HomeMy WebLinkAboutAGENDA REPORT 2006 0621 CC REG ITEM 10KMOORPARK CITY COUNCIL
AGENDA REPORT
ITEM 10. K.
CITY OF MOORPARK, CALIFORNIA
City Council Meeting
of : 'o21-oZ00�
ACTION: -
a - IR
TO: The Honorable City Council
FROM: Yugal K. Lail, City Engineer / Public Works Directo 30
PREPARED BY: Ken Gilbert, Public Works Consultant
DATE: June 14, 2006 (Council Meeting 06- 21 -06)
SUBJECT: Consider Plans, Specifications and Cost Estimates (PS & E) and
Authorization to Solicit for Construction Bids for the 2006
Pavement Rehabilitation Project; Authorization to Proceed with
the Design for the Tierra Rejada Road AC Overlay Project; and
Resolution Amending the Fiscal Year 2005/06 Budget to Fund
the Design Phase for the Tierra Rejada Road Overlay Project
BACKGROUND
L 2006 Pavement Rehab Proiect. One of the elements of the City's pavement
maintenance program is the periodic application of a protective slurry seal to the
pavement surface of all of the streets in the City. The program objective is to maintain a
bi- annual program (construct a project every other year) in which each project
addresses approximately one -third of the residential streets in the City. In this way,
every residential street in the City should be slurry sealed once every six (6) years.
Unfortunately, our bi- annual schedule has slipped a year, since the last slurry
application was in 2003.
It. Tierra Rejada Road AC Overlay Project The pavement condition on Tierra
Rejada Road is deteriorating rapidly, and the City is conducting, on a weekly basis,
maintenance of the recurring pot holes. Tierra Rejada Road is in urgent need of
rehabilitation and requires construction of an Asphalt Overlay. This report requests
funds to proceed with the preparation of a design for that project.
P WNKL06040/RPT /05/18/06
2006 Pavement Rehabilitation Project / Tierra Rejada Road AC Overlay Project
June 21, 2006
Page 2
DISCUSSION
L 2006 Pavement Rehab Proiect
A. Proiect Description: Slurry Seal and Asphalt Rubber Aggregate Membrane
ARAM
As indicated by the project name, the proposed project will include two types of
pavement rehabilitation: a) Type II Slurry for some streets, and b) an ARAM
surface for others. The streets included in the 2006 Pavement Rehabilitation
Project are shown on the maps attached as Exhibit 1, and listed in the charts
attached as Exhibit 2.
B. Project Scope: Detail
1. Slurry Seal: The slurry seal portion of the project will include the application of
Type II Slurry on all designated streets, installation of crack filler material
where required and the re- striping of all affected streets subsequent to the
application of slurry seal.
2. ARAM: An ARAM pavement surface is a type of a cape seal requiring three
steps: A) the application of an asphalt (oil- based) rubber binder which is
sprayed onto the existing pavement, followed immediately by B) the spreading
of a pre- coated rubber /gravel aggregate which is then "rubber- tired" rolled and
embedded into the oil binder, followed one or two days later by C) a Type II
Slurry Seal. An ARAM pavement surface is typically used to address
pavement demonstrating more severe distress, and at a lower cost than an
asphalt overlay or reconstruction. A separate Memo has been distributed to
the City Council with color pictures showing the various steps required for this
construction technique. This method of pavement rehabilitation has been
used successfully in many cities, including Simi Valley (streets at the southeast
corner of Tapo Street/Cochran Street shopping center); Westlake Village
(Lakeview Canyon Road, Agoura Road to Lindero Canyon Road); and City of
Ventura (Seaward Avenue and Thompson Boulevard).
PW/YKL08040/RPT/O5/18/08
2006 Pavement Rehabilitation Project / Tierra Rejada Road AC Overlay Project
June 21, 2006
Page 3
L
E
Fiscal Impact [Slurry / ARAM Proiectl
1. Cost Estimate: A preliminary estimate of project costs is as follows:
Element
Design
Construction
Constr Contingency (10 %)
Inspection **
Total
... _ .................. _.__ ...
......_
Amount M
3,000
1,700,000
170,000
30.000
1,903,000
Note: Inspection services are to be provided by consultant services augmented by in -house
inspection efforts.
