-5 8 .5 4.1 ,,,j•) c .- 0-) l'' f.. m 2 - ........ c, •,..., .0- Cry ,,s * C.,= ED t7. ';....• ' .... .,-., 41' • E z;. -4' ,..--,,, 8 ''....i-_, c E C • •L. ••.. ,.,. 4.-. 4 'a •41 2,,- ' 0 .4 :,,..*:- s s . 0 z 4,',1 <) tt e e E 8 2 . :,--, .. a ... • , - •- ...., , ..-:..r- -..... g ..... t :t tu -: c 0 c• G vc - ,..... .-...... .--. ,.... •... ,- -... -I 7.- t)41 :4) il,';?.. * I '- ° . = E ,j CC yr, CC C.) ...:, 241 -= ' V 4•••...... 0.4'...A' 0 II 'al) '4 - -44 ..., ... -c > v.' .... .•-•; ---, '"" ,'..D., VIS .,•,, .,,,,-- >- .5, „.„.. -- ec c V c .1 ,.. 0 C ,, i 0 E..... ... 0 0 ,,, 0 t.) ...' = :-; .... G •-•_."c - ...., • g _ -0 -, - < •- s c 1 .--, • 17 v... -A) 7 -2 7 .,;jj ts'71 :-, .•'-' '- ,' O .- ...'X = 0 C4'. "1.;; c E ' '; •5 •,-,5 - 7) u ,.. ---i c., :,-) L..") 7) 0 •./) ,-. _ c :•. >, • '7 = 7) 0 E - cc - cc :.() '...., .- 4.) :I, ;-) , ... 4, ;1 %-•-:-"'.4 ."7 "....-' `....,, 4 - . - ... -.• 0 -,.. - -' ,,E• ..c .) 1:, 5' 0:ID > i-.3 F 0"..a. 3, .P-L, . ...., ...Z 3,Z. •.• Of1-0 'f2:1 5 `.) I' "E c; a '-'; r ,.. 0 > 6.s' ,-, ^-, t-, ..! V 1--, v..1 .., ce ..., co ,f, >,.., 5 -.; ' '... ,_>" 4 e. - E '.- ‹. • - . - >,....„ •... ,,,-- - .," - -- x-... ,.7.... 7) -2.-• 7-, c 7) ,4 ,,,,, 0 .,-,, _ a 0 0 1..,. •-' „Sc >,,0Z5''t 0 0 - .C.- c. 0- Lo 0. L'u ',...• - ,-' = v., = _0-0 -T..,_, C:. F. r. ,_..- z . Ta 71 F5 7 cz - . - -- - C a,* 0 ...''' .0 r,° FP''5 , co ....:_- c.c --,..-, 2.c -,-.. Ir. ,3 ...0 U .., C> 1 , ....., cc-, v :--- .., 0-cc, G.--• .'"'. , 2-:= 2.144.zt7 ig ..., cc tl.),2_,, 4,7. y.,, o•F... re F., 0 -•• . c 0 ,-. E f,--...- 4-, 0. - c - •....1 -6 c; F.i..--5, 'E 7. 0 cc r ..2 •-.., V' LT: ,, ^., = I)_,I., *1.•--, le: .,.. .--.. ft.--, ,..., 1.., ,0 0 ...., •-a ,.. , ..,, '‘.." "' .,' ,i . "..., "' ..: p ,... 1.., 1.. ''.' . .., .., ce .-. ,,...,- t., = = .1> .-z t m.„9. . A; 7..... 0: 7 ..c ._ ,,• - :0,,er. - = - c it ,,r, Ez =7-2 •---- E -0' Er., -- c •L -..5 a-. c , . >‘ ', r-' "I' t 7 !..-q, 7 a •-, a.2, 7 .;;.,.-c; 5 •..2,,t-_-_-7 2-El' ...2..cc r ..c 4.) ;..,; I- El:: "N. 4) ,., 4) _ -c.- -c. .. ::, ...; 7.:1:-- c ,.. --,- v:= ^ = . .7... 47' .4 41 5 "5 t.) L. '" I) _ ii ..;e L 'c - c < - c :".- ... c ;•• c .L., C c _ c - .....-- c ..,.,• o c 0. - 0 = a ....1-11g , ...., ,.. -..., i;... 7.,, 7::". -.7 o - -O 7. .E, ;•....4 -..o - 0 0 c - c ,... . , -. ,-.1 g 5 . rs -•: < - - ..c = a = CC :.) ..... 3 0 -o , -0 •_ .. •- 1.. .:-.> H u -4^ '5 = = C: . ei . .._C = v; ' , -0 ,ts,, --. m - E -s• 2 III es - •-c, ,..,• 'e z .. - •••.0 -, - , c - c: • = . '.- ICI A A Y.: ...., 0 .r...4 e-,`, *'• ar; 6. .0 N ;im• T.1 cr. .. 1 CC ! . Im no, ,.., ow .1 ,., i -- CO "" ._y. ,... ...,„. „_. i_, La. ...., ..., lat I= a 164 __ - iia. I MC CD to ✓ r G L cc c :: 3" '� _�-C •J fj f .r. C .- .7y g l :+C . C " C r G F V r7 tt�33 C O x, C u E 21 vl r N v. n u .� r E - U fl U Q V': 'f r C J iI11 C2_C " •.- C rA 7 C a C G 7 N - .. N f1 r rl c; C �• , .% 7 r> C :9 eCts. f..1 f1,yCl 7 •bL C i :,U - y a 04,N •c �1) 'J _f'1 9 C P L ^ N. C r.Qr _ o4 a _ fy r E,_ ` r • a = i s _ f t= c =3 r.) u C l t4 v ,- r L\i C C 1 c v C w J y L a J .c i.'v. y L L. r▪ L • tll a C J11 p O _ N 2 _ E j C. _^.moi , (_• .� C 1"' , v s c5 :a N v1 • `? . i0 >'r :J E {i' 1 7 J 4......i. :Lc- L ;7.O ._rte U :J .'i ^j -4., ` 7b-: .-N^- vi✓ r. ci c mac: - '-, -• c , - -' c. - v u osC.7 v V T N R G 0 N -7 '�J G. N .r L = 1 O J 17 `J 0 O tr r r 1 v u c G C'r. `- L r0 'il .iP .rJ +.r 'C C Q U l'` J 8 .s 1 = Z r 'j ,P ? y - , J a- ✓ E = a /: J CID ^ a i +� }}te a . ',^- N w1 d.. e 1 1 1 N mil M. 1.1. 165 Appendix I City of Moorpark 166 This page intentionally left blank Ea 167 AL - et ‘.0 -t N N ' 'C N N 0 N N N N a ti O In a M O et —, O 00 '0 N ON M N O N 'O 'O O 00 'O 0 00 (7% ON t q O .ct 00 00 O AM r ^ Nen O a N v7 l-: 01 c 0 '0 - = . 0\ et M N et M '0 ON ON to a 01 et 00 N O CO M 5A 69 69 6A 69 N \o N 59 69 69 69 - - EA E , ss s9 EA ElmO PI a N N 0 0 N N ON �"� N N N N O O O I. Q Q N d O -. O 0 O en en 0' O ' 0 en pt 44 U d o U °, rn 0 ON re) d d = U U N U U < ° U o . d fn C.-) xM I -/. E. IU r-' .X X0 CO a,L 0 0t sM s. < T. (a � c3 6, OcaC\ CO cd 0. °, oUo 0 - Q oU ec b o e, o 0 E. - o • v0 CA -o 0a .x a o0 c a -0 p; Q _ s - o 0 • _ as ao t x > 0. 0 CO. CO& ° °m oCO sF > 0 . .s a o 0 F - Q oe: p y •' •, U v) 0 o d - it c o q s.m FH u x U ° x con ° -0 W 4 4 a •- - --�ezt s �" 0 0 0 0 0 0 0 U 0 0 0 0 al., x O '- a in In N 0 et rn N 00 0, '0 0 M 0 in N 0 0 a O_ cn 'n 0' et cn 0, kr) ON ON 0 cn N M MOO :f.... .U., et et .0 '0 .