Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0217 CC REG ITEM 11B ITEM // . OORPARK, CALIFORNIA City Coun it Meeting AG�1NTIDA RAE P®R'r of a- 199, ACTIN: • f TO: The Honorable City Council FROM: Ken Gilbert, Director of Public Works By DATE: January 12, 1992 (Meeting of 1-20-92) OORPARK, c�,�_��^ NIA r CtyCo cf!�.` �g SUBJECT: Consider Bids for the Construction of an of /7 1993 ; Asphalt Overlay on Peach Hill Road and on Tierra Rejada Road ACTION: DISCUSSION By�---- A. Background Last October the City Council authorized staff to advertise for receipt of bids for the subject project. B. Project Design The asphalt overlay design for the subject project provides for the construction of two inches of asphalt over a pavement fabric. The pavement fabric serves to 1) inhibit penetration of water through the pavement; 2) inhibit reflective cracking from the existing asphalt through to the new pavement surface; and 3) reduce the thickness of the required overlay. This improvement is expected to extend the useful life of the street ten to fifteen years. The design also calls for the removal and replacement of pavement and base where required. In addition, a portion of the pavement under the Route 23 Freeway will be reconstructed in order to maintain a minimum vertical clearance. Also, conduits will be constructed where required to accommodate future installation of landscape irrigation systems. C. Scope of Work The City Council directed staff to provide for the construction of an asphalt overlay on Tierra Rejada Road from Moorpark Road easterly under the Route 23 freeway to the City Limit line, plus the construction of an asphalt overlay for a portion of Peach Hill Road. Bid alternates were requested to allow some flexibility in determining the scope of work for the Peach Hill Rd. overlay. Those alternates are described as follows: • Base Bid: Christian Barrett to Spring Road • Alternate #1: Christian Barrett to Bella Vista Drive • Alternate #2 : Christian Barrett to Mesa Verde Drive wp\rpt\ovrly_aw Asphalt Overlay Page 2 D. Bid Results Bids for the subject project were received and opened on January 25, 1993 . Charts have been prepared setting forth a summary of the bids identified as follows: Exhibit Description 1 Tierra Rejada Road Overlay 2 Peach Hill Road -- Base Bid 3 Peach Hill Road -- Alternate #1 4 Peach Hill Road -- Alternate #2 E. Options There are three options available in determining the Scope of Work. A summary of the total bid amounts using each approach is as follows: 1. Peach Hill Rd, Christian Barrett to Spring Rd (Base Bid) : Tierra Peach Bidder Rejada Rd Hill Rd Deduct Total Nye & Nelson 161,539.40 123,516.00 0 285,055.40 Granite Construction 174,070.00 130,892.00 0 304,962.00 R & H Paving 167,693.80 141,278.00 0 308,971.80 S. P. Milling 192,705.50 138,566.00 -500.00 330,771.50 2. Peach Hill Rd, Christian Barrett to Bella Vista (Alt. #1) : Tierra Peach Bidder Rejada Rd Hill Rd Deduct Total Nye & Nelson 161,539.40 79,216.20 -1,000 239,755.60 R & H Paving 167,693.80 