HomeMy WebLinkAboutAGENDA REPORT 1997 0402 CC REG ITEM 10G 2i ITEM /® . G• AGENDA REPORT CI Y OF MOORPARK,CALIFORNIA City t.Meeting of ek 199.2 To: The Honorable City Council ACTION: a � .7� From: Dirk Lovett, Assistant City Engineer Prepared By Anthony Cooper, Civil Engineer BY. J �'�r Date: March 21, 1997 (Council Meeting of April 3, 1997) Subject: Notice of Completion of the 1995 Overlay Project. BACKGROUND On May 15, 1996, the City Council awarded a contract to Nye & Nelson for the construction of an asphalt overlay on a number of streets throughout the City, including: Magnolia Street, Goldman Avenue, Flory Avenue, Tierra Rejada west of Spring Road and Spring Road south of Peach Hill Road. Construction began on June 21, 1996. Final Punch list repairs were completed on January 6, 1997. DISCUSSION A. Quantity Adjustments The quantities of bid items required to complete the project was less than the engineer's estimate of quantities stated in the bid documents. The resultant cost reduction is summarized as follows: \ Bid Amount: $ 780,848.40 Quantity Adjustment $ (37,745.121 Adjusted Costs $ 743,103.28 B. Change Orders Six construction change orders were issued for this project, totaling $18,805.48. A brief description of these Change Orders is as follows: (1) Additional grading was done on the west side of Magnolia street due to the relocation of the proposed sidewalk. In addition, it was necessary to remove and replace additional curb, gutter and sidewalk on the east side of the street because of poor existing drainage. 1 000329 9� -a 7 (2) Additional asphalt removal, asphalt placement and pavement fabric was deemed necessary during construction of Flory Avenue and Spring Road to remedy deteriorated asphalt. (3) 400 lineal feet of asphalt berm was installed on the north side of Old Los Angeles Avenue to better drain the newly widened street and protect the toe of the existing slope. (4) Repair of severely alligator cracked asphalt at the City Hall parking lot and at Arroyo Vista Park Access Road was added to the contract. (5) A concrete driveway and steps were placed at a residence 'on the west side of Magnolia Street because of sidewalk being relocated further west than originally planned. (6) A deduct change order was authorized by the contractor to reimburse the City inspector for overtime hours. This overtime was a result of the contractor's request to work on the weekends. A cost summary of the above described Contract Change Orders is as follows: Approved Final Actual Item Amount ($) Cost ($) C.O. #1 $ 9,000.00 $ 4,364.16 C.O. #2 $34,000.00 $ 1,725.00 C.O. #3 $ 2,283.00 $ 2,077.60 C.O. #4 $ 8,606.72 $ 8,606.72 C.O. #5 $ 2,816.00 $ 2,816.00 C.O. #6 $ (784.00) $ (784.00) Total $57,361.72 $18,805.48 C. Fiscal Impact 1. Total Contract/Actual Construction Cost: The final contract construction costs for the project are summarized as follows: Approved Actual Item Amount ($) Adjustment ($) Cost ($) Bid Amount: 780,848.40 (37,745.12) 743,103.28 C.O. #1 9,000.00 (4,635.84) 4,364.16 C.O. #2 34,000.00 (32,275.00) 1,725.00 C.O. #3 2,283.00 (205.40) 2,077.60 C.O. #4 8,606.72 8,606.72 C.O. #5 2,816.00 2,816.00 C.O. #6 (784.00) $ (784.00) Total 838,210.12 (74,861.36) $761,980.76 2 000,7. 30 2. Total Project Costs: An estimate of the total project costs for the A/C Overlay contract is as follows: Element Cost ($) • Design [94-044, 96-002] 93,927 • Printing, Advertising, etc. 500 • Construction 761,981 • Construction Engineering 90.000 Total 1,053,000 3. Multi-Year Costs: Costs for this project have been incurred over several years. A summary of these costs are as follows: Prior Total Element Years FY1996/97 Project ($1 Design * 97,427 0 97,427 Construction * 162,000 761,981 923,981 Admin & Inspection * 10,000 59,500 69,500 Total * 269,427 821,481 1,090,908 Notes: * Includes Sub-Drain Project. 4. FY 1996/97 Budget: The amount of the appropriations and budget for the subject project for FY 1996/97 is as follows: • Local Transportation Fund [203.801.8004.000.9903] $ 820,000 • Federal STP Grant [244.801.8004.000.9903] $ 480,000 • NRA [410.801.8004.000.9903] $ 100,000 *** Total $ 1,400,000 Notes: *** Construction costs related to improvements constructed on Goldman Avenue, Flory Avenue and Magnolia Avenue and non street related work. 5. STP Grant: The City has received a Federal Surface Transportation Program (STP) grant in the amount of $480,000 to fund the majority of the costs related to the improvements constructed on Tierra rejada Road and Spring Road. 6. SB-821 Funded Improvements: A portion of the FY 1995/96 SB-821 Bicycle / Pedestrian facilities grant monies ($40,000) funded the sidewalk improvements constructed on Magnolia Street. 3 000331 7. Budget Adjustment: It is the intent of staff to prepare a resolution adjusting the FY 1996/97 Budget to reflect actual costs and funding sources for this project A summary of that future proposed action is as follows: Current Proposed Revised Funding Source Account No. Budget ($) Change ($) Budget ($) Local Trans Fund 203.801.8004.000.9903 820,000 (535,000) 285,000 Federal STP (ISTEA) 244.801.8004.000.9903 480,000 0 480,000 SB-821 242.801.8804.000.9903 0 7,000 7,000 MRA 410.801.8004.000.9903 100,000 (50,000) 50,000 Total 1,400,000 (578,000) 822,000 D. Final Inspection and Acceptance The City Engineer has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as completed, direct the City Clerk to file a Notice of Completion and authorize release of the retention. RECOMMENDATION Staff recommends that the City Council take the following actions: 1. Accept the work as complete; 2. Instruct the City Clerk to file a Notice of Completion for the project; and, 3 . Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period. 4 100332