2. Budget The FY 2005/06 Budget currently provides funds for this project
(Project 8002) in the amount of $320,000, from the TDA Article 8 Fund (Fund
2603) (Local Transportation Fund [LTF]). It is recommended that the Budget
amendment required to fully fund this project be deferred until the award of
contract.
3. Funding Source: It is the intent of staff to recommend full funding of this
project from Fund 2603: TDA Article 8 (LTF). As discussed later in this report,
other anticipated Federal and State funding will not be used on this project in
order to avoid costs related to efforts necessary to comply with Federal (and
State) requirements and regulations. Those grant funds will be applied to the
construction phase of the Tierra Rejada Overlay Project.
4. Unappropriated Fund Balances and Projections: In Section II of this report
there is a discussion of unappropriated Fund reserves available for both the
2006 Pavement Rehab Project and the proposed Tierra Rejada Road AC
Overlay Project.
Plans. Specifications and Cost Estimate
A review copy of the Plans, Specifications and Cost Estimates for the subject
project has been placed on top of the file cabinets in the City Council Conference
Room.
Project Inspection
As mentioned above, it is the intent of staff to utilize consultant services,
augmented by in -house inspection efforts, to provide the required project
P W NKL06040/RPT /05/18/05
S.') CN
2006 Pavement Rehabilitation Project / Tierra Rejada Road AC Overlay Project
June 21, 2006
Page 4
oversight. In past years we have found that one inspector at the stockpile site and
one inspector in the field, is the best way to assure a quality job with adequate cost
control.
F. Project Approval -- Design Immunity
It is recommended that the City Council approve the project plans and
specifications in order to document City Council approval of the scope and design
of the project. Such approval is also required for the purpose of establishing
design immunity pursuant to Section 830.6 of the Government Code of the State
of California.
G. Schedule
It is anticipated that bids for the subject project will be opened in July 2006 and
presented to the City Council for award of construction contract. Construction
should start in August. Construction in the vicinity of schools will be conducted
when school is not in session.
fl. Tierra Rejada Road AC Overlay Project
A. Project
The full scope, requirements and costs for a project to resurface Tierra Rejada
Road, has not yet been determined. If the recommended action is approved, staff
will retain the services of a consultant to perform necessary pavement analysis
and develop a design for this project. The preliminary cost estimate for this project
is $2 million.
B. Available Funding Estimate
1. Project Needs: Total
project needs for
both the 2006
Pavement Rehab
Project and the Tierra
Rejada Road AC
Overlay Project
are estimated as
follows:
--._......_...__..._._. ...--- ........... _..__...._...-
-- ......... -- ..................
--- .................. _ ...... _........ - - -- ._............ --
Current
...- ....----- _-- - ------ _ -- ._._...._... --
Estimated Future
---- _........- - - - - - --
Project
Budget ($)
Appropriation ($)
Requirements ($)
8002: Pavment Rehab.
320,000
1,583,000
1,903,000
8011: T. R. Rd. Overlay
0
2,000,000
2,000,000
Total
320,000
3,583,000
3,903,000
P W /YKL06D40/RPT /05/18/06
2006 Pavement Rehabilitation Project / Tierra Rejada Road AC Overlay Project
June 21, 2006
Page 5
2. Unappropriated Fund Balance Projections: An estimate of funding
availability for the two above described projects is summarized as follows:
.............. .... _ ..................... ...__._ .................
Fund Description
- - - - --
Amount ($)
2603: TDA Article 8A June 2007 Unappropriated Reserve
907,802
2604: Federal Grants Federal STP Local - Future Revenue
595,923
2609: State Grants Prop 42 - Future Revenue
176,000
Estimated Total Funds Available
1,679,725
Less Above Described Project Requirements
(3,583,000)
Budget Amount for FY 2006/07
1,355,252
Net
(548,023.00)
3. Funding Shortfall: Sources for the above cited shortfall have not yet been
determined.
C. Budget Amendment
It is recommended that the FY 2005/06 Budget be amended to fund the design
phase (requested amount: $100,000) for the Tierra Rejada Road AC Overlay
Project. The recommended funding source is Fund 2603: TDA Article 8A (Local
Transportation Fund).
STAFF RECOMMENDATIONS (ROLL CALL VOTE)
Approve the plans and specifications for the 2006 Pavement Rehab Project and
authorize staff to solicit bids for construction for the project.
2. Adopt Resolution No. 2006- amending the FY 2005/06 Budget to fund the
design phase for the Tierra Reiada Road Asphalt Overlay Project [Project 80111
and authorize staff to proceed with the project design.