87,364.20 0 255,058.00 Granite Construction 174,070.00 94,501.00 0 268,571.00 S. P. Milling 192,705.50 88,449.50 -400.00 280,755.00 wp\rpt\ovrly_aw Asphalt Overlay Page 3 3 . Peach Hill Rd, Christian Barrett to Mesa Verde Dr (Alt. #2) : Tierra Peach Bidder Rejada Rd Hill Rd Deduct Total Nye & Nelson 161,539.40 65,905.69 -1,000 226,445.09 R & H Paving 167,693.80 72,880.24 0 240,574.04 Granite Construction 174,070.00 84,164.00 0 258,234.00 S. P. Milling 192,705.50 72,459.70 -300.00 264,865.20 F. Recommended Option It is recommended that Option #1 be chosen for the construction of Tierra Rejada and Peach Hill Road Overlays. (Christian Barrett to Spring Rd) . An analysis of the options shows only a slight cost advantage is gained by selecting Option #1 . However, since bids were very favorable, compared to the Engineer's estimate, it would be to the City's advantage to construct the entire project at this time. G. Fiscal Impact 1. Project Cost Estimate: The following is a summary of the estimated total project costs. If a portion of Peach Hill Road is deleted from the project Scope,. Project costs will be decreased accordingly. Peach Tierra Element Hill Rejada Total Road Road 3_99X/1_992 neeigx, 6,700 7 , 100 13,800 FY 1992/1993 Construction 123 ,516 161,539 285,055 Contract Admin. & 9, 000 9,000 18 , 000 Inspection Contingency (10%) 14,000 18 , 000 30, 945 Total FY 1992/93 146,516 188,539 334,000 153 ,216 195,639 247,600 Project TOte1 wlArPt\oWlY.-aW Asphalt Overlay Page 4 2 . Adopted Budget: a) STP -- At the time the FY 1992/93 Budget was being prepared, the subject project was identified as a candidate for funding through the federal Surface Transportation Program (STP) . Staff has since learned that these funds have been allocated to other projects. It is, therefore, the recommendation of staff that the City's STP funds be directed to a future projects and the subject project be funded with Gas Tax funds. b) Gas Tax Fund -- Currently, the unappropriated fund balance in the Gas Tax Fund is sufficient to fund the budget amendment recommended herein. c) Grimes Canyon Road -- Since the adoption of the FY 1992/93 Budget, the City has been advised by the County of Ventura that the County Road Department has responsibility for the maintenance of Grimes Canyon Road. It is therefore appropriate to re-allocate certain funds which have been budgeted for that purpose. d) Increased Allocation -- The amount budgeted for the subject project is based on preliminary figures carried over from the prior year's budget. The final project cost estimate will require an additional appropriation to totally fund the project. 