-. N .-. d• 'O N t '7 V et v1 •-. imd .� O N a CI n. CCS Ct..,Cr ' Sr A-+ '0 N O 0 On r. 1 Q.) N e~ N W 5 - Z Gm rm O ti 4.O O , = v' r R , p s0. ) — Cl) C N v .0 t' ^ CO 4�'' ~ v7 p • e3 0. h 5 c3 00 O O ° ' a :. 0 a a o U Sj 0 CG ° x N O N td) j N p- sr .S U W 0 v c 2 al E ct c _ a -O U p" E- o aI) cy 4 c - C E-( o o CI Q, - on c '' 3 `i' ,. O o c,-• cd y °x' O ° °i o a aci •"° cccs° c1 -7°' •o o 5 `O d ¢ u u o u u t7 x a a a. a° J 'a '.J c CO ,0O 0 0 C CO c CO ^ ^ C CO C A CO 0, = .7 .., r r r r r ., J .• r r NA x 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a CC UUUUUOUUOUUUUUUUUU 168 i Min MIC O 00 M '0 O N en O :I= 00 �O N V ;, \O "or 0 0 r O r-+ C O N d 00 vi N 0 P. O 1--- 00 en en hV .x '0 69 69 69 69 M N 0 0 C O O ,c5- 0 Q 69 69 N ,r) 6) OO 00 N S. 1 0 M N N a O M raj N U en M < as O < N N v i en x a, U d en U rn rn a s— U x U Q U b a.. ,x O 8 O .T. O E. 1:: O .c7d ° "0 °O 0 00 H > ° '013 V) c)> Q d d p -0 •a 0 0 .. ..- ai �"c'd o Q �n on ° on on 0 ▪u 0 ❑ 0 ..0 .0 • va) o C# d o w x Y CCC N— a,UO O 't — NO0 es V %. —, ' d• '0 N '0 en ..a W .n1 rJ~ V ) r.. ,0 > [0* t..1 .Fyye 0 .i., RI v 0 w CO- C�. a) O 0 0 U 0 w v V) ,, co.(r 0 0 P. cUOA `C 0 '� ° m , .x O OO0 i Z I) 4-4 V 0 x O co a 0 as va -a = cj _ ti > U x .9 v 0 oD .4.) 2 'O N Ca) O O U i 4 U GO 0 U = cn 'a tj o = P 0 C ° U 'E a) fl- E'.. ^ r C N - - .O O° ..6 O° .cca °O fL : > > > a Y CO i CO CO 0 G o i0 CO O CL �0 0 .. O A V C , a) a) COC CO 7 r r 0 r N F 0 o 0. O = E ^ , m u, 7J E .~^. E I > > 0 0 eml UUUU 51 6 U w 7 C7 F E= N 169 A M Dmcr ttt - CZ C a 'D 0 = x E .' o 0 0 0 00 0 0� o 00 00 0 0 0 0 0 0 0 c air ; O O 00 .N. O N 'Cr d' O O O M 0 ,C O o O r- O N ct VO O O O O h O O ho O C O C O a .- c7 CUD Ei qry=ry F+••I ct ft CI.) :a) W co ten N N itre) M M SO w = O O a1 ....... N O pp h OO O tn O O O M :".+ N — o0 M .--i d' h kn., cl J i..4• - 4 z c2. 0 G, t — 0 0 0 0 0 0 0 ' 0 0 0• 0 0 0 0 U N o0 'V' 6� cn O �' - O O a' O CT M to h O O O O O O O MOO N O O O O5 — � W 4▪* O CC 5 O hr" n M ° °, Oj - O O `D o rn 1/46 p N O o O CQ - Sr O O 7 O `.' - w > , X X ai o ti .a on 0 0O 0 0 o . - 0 c 0 U U U a) Co C� E crra U ., -a 0 eno o OD p z) a ' r a r Ne4 � � x ? o. O O O ) D�D _ s, v o by C- C �' ° CO «i N = CO a) O 1- a) 0., a) O O O n n V) WW = U U . x x OoN a0 GL, ,- CO CO CO U 'O 'O 'O N ' a) em0 ar Ca cO CO p s, 0' ,�, �" y Y = N -0 "0 y U CC CC 4, 4: Q .2 7 b C C ❑ -p -0 C c� 'C3 Q w w w a 57 k, a a a a4 F2 Fes- 3 3 170 MC 1=CO 44 1 CL Q i a+ R L W fi M 0 0= ,r 0 o C o ...5. a, —. � p O CO O _ N !� V1O rOOO _ :. O O M O oo _ M M O M O O O O W — • 7.1 ms CJ N ; L r _v W ..mow v 33: u s ", J U L f L ....` U ct C r O O N N O N d' O O n-. M O O O O .0 'z Z O V v al* O O © E „ a) , - 0, _ M � y vtia -0 O'd b.0 01) d0 ca r CZ 4 H �a . .S .E U U U d ca ca 'V op = cC c3 00 cd Y >, '�. ct = . C> .p T7 'O T3 •fl ••O x O O Y i R = 'C O O -. r CC _ N ,0 00vpUUb � C ›' � vi rvi r O cC [C q N e3 es Nxo > > x — CC .x ' O 0 0, 0) 0) L1. W W ctcGca U h . T3 . ^O 5 " F Y = $ $ c T7 -a = c •o b o v c� A W W W I-1 w w a .i ate' H E 3 3 a 1- a ..., 171 Rag Dm 4. - CO 0 to•: � C "a 4:4' ccC ^ a) ) E... a) •-• ,> a - cd . to" U E a) U �' $" u '- C c- C .;0i' o > NO 'dO yv1.) N 0 � pO -F), r. aC • d O.. y to.id,. . CO i cr e -, O O^ `n > C V 0 a) as O U O O O O O O �, 4. ��PR GI 3 a a s G. U V �' ti ✓ U y - a C � caCy, 3 o • 0 � . ; � ❑ o = 0 ts. N G U •,73> '5 o U o ad O U �' a) o s� r •, a) cd a) y ,r• 3-o s- , b = 0 2,), ,E) -g ,0 : > y CC�y C QU UUo bOr . N cc cc3 � V) mai C.1 ci) a �, ' o oCn o 3 ¢ oa . _ o0yO -o O > •U v 0 E CO ' tua c.) a) CO et E C 1 s.. n CO O ° i . y a) p y, , i p > CO = >a UsvO C ti= ' - o ;? a C -a n. C = co s _ r O acd a) cn -03 cn N s. ai. -0 a) y U .+ N ai C a3o '= > 0 ` oo te= O C 511 a) .2 y a)C.4-4 =+ a7.3a 4. ) CO y p 0 -0 CC n CO CO a) cn I. wpa, s a, oL: u o s a O a i > o• Wo `d a) >,c Cv) a1 o 0 .^ a PQ U d o OY O. a) a) w a s� cn Ca CC C v '".. F y O 40 cd .^. C4 Ca 0 °' ani o p4 F� Q aa)i Z? CO ti a) N .4 .0 i CU � ,> s~ �'�cl i 0 ...40m tycC �^ a) U p. N Q Q .. N A--6.- .5C/) p < a C) p r C • C P. CO � aGa � CO a 00 a 11 C. (� CO a U O W a n OU a a U 0 C oc0' O vi a.. C _� b. C v ,; o a' C L.': as C • CO C C a) :.15 ..- :. p C N '^ 'cn ^ -p 0 y.., C .; 'n s. s. CO + O 'pC . b ..'Z C -o , C E ,�, `1 _ CA O C 6 Q = fsf. o O aC) ad p cd V• `/ C Fd ) o g) •3 � a) a U ) °"wcn 0ai C° ." 