MOORPARK CITY COUNCIL
AGENDA REPORT
TO: The Honorable City Council
FROM: Yugal K. Lail, City Engineer / Public Works Director _
Prepared by: Kenneth C. Gilbert, Public Works Consultant
DATE: September 13, 2006 (Council Meeting 09/20/06)
SUBJECT: Approve Change to the Conceptual Design for the Walnut
Canyon / Gabbert Canyon Storm Drain Channel Improvement
Project
BACKGROUND & OVERVIEW
In 1997 the City Council approved the conceptual design for a proposed future project to
construct capital improvements to portions of the Ventura County Watershed Protection
District's (District) drainage facilities serving the Walnut Canyon Watershed and the
Gabbert Canyon Watershed, within the City. This request is for approval of a revised
conceptual design for that project.
DISCUSSION
A. Prior Studv
In 1997 the District, through their consultant, completed a study of the combined
Gabbert Canyon and the Walnut Canyon Watersheds to asses the condition and the
capacity of the District's existing drainage facilities. That study confirmed the fact that
those facilities were inadequate and analyzed numerous alternative design concepts
for a future project to make improvements to those facilities. The design alternatives
developed by the District's consultant used a combination of a) capacity
enhancement, b) detention and c) diversion to upgrade the existing facilities to
contain 100 year storm flows.
PW/YKL06039/RPT /05 117108 00011111-8
Honorable City Council
September 20, 2006
Page 2
B. Prior Approved Design
The Gabbert and Walnut Canyon Channels Flood Control Deficiency Study
prepared in 1997 presented a recommended alternative, "Alternative -B ", which
included a 70- acre /ft Detention Basin No. 3 with a 300 -cfs diversion to the Arroyo
Simi occurring at Shasta Avenue. The revised study was prepared in August 2005
and adopted as the regional watershed master plan for the Gabbert and Walnut
Canyon watersheds by Ventura County Watershed Protection Agency (VCPWA) on
May 5, 2006. This study updated the original study to incorporate the
improvements proposed in the flood control study prepared for Triliad Development
Incorporated, titled Moorpark West Corporate Center Flood Protection Project —
Walnut Canyon Regional Detention Basin; dated March, 2003, and prepared by
RBF Consulting. The study prepared by RBF Consulting was conducted to provide
preliminary design of the regional flood control improvements proposed in the
original study that would be implemented in order to eliminate or decrease the flood
hazard at the Moorpark West Corporate Center project site. The proposed
improvements followed the adopted regional plan but also introduced some
variations from the original basin configuration proposed for Detention Basin No. 3.
The revised study will update the adopted Regional Masterplan to include the basin
configuration proposed in the 2003 RBF study with an additional modification
proposed by VCWPD. That additional modification is that the Shasta Avenue
diversion to the Arroyo Simi is not feasible to construct and will not be implemented.
It was determined that the cost of acquiring the necessary right -of -way, and
easements would be prohibitive to the construction of the Shasta Avenue Storm
Drain presented in the original Alternative -B. In its place, there will be a 100 -cfs, in-
channel detention basin bypass. The basin bypass provision will result in an
efficient use of the proposed detention basin storage area by allowing the base of
the inflow hydrograph which contains the majority of the storm runoff volume to
bypass the basin. So the detention volume provided by the basin is preserved to
attenuate the peak of the storm hydrograph. The revised watershed study focused
exclusively on the design and analysis of Detention Basin No.3 and its effects on
the downstream watershed hydrology and channel hydraulics. The proposed
detention basin site is bounded along the east by the Walnut Canyon Elementary
School property, the proposed Casey Road alignment along the west, the proposed
High Street extension along the south, and steep hillsides long the north all within
Specific Plan No. 1.
In June of 1997 the City Council concurred with District and City staff
recommendations and approved design Alternate B.
P W NKLOW39 /RPT /05/17/08
Honorable City Council
September 20, 2006
Page 3
C. Recommended Revised Concept
The District retained the services of a second consultant to review and reassess
Design Alternate B. As the result of that effort, a revised Alternate B has been
recommended by the District. As depicted in the diagram (Exhibit 2), this revised
design calls for certain increases to the detention and capacity enhancement aspects
of the design, and the elimination of the Shasta diversion channel. It is estimated that
these changes will reduce costs approximately $2.4 million (from $9.6 to $7.1 million).
The recommended revised concept has been accepted by the District.
