DATE: April 6, 2006 (Meeting of April 26, 2006)
SUBJECT: Consider Amending the Scope of Work for the Design of the
Arroyo Vista Recreation Center and Gymnasium Expansion
DISCUSSION
On October 5, 2005, the City Council approved the scope of work for the design
of the Arroyo Vista Recreation Center (AVRC) and Gymnasium Expansion
Project and authorized staff to solicit proposals. The stated estimated project
costs were $5,760,000. On January 18, 2006, the Council awarded an
agreement to WLC Architects in the amount of $550,510 the design of
expansion. This project is one of the Council's approved objectives for FY
2005/06.
The original scope of work, in addition to expanding the gymnasium to twice its
existing size, adding an additional activity room, and providing more office space,
included the design of a men's and women's locker /shower room facility. The
addition of a locker /shower room facility at AVRC has been discussed by the City
over the past several years, and with the expansion of the gymnasium and
recreation center, this appeared to be a good opportunity. However, as a result of
staffs' initial meetings with the project architect and sub consultants, and after
reviewing the architect's first draft conceptual plan, which included the proposed
shower /locker rooms (see Attachment A), staff believes that such a facility would
be greatly under utilized unless the City builds a community pool complex in the
near term future. Since a final decision regarding a community pool seems to be
farther off in the future, staff is recommending that the Council revise the
project's scope of work to delete the design of the locker /shower room.
The type of programs held in the gymnasium and recreation center now and in
the future, even with the expansion, do not create a demand for a shower /locker
room facility. A few individuals who participate in our sports leagues may change
M: \MLindley \PARKS\AVCP\AVRC- Gym Expansion \Gym Expansion Scope of Work Amendment ccagda 4() 0U 012
5- 06.doc
Honorable City Council
April 26, 2006
Page 2
into their playing clothes before their game if they arrive from work. Our existing
restrooms are sufficient to accommodate their needs.
In staff's opinion, the types of programs and /or facilities that would generate
sufficient demand for a locker /shower room facility would be a community pool or
a fitness center. While the City still maintains the goal of building a community
pool, it appears to be far enough in the future that designing for its needs now
may not make economic sense. The utility connections (water, sewer, gas) are
already in close proximity to the area were the City would most likely place a
locker /shower room, in the open space just to the east of the recreation center.
Therefore, there is no advantage to constructing connections any closer to the
ultimate site of a future locker /shower room facility. In addition, staff proposes
reserving future options for locating the locker /shower room adjacent to the
existing restrooms and in the previously identified site for the community pool.
The proposed expansion of the gymnasium and recreation center will not impact
those two site options.
While staff recommends the elimination of the locker /shower room facility from
the project's scope of work, the expansion of the gymnasium and recreation
center requires that additional public toilets be installed under the California
Unified Building Code (Code). Following Appendix 29 of the Code for the square
footage and use of the planned expansion, the City needs to add the following
toilet facilities: for gymnasium - two toilets and a urinal for men, and three toilets
for women; for the recreation center — two toilets, one for men and one for
women. Appendix 29 provides for an exception to the requirements when
circumstances indicate that a different ratio is warranted with the approval of the
building official. Based on current and anticipated use patterns, staff does not
believe that additional toilets are needed in the recreation center. The City's
building official concurs.
Based on staff's proposed recommendation, elimination of the locker /shower
room and the addition of restrooms in the gymnasium, the architect prepared a
new draft conceptual plan (see attachment B). The plan provides for expanding
the gymnasium and adding an office and storage; a new activity room, with a
room divider, and interior office space across from the existing pubic counter.
This is consistent with the original scope of work. Additionally, the plan provides
restrooms in the gymnasium and conference and storage rooms to the east of
the new activity room in the recreation center. This is approximately 1,212 square
feet (400 for gym restrooms and 812 for recreation center conference and
storage rooms) that was not a part of the original scope of work, but was
identified as a need.
Eliminating the locker /shower room facility from the project would generate a
saving of approximately $1.1 million in construction and design costs. However,
000013
Honorable City Council
April 26, 2006
Page 3
the additional 812 square feet proposed for the conference /storage room would
generate an additional cost of approximately $304,500 and the additional 666
square feet for the gym restrooms would add approximately $265,200 for a total
added cost of $569,700. Based on this scope of work, the estimated project
budget is $5,229,700. However, staff recommends budgeting $200,000 for
improvements to existing structures including the two covered walkways between
the recreation center and gym, replacing the wall mats in the gym, the addition of
a sink in the existing activity room, and repairs to an interior wall in the activity
room, and $100,000 as a contingency. This brings the total cost savings to
approximately $230,300 and a total estimated project budget of $5,529,700. The
estimated cost breakdown for the proposed revised scope of work is as follows:
Description
Cost Est.
Gym Expansion, including office /storage
$3,259,500
Gym Restrooms
$ 266,400
Activity Room
$ 598,500
Storage /Conference Room
$ 304,500
Internal Office Space
$ 18,800
Exterior Corridor
$ 132,000
Site Work
$ 100,000
Improvements to existing structures
$ 200,000
Subtotal — Construction Hard Costs
$4,879,700
Architect
$ 500,000
Project Coordinator
$ 50,000
Contingency
$ 100,000
Total
$5,529,700
Staff is requesting that the City Council approve the proposed revisions to the
scope of work. The City Manager has the authority to amend the City's
agreement with WLC to address the revisions. The Council will be asked to
consider a final conceptual design for the project at a future date.
STAFF RECOMMENDATION
Approve revisions to the scope of work for the design of the Arroyo Vista
Recreation Center and Gymnasium Expansion.
cc: Attachments A & B
000014
ATTACHMENT A
9 N /
❑° ❑° / W
Il CE,
0 0� xvsr� � w...ru °,•
sro•.oe vv� M � �"xnM•"� twr>�.'IEtl6![�CAIIYd�hYA
o ®a�I LE O
:fro E W
CS) WA
_Illy z
(66) w
K () Z w
ED \ 0 wo
IF °m
rn a
1\ U Z N Lu
U
W EL o
d' x o
new O \I Q W a >
1 H wQ
/ fn z
o o/ w
❑° ��: o ti 0
0
0 o n
Q
T— I o r. orrc� O
o
w drE e.
❑
0 0
o
o
w E. A2.1 �
ATTACHMENT B
0 0
WL
o
® 0
t �+«
iw...n wo
O
0 o
1
Z
w
U w
ZO =
�
H wa
wo
� Z W, rn
NQ
R.O
O
z N"
W as Q
O O o I
Lu
Q <>
za
ED
° �
®
❑ E,m,�� o � �s ° ° �4�� o
cZ)
w
O M
}
QD
o � °
o o o QoFw
Q
a i
bCDo o
°
0 0
e
E�° A2.1