0° „=+ ' .aYa - -o ❑ a., . •CCC • ..c o � .xL C 44) CU a7 O >, O Np -p • O C OccU O ocd s. 0 ) opc3 cUsv v a' a) . a) CmP ai a o v � VfU = UU ' )4 5 .a COQ .fl Q n co a) U U r 0 •. oRo on CO h C0 C 0oa , = c°...4 c p c : W to a _ ' a) oma . . 0-.c,, o C v o =cl rti c'l CO a'- a) c a a an., on cn "0 ° 4- ocnC o F CO CO =a s. ' 0 O CO C C ) "O . O - — a) ., ;� a) >r•-0. m ° y : O O d v • a .0Co9 .a ) b0 CC) 0 -' NC . ^ .a a.� a OW \Q i U CW, › Q7O o ao - .s d ca U0 Y ° 0) C^ CO 0 >, a) aw COC O - 9! U n Q ti Cl. O Q. cti co C s.. •4, C . i C 00r •' ,_ Cb0 O O U0 . OCt cUd DCO N C ) y ) . GN r 0 -C5cd v, • U . g bd a) COW a) pp xro •,^ O C p. =j ., O •x CO C W . auCD oC o n a ? O an an' y o C oo as r2Wso i a. xo. U4Q � W W r U4U ,- W o UrW a) U ;.> c+ C 172 ,...1 o� a) -o Y "o � C os- a 0 as ocd ° al= = 0 0 a G o /az ga. aa o 0i ,O 0•❑ n N CU .9 0 •• ) o r o o y • o c 0 0 ,a aa °A � 0 • 09u 0cd o Q ., w .y C� a o o 'o ci a) a '•' y N En a) q "Cl U = O tr.- • -i .a > - —' 0 O bp 0 O CO 'a id a) VII .Ct % O 3 0 0. O ap ai 0 • O. O .' WO tQ N O y n N .0,, 'U .nn" N .. CG 0 .:0 W O O C bA ❑ r aJ 175 = y -C >>..+ 'O Y O y 6 0 c O C� t2, y . C O .ti aj 0 .0 0O a) a N C ^ 0 r0. .4 al 4 LA cd y b . co3do = 0 •a '' � � Q co = . 0 .O cd = c •F, U O 0-id r. T., czt a'Oa o °x. • 0ct 0.1 0 . , > 8 °dG 0 • 0 o O 0 U . 0 O O U C O O v fY Ct U ✓ ° E-1 cd ¢ 4 ^O o as• C N v • L WWF pP a' 0 U CC 3 C:2) al s. ¢ u. 0 0 _o o 'a U r 00 U Ili - O >, I = U U ~• i id.. N 0 OA Cl) E--{ 8 0 W cd cc � 3 a, ¢ i Ci as c2 � i 0 i 'o N oz t� O f ¢ . O _ a > U ed E '0 'aq A Q us= a- b4 o I, v O N .C1) '� U E 1=1 w U , w ¢ a w vo C.7 173 I, i y 10. lib ON• -0 .O b itl0 0 On o . a � a al 4' n., o v' 'B t-^ W ct i Otv �= U ca to Y '0 Mp 0 O 69 et 0 . o O > N O0 a = c ¢ ° ° E> > > a ¢ a . 1.- 0. 'V s. 0-3 aC y a) 0 a) n" O N s.„ bA V) R. .0 0 CIr./3 a) 0 ami 0 0 sO. 0 O cal .O U p O O O c/9W C E' bA i-. 0 .9 c' v f1 , .U O bA 0 0 0OO C .? v'' p ^ Oa O N >, O y O ., • 0 b y, O U T O - - „, E a) ,v, .9 a .00. N Cca a)75 OO - OD G 0 R. i • rn 0, > 0 �”.D w c>3 >cet vi 0 O V w el Q-.ts = E h _ !J. Sr ctscC s.. U .'�-., _ U TJ vi•N vi 0 to O id '`n' CL E .-' O sO. a) Q) a. a w 0 > 0 O Y i' 0 O. O N "fl a0., z'' �'-' r ^�' N ' U O �'" O O 'O atn+ ctnd .., •O f1 p -d O r O s., iC c� U 0 in 'O .�n U 0 ��" 0 .0 , 0 bbA V3 t`n.. 'U 0 'O cam„• 0 ^ O z~ 0 Cd U) 0 0 CI. 4)4) U P ci O LS 4• rn O Q) O ) t 'C 'vi CC 0 0 O r 0 0 ^ O U rn 'O a) a) = R. y p N O N •0 h w > v O 0 y 00 cd cd ^ A. S1, CL , L O E O co .. '% .:+ 'a.• y ca a) t°10 .-. 0 (510 'O 0 _F z 0 A. 0, 0 cC S. O O 0 A.'al •U t.. •U •U g e>,-o a) •0 t in y . U rn -p . -p LL, Ct ¢.•F e� a 0 ° ... caw - w a o .. ¢ 0.0 0 ... .-, -0 as 0 as Cl) 0. Cl) 0. x. O >, O U L bA p r bA bA OA CO O W . ss Cs cs ss 4 U U U U w ¢ [Wl. a) cue ° 0 0 cci a a) 0 0, A * cd r ^o a) > 0.al cn aA o w, s a..,.• , O aa)) .4 o cn o 0 a 6, Qcd to. a) ) -o Y 0).- c,) 0 . 00a) a D ti .. ai .. aa) a) rn 0 als.. x , C7 C .� aft P-, P... x0 .. a ao ax r' C G O C. u c. C a o tz Q 174 .m, a MC mom w _ -0 .. a) t ) W.:0 el �0 -o •p e) ? N a CC a) MI .O '4. (� 0,ci) vOi y" ma y!". � �'' '��' �i y , A O C • O C "C ca N sU. = .g., 1...Oa p a) b � U. ^Qcct ��" (7 a+ O P. O ago xr, OA cu y a) - vv)i a as -0 .. a) U ca `" ani ca tg ()i E c° t= vi >, y 0 v) . P � � � Y ya, c. ,. b3ar0 � - -fly as > c Y > .0 > • P c. O U ca 0 `� cct im N 0 U U y y w >, i G > o w ca �> ,� F cct i.. 0 4: 1) 0, as >.. OAU Q a 0 00 � 4 0 '0 (7 y Q ss 0 °' o `-�� a N .a3 1-- tj ccn a' a) at vi i e tip -0 E. ^ 0 o W y fl : j x > �ao � o > Ooo > = ocl _ 3 :- ,. 0V_ ¢ U t7 ... u. ¢ ^ o $ ¢ o U ..0 ..,, U :� n. 03 a,1 -os .+ o E' N o N 0 Q -0 ..° 0a) - j C 0 Ua cO ,.c U + . a)— a . ct ,5 •– E a) aO3 a o ' c • v " a •a ' O ° asa ,. . . a- a) a) - E ia)1cn o .... O 5 � v) 0. YYca ▪ `o ' Evi e. U o O a Cay aa aa) y U 0 n ca `d • a) 4•, 0a) i. 4. 0 rt 3•4UG W 1 O a) ao i S. a) wPO a.+ tr. tF0 a) . .YN 0 . . . c. Oi c. f .. ac.O O ° ❑ O - 0 vi Ovi cd U a ¢ k O OA3 • ,! - - Ao 2 p..(1) as bA i Ct o rU A gQN0 i o 3a ° c � 3 .4.0 . a) � _ oa wcc° > 3o� tea00 41 ` ° 0n- >, a ) . ' o c rc r a) Q ° to pi) a .> "01 U o1. v' rdU U > , G , •` c ,C -0 0,....4 4 b W o ^� ci.) 4 OA L) aU C U yr > S1 i-' N 0 ^p 0 = '0 O. G . N . yG r 0 i 0 p0 � � aaai .. t~ . ap 4. « . cs" ) N O 'O U) C • • aO .� � 0 3 = _ . PIOO4aN a NC w C Ua 0, y b PA PA 10 •-. i .� '9 O – v) "CO •O 0 U U t. • U Up. a 0 }. 0 ¢ •a c a, 3 ▪ v, F- at M., e E ' 0 0 ti. a) ci v) ca F- u) O. v, a) Q. a. O 0 0 s p PA O 6 4-, .