D. Implementation
The District, City staff and certain land developers have been working and continue to
work on serial implementation of segments of this design.
STAFF RECOMMENDATION
Approve the Revised Alternate B design concept set forth in the Walnut Canyon /
Gabbert Canyon Flood Control Deficiency Study dated July 2005.
Attachments:
Exhibit 1:
Exhibit 2:
Alternate B
Revised Alternate B
k9�
.O P W NKL08039/RPT /06 /17106 q)01')
If
if
Al
�• /�< �'� F. �. a�. = T
LEGEND
��..,
/✓ 7
��.�
EXISTING CHANNEL
11 - _` - --
- ice_. ���,�
,.•,t I ✓r i•, � � Lq �� 'V� +�
mod. ✓,��; I
J
NO MODIFICATIONS
�
� �� '. -\`�ll .k
� MODIFIED CHANNEL SECTION
~�� � �Il._. �v,,. � ii\� o(t
(t'�5r i✓!�L
\\ �\
fI. '-r.
_„ \
- - �� . _'• % _ . _: <, _ _ ::: ��
EXISTING CHANNEL REMOVAL
/ -_ - _� _�� Il i -i -7
_ \
�- PRO -"
PROPOSED CHANNEL
-
if
- \\`, �/ /l .. /✓...w- -' -_� «`'^ S - - it
® DETENTION BASIN SITE
11 =•�✓/ i�l i��� = - y V 4 AFT.. AA 11
/ - /VQLU AC -FT. I Ai1 l�/
' J - -- --
CHANNEL STRUCTURE
MODIFICATION
. NT N
141 rJ
,! %• - TAB; �•'�� _� a -:._> I� . --
a` a DN BST. BERT ic.a - s 7 -F$� . _sac /
It D. y AG -FT /. _ ✓i
COST ESTIMATE
(INCL. 10% CONTINGENCY)
DETENTION BASINS: x5A43,000
r✓ rF,. - 4 5 i/ ,' 0 RiL.' T luo 1198 I �!, F IsTI
1 1r I -y IID =4'�>Y
R N BASIN 1 II
STOR. lL= �I
SEO. `VBLj3 ACr t . , -•� 536 C� f T
� _ � INS � Fc I -� �k•i ,�. -'; _ , ��„%��� � , I /� ' J,
1 =14� �� l
CHANNEL IMPROVEMENTS: 13,861,000
4- -
` /- - pUT- -, 1 TRW l I
r C Y
RIGHT -OF -WAY: 903,000
_ \ 6/= v _ %✓
-77
TOTAL: x10,788,000
- QI : =43 CFS, POSE DETEF�TI �il L 'ff ,I, N, `1.•'
0p /j, rf
I V l B Si: o W 476'CFS+� N 1
- = _ RoP SECT ,� y�00= y
- - D-3.� �w6" p ��✓ i�l_ C CT. n1
., V `. HJ�L }
90 CL IF_
s,, y - - _
HIGH ST
CANYON � _ -
�`
u - -
-33
too -_.' Qa� t -
CHNL. SECS
—��
_ - NL. 9EFL
_ -� - :14 FS 40' DT5� -
d -1 z11JF5 _ y _
-1=XlS .CHNL SEC Tires _ � B -�- - �f A�
- W"�F* rw _ _
II B -1 ' -5 I �.._ -- -:
_ . _
� 0100 -283 CF - - �..: ®FS - - L
I I _ - - w: - wro
dw rrA Nni
- CHNL CHNL SE . M '
-✓ .. .SECT. - _
F ��� � r-0 5' - TM .m_i R r • a
_ -- - -. _. n
1I 1035 CF
Se' � _ }.
- _
_ I I 1 —
- CH SECT.
If
6=14' D
-ate`
1
11 CFS =� CANYON _ •' i= --
4100; 13 7€ I Cd Nn Vd RA - I
CB H=N16L . 5 SECT. - 4
IN SE�=
PIER =6' 400 =1035 CF
CHNL. SECT.
B =16' D =6. - -'
� •dNOa dr 1� • `�- I ���{ /
�, f I �
500 0 500 1000
Lul yIx u
; ddJl -1
C O_ O -
NATURAL TRAP.
0100 = 1 113 CFS — CHNL. SECT. a� a
SCALE IN FEET
_ -_
CHNL. SECT. B =14' D= 8' -15' y T
B 14 III
c •,' `�•i�, � *•� � - �� _ - � _ _ � d �•r r _ -N�.� _ � a' a.