3 . Proposed Budget Amendment: An amendment to the source and amount of funds for this project is recommended as follows: Current Budget Proposed Budget STP Gas Tax STP Gas Tax Grimes Canyon 0 50,000 0 0 Road Tierra Rejada & 274 ,000 0 0 334,000 Peach Hill Overlay Sub-Total 274,000 50,000 0 334,000 TOTAL 324,000 334,000 Increase 10 ,000 wp\rpt\ovrly_aw Asphalt Overlay Page 5 H. Qualifications Staff has reviewed the information provided in the bidding documents and made inquiries into the reference provided. Staff has determined that the apparent low bidder is qualified to construct the project. I. Project Schedule It is anticipated that construction will commence in March and be completed early in April. J. Committee Review The Public Works, Facilities and Solid Waste Committee has reviewed the bid results and recommends award of a contract for Option #1 , Tierra Rejada Road, plus Peach Hill Road from Christian Barrett Road to Spring Road. RECOMMENDATION (Roll Call Vote Required) Staff and the Public Works, Facilities and Solid Waste Committee recommend that the City Council take the following actions: 1) Approve the scope of work for the project as described in Option #1 (Tierra Rejada Road, plus Peach Hill Road from Christian Barrett Road to Spring Road) . 2) Approve the revised budget appropriations and budget amendments set forth in Section G-3 and summarized as follows: • reduce the Fund 14 appropriation (STP) from $274,000 to 0. • increase the Fund 03 appropriation (Gas Tax) from $50,000 to $334,000 . [Note: Net Budget increase of $10 ,000 . ] 3) Award a contract for the construction of said project to Nye & Nelson for the bid amount of $285,055.40; 4) Approve a ten per cent contingency for the project and authorize the City Manager to approve additional work, if required, not to exceed ten per cent (10%) of the contract price; and, 5) Authorize the Mayor to sign necessary contract documents. wp\rpt\ovrly_aw EXHIBIT 1 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 1 Bidder No. 2 BID RESULTS NAME: NYE&NELSON R&H PAVING TIERRA REJADA RD. ADRESS: P.O. BOX 756 1497 LOS ANGELES AVE. OVERLAY CITY,STATE: VENTURA CA 93002 SATICOY, CA 93004 Date: 25-Jan-93 PHONE NUMBER (805) 654-1682 (805) 647-3286 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $13,925.00 $13,925.00 $5,700.00 $5,700.00 2 Sawcutting 460 LF $1 .10 $506.00 $0.50 $230.00 $0.35 $161 .00 3 A.C. Removal 509 CY $26.00 $13,234.00 $12.00 $6,108.00 $20.00 $10,180.00 4 8" P.M.B. 337 CY $33.00 $11,121 .00 $34.00 $11 ,458.00 $27.50 $9,267.50 5 A.C. Overlay 2514 TON $44.00 $110,616.00 $30.50 $76,677.00 $31 .35 $78,813.90 6 A.C. Reconstruction 330 TON $44.00 $14,520.00 $32.00 $10,560.00 $42.50 $14,025.00 7 Adjust Manhole 3 EA $300.00 $900.00 $260.00 $780.00 $265.00 $795.00 8 Adjust Valve 6 EA $150.00 $900.00 $185.00 $1 ,110.00 $185.00 $1 ,110.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $3,700.00 $3,700.00 $3,800.00 $3,800.00 1 0 Cold Planing 62620 $0.50 $31,310.00 $0.17 $10,645.40 $0.17 $10,645.40 1 1 Weed Control 1 LS $500.00 $500.00 $950.00 $950.00 $1 ,000.00 $1,000.00 12 Traffic Loop Detector 8 EA $260.00 $2,080.00 $270.00 $2,160.00 $275.00 $2,200.00 1 3 Pavement Fabrics 146000 SF $0.11 $16,060.00 $0.07 $10,220.00 $0.11 $16,060.00 1 4 Surface Prep. 1 LS $5,000.00 $5,000.00 $4,000.00 $4,000.00 $3,200.00 $3,200.00 15 Calt. Enc. Permit 1 LS $1 ,000.00 $1,000.00 $750.00 $750.00 $750.00 $750.00 1 6 