Attachments:
Exhibit 1: Pavement Rehab Location Map
Exhibit 2: List of Streets
Exhibit 3: Resolution.
PW/YKL06040/RPT /05 11 &OB
(\ �. Ali �"4� (R•;* I1,
/1v
Printed 10/21/03 City of Moorpark 3.000 1.500 0 3 000 Feet
4
10
E75
1
OB Intersection Join (Detail B)
OCul-de-Sac Section (Detail C)
t
1z
0
J-0
P:
App 21411.0
t4
4-_
RILL M
B
00
00
'00
0
00
0
00
Arroyo West School
Drop-Off Lane v
1
U
W
'4111 - , . t
:A:
*EJAW RANCH
Slur ::
........................
.................. ....
Slur A
AXXxxxxx, A.R.A,I ,
BO Intersection Join (Detail B)
CO Cul -de -Sac Section (Detail C) '
.►:
Tierra Rejada Road '.'
..
J
. . fir► `!!�
�►O
U Z. `
.Cr
Q� f
LIN�-�
4
i
i
IN
:01
•.y �� v v ter'
N
2
(� Intersection Join (Detail B)
O Cul-de-Sac Section (Detail Q
4c�
to v o
i ELK
..... ... ...
B
0.0
00
00
00
00
(CD
N W,
C
CEDAR
B
OVE
-GR
0
CT B
m
(BOON ;pfc?\;
rrc))
C
OC,
PBOX IM LIOW)d
I VC,
C
�.::::
cc,
-.:::
C
N
BODE GA
PL
. • . . . . . . .•. . ♦. . .
Y
s
VISTA LEVANA OR
01,
...... *owl. ♦ 1
l Interjection Join (Detail B)
c�
C
.1
Slurry
Slurry - Alleys
......,�\ 1.�...,� A- A. R. A. M. i . .
A. s • . ♦ . i f
a ♦ . a
S&VER
R OW LN OR
'• C Cul_de-•Sac Section (Detail C)
Freeway
Slurry-Alleys
A.R.A.M.
Intersection Join (Detail B)
5
cc
r�
Princeton Avenue
..
S lurry -Al I eye
.................................
.............
NINA
.................
.. .............
................
................
OB Intersection Join (Detail B)
OC Cul -de -Sac Section (Detail C)
. N
New Los Angeles Avenue .. :.
• • •�• .� \. YJ �/
aTCH AqV
.. ....R:Jw!V.AV
Slurry
S lurry -Al I eye
.................................
.............
NINA
.................
.. .............
................
................
OB Intersection Join (Detail B)
OC Cul -de -Sac Section (Detail C)
. N
New Los Angeles Avenue .. :.
• • •�• .� \. YJ �/
♦�•
• • • ••• ..• •• . •.•
ALLEY V ; t , Y
oo
oo
�.
/
/ LQRY
i;
C/)
BBRr, SST
CD
• d
O MILLOM
CD
tz
cn
�. ST
. , FREMONT.
LORRAINE '
c M ST
��lS:........... '�O ... . ......
rvAU.
MR
U t
.i.
SSEN f►ASSE � .....!... ................... .
:Blurt
v
Slurry-Alleys
A R. A. M.
...................
........... ....................................
Los Angeles Avenue
a
AV
PARK CREST LN
VILLA BO Intersection Join (Detail B)
W.�::;:
. � ESNA AV.
• O Cul -de -Sac Section (Detail C)
O
N
0
Poindexter Avenue
.� B ... iASTA AV R
B
. rn
V
4s C Q
0
z
M>>
v �
'
LAS
OSiicSJ
RTZ`
LLENGER
r Q ST
Si A
�O Y
�v��ESr
AV
0 B
................
: .. . • .. Los Angeles Avenue
Slurry
Slurry - Alleys
A-l"R's A's M 2`
Intersection Join (Detail B)
0 Cul -de -Sac Section (DeUll Cr ,^
N
RE
O
0
Intersection Join (Detail
Cul-de-Sac Section (Detail Q
u rry
-Slur ry-Alleys
A. R. A. M.
...................... ..............
.......... ;L
................ ........
............
............
>
:1 O X
.............
X ....
* .
77�� !,M N
TTON-::.':TAIL L"
RD
UCK.
Ct
. .... . ST
...............