_ - u n? I w: >x Iw.•. 4.
l.I- �= 6.5'_- _. 1 ,.•,r �, .' ;m _�- -.. .� �_--• �F.r#
'z.. 1 / '., +
� �
�.. ,. +�N lam. l■
��
_ k �� � � GI _ a�'�' ,,.
pi � P�v
,
yi
'�; '• fC p ''A ^r . 100.
. ,.. ,•... ;.. —. �w_n .. a yr%' " gas Iw n _ _ n.
'Y. T` —
- M - f'
�. e��•, d��
''i�'r�j:�
EXHIBIT-1
_ �- - ziA'__ -4 ryf 111Y...
-�
VENTURA COUNTY, CALIFORNIA
FIGURE
WALNUT /GABBERT CANYON
WALNUT /GABBERT CANYON STUDY
Robert Bein,Wiliiam Fzwt & Associates
PROFESSIONAL E%EET PLANNERS k SUR%EYORS
�m`'>�
TO waam ru mq an-dw
ALTlIWATIr! ro .
[]F 9
-7
r
�' °°
-
Grt
tGOIATIC ■Y
WF
rr
IQ IIP— MD
dw
dad
REVISIONS
VCFCD
PROPO
ASIW
�� --
� t ciao IN =390 CFS i
7 0100 2737S -
�� STOR. -14 AC-FT
SED. -11 AC -FT.
I
DETENTION B "NN '
I: — 10(1 IN` / I
31.32 - - -�_ T V 412 W srrE N0. I'_ s3 u 4 . N few
illr 0100 -0UT =65 S -- .....
MOOIFlE GABBE STOR. VOL- -FT
if
ETENTI ASIN SIZE - SED.,.
01=3 CFS
O i )O IN 4. CFS - _ (I EXIST. NL. SECT.
0100 OU 514 CFS _I `.. ROPOSEO \ I B =Y O 4' -6-
OBYPASS- 02 CS DE NTION BASIN t �.
STOR. 145 AC -FT - ITE N0. 2
-53 AC-FT :.
IN =536 CFS � 1
0 OUT=143 l
. VOL. AC— \\ CTION S RE
ST /.
_. -.SE- VO -AC- CA RD. fIGA71 .�1_
DSTING CHANNEL
— NO MODIF1CA110NS
MODFIED CHANNEL SECTION
EXISTING CHANNEL REMOVAL
PROPOSED CHANNEL
DETENTION BASIN SITE
• CILAN, And CLARE
COST ESIWATE
(INCL 30% CONTINGENCY)
DETENTION BASINS: 16,017,000
CHANNEL IMPROVEMENTS: 52,038,400
RIGHT -OF -WAY: 5 927:000
TOTAL 983,100
I
> w
ll
U � 5
f_ OSED DETCNd10N
OI00 =143 CFS i BASH s an.'3' —
C RCP SECT. 1GO IN — 769 CFS
r,
D =3.S� �/- 0100 0U1�, - 241 CFS __ CHNL 'SECT. p
-. - - .�'
8
—FT
f .,. _ —-
10 0 CFS HIGH SL f a
_ o
ti C YON �I O
108 =902 CFS I 0101 CFS Oo=5 9 CFS o M
CHNL SECT. CHNL CL { SL HNL SECT. Wryer
4' D =5.5'- 4.0' w �t `.� 481 CFS a_6' �' 6' =5' LJ
- - 508 CFS EXIST. CHNL. SECT. �J -
100 - - -- �
CHNL SECT. - CT. ;
- - ' f t2' tS'' c
0100=1 35 CFS `�&
CHNL CT
8 . s M
=14' D =4.5'
LOS ANGELES
01081113 CFS CANYON - A •�
CHNL SECT. 8' 0 CFS i CFS - SHA TA RSION
B =16.5 ET. DEL G O
D=6' ( T. CH L. SECT. _5' g
PIER =6' 2'. D 5' ❑ _. O Q
OI 035 CFS 00 °1 j,
CHNL SECT. q
830 CFS
m [3
Q,00-5"Q,00-5"-F3—
NATURAL TRAP. X08() -
01� =1113 CFS CHNL SECT. I PFl
Rs
CHNL SECT, B =21' D= 6' -15'
I �
B =14' Z =2'
D =8.5' e
a J ' -- w
it Waa
NO
S
FIGURE
�
500 250 0 500 1000
OF �EETS
JOB N0. me-E
U
o�
bl �
�i