Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 0515 CC REG ITEM 07G //L/ ITEMY b .f � c.,,__, AGENDA 12EPOI2111 :' =,..-r ? ' C7CTY ®F WIC)OI E' .I e of 5— • A TO: The Honorable City Council CY 1 FROM: Kenneth C. Gilbert, Director of Public Works DATE: May 3, 1996 (CC Meeting: 5-15-96) SUBJECT: Consider Bids for the Construction of the 1995 Asphalt Overlay Project BACKGROUND On April 3 , 1996, the City Council approved the plans and specifications for the subject project and authorized staff to advertise for receipt of bids. DISCUSSION A. General Description The subject project calls for the construction of minor repairs and then the construction of an asphalt overlay (with reinforcing fabric) on the following streets: 1) Tierra Rejada Road from Los Angeles Avenue southerly and easterly to a point just west of Spring Road; 2) Spring Road from Peach Hill Road to Tierra Rejada Road; 3) Old Los Angeles Avenue from the rail crossing located east of the Collins Drive freeway interchange, easterly to the City Limit; 4) Flory Avenue from Third Street to Los Angeles Avenue; 5) Goldman Avenue; and, 6) Magnolia Street from Charles Street to High Street. The work to be done on Magnolia Street includes the construction of a new curb, gutter and sidewalk on the west side of the street. It is recommended that this upgrade be funded by the Moorpark Redevelopment Agency (MRA) . acovly.awd ,I 96- 0-7 Asphalt Overlay Project May 1996 Page 2 B. CCB Participation 1 . Payment In-Lieu of Slurry Seal: California Community Builders (CCB) and the City had agreed to jointly fund the cost of a project to Slurry Seal Tierra Rejada Road. That portion of the project within PC-3 was to be funded by CCB. When it was decided to defer the appplication of slurry seal, CCB paid the City $40,961 in lieu of the slurry seal treatment, said amount to be credited to future A/C Overlay costs. 2 . Sub-Drain Project: Prior to proceeding with the subject project it was necessary to install a system of subdrains along selected portions of Tierra Rejada Road, to prevent subsurface water intrusion into the roadbed. The costs for that portion of this work which was constructed within PC-3 was offset by a payment from California Community Builders (CCB) in the amount of $90,000. The construction of this project is nearing completion. The cost of this work has been charged to the subject 1995 Asphalt Overlay Project. A summary of the total anticipated costs for the project is as follows: From From Description CCB ($) 011 ($) Total ($) Design 0 3,000 3,000 Construction 162,000 162,000 Construction Contingency (20%) 0 32,400 32,400 Contract Admin / Insp 0 10,000 10,000 Sub-Total 0 207,400.00 207,400 Partial Funding from CCB 90,000 (90.000) 0 Net Total Cost to City 90,000 117,400.00 207,400 3 . Total CCB Payments: The total amount of CCB payments which have been credited to overall project costs (Sub-Drain and A/C Overlay) is $130,961 ($40,961 + $90,000) . C. Bid Results Bids for the subject project were received and opened on May 6, 1996. A tabulation of the bid results is attached as Exhibit 1. The apparent low bidder is Nye & Nelson with a total bid of • $789,504.40. The Engineer's Estimate was $1,205,674.12 . acovly.awd Asphalt Overlay Project May 1996 Page 3 D. Oualifications It has been determined that the