Irrigation Crossovers 270 LF $14.00 $3,780.00 $29.00 $7,830.00 $35.00 $9,450.00 1 7 Pull Box 2 EA $20.00 $40.00 $125.00 $250.00 $175.00 $350.00 1 8 Adjust Monuments 1 EA $300.00 $300.00 $185.00 $185.00 $185.00 $185.00 1 9 Release Contract 1 LS $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 $1.00 TOTAL $216,868.00 $161,539.40 $167,693.80 Page 1 EXHIBIT 1 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 3 Bidder No. 4 BID RESULTS NAME: GRANITE CONSTRUCTION SOUTHERN PACIFIC MILLING CO. TIERRA REJADA RD. ADRESS: 585 WEST BEACH ST. 3555 VINEYARD AVE. OVERLAY CITY,STATE: WATSONVILLE, CA OXNARD, CA 93030 Date: 25-Jan-93 PHONE NUMBER (408) 724-1011 (805) 485-3101 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $20,635.00 $20,635.00 $7,000.00 $7,000.00 2 Sawcutting 460 LF $1 .10 $506.00 $1 .00 $460.00 $2.50 $1 ,150.00 3 A.C. Removal 509 CY $26.00 $13,234.00 $30.00 $15,270.00 $17.50 $8,907.50 4 8" P.M.B. 337 CY $33.00 $11,121 .00 $45.00 $15,165.00 $45.00 $15,165.00 5 A.C. Overlay 2514 TON $44.00 $110,616.00 $27.00 $67,878.00 $37.00 $93,018.00 6 A.C. Reconstruction 330 TON $44.00 $14,520.00 $40.00 $13,200.00 $43.00 $14,190.00 7 Adjust Manhole 3 EA $300.00 $900.00 $400.00 $1 ,200.00 $250.00 $750.00 8 Adjust Valve 6 EA $150.00 $900.00 $250.00 $1 ,500.00 $220.00 $1 ,320.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,650.00 $3,650.00 10 Cold Planing 62620 SF $0.50 $31,310.00 $0.05 $3,131.00 $0.35 $21 ,917.00 11 Weed Control 1 LS $500.00 $500.00 $500.00 $500.00 $900.00 $900.00 12 Traffic Loop Detector 8 EA $260.00 $2,080.00 $300.00 $2,400.00 $275.00 $2,200.00 13 Pavement Fabrics 146000 SF $0.11 $16,060.00 $0.08 $11,680.00 $0.10 $14,600.00 14 Surface Prep. 1 LS $5,000.00 $5,000.00 $10,000.00 $10,000.00 $0.00 $0.00 15 Calt. Enc. Permit 1 LS $1 ,000.00 $1 ,000.00 $500.00 $500.00 $345.00 $345.00 16 Irrigation Crossovers 270 LF $14.00 $3,780.00 $25.00 $6,750.00 $27.00 $7,290.00 17 Pull Box 2 EA $20.00 $40.00 $150.00 $300.00 $26.00 $52.00 18 Adjust Monuments 1 EA $300.00 $300.00 $500.00 $500.00 $250.00 $250.00 19 Release Contract 1 LS $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 TOTAL $216,868.00 $174,070.00 $192,705.50 Page 2 EXHIBIT 2 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 1 Bidder No. 2 BID RESULTS NAME: NYE&NELSON R&H PAVING PEACH HILL OVERLAY ADRESS: P.O. BOX 756 1497 LOS ANGELES AVE. - BASE BID CITY,STATE: VENTURA CA 93002 SATICOY, CA 93004 Date: 25-Jan-93 PHONE NUMBER (805) 654-1682 (805) 647-3286 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $7,955.00 $7,955.00 $5,700.00 $5,700.00 2 Pull Box 4 EA $20.00 $80.00 $105.00 $420.00 $170.00 $680.00 3 A.C. Removal 90 CY $26.00 $2,340.00 $34.00 $3,060.00 $25.50 $2,295.00 4 6" P.M.B. 132 CY $33.00 $4,356.00 $34.00 $4,488.00 $42.00 $5,544.00 5 A.C. Overlay 2288 TON $44.00 $100,672.00 $30.00 $68,640.00 $33.75 $77,220.00 6 A.C. Reconstruction 168 TON $44.00 $7,392.00 $35.00 $5,880.00 $50.00 $8,400.00 7 Adjust Manhole 27 EA $300.00 $8,100.00 $170.00 $4,590.00 $270.00 $7,290.00 8 Adjust Valve 28 EA $150.00 $4,200.00 $155.00 $4,340.00 $190.00 $5,320.