� "O G 0 ¢ •C u r bo .a O .# v? c vi c• a, > V) o PQ. ¢ w wQc � P.a¢ Xi cv el ^ o O a) Em - C� 3VO ^ CO - 7 >-cG0 )0 3• . on , o y _ UO U N s.. .� p C C C • 0oop 3 • f aa V, • s Q. ai ^ 5 W 0 R CA I � � wmw ¢ on ¢ w ¢ 0C7wwv ix Q im O O C c L +.t 1,1 O tiCO w � PIilml CCNMCZ 175 AC 9\i A ti CQ .O Y 10. es Q a) 0 t0 ate) v, V a y O .0 .. O PI C7 a.'x en 'C r cd _ U CA = 4.. 0 v 11Z io co •o� cn N '0 ct 'd C. V EL. C ct i Y cz c�C O v) ticSIHh a) 0A et Q"b CD -0 .4 > CO N O 2 a) a) a).a) y O U -0 -a A F-, O a. a. = ON U _c cd C O cc$ Y I.. '•,= "5 x0- v) Te009 „g C4- V 4-i 0 ic C O N b O O Ya▪.'O4"i 0 YC .fl Vt. � C .. MI u) O �0s-. C. yN� V . a) t O tP G. aO bA p N p O y_ V . . C .O � V • "0V rYa)0 'i vi a, aCC 74 En ) OD ..w .Dati � ' O P. N O N .cd.. > i. C. C = h U LI V a) bD gal P a) ai Oi, p u, c03 C 0 y CZ a -a r vJ C• O V 0-1 f-t•. O.. �, CQ ccC .� a. . i. O C _ en • t al O r.. O `x x Q d U l.+” 0 AxcnUU6. [�. a.) E et arth I- i. _ h a) v) C1. . co U a .- 0 -a c3 C G. r b• Aa) P. 0 F m a) •V yF a) S].W 0 F a'Uy c, o a ) — a. f4aL < 0 E< mot PG 'C c = ^a o 0 ... 0 co = 6T,„ .. C 176 i = lim .J Q R J _ C L 12. Qi r L �y ,y -.Z. -ZD y l'i "C7 g ti g = = O .� a) y a) y O a) ""' v.=.. r 4, oA 0 O 6 O > co Ct o L 0 r+. Y., , y.. N fin-. 0 ._ N ill M. P. c area a et OA V cn ° - sn a -5. .O ^ A ° o ° 0- u 'd U ai .r C J � .--i L .r al L' N GO ti :J r. .7., v = Q CI 0I p J _ �3 U O Pi C ^ i. C c A O C C� 7; r - c A U `, O.^ bA c 0 OA R. 0 .bA - O. bD• c° Qs :0 a a .• aCe °- a. a4 aig baa; a : tet vn 4. r it r L 0 cn CC Z = �. d CCO • yy Q O ¢ al c w Z w 6° COI onl = y _ 0 cu a� — O o • o °�' o _ o v o 2 0 U .'c,, U w v cu c„p w O 0 .._....: • la 0 _f ° = .o 1 cn 5 O N o , O °' O o it: :: c Y a� 3o - ..0 a � O Y °' o & iw ¢ .0 3 .� 0 0 O 6. r., r to o 2.. a� •. o z O m Li o . a 0 O = ct cu t=4 c�., t, OZ U c a) 9O , OA pv . -a a ,c0w o ob 0 ~, y• •, ic c 8fl ai ° to OO o 'ZS 0I- ua. O -o a 6. Us, a.) _• ^ a CZ U 'OO � U0 i .0O O .... O n .� O = ,_ c O -O cn 0 ti W 0 Ll-0 -7-• = ... ...'p c U 'O O U0 ,, aw OOO O ,Lca c C ` ' -o ,.a ° ' O ) � O Oo do s, aJ cfO ) y• 0C U > :d G a .❑ G •., c N N , .y `n � w c iUU2 G. co = — •5 D . a. 0c • � ^ N .b vC S. L . � ON w n i "' a0O ? NJ OY z • O C2 r 4 g ;71) z U c n . v ..0 U a v ❑ g w I. r o ¢ o y, c0 c _ ° ° .0 a a� -p o oo G • O NO c C . 00 0 O ^ U b▪ Ocys'" 0 t, U .' a, A,( oo.00C ° w0 .0 � U 'U ° o „ G.,, 0 0. a) 0C OC. a , - . 0 C. 0 y•-• oa 0 E y r4 B y cs 1-9 r O OA 'a �CA 5 61 , V] z. C ',-.^ CnCS O r-1 oo n co y w Z oaMcmrn — cV ai0,6 Q 1C.) 0 , •O 7a = R N O a) '-' M i U 00 N O OA 4? c01 S. N fl, 11. a) �O O Z a, F- a U : E✓ O a. F- U ?Oy 0 0 aF o u o � V 178 e E a y 'O u c e4 0 o z r = ? z L a � ) .=_ a CU 0 a tu CaNC y L C ;r O ... 0y m �y ti �y �y �y w "q cn "CI [q `[7 y - "V tq "CI vJ ' -o a u a g C C O G C g C c of N • N 7U. 7U-. L 0. a. a t" a. P. a. at '1:: L f N 0 Lcc a> 01 es 7 a Z CC =' I '0 .0 .0 -oa. „, :. w w W w w 0 S. 4, T w b N U •^ pp O cCG O 0 N ° N N y y `o_ •° 'x o al o > 0 a' 0 12 4)S. OD al 4, Y. O O . C =i O 'op •-• a)aoi to n v ti 0 ;El ' 0 $ o n 0 4, -o a En _ y 0 0 .fl 0 c. cd cn m cn ami ^^ °' = °"' °' 3 ° ° ai a -0 y r cZ 3 .= on edP..1^ . t. yO CU a> cd 3-• cnN 'G a' O 4y 'O cn O MS 'a o C C � a) „ m — ° > a; -0 Oo oh acali > a c. 4 ... 'n '" , O 3 4) '^ -- U 0 0 ca o 0 is •C •p '(n 4.) 0 0 O bU s. "�' .0 to ' ti •b -0 4 .N Q' U s.. 0 0 .= C v ^ 0 U O .- O. cd C "0 'U " . 0 C p C E w cysC 0. C 0 q).0 w N N 'C7 O y N ..= N '•' 0 11) c3 y u' s•• N y N H ti Cr ate+ G ""' 'B cn •0 .O y P, O ;•� E ^fl a,N U U .+°" N c1 sU. N .0 r :: : : : : : e. X Q ^O aJ �' '6 a• -0 as W O r O c3 k" N cd Cct C c N 'O N - 0 O C = P. =— W czt :n = W O OD OD � R3 CC G 2 b 0 b N U C d- co C ‘,0 ti C O C N ., C N SS. C M N r.-) U C O C C O y C U cn a'aj O y ° • O a1 o Cn g C] W o .-• m N P N N .� C c00 N .• C cccS d ^ cd P. N 0 cd' N '� N tt 7'.. a>N d' U QE—,."- L) ~ crs 5' (..) Z0:1 01 a N y, F- CU U U H U U Q F U U '.� Q� F- U F-' U v°" O O o` a co 0 ? o v v azt mos ) F o 0. o 179 I - M OO �- CIL 8, N15 a) O O O N N ii. m O O N a) 7��) i. O C q� , ' M '— aO O .... ' _ 0 = O 0 � 0 O 0 0 O a) N N 0 =IIi MIMI CG g do N N p O O oN O O N O S, bA O y a)pyQ Fb -0 4. .0 1. • A ill: "O 0aO 4., m a) d =t •? tiat O U fl D0: 3 c o of ac o °' w ` � � -at on a o a . coa -o o ° . > y c to ocQ wo a ,. ? o • . 0 I-, • o 0o5ito a a. b an n Q w 0on >, s o o 0 .x ' n or o o 8 -0 o .= C s_ 0 W , ^ CX C o .r r V 0 0 y q:-... ° 4--. 