..........
^*4 1
10
Y
���j 1i.
..•swr/7V�./� . . . . . . .
. iska
N CGess
-N
A"
o� : c�
CO
:�` ✓�o�
cp
Slurry
X., S
urry- eys
A. R, A, M,
Eno
2006 Pavement Rehab Project
List of Streets
Street
Adlena Place
Adonis PI.
Alandia Ct
Alderglen Street
Aldergrove St.
Alleys (N /S) - West
Alleys (N /S) - East
Alleys (ENV)
Alleys (N /S) - West
Alleys (N /S) - East
Alleys (ENV)
Alleys (N /S)
Ambermeadow St
Ambermeadow St
Appleglen Court
Arroyo Vista Prk Road
Arroyo West School
Ashbourne Lane
Ashbrook Lane
Atlantis Ct
Atwood Court
Autumn Meadow Circle
Autumnglen Court
Avenida Colonia
Bard Street
Bard Street
Beechgrove
Bella Vista Dr.
Blairwood Drive
Bodega PI.
Bonita Heights
Bonsai Ave.
Brookglen Street
Brookhurst Ct
Camden Ct
Candlewood Court
Canario Ct.
Canyonwood Court
Cedar Grove Lane
Cedar Springs St.
Cedarglen Court
Cedarmeadow Court
Cedarpine Lane
Cedarpine Lane
Challenger Ct.
Charles Street
Cherrygrove St.
Chesterfield Dr
Christian Barrett Drive
Christian Barrett Drive
Cliffrose Avenue
From
Vista Del Valle
Bella Vista Dr.
Wm Ranch Rd
Walnut Creek Rd.
Mtn. Meadows Dr.
First Street
First Street
Between First
Second St.
Second St.
Between Second
First Street
Deermeadow St.
Misty Meadow
Mountain Trail St.
Tierra Rejada Rd.
Drop -Off Lane
Blairwood Dr.
Christian Barrett Dr.
Hertz St
Willow Creek Ln.
Country Meadow Rd.
Walnut Creek Rd.
Nogales Ave.
Second St.
Second St.
Misty Grove St.
Peach Hill Rd.
Christian Barrett Dr.
Bella Vista Dr.
Bella Vista Dr.
Hertz
Alderglen St.
Tierra Rejada Rd.
End (E)
Christian Barrett Dr.
Wm Ranch Rd
Hidden Pines Ct.
Candlewood Ct.
Mountain Meadow Dr
Walnut Creek Rd.
Deermeadow St.
Gunsmoke Rd.
Christian Barrett Dr.
Maureen Ln.
Spring Road
Misty Grove St.
Rolling Knoll Rd
Candlewood Ct.
Candlewood Ct.
Summer St.
To
End (E)
End (N)
End (N)
End (W)
Heatherwood Hollow
Second St
Second St
and Second
Third St.
Third St.
and Third
Los Angeles Ave.
Misty Meadow
End (W)
End (N)
W. Parking Lot
End (S)
End (W)
End
End (E)
End (E)
End (N)
Virginia Colony Place
End (N)
S/O 2nd
End
Vista Del Valle
Ashbourne Ln.
End (W)
Vista Del Valle
Tejeda
Riverglen St.
End (S)
End (W)
End (E)
End (N)
End (E)
End (S)
Mt. Trail St
End (N)
End (N)
Christian Barrett Dr.
Christian Barrett Dr.
End
End (E)
End
Mill Valley Rd
Spring Rd.
Peach Hill Rd
Winter Ave.
0
Z N
m �
� L
a 0
m @
4 F
4 F
2 F
1 M
1 T
7 W
7 W
7 W
7 W
7 W
7 W
7 W
1 F
1 F
1 F
11 - --
3 F
3 F
9 - --
3 F
1 F
1 F
5 T
7 W
7 W
1 T
4 F
3 F
4 F
4 F
9 - --
1 M
2 M
2 M
3 F
2 M
3 W
3 F
1 T
1 F
1 F
3 F
3 F
9 - --
6 T
1 T
4 F
3 F
3 F
1 M
Method
Q :D
Q
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Page 1
Detail
U N
m m
U.)
