HomeMy WebLinkAboutAGENDA REPORT 2016 1116 CCSA REG JNT DC ITEM 10E ITEM 10.E.
CITY OF MOORPARK,CALBFor'NIA
City Council Meeting
of -0%0/4
ACTION:I
MOORPARK CITY COUNCIL "-------
AGENDA REPORT
TO: The Honorable City Council
FROM: Jeremy Laurentowski, Parks and Recreation Di,ecto
BY: Jessica Sandifer, Senior Management Analys 041'
DATE: November 7, 2016 (CC Meeting of 11/16/2016)
SUBJECT: Consider Amendment No. 1 to Agreement with Phoenix Civil
Engineering, Inc. for Construction Management Services for the
Retaining Wall Project at Arroyo Vista Community Park and
Resolution Amending the Fiscal Year 2016/17 Budget
BACKGROUND
A project is in process to replace a retaining wall at Arroyo Vista Community Park
(AVCP). The retaining wall was installed at the top of the slope on the south side of the
park, adjacent to three homes at the end of the cul-de-sacs on Honeyglen Court and
Summerglen Court. The original retaining wall was constructed with wood beams and
galvanized steel posts for support and over time, several wood beams had dislodged
from the wall causing a significant amount of outward deformation. In December 2013,
the City Council authorized a.geotechnical investigation of the retaining wall area. The
investigation concluded that the movement of the existing wall is due to a combination
of factors, which include the initial design and degradation of the existing wall, as well
as the creep-type soil movement of the fill soils above the wall. In September 2014, the
City Council approved funding to hire a civil engineer to design the retaining wall options
recommended by the geotechnical consultant. Staff contracted with Phoenix Civil
Engineering (Phoenix) to complete the construction drawings and specifications for the
project. In November 2015, the City Council approved the project plans and
specifications and authorized staff to go out to bid on the project. In December 2015,
the City Council approved an Agreement with Phoenix for Construction Management
Services.
DISCUSSION
Staff recommended hiring a construction manager due to the size, type, complexity, and
location of the retaining wall and the fact that we have limited City staff to provide daily
project oversight and coordination. Phoenix has been providing construction
160
Honorable City Council
November 16, 2016
Page 2
management services for the retaining wall. However, several construction deficiencies
were discovered by Phoenix during the course of this project. This has resulted in
Phoenix spending additional time on contractor oversight to ensure compliance with the
design plans. Phoenix has also been required to repeat inspections on multiple
occasions and spend additional time reviewing contractor submittals and general project
coordination.
FISCAL IMPACT
The original Agreement for construction management and materials testing services
was $33,396.00, which includes the costs for a sub-consultant to provide materials
testing and a 10% contingency of $3,306.00. The Amendment is requesting an
additional $14,032.00 for additional construction management and materials testing
services. No additional contingency is being included. The new total agreement amount,
including contingency is $47,428.00.
Funding was not included in the Fiscal Year 2016/17 budget for these additional
construction management services. Therefore, staff is requesting an appropriation of
$14,032.00 from the General Fund (1000) to complete this work.
STAFF RECOMMENDATION (ROLL CALL VOTE)
1. Approve Amendment #1 to Agreement with Phoenix Civil Engineering, Inc. in the
amount of $14,032.00, and authorize the City Manager to sign the Agreement,
subject to final language approval of the City Manager; and
2. Adopt Resolution No. 2016 - amending the FY 2016/17 budget to appropriate
$14,032.00 from the General Fund (1000) Reserve to fund this work.
Attachments:
1. Amendment#1
2. Resolution No. 2016-
161
ATTACHMENT 1
AMENDMENT NO. 1
TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN
THE CITY OF MOORPARK AND PHOENIX CIVIL ENGINEERING, INC.
FOR CONSTRUCTION MANAGEMENT SERVICES
This Amendment No. 1 to the Professional Services Agreement between the City
of Moorpark, a municipal corporation ("City"), and Phoenix Civil Engineering, Inc, a
corporation ("Consultant"), for construction management services ("Agreement"), is
made and entered into this day of , 2016.
