Loading...
HomeMy WebLinkAboutAGENDA REPORT 1985 0603 CC REG ITEM 07B 07C 07D SUPPLEMENTAL ) ;11 0 4, -111, AR ALBERT PRIETO STEVEN KUENY Mayor c<4.4‘.. City Manager JAMES D. WEAK0° 1070:1\ CHERYL J. KANE Mayor Pro Tern sta."' City Attorney THOMAS C. FERGUSON 0.41% NIALL FRITZ Councilmember distNit ‘‘1°.2 Director of DANNY A. WOOLARD 1-(' Community Councilmember Development LETA YANCY-SUTTON R. DENNIS DELZEIT Councilmember City Engineer DORIS D. BANKUS JOHN V. GILLESPIE City Clerk' Chief of Police JOHN C. GEDNEY City Treasurer MEMORANDUM TO: The Honorable City Council FROM: Steven Kueny, City Manager DATE: May 29, 1985 SUBJECT: Supplement to Engineer ' s Report for Proposed Parks Maintenance Assessment District (AD-85-1 and AD-83-1) and Lighting Maintenance Assessment District (AD-84-2) BACKGROUND INFORMATION: On May 18' the City Council formally initiated proceedings and approved the amended Engineer ' s Report for each District. At that time the City Council directed that all direct costs be included for each proposed District. In addition, for the Lighting Maintenance Assessment District, staff was directed to apportion the costs for the existing landscaping within AD-84-1 (Griffin project north of Campus Park Drive) between exterior (Citywide benefit) and interior landscaping (tract benefit) . It was determined to be 1/3 and 2/3 , respectively. Staff was also directed to include only the actual estimated cost for tree removal and tree trimming, and not the cost to repair the damaged curb, gutter, sidewalk or pavement. These latter costs are to be funded by gas tax. DISCUSSION: The following is a breakdown of the proposed Parks Maintenance District budget: Administration and Personnel Costs $33 , 747 . 00 1. Facilities Coordinator 60% Community Center $14, 423 20% Parks 4, 840 2 . Administrative Secretary 50% parks 7, 76 3 . Part-time Community Center 4, 512 Parks 2, 256 799 Moorpark Avenue Moorpark, California 93021 (805)529-6864 The Honorable City Council May 29 , 1985 Page 2 Operation and Maintenance $75, 910 . 00 1 . Parks a) General Supplies & Services $ 8 , 200 b) Water 22, 000 c) Electrical 500 d) Contract Services 36 , 000 2 . Community Center a) General Supplies & Services $13, 710 b) Water 4, 000 c) Electrical 8, 000 d) Gas 1, 500 e) Less Rental Income (15, 000) f) Less City Hall Share of Utilities ( 3 , 000) Engineering $14, 500 . 00 TOTAL $124, 157. 00 The following is a breakdown of the Lighting Maintenance Assessment District budget: Administration and Personnel Costs $ 6 , 000 . 00 1 . Facilities Coordinator $ 4, 842 2 . Part time 1, 158 Operation and Maintenance - Landscaping $ 65, 200. 00 1 . General $ 3, 200 2 . Tree Removal 25 , 000 3 . Tree Trimming 10, 000 4 . Tierra Rejada Road Medians and Parkway a) Contract Service 2, 500 b) Utilities 1 , 500 5. Campus Park Median and Slopes (Citywide) a) Contract Service 3, 667 b) Utilities 1 , 667 5. Benwood, Pecan, Bambi and adjacent Flood Channel land- scaping (Tract benefit only) a) Contract Service 7, 333 b) Utilities 3 , 333 7 . Miscellaneous Improvements various locations as determined by City Council (see attached Exhibit A) 7, 000 The Honorable City Council May 29 , 1985 • Page 3 Street Lighting $124 , 800 . 00 Engineering 11 , 400. 00 Contingency 7 , 600 . 00 TOTAL $215, 000 . 00 Existing Assessment District No. AD-83-1 : In the event the Parks Maintenance Assessment district is not created, the City Council will need to order that annual assessments be set for this District for the maintenance of Glenwood Park. The medians and parkway on Tierra Rejada Road could either be placed in the City wide Lighting and Landscaping District, or left as part of existing Assessment District No. AD-83-1 . The cost for Glenwood Park would be about $19, 000 . 00 for 1985-86. RECOMMENDED ACTION: Conduct public hearings for the respective districts and direct staff concerning any modifications to Engineer ' s Reports (costs and/or assessment spread) and subsequent action regarding formation and setting of annual assessments. SK:ddb • EXHIBIT "A" AREAS TO BE CONSIDERED FOR POSSIBLE IMPROVEMENT 1. Parkway on eastside of Peach Hill Road from Peach Hill Park north to Peach Hill Road A) Peach Hill Park north to Westgate - 243/sq. ft. B) From Westgate north to Peach Hill Road - 2 , 745/sq. ft. C) One (1) visible slope in area 1 .A) above - 657/sq. ft. D) Two (2) visible slopes in area 1 .B) above - 3 , 578/sq. ft. 2. Triangular shaped area at southwest corner of Moorpark Road and Peach Hill Road - 9 , 500/sq. ft. 3. Three (3) visible slopes along west side of Moorpark Road south of Peach Hill Road - 3 , 900/sq. ft. 4 . Princeton Avenue A) West side of parkway from Highway 118 to Amherst Street - 4, 460/sq. ft. B) East side parkway from Highway 118 to Amherst Street - 4 , 820/sq. ft. C) East side parkway from Amherst Street to Campus Park Drive - 1, 775/sq. ft. D) Median from Highway 118 to Amherst Street - 5 , 240/sq. ft. E) Median from Amherst Street to Campus Park Drive - 2 ,350/sq. ft. 5 . Campus Park Drive A) Parkway from Shopping Center to Loyola - 800/sq. ft. Street B) Parkway from Loyola Street to Cambridge - 4 , 270/sq. ft. Street C) Southside parkway from Princeton Avenue to - 6, 800/sq. ft. Penn Street D) Median from Princeton Avenue to Marquette -44 , 800/sq. ft. Street 6 . Poindexter Avenue (south side) both east and - 3 , 400/sq. ft. west of Sierra Avenue