> C
-o Q
U cn
1 0
1 0
0 0
1 0
1 0
1 0
1 0
0 0
1 0
0 1
0 0
1 0
0 0
1 0
2 0
1 0
1 0
1 0
0 1
0 1
1 1
1 0
0 1
lam' p✓ �. .t j t.. �,,
2006 Pavement Rehab Project
List of Streets
r..__ _. C,--
Colibri Ct
Commerce Avenue
Condor Dr
Coral Crest Ct.
Cornett Avenue
Countrymeadow Rd
Courtney Lane
Courtney Lane
Crescent Meadow Ct
Crystal Ranch Road
Crystal Ranch Road
Deering Lane
Deerm eadow Street
Diablo Avenue
Discovery Ct.
Doneva Road
Donnybrook Lane
Dorothy Avenue
Elderberry Avenue
Elmrock Avenue
Endeavour Ct.
Esther Avenue
Everest Avenue
Fern Valley Ct
First St
Flory Avenue
Forestglen Court
Goldman Ave
Golondria St
Granadia Dr.
Grand Isle Dr
Greenbush Lane
Grovedale Lane
Hargrove Court
Harry Street
Harvester Street
Hatfield Court
Hatfield Court
Heather Court
Heatherwood Hollow
Hedyland Court
Hertz St.
Hidden Pines Court
Hilburn Court
Hillshire Ct.
Hillside Drive
Honeyglen Court
Hunters Grove Ct
James Weak Ave
Juarez Ave
Justin Court
To
Wm Ranc Rd
End (N)
Gabbert Rd.
Poindexter Ave.
Princeton
Princeton
Walnut Creek Rd.
End (E)
Poindexter Ave.
End (S)
Walnut Creek Rd.
End (S)
Tierra Rejada Rd.
Penrose Ave.
Penrose Ave.
Elderberry Ave.
Walnut Creek Rd.
End (E)
Walnut Creek Rd.
Cliffrose Ave.
Walnut Creek Rd.
End (W)
Cedarpine Ln.
End (E)
Walnut Creek Rd.
Country Meadow Rd.
Sierra Ave.
Shasta Ave.
Maureen Ln.
End
Crystal Ranch Rd.
End (S)
Cedarpine Ln.
End (E)
Millard St.
Harry St.
Nightingale St.
Harvester St.
Blairwood Dr.
Trailcrest Dr.
Poindexter Ave.
End
Millard St.
Harry St.
Shasta Ave.
End (E)
Chesterfield Dr
End (N)
Moorpark Ave.
Bard St.
Third St.
Los Angeles Ave.
Walnut Creek Rd.
End (N)
L. A. Ave.
Tejeda
Peach Hill Rd.
End (S)
Wm Ranch Rd
Oloroso Cir
End (W)
End (E)
Trailcrest Dr.
End (E)
Cedarpine Ln.
End (E)
Willow Creek Ln.
End (E)
Dorothy Ave.
Sherman Ave.
Tierra Rejada Rd.
Elderberry Ave.
Weeping Willow Dr.
Christian Barrett Dr.
Christian Barrett Dr.
End (E)
Courtney Lane
End (N)
Misty Grove St.
Cherrygrove St.
Charles Street
End (S)
Maureen Ln.
Bonsae Ave.
Tierra Rejada Rd.
End (S)
Cedarpine Ln.
End (E)
Westport
End (S)
Spring Creek Rd.
Laurel Glen Dr.
Mountain Trail St.
End (N)
Misty Grove St.
End (S)
Leta Yancy
End (E)
Unidos
End (S)
Harvester St.
End (N)
0
Z m
6 0
a r
a m
f4
I-
2 M
10 - --
5 - --
1 T
8- W
1 F
10 TH
10 TH
1 F
1 M
1 M
3 F
1 F
9 W
9 - --
1 M
3 F
7 W
10 TH
3 F
9 - --
7 W
9 W
4 F
7 W
7 W
1 F
9 - --
2 M
2 M
4 F
3 F
3 F
3 F
7 W
10 TH
3 F
3 F
10 TH
1 T
6 T
9 - --
3 W
3 F
2 M
1 M
1 F
1 T
8 TH
8 TH
10 TH
Method
}
Q
Q' J
a C/)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Page 2
Detail
U)
0 U)
ca m
a) Q
v a
U cn
1 0
1 0
0 0
0 1
0 0
1 0
0 0
0 0
1 0
2 0
1 0
1 0
1 0
0 1
1 0
1 0
0 0
1 0
1 0
1 0
1 0
0 0
1 0
1 0
Page 3
2006 Pavement Rehab Project
Method
Detail
List of Streets
O
U
N
Z
N
i
U)
�
Q
a
CU
U)
Q
Q
O
Street
From
To
2:
Q
U
U
U)
Kazuko Ct.
