Loading...
HomeMy WebLinkAboutAGENDA REPORT 2007 0307 CC REG ITEM 10GMOORPARK CITY COUNCIL AGENDA REPORT TrEM 10 - G. TO: Honorable City Council FROM: Yugal K. Lall, City Engineer /Public Works Director Prepared by: Ken Gilbert, Public Works Consultant DATE: February 28, 2007 (CC Meeting of 03/07/07) SUBJECT: Consider Notice of Completion for a Project to Modify the Raised Median on Princeton Avenue at Campus Park Drive DISCUSSION A. Project Scope The project provided for the modification to the raised median on Princeton Avenue just south of Campus Park Drive, to eliminate the left turn pocket and covert the two remaining lanes to a Left -Turn only and a Right -Tum only. The project also included re- striping to provide bike lanes on the east and west side of Princeton Avenue in the vicinity of the median modification project. As a separate project, the median landscaping will be modified to match the existing adjacent landscaping. The Community Services Department is in the process of designing and constructing these landscape improvements. B. Changes 1. Quantity Adjustments: As is typical with public works construction projects, the actual quantities required for the job differed from the engineer's estimate. This project required less quantities of certain bid items resulting in a decrease to the contract price of $903.10. 2. Change Orders: One Contract Change Order was approved for the removal and replacement of damaged curb and gutter at the sidewalk, at various locations in the vicinity of the project. city share /public worksteveryone/staft reports72007IMarch/Princeton median comp 00 V 1 E Honorable City Council March 7, 2007 Page 2 C. Fiscallmpact Construction Cost Summary: The total project construction cost is summarized as follows: Description Amount ($) Bid amount 73,744.00 Quantity Adjustment (903.10) Change Orders 4,730.00 Total 77,570.90 2. Total Project Cost Summary. Total project costs are summarized as follows: Description Amount ($) Design 260.00 Construction 77,570.90 Inspection 1,600.00 Design Total 79,430.90 3. Budget. The project is included in the FY 06/07 Budget as Project 8069 and is funded by Fund 2603: TDA Article 8A (Local Transportation Fund). A re-cap of the budget and budget surplus is as follows: Project 8069 Current Description Budget ($) Actual ($) Surplus ($) Design 5,000 260 4,740 Construction 70,000 77,571 (7,571) Inspection 10,000 1,600 8,400 Total 85,000 79,431 5,569 D. Final Inspection and Acceptance The City has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as complete so that the City Clerk may record the Notice of Completion to start the final lien period. Absent the receipt of any Stop Notices from subcontractors or suppliers, the ten percent retention will be released thirty -five (35) days after the date of the recordation of that notice. STAFF RECOMMENDATION Accept the work as complete and direct the City Clerk to record the Notice of Completion. c c,ty shore/public works/ev"ne/staH reports/Pnnceton median Comp G. 0 0 1 v, 0