0 C kW. = o L a" U 0 :'O , d 0) 003N 03 = UOa� o0 0 al 0 b ca w O a) C v y, cC aa 0 ° O d � N C . -co O O a. O 'v +r 0 0 • 6) r v M 0 cZ p a) yN O w m :11 r . j o -i 0 •i o a 4) i. o Q. a� o 0 0 0 0 t o y - d.) m CO 3 = CO U H o .,., Cd (.1) m m > U ap. .• U U m 0, .c o U 005 O m ., o o m y 0 a • E Col X 0 °o. a 0 • Z by �'" 0 a) a y• q 8 v E U b4 ¢. e Cd N 4-• g •C >, ti O O ..g b0 p m a) bA V Gi. 0 ) a e x a H own ) QW o o �o WF °' r� acu t - o © v P a Y R.' °' x C:, 0.) VI 3W a m '5 `° °'d-0 co) 0.? aa �n °w a,as �C7o OF f� .F. w 0 U 00 — 0 E 0 yU C L' .r O w _1 J MC L aim � = a) 0) = a. a) a)E I- a) o N N N C U U U 0 0 U 0 U 180 aco-- Co ,„, ... ,.,„, .,„, , ... ... .... _,:,, o N in in L cYa c+a N ca • cd Qi _¢ O - A .0. O ¢ O • O O 0. _� >. v 0 - O v 0 � O _ O v 0 O V O V O c a 0 ea 0 cd N O N �.N O N ct 0 mg N g N a •O ¢, 0. O0 L3, O f3. O S]�. O f1 00 !3. 00 t]. O 0. E E .-•� N N o N , N O O O 0 O 0 O O O O O O O O 0 0 co O cet 0 N 0) N o Nu N U N 0 N U N 0 N U N o bA �_ _ ❑ b4 a o 0 0 Ea 3 a� °' cal 0.., 0 :g 1-. R � U 00 CL)00 a '° ..O 44-4 O 0 '7 'CA=S 0 a •0 O •4.. � C 0�0 c 0 ❑ A E rx ^ 'oo 0 ai.o a 0 0 0 y p a. •S E g E on 3 'E ° c 3 :� ai c o c �" cci CO E a) 0 0 .E O 0 , '- .0 Vi 0 O 0 •i. Z `n ^? V Q o� 6 C a, °° M b o - a) P. .- v, C. © y a Cr) �Q.„" A o0 = 0 n y 0 O> � En O , 0`11 2 '17 Ta A • 6C O. 2 0 00 yY El) is„ Q oo WI) 'a • "" .O " x-4:3 C0 � a .Eo > o .1 C. . ' CO - 0 cn - ct a p 4 - o • c: a 3 U ; t �.ta f s. 00 0 0 > we:i ❑ _ CO 4. ca _ CO 4, 0 °` 00 MI O as aa) y . d O LL 'O O U is ca N ca p 0 0 O 0 y^'•", O y O 00 N 'C7 E —0.0 y p p T YO �' yam, O CCG w 0 ^O a. et rn bA E V A 0 C f� P—. O O V O > 0 U o U x as x • _ • .� U a) U •> 0 Q ••> o -a a) -a •C 00 'a c .E d• O C 0 . -a w 0 a 02 0 ±1) P `a o c,. 0 0 0 00 0 0 0 0 o a as cn c.) cm...F. 3 ,..1 Q, U 3 a3 ':s 00 3 v) p- w a. oo U 0 U a oo U ❑ Vi Cl., E © rs U 0 = 33 Y or�n ag ^n a 0 + Z U • 0 a' 0 d 0 a Sr E 3 O 17 -a . ❑CU a)72 -a 9 c F- = oc .a - c 0 CO 3 ao cm`s 0 0n 0 a) 0 Q Q au U a. > E > c a) Y .0 = e°n �: d d 0 a� o '- a, ca c/o > o > ca ". ° Ua ° d ¢ Z Z , d I �" L ~ N a0 "a Ce b�D f� O N F-. . A O A. p C Y pcn P r N Q- O C O CO , ' c) p i03 0 1, 1 _ 0 y • 0 oaW o .0 0 ¢ oa. . 0 t., an 0 ,-J V) P4 V) .-7 (/) a W o U I:, 0) a i ✓1 121 r.o O L. E L 7 Wm PI e�oi Oa s. 0 6.5 a)oi a) a) ai i. CC o I= 0 O v I ... N a) N CA r ,fl •9 to CIO bD OD ' ¢ X to X X X bA = w w w w O O O X 4] X a) a) a) X z Z z w z w z Z z w y L U N a) 4.) :17O •O_ �"" �; "CS fn r a a _ m Q O O C ❑ A C VD C cd Z c_pd p U., O O O O O O O p • a `' t 4 _t U oD 3 :� cis a) a 3 r 3 v ooD z apse Za w < za Za w ¢ no ,_pia: to tn � U U y y N a) 2 I. > `J > — \ CCS 7) 3 r, ...; .5,: a = N N > ^ a > U . HCC7 ft3 c, • 65 N CC 3.. OD bD y ccl O 0. O S— N h a) CG eaw CG tt7¢ ¢OA a ) < a ' U U ( o CW wC ® r — -0 c 0•0c. aa) 0 y o w o cg° CD o •.0 '" u r ° a 3 y 0 ,= 0.07d c . a 0-4,* OA r P' a) 0 -o r - on G WJU3 0.nzi O � ` a Y T ,. vs = a V a et 0 O E - E � p a • v co c. c, ao• > Y0 . _ . . . y °U 00 Ocn o teNcOCv Cnm'.. C ) bD i cc 0) , ' 0 ' ' ^ `z c Lc 0 co C. aN AAbj ' _ = a. E a fl E^o cs Cl.) _ ap > _ ,= • to 2 I aN O . t.() N a u ` a . N 0 •O ca p on fl y ' > 3 ° p ivs � o X0 _N )oo 3 ° a a) ' � ' al o px F, r ( o ) 9 ) 2 • Q -v ea2O �. 0 ? r O A �� 'O y ;0 w 0 p 4, ^ O fl > „ 0cc w E w . ) a y . Vv' oa) -O = 3is 0 ) bA A u) O � -ae' OD w EV P '” '7 ea) 0 E ^ o o c 0 Eti >,a' aa_ o :^E E wgal70ao E = or, -.0 oD. = , ) vs ot • ti o > • wy el')..= X = a • 5 0 ` °n at ^ a'E a' dD a.�c ^ 3 -o s0ar to 0C! 0 a — O uIOU . a) ) ) > to O O •om V E) E em > '^ $ 'C ) A — co y z. ..o a s. `n '-• n ,••• ^ •- Ci UI CUilHUJ Ififift -- .a Ep av co ci C G N M d' CPS ,p r co Q` CC 0 0 0 0 0 0 0 0 0 0 182 cn mmi CU Dig _ Lam a = 11 E N CD L o &as CI h al U gli = .L Q V 0 30 -o 0o y 0 "•U CU fs7 O `� U G C '3 . -- ._ bo •x •Y co to o. 'x 'x . ❑ r. w w b C., 4... .� 3 3 w Zm ° = w w Z z 2 1 'Ci 0 rci O O O ▪° Uc23c 0O "0 a) -oa� � � y o = bA `°P. -, ti Ew a <4 -CG 0o rw •o ` o It as < w ¢ v) -, Do - ,_.1 IX cn � atn Za PA4.• 1 o 0 P. RI cn) 0. = r -c: o x 0 0 0 0 •0 w i. 0 0 0 0 cb o CZ O„ w �.. w w w a P. °?a .O vi 4° cu O or U O" O G N . . r O U r O° = 7 O sby L U U n •aYCax U a cC C -o . cn ., 0v 0 c� ¢W to Ob Ll m0 O O 'O_ c�N _ on iY�. U 'o c3 �, ^ , O r o N r co U GJ U al s, r.; O cC r - P, U •.. to -0 U y v O bq ObD !0. Yct) oo >, o' tev^ c 0 ...=.= ^ Da. o o c.^ . y ▪ c U 0 Q, Ar. NN ' h• ..