HomeMy WebLinkAboutAGENDA REPORT 2006 0301 CC REG ITEM 10DMOORPARK CITY COUNCIL
AGENDA REPORT
TO: The Honorable City Council
IYM
ro. "Z.
FROM: Yugal K. Lail, City Engineer / Public Works Director
BY: Ken Gilbert, Public Works Consultant 141—
DATE: February 15, 2006 (Council Meeting 3 -1 -06)
0
SUBJECT: Consider Notice of Completion and Resolution Amending the FY
2005/06 Budget for the Construction of the Los Angeles Avenue
Widening Project at Beltramo Ranch Road
BACKGROUND
• In May of 1999, the City Council approved the Mitigated Negative Declaration for the
project.
• In March 2001, Boyle Engineering was selected to prepare the design for the project.
• In September of 2001, the City Council approved the conceptual design for the
project.
• In October 2003, the City completed efforts necessary to acquire all of the street
rights -of -way required for the project.
• In January 2004, the City received the approved Caltrans Street Encroachment Permit
for the project.
• In February 2004, the City Council approved the project plans and specifications and
authorized staff to advertise for receipt of bids upon approval of the grant funding for
the project.
• In November 2004, the Federal funding for the project was approved and the project
was advertised.
• In January of 2005, the City Council approved the Caltrans' Supplemental Agreement
pertaining to the Federal funding for the project.
• In February 2005, the City Council awarded the construction contract for the subject
project.
Beltramo_cmp_0602
Los Angeles Avenue Widening: Beltramo Ranch Road to Maureen Lane
Notice of Completion
March 1, 2006
Page 2
DISCUSSION
A. Project Description
Attached as Exhibit 1 are diagrams showing the project location and design cross -
section. That design called for widening the south side of the street to provide for
the ultimate street width within the project area. A summary of the project scope is
as follows:
• Location: The project is located on the south side of Los Angeles Avenue and
funs from Beltramo Ranch Road easterly to a point east of Maureen Lane.
• Prior Right-of-Way [half- street]: As shown on Exhibit 2, prior to the
construction of the project, the right -of -way widths were as follows:
- at Maureen Lane: fifty feet (50'); and
- at and east of Beltramo Ranch Road: thirty feet (30').
• Current Right -of -Way [half- street]: The project now provides the ultimate
fifty -nine feet (59') wide half- street.
• Landscape Easements: Landscape easements were acquired in certain
areas as generally shown on Exhibit 3.
• Proposed Street Improvements: Project improvements included..
- additional pavement width;
- curb & gutter; and
- a six feet (6') wide sidewalk.
- [Note: The south right -of -way line is eight feet (8') from the new
curb face. The future landscaped parkway (see below)
includes the two feet (2') wide area between the back of the
sidewalk and the new south right -of -way line.]
• Street Lighting: The project included the installation of conduits and pull boxes
for the installation of new street lights.
• Striping: Full improvements included re- striping to provide six (6) lanes of
traffic in the vicinity of Maureen Lane.
• Traffic Signal: The project included construction of a traffic signal at the
Maureen Lane intersection.
• Storm Drain: The project included the construction of a storm drain to
convey drainage from Los Angeles Avenue to the south end of Maureen
Lane.
• Future Parkway Landscaping: A project now in design calls for the
installation of parkway landscaping in the vicinity of Los Angeles Avenue and
Tierra Rejada Road. That project will include the installation of landscaping
within the landscaped easements mentioned above.
• Block Wall: An eight feet (8') high block wall was constructed immediately
south of the landscape easements.; and
• Block Wrought Iron Wall: Consistent with the wishes of the property owner,
the wall just east of Beltramo utilizes wrought iron to improve visibility.
Beltramo_cmp_0602 000086
Los Angeles Avenue
Notice of Completion
March 1, 2006
Page 3
B. Changes
Widening: Beltramo Ranch Road to Maureen Lane
1. Quantity Adjustments: As is typical with public works construction projects,
the actual quantities required for the job differed from the engineer's estimate.
This project required more quantities of certain bid items resulting in an
increase to the contract price of $14,351.64.
2. Change Orders: A number of Contract Change Orders were required by the
project. The total cost for all Change Orders was $100,216.03 [8.7 %]. A
breakdown / summary of the Change Orders is attached as Exhibit 4.
C. Fiscal Impact
Contract Construction Cost Summary: The total project construction cost is
summarized as follows:
2. Total Project Cost Summary. The total project cost is summarized as follows:
Description
Grant
L. A. AOC
Total ($)
Description
Eligible ($)
Fund ($)
Total ($)
Bid Amount
671,650.00
454,903.35
1,126,553.35
Quantity Adjustments
24,895.34
(10,543.70)
14,351.64
Change Orders
90,662.59
9,553.44
100,216.03
Local Share Adjustmnet
(257,207.93)
257,207.93
0.00
Total
530,000.00
711,121.02
1,241,121.02
2. Total Project Cost Summary. The total project cost is summarized as follows:
Description
Prior Years ($)
FY 05106 ($)
Total ($)
Design
176,171
3,655
179,826
Right -of -Way
129,780
0
129,780
Construction **
73,759
1,172,290
1,246,049
Inspection
14,093
120,000
134,093
Total 393,803
1,295,945
1,689,748
** Includes non - contract construction costs.
3. Budget Re -Cap Sheet. A re -cap of the project budget, including the proposed
Budget amendment discussed below, is set forth in the Budget Re -cap sheet
attached as Exhibit 5.
