Loading...
HomeMy WebLinkAboutAGENDA REPORT 1995 0906 CC REG ITEM 08QAGENDA R E PORT CITY O F MOORPARK TO: The Honorable City Council 11- ,'6ci ITEM�� Q • C:'y Cov . of s > >S ACTION FROM: Kenneth C. Gilbert, Director of Public Works DATE: August 25, 1995 (Council Meeting 9 -6 -95) :'' i; SUBJECT: Consider Authorizing Recordation of a Notice of Completion for a Project to Reconstruct First Street and that Portion of Bard Street between Second Street and the Metrolink Parking Lot BACKGROUND On February 1, 1995, the City Council awarded a contract for the subject project. DISCUSSION A. Scope of Work This project called for the reconstruction of FIRST STREET from Moorpark Avenue to Bard Street, and the reconstruction of BARD STREET from Second Street northerly to the Metrolink parking lot (see map attached as Exhibit 1). The scope of street reconstruction efforts include the following: • removal and reconstruction of the roadway pavement and base; • reconstruction of curb and gutter to improve drainage; • construction of new driveway aprons; • relocation of private property fences encroaching into the street right -of -way; • construction of a four feet (41) wide sidewalk; • planting of parkway trees; • the installation of sleeves under the sidewalk at each property to facilitate the installation of individual parkway irrigation systems; • the installation of sleeves under all driveway to facilitate the possible future installation of an alternative common parkway irrigation system;a nd, • installation of sleeves under sidewalks and driveways to facilitate future parkway landscaping. B. Project Status The construction of this project has been completed less the completion of minor corrections. First St. & Bard St. Reconstruction September 1995 Page 2 C. Penalty The contractor has been sent a notice from the City advising of the City's intent to levy a penalty (not to exceed $4,400) for retaining a subcontractor in a manner which is in violation of certain provisions of the Public Contracts Code of the State of California. That matter has not been resolved. The project cost figures cited below include this penalty. Therefore, any future additional cost resulting from a reduction of this penalty will result in additional project costs equal to the amount of that reduction. D. Fiscal Impact 1. Construction Cost Summary: The following is a summary of the total construction cost for this project: Bid Price MRA ($) Quantity Adjustment Total FY 1994/95 Sub -Total Change Orders 1. Commercial Driveway @ Alley 2,697.91 2. Not approved 50,520 3. Not approved 0 4. Not approved 230,410 5. Curb Drain 196.55 6. Not approved 31,942 7. Wrought Iron Fence 2,534.34 8. Not approved 1,200 9. Not approved 83,662 ** Penalty (4,400.00) Total Amount ($) 279,629.60 (16,341.65) 263,287.95 1,028.80 264,316.75 2. Total Project Cost Summary: The following is a summary of the total estimated project costs shown by funding source: Element MRA ($) CDBG Total FY 1994/95 Design 50,520 0 50,520 Construction 0 230,410 230,410 Contract Admin. & Inspection 31,942 0 31,942 Misc. (Printing, Etc.) 1,200 0 1,200 FY 1994/95 Sub -Total 83,662 230,410 314,072 1U001. First St. & Bard St. Reconstruction September 1995 Page 4 4. Approve an amendment to the appropriations and the budget amount for the subject project defined as follows: • FY 1994/95: • Acc. No. 01- 170 - 903 -0347: from $52,000 to $83,662 (net increase of $31,662) • Acc. No. 018 - 142 -903 -0347: from $223,000 to $230,410 (net increase of $7,410) • FY 1995/96: • Acc. No. 01 -170- 903 -0347: from $45,000 to $8,708 (net decrease of $36,292) • Acc. No. 018 - 142 - 903 -0347: from $55,000 to $33,907 (net decrease of $21,093). 1st.cmp 000134 I N AVE. DEEDED o ( Q E E � BUT NOT TRAVELED) U) < cc 0 0 HIGH m S. P. R. R. IN 5120 %- �� =gym ST. HWY. 118 FED 00016 000IL35