-+ r = o 3 m bb a C 0 cc) _ - y CA bo U -0 ct 0 • "0 OO= U • O QU 'O •d cl0 O cN "L `.' ¢ bA U • C T 0,5-= n := *r-• r 7 ._Sat Ea .Ycd > ti -0 ._ A h :. ' y c3. N • C ' ' = v u) B ` r0i� ' . U s. bA 0 y G 0 s. p „, . 0r Cd 0 0 CL• C y -- bA s. CO p . A rn O 0 w O 0 00 3 .U w o, v "03' .-. ° 2 p 3 (1,4 .411 ° c�UO G�~i Z A o o U = o a a .8 o Q o. 3 • UQ v) 0 -0a U : -o 1.1 PI 0 O O O O O O O 183 AC ° o i' .0 op 3 = .0 G r_ mort 0.0O '0 0O aO P. . .d: co &-,O N O NC W W Co)iiall � o +-C CL '' , C C6 CCS oCa) Mt va3C C 0 _ = 0 CO •� 0 0 0 an by WIU��r0 i. 'C3 ..0 F. 0 0.~O 00 vic •in ,ted bo... ca 0 0- 4 ul .s~ 3 :b -c 3 3 o '-' O k to C) N 0A 0 a) oa >r 2, .+ 0 0 z W : z :c z z W caw 0.t) z L. 0 N . c`ti sc.. .O $�. .O 0 .im 03 CO zo � �, zo ca U C 0 m . a-, cn $., cC O ti '' _ 0C ) ^ P. aso cn a 0 a o C o �, o 0 a o vatn W 0 r_ ¢ W QW ) za Qcn � l QW b 0 CA al I. aiomi ` 3 u 0 o as ° ° u _ o a) 0 a) o cat c. sem. C . > 'a a' F= 3 3 3 3 a° � o 0 © C > -P C as o o o °°o=, cG o) ° •y o w 0 0n v) C p o 04 0 0 `� Y o 0 1� 3 ° a a° w U v U a) " Y cmc m v� 3 " r o Fa' tu ^ '11 •0 a) 0 as •3 .o � ' r � coo o � �, o _ ° ; : ca :--., tu) � y o ' cri a OA O o >, o = o a) a 'o . , C . n,j ^ O tei C a O Oh O °A c+. r 75 po v U aa "0oW O Uw0 , cn , t. a) y0 o -o mo •71 ¢ - a c -o oE-et ° i o -° o � oaa ai � �Ccd� ti v0 aoc :o C C0N. io J ) � N r 0 •• O 0 o > 0 0 3 .t2°, 0 C a) >0, 0 C Cn 0 0 ,O UC 0 -o � bs) mao o '> ar _gP" aaio ` a3 0. C C •— CO 0 > o o a) co o - - O 3 ° - 2,), U '''' • gY ° ° Q�' •� o o `� , ° 0 0 0.1 0 cu o -0 �s a) o •a o 0 :. 30 0n .0Z3 ,— = C a . , 0y o C >, °3 F o. > mi 003 E .� w c s ^ ^ > c -0 = c, ° �o c 3 r o o .0 0 c }, . ° 0 °Ao= 0 ° ° oo ^a� . F) . mowa0 .o^ 0> 0Ob O - a C a - o � .a) C o — a) c � 0 V o .a 0 0 C 0 • . 0.MIMI =' O C .F., 0 M ° 'C LL 0 a) 0 > 0 L1.•cr3 • w > '0 .�' 5 C _. '0 5 0 N ,to U P. X. O O ,—, s-, 0 U c >, O +^ O 0 0 0 ,- (' 0 C •s=, cC 0 ° C ccs •0 a) y ;a U U o U > .E ,.0 Q z«: o Q -0 Y : °: M c° -0 3 0 w r r U x z a) X) CO * _ . 00 cv — Cr, N N N N CI CS O O 0 0 0 2 2 184 f 1 11 t t 1 U 1 EL s, : } i in c5 cid ON 5 C7 L NN N Q' m O O 0 N C C ton 0 00 - ° b � 0 -0 . b . — O ed U �C. ^ ed U ed QQ .12 0x C to O 4) E '- U O N O 0 Lr.: t• U0. U U , z c 1:4Q >, Ix R: 0 •X pCd '" U a b .� x = QZ w aU ° v C a a Cd U i• U U CL O O :r C CC a a 0 u �, t. U s� U� b aa) 'O 'G 'O ® �C U c`aa o –, W C W W LL .. - al) tn � V) . = a`) p - o 0 0 dam.- - N ° sI-. N 0 N 0 0 x 0 0 0 0 3 �? 4- = ...= ❑ 2 ° cc o �� 4: a) U V C Q+ = a? bas a .., CC a o � � � ° a) p4 ) C) a. - L o o � ¢ 3 °' ao lc do c ° o � U O ¢ e a, o o a o a 1 o i U a) t >, .o a� o a F r, -_ o >, v ° c 3 0 V, U on c V, 0 a� i a� 0 >, s. U o o �. >; � •o w o ..o Et a) r C) o w Y 3 V -a N E Z CA4°, c3 U o x o ° ai v, :a w o 0 . 'D e� «1:11)o a ECI tO O o c 4. c) CA o •= w o o X a c 0 O a) Dame y r Z — v UN ° ° ° •O V' x AC a' 0 CU a) u, O %) _M _ 0 " U o v Ce " V o U w 0 w O "a > «0 . Z co a4^0 0 Q to '0 0 Cd w 0 -0 CU = C y c° :° a) .� G m y C ^�' o o 8 o 3- -o 3 0 cu Xi o = cn L o> ° r o o ofo 0O ° O CE i1a n O o w U rRooO. p. O O mO o yT " 0 II II a 4uUO � w 3a,i aU ,fttoo°r 'za a a • — N M 7t 185 G r.: AC L J O\ •U '� ,n cn u) cn E ;n �ai �, �i Ri cd ca ca 0 cia ti F Ov >, >, > >, >, T O N N N N N kr-1 C O O O O O N ai. a i N a N 1) -17 N C >. ° ° ccs Q N ° •• CJ u y •is V) is v) «3 v) ca � C a c = C4 a C4 r PG 0 w - = p cii C hl > y x a x . c o s. VA C33 aU aU aU aU m a a) a I~ I co a a, w w. aG wu:; t$. �0. ice, 1.-. sem. •U N O °� O O C7 c7 C7 c7 w▪ 0 r y • O la U uu (.7 4 w 10 • J N • • • _U N .7L G O — a .c aC .� U Qn ! i a) O • C 0 O 0 0 N 0 a) .N U G) "' C3 .0 . .0 A ..G O �• F U 0 0 ct U U 0 'T3 0 C4. i - .. .., h ydi Y < < < < < < a) 0, N 0 cs pa) r io• o 0 F c� cn +� y a) o >~ N ccs O N U O .Y ^o cc! 0 ..= O o g a) cn a -o o ct 0' >,.c 00 3ct a A ., = 'o O > O a) In 0 4 O '� . sanO U a > a .o U E ✓- 14 b13 CL) _ cs > _o «0 ti y_ o b a) o G .' cd; f1' 0 0 _- 0 '~ 0 0 sem.. f�-. COU1- 0 C. x w -o -o > 0 w c- ,c,-,i Y :jaa) ° ^ 7 :°n ' c > ro w a oca U r >, a) o .° a) a) ° w ao ., as 0 .a• L - a a) � sCO a) 0 o P 7" 4)ca O0 � 'te a N r 0 r F 0 i to . 2 4- 3 byA O = •-^ G 0 u, a c3 �' ,..0 a) 0o ❑ 0oc. on vc >' � c > 0 . a) �a a 4., 0 24 �td � ¢.Z,.