4. Federal Grant Funding: The maximum grant funding authorized by the
Supplemental Agreement approved by the City Council on January 19, 2005, is
$442,789. However, in that the bids came in higher than the estimate used to
calculate that figure has been increased to the amount previously set forth in
the STIP (State Transportation Improvement Program) — $ 530,000. Grant
eligible vs. actual costs are noted in Section C -1 above.
Beltramo_cmp_0602 000087
Los Angeles Avenue Widening: Beltramo Ranch Road to Maureen Lane
Notice of Completion
March 1, 2006
Page 4
5. Budget Amendment. Based on the above analysis, it will be necessary to
amend the Budget as set forth in the attached Resolution (Exhibit 5) and
summarized as follows:
D. Final Inspection and Acceptance
The City has completed a final inspection of the project and has found the work to
be acceptable. At this time it would be appropriate for the City Council to accept
the project as complete so that the City Clerk may record the Notice of Completion
to start the final lien period. Absent the receipt of any Stop Notices from
subcontractors or suppliers, the ten percent retention will be released thirty -five
(35) days after the date of the recordation of that notice.
STAFF RECOMMENDATION (Roll Call Vote)
1. Accept the work as complete.
2. Adopt the attached Resolution amending the Budget for the project.
Attachments:
Exhibit 1: Project Plan
Exhibit 2: Right -of -Way
Exhibit 3: Landscape Easements
Exhibit 4: Change Order Summary
Exhibit 5: Budget Re -cap
Exhibit 6: Resolution
Beltramo_cmp_0602
Current
Propsed
Revised
Description
Budget ($)
Change ($)
Budget ($)
Fund 2501: L A AOC
Design
13,806
(10,151)
3,655
Right -of -Way
4,920
(4,920)
0
Construction
698,964
6,351
705,315
Constr. Mgmnt. / Insp.
85,907
34,093
120,000
Sub -Total
803,597
25,373
828,970
Fund 2604: Federal CMAQ Grant
Construction
466,975
0
466,975
Total FY 04/05 Budget
1,270,572
25,373
1,295,945
Plus Prior Years Expenditures
393,803
Total Project Appropriations
1,689,748
D. Final Inspection and Acceptance
The City has completed a final inspection of the project and has found the work to
be acceptable. At this time it would be appropriate for the City Council to accept
the project as complete so that the City Clerk may record the Notice of Completion
to start the final lien period. Absent the receipt of any Stop Notices from
subcontractors or suppliers, the ten percent retention will be released thirty -five
(35) days after the date of the recordation of that notice.
STAFF RECOMMENDATION (Roll Call Vote)
1. Accept the work as complete.
2. Adopt the attached Resolution amending the Budget for the project.
Attachments:
Exhibit 1: Project Plan
Exhibit 2: Right -of -Way
Exhibit 3: Landscape Easements
Exhibit 4: Change Order Summary
Exhibit 5: Budget Re -cap
Exhibit 6: Resolution
Beltramo_cmp_0602
F-
w
m
m
Q
Palo,
Q
r)
Q
W
x
Q
s�
F
EXHIBIT 1
Page 1 of 2
Beltramol
Z7
000089
m
�o
r
rt
n
d
3
O
N
r
SECTION
118'
8, 59 30' 29,
8'
CL-- - - - - --
Existing R -O -W
89'
29'
I_
Proposed R -O -W
Acquisition and
Street Widening
DETAIL I
R -O -W Acquisition and Widening
MA
�J
In
Z
�m
X
N _W
54-
�
M NAXV =,-5---
Beltramol
EXHIBIT 2
r
0
a
z
C)
r
v J
21
000091
See
P� Z
ZD-
0 ;I I�
a
n
•
a: O
CY
O
0 a Cr
3
i~
U)
S00 w
EXHIBIT 3
Landscaped Areas
Page 1 of 2
Maureen Lane
000092
S eo Fj 1
lO.