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $2,800.00 $2,800.00 $2,900.00 $2,900.00 1 0 Cold Planing 50000 SF $0.50 $25,000.00 $0.16 $8,000.00 $0.15 $7,500.00 1 1 Weed Control 1 LS $500.00 $500.00 $1 ,050.00 $1 ,050.00 $1 ,100.00 $1 ,100.00 12 Traffic Loop Detector 8 EA . $260.00 $2,080.00 $270.00 $2,160.00 $280.00 $2,240.00 1 3 Irrigation Cross Overs 0 LF $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Adjust Monuments 2 EA $300.00 $600.00 $170.00 $340.00 $200.00 $400.00 1 5 Pavement Fabric 122400 SF $0.11 $13,464.00 $0.08 $9,792.00 $0.12 $14,688.00 1 6 Relaease Contract 1 LS $1.00 $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 TOTAL $173,785.00 $123,516.00 $141,278.00 DEDUCTION IF AWARDED BOTH PROJECTS $0.00 $0.00 Page 1 EXHIBIT 2 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 3 Bidder No. 4 . BID RESULTS NAME: GRANITE CONSTRUCTION SOUTHERN PACIFIC MILLING CO. PEACH HILL OVERLAY ADRESS: 585 WEST BEACH ST. 3555 VINEYARD AVE. - BASE BID CITY,STATE: WATSONVILLE, CA OXNARD, CA 93030 Date: 25-Jan-93 PHONENUMBER . (408) 724-1011 (805) 485-3101 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $16,261 .00 $16,261 .00 $7,000.00 $7,000.00 2 Pull Box 4 EA $20.00 $80.00 $1.00 $4.00 $190.00 $760.00 3 A.C. Removal 90 CY $26.00 $2,340.00 $30.00 $2,700.00 $45.00 $4,050.00 4 6" P.M.B. 132 CY $33.00 $4,356.00 $45.00 $5,940.00 $65.00 $8,580.00 5 A.C. Overlay 2288 TON $44.00 $100,672.00 $27.00 $61 ,776.00 $30.00 $68,640.00 6 A.C. Reconstruction 168 TON $44.00 $7,392.00 $40.00 $6,720.00 $50.00 $8,400.00 7 Adjust Manhole 27 EA $300.00 $8,100.00 $250.00 $6,750.00 $195.00 $5,265.00 8 Adjust Valve 28 EA $150.00 $4,200.00 $200.00 $5,600.00 $180.00 $5,040.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $4,000.00 $4,000.00 $2,800.00 $2,800.00 1 0 Cold Planing 50000 SF $0.50 $25,000.00 $0.10 $5,000.00 $0.25 $12,500.00 1 1 Weed Control 1 LS $500.00 $500.00 $500.00 $500.00 $700.00 $700.00 12 Traffic Loop Detector 8 EA . $260.00 $2,080.00 $300.00 $2,400.00 $275.00 $2,200.00 1 3 Irrigation Cross Overs 0 LF $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Adjust Monuments 2 EA $300.00 $600.00 $500.00 $1 ,000.00 $195.00 $390.00 1 5 Pavement Fabric 122400 SF $0.11 $13,464.00 $0.10 $12,240.00 $0.10 $12,240.00 1 6 Release Contract 1 LS $1.00 $1 .00 $1.00 $1 .00 $1 .00 $1 .00 TOTAL $173,785.00 $130,892.00 $138,566.00 DEDUCTION IF AWARDED BOTH PROJECTS $0.00 ($500.00) Page 2 EXHIBITS CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 1 BIDDER No. 2 BID RESULTS NAME: NYE&NELSON R&H PAVING PEACH HILL OVERLAY ADRESS: P.O. BOX 756 1497 LOS ANGELES AVE. - ALTERNATE 1 CITY,STATE: VENTURA CA 93002 SATICOY, CA 93004 Date: 25-Jan-93 PHONE NUMBER . (805) 654-1682 (805) 647-3286 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $8,620.00 $8,620.00 $5,700.00 $5,700.00 2 Pull Box 4 EA $20.00 $80.00 $105.00 $420.00 $175.00 $700.00 3 A.C. Removal 90 G1( $26.00 $2,340.00 $34.00 $3,060.00 $26.00 $2,340.00 4 6" P.M.B. 132 CY $33.00 $4,356.00 $34.00 $4,488.00 $43.00 $5,676.00 5 A.C. Overlay 1322 TON $44.00 $58,168.00 $30.00 $39,660.00 $33.00 $43,626.00 6 A.C. Reconstruction 168 TON $44.00 $7,392.00 $35.00 $5,880.00 $50.50 $8,484.00 7 Adjust Manhole 10 EA $300.00 $3,000.00 $170.00 $1 ,700.00 $275.00 $2,750.00 8 Adjust Valve 17 EA $150.00 $2,550.00 $155.00 $2,635.00 $200.00 $3,400.