Tejeda
End (N)
g
"'
Kiesha Drive
Southhampton Rd.
End (E)
3
W
1
Lassen Avenue
Shasta Ave.
End (W)
g
W
1
Lassen Avenue
Sierra Ave.
End (E)
g
W
1
Laurel Glen Drive
Hillside Dr.
Williams Ranch Rd.
1
M
1
Leta Yancy Rd
L A Ave
Include Park Parking Lot
8
TH
1
Little Hollow PI.
Aldergrove St.
End
1
T
1
1
1
1
0
0
London Grove Ct.
Pine Hollow PI.
End
1
T
1
1
0
Lucille Court
Charles Street
End (N)
6
T
1
1
0
Lucille Court
Charles Street
End (S)
6
T
1
Maureen Lane (N.)
L A Ave
Hertz Street
9
---
- --
Maureen Lane (S.)
L A Ave
End (S)
McBeth Ct
Chesterfield Dr
End (N)
4
F
1
McFadden Avenue
Poindexter Ave.
End (S)
8
W
1
Meeham Way
Southhampton Rd.
End (E)
3
F
1
Mill Valley Rd
Peach Hill Rd.
Chesterfield Dr
4
F
1
Millard Street
Dorothy Ave.
Second St
7
W
1
0
0
Millard Street
Second St.
Sarah Ave
7
W
1
Millard Street
N/O Roberts
Los Angeles Ave.
7
W
1
0
0
1
0
Misty Grove St.
Walnut Creek Rd.
Heatherwood Hollow
1
T
1
Misty Grove St.
Walnut Creek Rd.
End (E)
1
T
1
---
---
Misty Hollow Ct.
Rivergrove St.
End
1
T
1
Mistymeadow Street
Ambermeadow St.
Walnut Creek Rd.
1
F
1
" ""
" --
Mountain Meadow Dr [N]
Tierra Rejada Rd.
Walnut Creek Rd. [N]
1
F
1
---
- --
Mountain Meadow Dr [S]
Tierra Rejada Rd.
Mt. Trail [S]
1
T
1
Mountain Trail St.
Tierra Rejada Rd.
Summerglen
1
F
1
0
1
Mountain Trail St.
Summerglen
Walnut Creek Ave.
1
F
1
---
- --
Mountain Trail St.
Walnut Creek Rd.
End (E)
1
F
1
Nightingale Street
Penrose Ave.
Elderberry Ave.
10
TH
1
0
0
Nogales Avenue
Los Angeles Ave.
Avenida Colonia
5
T
1
Oakcliff Drive
Christian Barrett Dr.
End (N)
3
F
1
1
0
Oakglen Court
Crystal Ranch Rd.
End (S)
1
M
1
- --
- --
Painted Sky St
Westport
Camden Ct
2
M
1
0
0
Palomar Avenue
Sierra Ave.
Shasta Ave.
g
W
1
Palomitas Ct
Golondria
End (S)
2
M
1
1
0
Peach Hill Road
Tierra Rejada Rd.
Williams Ranch Rd.
2
- --
1
-
2
Peach Slope Road
Williams Ranch Rd.
End (N)
1
M-
1
Penrose Avenue
Nightingale St.
Harvester St.
10
TH
1
0
0
Pheasant Run
Tierra Rejada Rd.
Westport
2
M
1
0
0
Pine Hollow PI.
Aldergrove St.
End
1
T
1
1
0
Ransom Road
Southhampton Rd.
End (W)
3
W
1
1
0
Riverglen Street
Brookglen St.
Alderglen St.
1
M
1
Rivergrove St.
Pine Hollow PI.
Mt Meadow Dr
1
T
1
Roberts Avenue
Millard St.
Harry St.
7
W
1
" --
- --
Roberts Avenue
Harry St.
Spring Rd.
7
W
1
- --
- --
Rolling Knoll Rd
Peach Hill Rd.
Chesterfield Dr
4
F
1
---
---
Ruth Avenue
Millard St.
Harry St.
7
W
1
---
---
Sandy Hollow Ct.
Rivergrove St.
End
1
T
1
- ""
- --
Sarah Avenue
Millard St.
Harry St.