3
Qf v
a cn a
of w o of
i a
jS_ l'Z
*ZS' l 0
a
EXHIBIT 3
Landscaped Areas
Page 2 of 2
MN-1(- ;_ Li ti i,
000 093
EXHIBIT 4
Change Order Summary
Description
Amount ($)
Al
Street Lighting Conduit
18,307.26
A2
Change Block to slumpstone
35,303.09
A3
Relocate Irrigation / Relocate sign at church
1,150.00
Other Miscelaneous work
3,438.13
Excavate & Expose septic tank
850.00
5,438.13
A4
Removals & grading for driveway
3,919.52
Added removals N/E Maureen: elevation change
4,951.30
Change height of wroght iron
667.71
9,538.53
A5
Delineators for Left Turn Control
5,920.53
Un- planned lane closure (work too close to travel lane)
1,954.98
Remove treated base / add height to Vogel wall
2,158.45
Utility work / replace MH cover
2,497.60
Wood posts / Remove striping
1,171.99
RE- strip: change location of lane add
8,372.03
22, 075.58
Grant Eligible Sub -Total
90,662.59
B1
Ccontroller Costs
7,933.05
B5
R &R Driveway
678.27
Replace mail boxes
942.12
1,620.39
Grant Ineligible Sub -Total
9,553.44
Total
100, 216.03
000094
CITY OF MOORPARK
Capital Improvement Project
Budget Re -Cap Sheet
EXHIBIT 5
Date: February 13, 2006
Fiscal Year: FY 05/06
Department: Public Works 7-Department: 8310
Project Title: L. A. Ave Widening at Beltramo Ranch Road Project Number: 8003
Total Current Appropriations
Fund
Object
Code
Account
Description
Total Prior
Years'
Expenses
Current FY
Beginning Year
Budget
Prior Budget
Changes This
FY
Current FY
Total Budget
Total Approp. To
Date
2501
9601
Design
$176,171
$13,806
$0
$13,806
$189,977
2501
9610
R -O -W Acq.
$129,780
$4,920
$0
$4,920
$134,700
2501
9640
9640
Construction
Construction
Total Constr.
$10,734
$63,025
$73,759
$698,964
$466,975
$1,165,939
$0
$0
$0
$698,964
$466,975
$1,165,939
$709,698
$530,000
$1,239,698
2604
2501
9650
Inspection
$14,093
$85,907
$0
$85,907
$100,000
Project Totals:
$393,803
1 $1,270,572
$0
$1,270,572
$1,664,375
Requested Budget Amendment
/ Revised Total Appropriations
Fund
Object
Code
Account
Description
Current FY
Total Budget
Proposed
Budget Change
Proposed
Revised
Current FY
Budget
Previous Total
Appropr.
Proposed
Revised Total
Approp.
2501
9601
Design
$13,806
($10,151)
$3,655
$189,977
$179,826
2501
9610
R -O -W Ac q.
$4,920
$4,920
$0
$134,700
$129,780
2501
9640
9640
Construction
Construction
Total Constr.
$698,964
$466,975
$1,165,939
$6,351
$6,351
$705,315
$466,975
$1,172,290
$709,698
$530,000
$1,239,698
$716,049
$530,000
$1,246,049
2604
2501
9650
Inspection
$85,907
$34,093
$120,000
$100,000
$134,093
Project Totals:
$1,270,572
$25,373
$1,295,945
$1,664,375
$1,689,748
Propossed Revised Funding mmary
Fund
Fund Name
Total Prior
Years'
Expenses
Current FY
Beginning Year
Budget
Previously
Approved
Appropr. This
FY
R ropose
Additional
Appropr. This
Time
Proposed
Revised Total
Approp.
2501
LAAOC
$330,778
$803,597
$0
$25,373
$1,159,748
2604
ISTEA
$63,025
$466,975
$0
$0
$530,000
Pro ect Totals:
$393,803
$1,270,572
$0
$25,373
$1,689,748
000095
Exhibit 6
RESOLUTION NO. 2006-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FY 2005/06
BUDGET TO REVISE THE AMOUNTS OF THE
APPROPRIATIONS AND BUDGET FOR PROJECT 8003:
LOS ANGELES AVENUE WIDENING BELTRAMO RANCH
ROAD TO MAUREEN LANE [L. A. AVE. AOC FUND (FUND
2501) AND ISTEA FEDERAL GRANT FUND (FUND 2604)]
WHEREAS, on June 15, 2005, the City Council adopted the Budget for Fiscal
Year 2005/06; and
WHEREAS, a staff report has been presented to the City Council requesting a
budget increase in the aggregate amount of $25,373; and
WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said
budget amendment and its resultant impacts to the budget line item(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the aggregate increase of $25,373, as
more particularly described in Exhibit "A ", is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and
shall cause a certified resolution to be filed in the book of original resolutions.
PASSED AND ADOPTED this 1St day of March, 2006.
ATTEST:
Deborah S. Traffenstedt, City Clerk
Patrick Hunter, Mayor
Attachment:
Exhibit 'A': Appropriation and Budget Detail
000096
Resolution No. 2006 -
Exhibit "A"
Revised Appropriations & Budget
For Project 8003:
Los Angeles Avenue Widening
Beltramo Ranch Road to Maureen Lane
A. Fund Allocation
.................. ........ ......_ - _..._................ ............... .......... ...
Fund Account Number Amount
. ... .... ..........
L A Ave AOC Fund 2501.5500 $ 25,373
B. FY 05106 Budget Re -C
2501.8310.8003.xxxx
......................................................................................... ..1............................
2604.8310.8003.xxxx
C. Distribution of Appropriations to
2501.8310.8003.9650: I nsp.
................ .......
......... ........
Total Pro
Approved as to form:
$1,295,945
0000°x7