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $1 ,350.00 $1 ,350.00 $1,400.00 $1,400.00 1 0 Cold Planing 26086 SF $0.50 $13,043.00 $0.20 $5,217.20 $0.20 $5,217.20 1 1 Weed Control 1 LS $500.00 $500.00 $525.00 $525.00 $550.00 $550.00 12 Traffic Loop Detector 0 EA $260.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 3 Irrigation Cross Overs 0 0 $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Adjust Monuments 1 EA $300.00 $300.00 $170.00 $170.00 $200.00 $200.00 1 5 Pavement Fabric 61000 SF . $0.11 $6,710.00 $0.09 $5,490.00 $0.12 $7,320.00 1 6 Relaease Contract 1 LS $1 .00 $1 .00 $1.00 $1 .00 $1 .00 $1 .00 TOTAL $103,440.00 $79,216.20 $87,364.20 DEDUCTION IF AWARDED BOTH PROJECTS ($1,000.00) $0.00 Page 1 EXHIBIT CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 3 BIDDER No. 4 BID RESULTS NAME: GRANITE CONSTRUCTION SOUTHERN PACIFIC MILLING CO. PEACH HILL OVERLAY ADRESS: 585 WEST BEACH ST. 3555 VINEYARD AVE. ALTERNATE 1 CITY,STATE: WATSONVILLE, CA OXNARD, CA 93030 Date: 25-Jan-93 PHONE NUMBER (408) 724-1011 (805) 485-3101 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $17,015.00 $17,015.00 $6,000.00 $6,000.00 2 Pull Box 4 EA $20.00 $80.00 $1 .00 $4.00 $190.00 $760.00 3 A.C. Removal 90 GY $26.00 $2,340.00 $30.00 $2,700.00 $45.00 $4,050.00 4 6" P.M.B. 132 Cl $33.00 $4,356.00 $45.00 $5,940.00 $65.00 $8,580.00 5 A.C. Overlay 1322 TON $44.00 $58,168.00 $30.00 $39,660.00 $31 .00 $40,982.00 6 A.C. Reconstruction 168 TON $44.00 $7,392.00 $40.00 $6,720.00 $50.00 $8,400.00 7 Adjust Manhole 1 0 EA $300.00 $3,000.00 $300.00 $3,000.00 $195.00 $1 ,950.00 8 Adjust Valve 17 EA $150.00 $2,550.00 $200.00 $3,400.00 $180.00 $3,060.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $4,000.00 $4,000.00 $1 ,350.00 $1 ,350.00 1 0 Cold Planing 26086 SF $0.50 $13,043.00 $0.12 $3,130.32 $0.25 $6,521 .50 1 1 Weed Control 1 LS $500.00 $500.00 $500.68 $500.68 $500.00 $500.00 12 Traffic Loop Detector 0 EA $260.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 3 Irrigation Cross Overs 0 0 $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Adjust Monuments 1 EA $300.00 $300.00 $500.00 $500.00 $195.00 $195.00 1 5 Pavement Fabric 61000 SF $0.11 $6,710.00 $0.13 $7,930.00 $0.10 $6,100.00 1 6 Release Contract 1 LS $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 TOTAL $103,440.00 $94,501.00 $88,449.50 DEDUCTION IF AWARDED BOTH PROJECTS $0.00 ($400.00) Page 2 EXHIBIT 4- CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 1 Bidder No. 2 BID RESULTS NAME: NYE&NELSON R&H PAVING PEACH HILL OVERLAY ADRESS: P.O. BOX 756 1497 LOS ANGELES AVE. • ALTERNATE 2 CITY,STATE: VENTURA CA 93002 SATICOY, CA 93004 Date: 25-Jan-93 PHONE NUMBER . (805) 654-1682 (805) 647-3286 