apparent low bidder, Nye & Nelson, Inc. , is qualified to perform the work. Said bidder has confirmed their bid and their desire to proceed with the construction of the project. E. Schedule Construction should begin in June and be completed in August. F. Fiscal Impact 1. STP Grant: The City has received approval of a grant for Federal Surface Transportation Program (STP) funds in the amount of $480,000 for the subject project. In February 1996, the City Council approved the Master Agreement and Program Supplement related to this grant. The receipt of these grant funds is expected at or near the end of construction. 2. A/C Overlay Costs: An estimate of the total project costs for the A/C Overlay contract is as follows: Estimated Element Cost ($) • Design [94-044, 96-002] 93 ,927 • Printing, Advertising, etc. 500 • Construction 789,505 • Construction Contingency (10%) 79,068 • Admin & Inspection 90,000 Total 1,053,000 3 . Total Project Cost Summary: An estimate of the total project cost (including the Sub-Drain Project) is as follows: Element Amount ($) • Sub-Drain 207,400 • A/C Overlay 1 ,053 ,000 Total 1,260,400 4. Current Budget: The amount of the appropriations and budget for the subject project for FY 1995/96 is as follows: • Fund 014: Federal STP Grant 480,000 • Fund 011: Local Transportation Fund 1,020,000 Total 1,500,400 acovly.awd 00011U Asphalt Overlay Project May 1996 Page 4 5. Revised Budget: As implied by the schedule mentioned above, actual invoices for the construction of the subject project are not anticipated to be presented for payment until next fiscal year. Accordingly, is recommended that the budget and appropriations for this project be as follows: Ref. Prior Total Element Years FY1995/96 FY1996/97 Project ($1 Design 70,514 26,913 0 97,427 Construction * 162,000 789,505 951,505 Construction Contingency 32,400 79,068 111,468 Admin & Inspection 10,000 90,000 100,000 Total 70,514 231,313 958,573 1,260,400 ' Funding Fund 014: STP Grant 480,000 480,000 Fun 011: LTF *** 70,514 231,313 378,573 680,400 MRA ** 100,000 100,000 Total 70,514 231,313 958,573 1,260,400 Notes:: * Sub Drain Project. ** It is recommended that construction costs related to the proposed improvements on Goldman Avenue, Flory Avenue and Magnolia Avenue be funded by the Moorpark Redevelopment Agency (MRA). *** Includes $130,961 from CCB. 6. Budget Amendment: To provide for the project funding as described above, it will be necessary to amend the appropriations and budget as follows: Current Proposed Revised Description Budget ($) Change ($1 Budget ($) FY 1995/96 • 14-142-903-0028 480,000 (480,000) 0 • 11-142-903-0028 1,020,000 (770,000) 250,000, 1,500,000 1,250,000 250,000 FY 1996/97 • 14-142-902-0028 0 480,000 480,000 • 11-142-903-0028 0 420,000 420,000 • 01-170-903-0028 0 100,000 100,000 0 1,000,000 1,000,000 Two Year Total 1,250,000 acovly.awd ; Asphalt Overlay Project May 1996 Page 5 RECOMMENDATION Staff recommends that the City Council take the following actions: 1. Amend the appropriations and Budget for the subject project as follows: a. FY 1995/96 • 014-142-903-0028: From $480,000 to $0 ($480,000 decrease) ; • 011-142-903-0028: From $1,020,000 to $250,000 ($770,000decrease); b. FY 1996/97 • 014-142-903-0028: From $0 to $480,000; • 011-142-903-0028: From $0 to $420,000; • 001-170-903-0028: From $0 to $100,000 . $1,000,000 2. Award a contract to Nye & Nelson, Inc. in the amount of $789,504 .40 for the construction of the subject project. 