° a, ° = > 30 00 '6 car) zi5Y "0 .1.V? o C ' E a C1flilHll1 ! IH1Ht1H• H a a `a C7 o ,•0 r- 00 a• ,� • • • • O O O O 0 0 186 RESOLUTION NO. PC-2016- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF MOORPARK, CALIFORNIA, RECOMMENDING TO THE CITY COUNCIL APPROVAL OF GENERAL PLAN AMENDMENT NO. 2016-02 TO INCLUDE THE 2015 VENTURA COUNTY MULTI-HAZARD MITIGATION PLAN AS PART OF THE SAFETY ELEMENT AND FINDING OF EXEMPTION FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN CONNECTION THEREWITH WHEREAS, at its meeting of October 25, 2016, the Planning Commission conducted a duly-noticed public hearing on General Plan Amendment No. 2016-02 to include the 2015 Ventura County Multi-Hazard Mitigation Plan in the Safety Element of the City's General Plan, received public testimony on the proposed amendment, and after receiving oral and written public testimony, closed the public hearing and reached a decision; and WHEREAS, the Community Development Director has found General Plan Amendment No. 2016-02 to qualify for a General Rule Exemption in accordance with Section 15061(b)(3) of California Code of Regulations (CEQA Guidelines) in that Moorpark's Mitigation Action Plan of the Ventura County Multi-Hazard Mitigation Plan involves emergency equipment purchases, seismic upgrades to certain existing public facilities if necessary, educational efforts, communication improvements, landscape maintenance, and study of a potential new fire station site. It can be seen with certainty that there is no possibility that these activities may have a significant effect on the environment. No further environmental documentation is required. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. ENVIRONMENTAL DOCUMENTATION: The Planning Commission concurs with the Community Development Director's determination that General Plan Amendment No. 2016-02 qualifies for a General Rule Exemption in accordance with Section 15061(b)(3) of California Code of Regulations (CEQA Guidelines) in that Moorpark's Mitigation Action Plan of the Ventura County Multi-Hazard Mitigation Plan involves emergency equipment purchases, seismic upgrades to certain existing public facilities if necessary, educational efforts, communication improvements, landscape maintenance, and study of a potential new fire station site. It can be seen with certainty that there is no possibility that these activities may have a significant effect on the environment. No further environmental documentation is required. PC ATTACHMENT 2 187 Resolution No. PC-2016- Page 2 SECTION 2. RECOMMENDATION: The Planning Commission recommends to the City Council approval of General Plan Amendment No. 2016-02 to include the 2015 Ventura County Multi-Hazard Mitigation Plan in the Safety Element of the City's General Plan. SECTION 3. Filing of Resolution: The Community Development Director shall cause a certified resolution to be filed in the book of original resolutions. The action of the foregoing direction was approved by the following vote: AYES: NOES: ABSTAIN: ABSENT: PASSED AND ADOPTED this 25th day of October, 2016. Mark Di Cecco, Chair David A. Bobardt Community Development Director 188 MOORPARK,CALIFORNIA Planning Commission of IU. ;, . 2t ► ITEM 10.A. ACTION: ' `pC rc!'v✓i naw ITFS nF THE PLANNING COMMISSION BY: /Innrnark California September 27, 2016 A Regular Meeting of the Planning Commission of the City of Moorpark was held on September 27, 2016, in the Council Chambers of said City located at 799 Moorpark Avenue, Moorpark, California. 1. CALL TO ORDER: Chair Di Cecco called the meeting to order at 7:04 p.m. 2. PLEDGE OF ALLEGIANCE: Commissioner Groff led the Pledge of Allegiance. 3. ROLL CALL: Present: Commissioners Aquino, Groff, Hamous, Vice Chair Landis, and Chair Di Cecco. Absent: None. Staff Present: David Bobardt, Community Development Director; Freddy A. Carrillo, Associate Planner I; and Joyce Figueroa, Administrative Assistant II. 4. PROCLAMATIONS, COMMENDATIONS, AND SPECIAL PRESENTATIONS: None. 5. PUBLIC COMMENT: None. 6. REORDERING OF, AND ADDITIONS TO, THE AGENDA: None. 7. ANNOUNCEMENTS, FUTURE AGENDA ITEMS, AND REPORTS ON MEETINGS/CONFERENCES ATTENDED BY THE COMMISSION: (Future agenda items are tentative and are subject to rescheduling.) A. Future Agenda Items CPD No. 2016-01 and CUP No. 2016-04; Apricot Lane Farms Market, Restaurant and Microbrewery 189 Minutes of the Planning Commission Moorpark, California Page 2 September 27, 2016 ii. Safety Element Amendment: Ventura County Multi-Hazard Mitigation Plan Mr. Bobardt briefly discussed future agenda items. 