RECITALS
WHEREAS, on January 29, 2016 the City and Consultant entered into an
Agreement to have the Consultant provide construction management services; and
WHEREAS, the City and Consultant now desire to amend the Agreement to
increase the compensation for services to be performed by Contractor from thirty-three
thousand three hundred ninety-six dollars ($33,396.00), by a value of fourteen thousand
thirty-two dollars ($14,032.00), for a total contract value of forty-seven thousand four
hundred twenty-eight dollars ($47,428.00), which includes a contingency in the amount
of three thousand thirty-six dollars ($3,036.00), for continued construction management
services, and document said Agreement to amend by jointly approving Amendment No.
1 to the Agreement.
NOW, THEREFORE, it is mutually agreed by and between the parties to the
Agreement as follows:
I. Section 2, SCOPE OF SERVICES, is amended by replacing this section in its
entirety as follows:
"City does hereby retain Consultant, as an independent contractor,
in a contractual capacity to provide construction management services, as
set forth in Exhibits C and D. In the event there is a conflict between the
provisions of Exhibits C and D and this Agreement, the language
contained in this Agreement shall take precedence.
Consultant shall perform the tasks described and set forth in
Exhibits C and D. Consultant shall complete the tasks according to the
• schedule of performance which is also set forth in Exhibit C.
Compensation for the services to be performed by Consultant shall
be in accordance with Exhibits C and D. Compensation shall not exceed
the rates or contract value of forty-four thousand three hundred ninety-two
dollars ($44,392.00) as stated in Exhibit D, plus a contingency in the
amount of three thousand thirty-six dollars ($3,036.00), for a total contract
value of forty-seven thousand four hundred twenty-eight dollars
($47,428.00), without a written Amendment to the Agreement executed by
162
both parties. Payment by City to Consultant shall be in accordance with
the provisions of this Agreement."
II. Section 5, PAYMENT, is amended by replacing paragraph two of this section in
its entirety as follows:
"The City agrees to pay Contractor monthly, in accordance with the
payment rates and terms and the schedule of payment as set forth in
Exhibits C and D, based upon actual time spent on the above tasks. This
amount shall not exceed forty-four thousand three hundred ninety-two
dollars ($44,392.00) as stated in Exhibit D, plus a contingency in the
amount of three thousand thirty-six dollars ($3,036.00), for a total contract
value of forty-seven thousand four hundred twenty-eight dollars
($47,428.00), for the total term of the Agreement unless additional
payment is approved as provided in this Agreement."
III. Remaining Provisions:
Except as revised by this Amendment No. 1, all of the provisions of the
Agreement shall remain in full force and effect.
In Witness Whereof, the parties hereto have caused this Amendment to be
executed the day and year first above written.
CITY OF MOORPARK PHOENIX CIVIL ENGINEERING, INC.
Steven Kueny, City Manager Jon Turner, Principal Engineer
Attest:
Maureen Benson, City Clerk
Amendment No. 1 to Agreement between City of Moorpark and Page 2 16 3
Phoenix Civil Engineering, Inc.
Exhibit D
Phoenix civil Engineering, Inca
4532 Telephone Rod, Stc, 113 4. s14.£1.. Co 93003 8D_.6_ 6803
infoQ1 :rhoefl 't 1�}. . Frt, tr': Y f_h0 _,i5.{
Ms.Jessica Sandifer November 6,2016
City of Moorpark
Parks,Recreation and Community Services Department
799 Moorpark Ave.
Moorpark,CA 93021
City of Moorpark—Arroyo Vista Community Park Wall Services During Construction—Request for
Fee Amendment
Dear Jessica,
I am pleased to provide you with this fee amendment proposal for continued engineering services during
construction associated with the AVCP Wall Project. This scope of work addresses the need to perform
additional work by Phoenix Civil Engineering,Inc.(Phoenix)and Fugro Consultants Inc.(Fugro). There has
been substantially more time devoted to coordination(onsite and offsite),submittal review,RFI review and
construction observation with this contractor. This was not anticipated due to the scope and length of the
construction project. Based on our current rate of expenditures we are requesting an additional $11,832 for
Phoenix and$2,200 for Fugro to cover the remainder of the construction phase services.