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $7,895.00 $7,895.00 $5,700.00 $5,700.00 2 Pull Box 2 EA $20.00 $40.00 $105.00 $210.00 $175.00 $350.00 3 A.C. Removal 90 CY $26.00 $2,340.00 $34.00 $3,060.00 $26.15 $2,353.50 4 6" P.M.B. 132 CY $33.00 $4,356.00 $34.00 $4,488.00 $43.15 $5,695.80 5 A.C. Overlay 911 TON $44.00 $40,084.00 $32.50 $29,607.50 $35.25 $32,112.75 6 A.C. Reconstruction 168 TON $44.00 $7,392.00 $35.00 $5,880.00 $51 .00 $8,568.00 7 Adjust Manhole 8 EA $300.00 $2,400.00 $170.00 $1 ,360.00 $275.00 $2,200.00 8 Adjust Valve 15 EA $150.00 $2,250.00 $145.00 $2,175.00 $200.00 $3,000.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $1 ,181 .00 $1 ,181 .00 $1 ,200.00 $1,200.00 1 0 Cold Planing 21739 SF $0.50 $10,869.50 $0.21 $4,565.19 $0.21 $4,565.19 1 1 Weed Control 1 LS $500.00 $500.00 $525.00 $525.00 $550.00 $550.00 1 2 Traffic Loop Detector 0 EA $260.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 3 Irrigation Cross Overs 0 0 $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Adjust Monuments 1 EA $300.00 $300.00 $170.00 $170.00 $200.00 $200.00 1 5 Pavement Fabric 53200 SF $0.11 $5,852.00 $0.09 $4,788.00 $0.12 $6,384.00 1 6 Relaease Contract 1 LS $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 $1 .00 TOTAL $81,384.50 $65,905.69 $72,880.24 DEDUCTION IF AWARDED BOTH PROJECTS ($1,000.00) $0.00 Page I EXHIBIT ¢ . CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 3 Bidder No. 4 BID RESULTS NAME: GRANITE CONSTRUCTION SOUTHERN PACIFIC MILLING CO. PEACH HILL OVERLAY ADRESS: 585 WEST BEACH ST. 3555 VINEYARD AVE. ALTERNATE 2 CITY,STATE: WATSONVILLE, CA OXNARD, CA 93030 Date: 25-Jan-93 PHONE NUMBER . (408) 724-1011 (805) 485-3101 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 Traffic Control 1 LS $2,000.00 $2,000.00 $17,531.00 $17,531 .00 $4,000.00 $4,000.00 2 Pull Box 2 EA $20.00 $40.00 $1.00 $2.00 $190.00 $380.00 3 A.C. Removal 90 CY $26.00 $2,340.00 $30.00 $2,700.00 $45.00 $4,050.00 4 6" P.M.B. 132 CY $33.00 $4,356.00 $45.00 $5,940.00 $65.00 $8,580.00 5 A.C. Overlay 911 TON $44.00 $40,084.00 $33.00 $30,063.00 $32.00 $29,152.00 6 A.C. Reconstruction 168 TON $44.00 $7,392.00 $40.00 $6,720.00 $50.00 $8,400.00 7 Adjust Manhole 8 EA $300.00 $2,400.00 $300.00 $2,400.00 $195.00 $1 ,560.00 8 Adjust Valve 15 EA $150.00 $2,250.00 $200.00 $3,000.00 $180.00 $2,700.00 9 Signing And Striping 1 LS $3,000.00 $3,000.00 $4,000.00 $4,000.00 $1,150.00 $1 ,150.00 1 0 Cold Planing 21739 SF $0.50 $10,869.50 $0.13 $2,826.07 $0.30 $6,521.70 1 1 Weed Control 1 LS $500.00 $500.00 $500.93 $500.93 $450.00 $450.00 12 Traffic Loop Detector 0 EA $260.00 $0.00 $0.00 $0.00 $0.00 $0.00 13 Irrigation Cross Overs 0 0 $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 14 Adjust Monuments 1 EA $300.00 $300.00 $500.00 $500.00 $195.00 $195.00 1 5 Pavement Fabric 53200 SF $0.11 $5,852.00 $0.15 $7,980.00 $0.10 $5,320.00 1 6 Relaease Contract 1 LS $1.00 $1 .00 $1.00 $1 .00 $1 .00 $1.00 TOTAL $81,384.50 $84,164.00 $72,459.70 DEDUCTION IF AWARDED BOTH PROJECTS $0.00 ($300.00) Page 2-