7
W
1
0
0
Science Dr
L A Ave
End (N)
6
- --
1
--
Second Street
Millard St.
Spring Rd.
7
W
1
0
1
2006 Pavement Rehab Project
List of Streets
Street
From
To
Second Street
Moorpark Ave.
Millard St.
Shady Knoll Court
Christian Barrett Dr.
End (S)
Shady Point Drive
Candlewood Ct.
Cedarpine Ln.
Shasta Avenue
Sierra Ave. (N-S]
Sierra Ave (West End)
Shasta Avenue
Sierra Ave. (West End)
Los Angeles Ave.
Sherman Avenue
Millard St.
Harry St.
Sierra Avenue [E -W]
Shasta Ave. [N -S]
Sierra (N -S)
Sierra Avenue [N -S]
Poindexter Ave.
Sierra (E -W)
Silver Oak Lane
Rolling Knoll Rd
End (E)
Sir George Court
Charles St.
End (N)
Skidmore Ct
Grand Isle Dr
End (N)
Skyglen Court
Mountain Trail St.
End (N)
Southhampton Road
Donnybrook Ln.
Christian Barrett Dr.
Southhampton Road
Tierra Rejada Rd.
Christian Barrett Dr.
Spring Creek Court
Walnut Creek Rd.
End (E)
Spring Creek Road
Walnut Creek Rd.
End (W)
Springtime Lane
Blairwood Dr.
End (W)
Stanford
N. Amherst St
Penn
Stoneyglen Court
Walnut Creek Rd.
End (N)
Summer Shade Court
Elmrock Ave.
End (S)
Summer Avenue
Cliffrose Ave.
End (W)
Summerglen Court
Mountain Trail St.
End (N)
Sunny Slope Place
Hidden Pines Ct.
End (W)
Sunnyglen Drive
Mountain Trail St.
Walnut Creek Rd.
Sunrise Meadow Circle
Terracemeadow Ct.
End (E)
Sunset Meadow Ct.
Country Meadow Rd.
End (N)
Susan Avenue
Millard St.
Harry St.
Tech Cir.
Poindexter Ave.
End
Tecolote Cir
Wm Ranch Rd
End (N)
Tejada St.
Bonsai
Kazuko
Terracemeadow Court
Country Meadow Rd.
End (N)
Third Street
Moorpark Ave.
Bard St.
Thomasville Ct
Westport
End (E)
Trailcrest Drive
Christian Barrett Dr.
Blairwood
Unidos Ave
Leta Yancy
End (E)
Villa Campesina Ave
Leta Yancy
End (E)
Vinewood
Christian Barrett Dr.
End (E)
Virginia Colony Place
Condor
Rail Tracks
Vista Del Valle
Peach Hill Rd.
Bella Vista Dr.
Vista Levana Dr.
Vista Del Valle
Bella Vista Dr.
Vista Meadow Court
Country Meadow Rd.
End (N)
Walnut Creek Road
Sunnyglen Dr.
Tierra Rejada Rd.
Walnut Creek Road
Mountain Trail St.
Sunnyglen Dr.
Walnut Creek Road
Mountain Meadow [S]
Tierra Rejada Rd.
Warren Circle
Charles Street
End (N)
Weeping Willow Drive
Donnybrook Ln.
End (E)
Westmont Drive
Crystal Ranch Rd.
Walnut Creek Rd.
Westport St
Brookhurst Ct
End (E)
Whitney Avenue
Sierra Ave.
Palomar Ave.
Williams Ranch Road
End (W)
Landscaped barrier
Williams Ranch Road
Peach Hill Rd.