3 . Approve a contingency in the amount of ten percent (10%) of the bid and authorize the City Manager to approve additional work, if required, for an amount not to exceed said amount. 4. Authorize the City Manager to sign necessary contract documents. acovly.awd Exhibit 1 (1 of 4) _ r CITY OF MOORPARK Bidder VENDOR 1 VENDOR 2 Bid Results -*- -., May 6, 1996 NAME: Nye & Nelson Sully-Miller ADDRESS; Engineer's Estimate P. 0. Box 756 3555 Vineyard Ave Asphalt Overlay CITY, STATE: Ventura, CA 93002 Oxnard, CA 93030 Project PHONE NUMBER: (805) 654-1682 (805) 981-4275 CONTACT PERSON: Ruric Nye David McCracken „-r ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID r 1 Traffic Control 1 LS 15,000.00 15,000.00 10,000.00 10,000.00 22,800.00 22,800.00 2 SawCutting 450 LF 2.00 900.00 1.75 787,50 2.00 900.00 3 Adj. Monuments 4 EA 400.00 1,600.00 165.00 660.00 245.00 980.00 4 4" Sidewalk 1,917 SF 3.50 6,709.50 3.50 6,709.50 3.00 5,751.00 5 Curb & Gutter 745 LF 12.00 8,940.00 14.00 10,430.00 16.00 11,920.00 6 Driveway 798 SF 4.00 3,192.00 5.00 3,990.00 6.00 4,788.00 7 PMB 325 CY 36.00 11,707.20 40.00 13,008.00 30.00 9,756.00 8 Signing & Striping 1 LS 43,988.73 43,988.73 27000.00 27,000.00 26,000.00 26,000.00 9 Adj. Manholes 48 EA 300.00 14,400.00 185.00 8,880.00 170.00 8,160.00 10 Adj. Valve-Covers 78 EA 150.00 11,700.00 155.00 12,090.00 130.00 10,140.00 11 Tree Root Barrier 74 LF 14.85 1,098.90 20.00 1,480.00 40.00 2,960.00 12 Cold Planing 326,120 SF 0.14 45,656.80 0.12 39,134.40 0.14 45,656.80 13 Remove Curb 746 LF 5.00 3,730.00 6.00 4,476.00 8.00 5,968.00 14 Remove Existing PCC 72 CY 26.00 1,872.00 60.00 4,320.00 135.00 9,720.00 15A A/C: C3-AR-4000/8000 11,942 Ton 45.00 537,390.00 30.00 358,260.00 32.50 388,115.00 15B A/C: ARHM-GG 1,871 Ton 60.00 112,260.00 57.00 106,647.00 52.00 97,292.00 16 Surface Prep 930,891 SF 0.20 186,178.20 0.006445 6,000.00 0.06 55,853.46 17 Crack Sealing 1 LS 9,600.00 9,600.00 10500.00 10,500.00 8,500.00 8,500.00 18 A/C Fill Areas 1 LS 9,600.00 9,600.00 6000.00 6,000.00 9,700.00 9,700.00 19 Pavement Fabric 103,432 $Y 0.75 77,574.00 0.75 77,574.00 0.39 40,338.48 20 Weed Control 1 LS 1,000.00 1,000.00 4500.00 4,500.00 6,000.00 6,000.00 21 Remove Exist A/C 22 CY 25.00 560.00 45.00 1,008.00 140.00 3,136.00 22 Manhole Type II 1 EA 2,651.59 2,651.59 3100.00 3,100.00 5,500.00 5,500.00 23 18" RCP 52 LF 46,67 2,426.84 75.00 3,900.00 70.00 3,640.00 24 24" RCP 18 LF 61.52 1,107.36 93.00 1,674.00 140.00 2,520.00 25 Caltranms Permit 1 LS 12,000.00 12,000.00 550.00 550.00 525.00 525.00 26 Construction Survey 1 LS 10,000.00 10,000.00 1250.00 1,250.00 2,500.00 2,500.00 0901t3 Exhibit 1 (2 of 4) CITY OF MOORPARK Bidder VENDOR 1 VENDOR 2 Bid Results March 29, 1996 NAME: Nye & Nelson Sully-Miller ADDRESS: Engineer's Estimate P. 0. Box 756 3555 Vineyard Ave Morpark Avenue CITY, STATE: Ventura, CA 93002 Oxnard, CA 93030 Spring Road PHONE NUMBER: (805) 654-1682 (805) 981-4275 Storm Drain CONTACT PERSON: Ruric Nye David McCracken -- ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID 27 Replace Loops 69 EA 255.00 17,595.00 200.00 13,800.00 210.00 14,490.00 28 Earthwork 1 LS 2,100.00 2,100.00 24700.00 24,700.00 17,000.00 