Loading...
HomeMy WebLinkAboutAGENDA REPORT 1995 1101 CC REG ITEM 08C /I 171 626 ITEM 9. . CITY OF MOORPARK ' AGENDA REPORT TO: The The Honorable City Council ipp/d ea/ FROM: Christine Adams, Director of Community Servic 40/ , DATE: October 16, 1995 (Meeting of November 1, 1995) SUBJECT: Consider Award of Contract for Water and Sewer Construction to Restroom / Concession Building. BACKGROUND At the August 2 , 1995 City Council meeting, the City Council directed staff to reject construction bids for the restroom / concession facility at Arroyo Vista Community Park and to re- advertise for new bids . Staff also advertised for bids for water and sewer line construction. The City Council appropriated $642 , 700 of funding to make park improvements to the Arroyo Vista Community Park, Phase II . These improvements are to include two softball diamonds, with lights for one, with fencing, bleachers, dugouts, and infields ; a roller hockey rink; a tot lot, and a picnic shelter with tables, benches, barbecues , drinking fountain and a restroom and concession facility. The City retained the services of an architect , Andrew Alan Czubiak, to prepare plans and specifications for a restroom facility for Arroyo Vista Community Park. Mr . Czubiak was contracted with the City in the past and was the architect on the restroom/concession facility at Peach Hill Park. The City had also contracted with Dwight French & Associates to design the sewer and water line extensions . They were previously contracted with the City and did the on site utility work for Phase I of Arroyo Vista Community Park. DISCUSSION ON FINANCIAL OVERVIEW There is a preliminary cost estimate of $65, 000 for the design and construction of the sewer and water line, and the possible installation of a fire hydrant at this location . The City ' s consultants estimated that sewer and water construction will cost $68, 300 which is within the budgeted appropriation set by the City Council . BID SUMMARY There were four responsive bidders for the water and sewer line construction. The apparent low bid was for $58, 530 , which is less (jUi-i'MAva than the estimated cost by $6, 470 . However, staff included three alternates in the bid for water and sewer, which were included to further reduce the bid, if necessary, and would also change the apparent low bidder. The first alternate was to delete the 8" waterline in its entirety and delete the fire hydrant and water laterals . This was done to avoid the need to set a new water meter and pay an additional $6, 500 to Waterworks I and $157 . 00 to Callegus Water District, for capital improvement charges . Unless future buildings are constructed beyond the location of the proposed restroom, in future phases of the park, there is no need to install an 8 " waterline at this time. Alternate #2 was to install a "T" and gate valve on the building side of the existing water meter and to install a 2 " water line back into the temporary access road and to terminate with the gate valve where the water lateral termination is shown on the water plans . This was done in lieu of Alternate #1 and is predicated upon having enough water pressure. Staff has discussed this with Ventura County Waterworks, and had the water pressure evaluated by a hydraulic engineer. The Engineer ' s findings indicate that there is enough water pressure to connect the water line to the existing water meter for the Recreation Center. Alternate #3 was to remove the fire hydrant, which is indicated on the plans, and to leave the lateral capped and to install a thrust block at the cap . This was done to save about $800 in fees for the hydrant . Based on supporting information from the hydraulic engineer, staff would recommend the elimination of the 8 " waterline, the installation of a "T" and gate valve on the building side of the existing water meter, to install a 2 " waterline back into the access road, and to eliminate a fire hydrant near the softball fields . In total, by combining the deducts and additions for these alternates, the City could save approximately $31, 000 . Including the three alternates , the apparent low bidder was Ferrie Construction, with a bid, including alternates, of $35, 350 . If anything additional that requires plumbing is added to anywhere out in the park, beyond what was already calculated for future improvements at the Recreation Center ( such as the kitchen improvements and the possible expansion of the gymnasium) , a 6" - 8 " line would be required, as well as the capital improvement charges required by Waterworks I and Callegus Water District . The recommended 2 " line would remain for the planned restroom near the new softball fields . Park Improvement Budget (Phase II) Approved Revised Water Well $ 80, 000 $ 80, 000 Well Pump Repair $ 15, 000 $ 15, 000 Ballfields (2 ) $ 73, 777 $ 51, 630 OO4 Ball Lights (1) Installed $ 89, 808 $ 85, 517 Restroom/Concession $ 85, 000 $ 85, 000 * Play Equipment $ 62, 941 $ 62, 295 Hardscape 0 0 Roller hockey $ 60, 736 $ 73 , 370 Picnic Shelter $ 21, 644 $ 21, 644 Tables, Benches, BBQ' s, Drinking Fountains, and Trash Cans $ 31, 082 $ 16, 304 TOPO/ Survey 700 700 Soils Test $ 1, 500 $ 1, 500 Architect for Restroom $ 3, 400 $ 3, 400 Sewer/Water/Hydrant $ 65, 000 $ 38, 885 Blue Prints $ 1, 500 $ 1, 500 Construction Admin. (Picon) $ 15, 100 $ 15, 100 Sod/Irrigation Removal for improvement areas, plus brickdust for infields $ 1, 000 $ 32, 000 Road Oil Treatment $ 5, 600 $ 5, 600 Fencing $ 3 , 500 $ 3, 500 Inspection / Permits $ 3, 500 $ 3, 500 TOTAL $620, 788 $596, 445 Contingency $ 21, 912 $ 46, 255 $642, 700 $642, 700 * Estimate Only Staff has discussed the installation of a backflow and pressure regulation device with Ferrie Construction. If required, the quote from Ferrie Construction to install this is $1, 225 . These items are recommended by the hydraulic engineer. RECOMMENDATION 1 ) Award contract for construction of water and sewer line extensions and appurtenant work at Arroyo Vista Community Park to Ferrie Construction, which includes the elimination of the 8" waterline, the installation of a "T" and gate valve on the building side of the existing water meter, to install a 2 " waterline back into the access road, and to eliminate a fire hydrant near the softball fields , for the amount of $35, 350 ; and 2) Authorize City Manager to sign all appropriate contractual agreements, and to approve up to a 10% contingency for this project . Attachment Bid Summary Otlii)(3 ,7- Bid Summary Water / Sewer Bidder Bid TOTAL Alt 1 (-) Alt 2 (+) Alt 3 (-) TOTAL w/Changes Ferrie $59,850 -25500 +1500 -500 $35,350 Blois $58, 530 -25160 +5300 -800 $37,870 J&H $68, 000 -28000 +5250 -1000 $44,250 Chutuk $69, 500 -25000 +18000 -3000 $59, 500