Landscaped barrier
Page 4
Method
Detail
O
U
(n
Z
M
}
U)
CL
Q
d
ca
N
Q
�
J
Q
O
g
Q
rn
U
cA
7
W
1
0
1
3
F
1
1
0
3
F
1
0
0
9
W
1
- -- -
--
9
W
1
0
1
7
W
1
- -- -
--
9
W
1
0
0
9
W
1
- --
- --
4
F
1
- --
- --
6
T
1
1
0
4
F
1
1
0
1
F
1
- --
- --
3
F
1
- --
- --
3
F
1
0
1
1
M
1
1
0
1
M
1
- --
- --
3
F
1
1
0
5
1
0
1
1
F
1
- --
- --
3
F
1
1
0
1
M
1
1
0
1
F
1
- --
- --
3
W
1
1
0
1
F
1
0
0
1
F
1
- --
- --
1
F
1
---
- --
7
W
1
- --
- --
9
- --
1
1
1
2
M
1
- --
- --
9
- --
1
- --
- --
1
F
1
- --
- --
7
W
1
0
1
2
M
1
1
0
3
F
1
0
0
8
TH
1
0
0
8
TH
1
0
0
3
F
1
0
0
5
- --
1
- --
- --
4
F
1
- --
- --
4
F
1
- --
- --
1
F
1
- --
- --
1
M
1
- --
- --
1
F
1
- --
- --
6
T
1
1
0
3
F
1
- --
- --
1
M
1
2
M
1
1
0
9
W
1
0
0
1
M
1
- --
- --
2
M
1
0
1
2006 Pavement Rehab Project
List of Streets
Street From
Willow Creek Lane
Willow Creek Ln.
Willow Forest
Willow Grove Court
Willow Hill Drive
Willow Springs Drive
Willow Springs Drive
Winter Avenue
Wintergreen Lane
Woodlake Manor
Christian Barrett Dr
Christian Barrett Dr
Willow Springs Dr.
Willow Springs Dr.
Willow Springs Dr.
Mountain Trail St.
Willow Grove
Cliffrose Ave.
Hidden Pines Ct.
Cedarpine Ln.
To
End (E)
End (N)
Mountain Meadow
End (E)
Mountain Meadow
Willow Grove
Mountain Meadow
End (W)
End (W)
End (S)
Page 5
Detail
cq
U ul
M M
(n N
d Q
� d
U Un
1 0
1 0
1 0
0 0
1 0
1 0
59 20
`l1 J %, .. y •'- —
Method
6
L
Or-
CU
0�
J
2
Q
cn
3
F
1
3
F
1
1
F
1
1
F
1
1
F
1
1
F
1
1
F
1
1
M
1
3
w
1
3
F
1
Total Number
101
112
Page 5
Detail
cq
U ul
M M
(n N
d Q
� d
U Un
1 0
1 0
1 0
0 0
1 0
1 0
59 20
`l1 J %, .. y •'- —
Exhibit 3
RESOLUTION NO. 2006-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
MOORPARK, CALIFORNIA, AMENDING THE FY 2005/06
BUDGET TO APPROPRIATE FUNDS AND ESTABLISH A
BUDGET FOR PROJECT 8011: TIERRA REJADA ROAD AC
OVERLAY PROJECT (LOCAL TRANSPORTATION
ARTICLE 8A FUND - FUND 2603)
WHEREAS, on June 15, 2005, the City Council adopted the Budget for Fiscal
Year 2005/06; and
WHEREAS, a staff report has been presented to the City Council requesting a
budget increase in the aggregate amount of $100,000; and
WHEREAS, Exhibit "A ", attached hereto and made a part hereof, describes said
budget amendment and its resultant impacts to the budget line item(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the aggregate increase of $100,000 as
more particularly described in Exhibit "A ", is hereby approved.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and
shall cause a certified resolution to be filed in the book of original resolutions.
PASSED AND ADOPTED this 21St day of June, 2006.
Patrick Hunter, Mayor
ATTEST:
Deborah S. Traffenstedt, City Clerk
Attachment:
Exhibit 'A': Appropriation and Budget Detail
PW/YKL06043IRPT 105119/06
Resolution No. 2006 -
Exhibit "A"
A. Fund Allocation
Fund
Local Transportation
Appropriations & Budget
For Project 8011:
Tierra Rejada Road AC Overlay
— Article 8A Fund 2603.5500
100,000
B. Distribution of Appropriations to Expense Accounts
.. . .... . .....
-----------------
Current
Subject
Revised
FY 05/06 Appropriation
FY 05/06 1
'Account Number
Budget 1
(Reduction)
Budget. 1
1 2603.8310.8011.9601: Desiqn
0
100,000
$
100,000 i
_...- ------- -- --
2603.8310.8011.9640: Const. 0 $
. .. . . .......... ................ . ... . ....... ........ . ........ . .... ................
0
2603.8310.8011.9650-
$ 01
0
0
Total Project -- -----------
.
-- -- .__$_._0_._.......__....... ..__......._$._._.._100,000
-- ----
:
100,000
Approved as to form:
PWNKLO6043IRPTIOS/19/06