17,000.00 29 Cement Treated Base 290 CY 90.00 ' 26,100.00 50.00 14,500.00 72.00 20,880.00 30 Adjust Meter 2 EA 100.00 200.00 100.00 200.00 100.00 200.00 31 A/C R&R 1,375 SF 13.00 17,875.00 5.00 6,875.00 8.00 11,000.00 32 Catch basin 1 LS 8,960.00 8,960.00 5500.00 5,500.00 6,500.00 6,500.00 33 Release 1 LS 1.00 1.00 1.00 1.00 1.00 1,00 I 1,205,674.12 II 789,504.40 II 859,190.74 r 09011 Exhibit 1 (3 of 4) CITY OF MOORPARK Bidder VENDOR 3 VENDOR 4 Bid Results 7 .c May 6, 1996 NAME: Antler Construction Professional Pipeline ADDRESS; P.O.Box 3617 45326 Trevor Ave. Asphalt Overlay CITY, STATE: Simi Valley, CA 93093 Lancaster, CA 93534 Project PHONE NUMBER: (805) 527-7424 (805) 949-9799 CONTACT PERSON: Sherry Giddings Mark Norris ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID 1 Traffic Control 1 LS 60,786.00 60,786.00 55,000.00 55,000.00 0.00 2 Sawcutting 450 LF 2.65 1,192.50 1.50 675.00 0.00 3 Adj. Monuments 4 EA 140.00 560.00 250.00 1,000.00 0.00 4 4" Sidewalk 1;917 SF 2.40 4,600.80 2.70 5,175.90 0.00 5 Curb & Gutter 745 LF 11.50 8,567.50 15.30 11,398.50 0.00 6 Driveway 798 SF 3.50 2,793.00 3.85 3,072.30 0.00 7 PMB 325 CY 40.00 13,008.00 24.00 7,804.80 0.00 8 Signing & Striping 1 LS 27,660.00 27,660.00 37500.00 37,500.00 0.00 9 Adj. Manholes 48 EA 176.00 8,448.00 290.00 13,920.00 0.00 10 Adj. Valve Covers 78 EA 140.00 10,920,00 210.00 16,380.00 0.00 11 Tree Root Barrier 74 LF 40.00 2,960.00 49.00 3,626.00 0.00 12 Cold Planing 326,120 SF - 0.12 39,134.40 0.12 39,134.4Q 0.00 13 Remdve Curb 746 LF 9.35 6,975.10 7.78 5,803.88 0.00 14 Remove Existing PCC 72 CY 82.50 5,940.00 50.00 3,600.00 0.00 15A A/C: C3-AR-4000/8000 11,942 Ton 31.50 376,173.00 31.27 373,426.34 0.00 15B A/C: ARHM-GG 1,871 Ton 60.00 112,260.00 62.37 116,694.27 0.00 16 Surface Prep 930,891 SF 0.07 60,507.92 0.07 65,162.37 0.00 17 Crack Sealing 1 LS 14,850.00 14,850.00 19000.00 19,000.00 0.00 18 A/C Fill Areas 1 LS 2,675.00 2,675.00 38000.00 38,000.00 0.00 19 Pavement Fabric 103,432 SY 0,75 77,574.00 0.80 82,745.60 0.00 20 Weed Control 1 LS 4,775.00 4,775.00 12800.00 12,800.00 0.00 21 Remove Exist A/C 22 CY 175.00 3,920.00 72.00 1,612.80 0.00 22 Manhole Type II 1 EA 2,585.00 2,585.00 3200.00 3,200.00 0.00 23 18" RCP 52 LF 165.00 8,580.00 45.00 2,340.00 0.00 24 24" RCP 18 LF 170.50 3,069.00 70.00 1,200.00 0.00 25 Caltranms Permit 1 LS 550.00 550,00 10000.00 10,000.00 0.00 26 Construction Survey 1 LS 5,170.00 5,170.00 9700.00 9,700.00 0.00 = .- = 000115 Exhibit 1 (4 of 4) r CITY OF MOORPARK Bidder VENDOR 3 VENDOR 4 Bid Results March 29, 1996 NAME: Antler Construction Professional Pipeline ADDRESS: P.O.Box 3617 45326 Trevor Ave. Morpark Avenue CITY, STATE: Simi Valley, CA 93093 Lancaster, CA 93534 Spring Road PHONE NUMBER: (805) 527-7424 (805) 949-9799 Storm Drain CONTACT PERSON: Sherry Giddings Mark Norris ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID 4 T f-_ 27 Replace Loops 69 EA 203.50 14,041.50 230.00 15,870.00 0.00 28 Earthwork 1 LS 17,400.00 17,400.00 19850.00 19,850.00 0,00 29 Cement Treated Base 290 CY 40.00 11,600.00 105.00 30,450.00 0.00 30 Adjust Meter 2 EA 100.00 200.00 320.00 640.00 0.00 31 A/C R&R 1,375 SF 6.75 9,281.25 4.80 6,600.00 0.00 32 Catch basin 1 LS 12,485.00 12,485.00 7500.00 7,500.00 0.00 33 Release 1 LS 1.00 1,00 1.00 1.00 0.00 - I 931,242.97 II 1,020,943 16 II 0.00 1 6