Based on our discussions,I have developed the following task in our proposal. The task numbering is
consistent with the previous tasks listed in the proposal.
Construction Services During Construction Additional Fee Request
Cl Task 102: Submittal Review $620
❑ Task 103: Response to Requests for Information $620
❑ Task 104: Project Coordination/Construction Observation $12,792
Our original approved project fee was for$30,360. This amendment is for$14,032. The proposed total
revised contract amount is$44,392. Our services will be billed on a monthly basis in accordance with the
project professional services agreement.
Th. ou again 1. this opportunity.
Sincerel
Mid
Jon 'urner,PE
Prin ipal Engin,•r
164
ATTACHMENT 2
RESOLUTION NO. 2016-
A RESOLUTION OF CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FISCAL YEAR
2016/17 BUDGET BY APPROPRIATING $14,032.00 FROM THE
GENERAL FUND (1000) FOR ADDITIONAL CONSTRUCTION
MANAGEMENT AND SPECIAL MATERIALS TESTING AND
INSPECTION SERVICES FOR THE ARROYO VISTA
COMMUNITY PARK RETAINING WALL PROJECT (CIP 7856)
WHEREAS on December 18, 2013, the City Council adopted Resolution No.
2013-3256, which allocated $15,800 from the General Fund to obtain a geotechnical
evaluation of a retaining wall at Arroyo Vista Community Park (AVCP); and
WHEREAS, on September 17, 2014, the City Council adopted Resolution No.
2014-3321, which allocated $26,610 from the General Fund for additional geotechnical
and civil engineering services to prepare plans and specifications for the retaining wall
project; and
WHEREAS, on December 16, 2015, the City Council adopted Resolution No.
2015-3467, which allocated $33,396.00 for Construction Management and Materials
Testing and Inspection Services for the retaining wall project; and
WHEREAS, on June 15, 2016, the City of Moorpark adopted the Operating and
Capital Improvement Projects budget for Fiscal Year (FY) 2016/17; and
WHEREAS, a staff report has been presented to the City Council requesting
funding for additional construction management and material testing services for the
project; and
WHEREAS, an aggregate budget amendment of $14,032.00 is requested to fund
the additional construction management and material testing services from the General
Fund (1000); and
WHEREAS, Exhibit "A", attached hereto and made a part hereof, describes said
budget amendment and the resultant impact to the budget line item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. A budget amendment in the amount $14,032,000 from the General
Fund (1000) , as more particularly described in Exhibit "A", attached hereto, is hereby
approved.
165
Resolution No. 2016-
Page 2
SECTION 2. The City Clerk shall certify to the adoption of this resolution and
shall cause a certified resolution to be filed in the book of original resolutions.
PASSED AND ADOPTED this 16th day of November, 2016.
Janice S. Parvin, Mayor
ATTEST:
Maureen Benson, City Clerk
Exhibit A — Budget Amendment
166
Resolution No. 2016-
Page 3
EXHIBIT A
BUDGET AMENDMENT FOR
GENERAL FUND (1000)
FOR CONSTRUCTION MANAGEMENT SERVICES FOR AVRC RETAINING WALL PROJECT
FY 2016/17
FUND BALANCE ALLOCATION:
Fund Title Fund-Account Number Amount
GENERAL FUND 1000-5500 $ 14,032.00
Total $ 14,032.00
EXPENDITURE APPROPRIATION:
Account Number Current Budget* Revision Amended Budget
1000.7800.7856.9601 $ 7,285.46 $ 7,285.46
1000.7800.7856.9613 $ 135,800.00 $ 135,800.00
1000.7800.7856.9650 $ 33,396.00 $ 14,032.00 $ 47,428.00
$
$ -
$
Total $ 176,481.46 $ 14,032.00 $ 190,513.46
*current budget numbers do not reflect final adjustments of FY 2015/16 continuing appropriations
?_,P_Finance Approval:
167