8. PUBLIC HEARINGS: (next Resolution No. PC-2016-612) A. Consider Resolution Approving Conditional Use Permit No. 2016-03 and Administrative Permit No. 2016-09, to Allow a Service Station and 2,484 Square-Foot Convenience Store with Beer and Wine Sales for Off-Site Consumption at 13800 Princeton Avenue; And, Making a Determination of Exemption Under CEQA in Connection Therewith; On the Application of Henry Ling for Western States Engineering. Staff Recommendation: 1) Open the public hearing, accept public testimony and close the public hearing; and 2) Adopt Resolution No. PC-2016-612 approving Conditional Use Permit No. 2016-01 and Administrative Permit No. 2016-09 with conditions of approval and making a determination of exemption under CEQA in connection therewith. (Staff: Freddy Carrillo) Mr. Carrillo gave the staff report. Commissioner Groff recused himself from this item to avoid a potential conflict of interest and left the dais at 7:12 p.m. A discussion followed among the Commissioners and staff, which focused on the metal vine trellises to be installed in wall panels of the south elevation; proposed set back three feet from the south property line; condition of approval recommending a fencing plan; and title report showing the number and ownership of the two parcels. Chair Di Cecco opened the public hearing. Shiper Chowdhury, Moorpark Service Inc., property owner, discussed the project and stated that he appreciates staff's cooperation and the community of Moorpark's support. Tom Vincent, Phillips 66, parent company of 76 Gas Station, spoke in support of the project and commended staff on doing a great job with the brick and architectural look to match the Moorpark Fire Station. Sief Yosef, a Moorpark resident, spoke in support of the project. In response to Chair Di Cecco, Mr. Bobardt stated there were no additional speaker cards or written cards for this item. Chair Di Cecco closed the Public Hearing. 190 Minutes of the Planning Commission Moorpark, California Page 3 September 27, 2016 A discussion followed among the Commissioners regarding: preference of brick element on the west elevation coming up from Spring Road; opportunities regarding architectural elements of the canopy; 3-feet set back from the south property line may not be quite enough to service the area very well; onsite plan does not show what is going to be on the ground; prefer handicapped access on the south side; request to have tower three-dimensional and treatment on front of tower appear on the back of the tower also; and support of the project. At the request of Chair Di Cecco, Mr. Vincent stepped forward to the lectern and responded to concerns that were raised regarding the architectural features of canopy. Mr. Vincent stated that the west elevation of the building needs brick and the architectural features of the gas canopy columns have the same brick and look as the building. This is a flagship site that has the architectural features that tie the gas pumps to the building. MOTION: Vice Chair Landis moved and Commissioner Hamous seconded a motion to approve staff recommendation, with changes as proposed by the Commission, including adoption of Resolution No. PC-2016-612. The motion carried by voice vote: 4-0, Commissioner Groff absent. The Planning Commission has final approval authority for this item. Commissioner Groff returned to the dais at 7:40 p.m. 9. DISCUSSION ITEMS: None. 10. CONSENT CALENDAR: MOTION: Commissioner Hamous moved and Commissioner Aquino seconded a motion to approve the Consent Calendar. The motion carried by unanimous voice vote. A. Consider Approval of the Regular Meeting Minutes of August 23, 2016. Staff Recommendation: Approve the minutes. B. Consider Finding of General Plan Consistency for the Purchase of Property at 766 Los Angeles Avenue by the City of Moorpark for Public Purposes. Staff Recommendation: Find the acquisition of the property at 766 Los Angeles Avenue (APN 506-0-050-515) for affordable housing to be consistent with the goals and policies of the Housing Element, but would require an amendment to the Land Use Element Map, and direct staff to report this finding to the City Council. 191 Minutes of the Planning Commission Moorpark, California Page 4 September 27, 2016 11. ADJOURNMENT: MOTION: Vice Chair Landis moved and Commissioner Groff seconded a motion to adjourn the meeting. The motion carried by unanimous voice vote. The time was 7:41 p.m. Mark Di Cecco, Chair David A. Bobardt, Community Development Director 192