MOORPARK CITY COUNCIL
AGENDA REPORT
TO: Honorable City Council
FROM: Yugal K. Lail, City Engineer /Public Works Director `�-f
Prepared by: Teddy Okoye, Assistant City Engineer
DATE: September 14, 2006 (CC Meeting of 09/20/06)
SUBJECT: Consider Approval of Plans and Specifications for Modification of
the Median at the Intersection of Princeton Avenue and Campus
Park Drive
BACKGROUND
On August 2, 2006, Council approved the design "Concept" and a Budget Amendment
for modification of the median at the intersection of Princeton Avenue and Campus Park
Drive. The proposed improvements include modifying the existing configuration at this
intersection to dedicated left turn and right turn lanes only, and the installation of bike
lanes on the east side of Princeton Avenue from Campus Park Drive to the south leg of
Condor Drive, and on the west side of Princeton Avenue from Campus Park Drive to the
north leg of Condor Drive.
The median will be landscaped to match the existing landscape in this area, in
accordance to the Landscape Plan developed by the Parks, Recreation and Community
Services Department.
DISCUSSION
A. Project Plans
Staff has completed the preparation of the Plans and Specifications for the project.
A copy of the plans has been placed on top of the file cabinets in the City Council
Conference Room. Bid proposals will be requested from qualified contractors
informally.
4)00411 )
Honorable City Council
September 20, 2006
Page 2
B. Budget Impact
The funding source for the project is TDA Article 8 Reserve (Fund 2603). The
estimated cost for the project is summarized below:
Description
Design $5,000
Construction $70,000
Construction Administration $10,000
Total $85,000
C. Project Approval -- Design Immunity
11
E.
It is recommended that City Council approve the project plans and specifications to
document City Council approval of the scope and design of the project. Such
approval is also required for the purpose of establishing design immunity pursuant
to Section 830.6 of the Government Code of the State of California.
Schedule
The project is anticipated to be completed in 20 calendar days. Informal bids will be
requested from qualified contractors. Construction should be completed by
December 31, 2006, barring unforeseen circumstances.
City Manager Approved Contract
The Public Contracts Code allows construction contracts for projects costing less
than $100,000 to be approved by staff. The estimated construction cost for the
subject project is $70,000. Accordingly, it is the intent of staff to award a contract
to the lowest responsible /responsive bidder, subsequent to the opening and
evaluation of bids. It is recommended below, therefore, that the City Manager be
authorized to execute a construction contract for this project not to exceed
$70,000. In the event that the bids are higher than $70,000, staff will return to the
City Council for approval of the contract award.
' #00d!20
Honorable City Council
September 20, 2006
Page 3
F. Notice of Exemption
A Notice of Exemption will be prepared by the Community Development
Department and will be filed with the County Clerk's Office in accordance with
California Environmental Quality Act.
STAFF RECOMMENDATIONS
Approve the plans and specifications for the modification of the median at the
intersection of Princeton Avenue and Campus Park Drive and authorize staff to
advertise for the solicitation of construction bids for the project.
2. Authorize the City Manager to execute a contract for the construction of the subject
project, based on a bid prepared, submitted, reviewed and approved in accordance
with applicable State and City requirements and regulations.
Attachment:
1 - Design Plan
4 J00 41'1�1
z
h,
If
l
IN-
m "d
mo �
! h 0m
11
4
IN
hem
+' N
C
pus
Ones
wo P' Told
V N
..�I
,.
BL— '&ke Lane with Armv! per 2006 Catlrans Standard Plans
s;
z
h,
If
l
IN-
m "d
mo �
! h 0m
11
4
IN
QUANTITIES
hem
2
pus
Ones
wo P' Told
LeQend
..�I
,.
BL— '&ke Lane with Armv! per 2006 Catlrans Standard Plans
.�.
k \ Pavement markkg and stripling per 2006 Caltrans Standard
2
-' Plan A24AA24D,8A20D.
Mn
All markings and striping shall be thermoplastic.
QUANTITIES
hem
2
pus
Ones
wo P' Told
Remme PCC sbbed Madien
119
Sp. FT.
2
Bartow AC Pa I
Mn
M. FT.
3
Com nso PCC Curb
270
So. FT.
4
Extoll I ' S
1
FA.
5
C alrvtl AC PawrlwN
513
so. FT
6
Conehuct S d
rA,m
q4
S FT.
7
-9
RertxweT IV R I mws
E
EA.
a
Ynbll T IV (- Artowa
2
EA
-
9
Cans RAU do Crosswalk
1
El
10
InsU" aria Lane/FVrmv
8
EA
11
Instill R81 8' ifs
B
EA.
12
Imbl RalA "o
13
Inabl De 3Y
1097
LF.
14
rnbM 0e as 39A
590
lF.
15
Insb T pan IV IR Arrows
2
EA.
16
Tra,TK Conhnl
1
L8.
co
1.
ym
P
Construction Notes
Remova eusbg P.C.C. rub• ysAd median and AC pavement am
- topper Section A- Ahereon.
', CwsVMt6- PC C mt per APWA 1201(Type A -1).
3 .., Cor— landsceprg per deba (A -A) hereal. Remove 12'sal and replace
wins aprowd 12 "topsoil.
4 Remove ark( dispose d as mgalgn Ones artl rephce apMOSirtalely 238 al
S' PVC BchM. 40 wiN ]5' PVC Sdwtl.40 kr5a'nn water f Conned a
PmcelOn A, aossmer stew apprme. 200' wulh of Carpus Pak Dr east
side. Conbxa rann to Campus Park Drove, Added 75' inch pipe aauld be
12' in from mow snip edge w2,5 from — lace. Cap Campus Pak 0, em
i 5) Prded in place. ant ex 4ol; holies b wrbin.
6 Sawcul, remove and hoaetni,16 lid@ by14' Mkk slydion of AC pavement
Dace.0— section m Imd 1' AC ma110- base(Pus V AC). Section
will be naked by Cary Inspedm.
;Remove etlstirg dghl -tuns snow ant mR krs Type N(L) arrow.
! a Install R81 sign on esislirg light pde.
r g) Detail 39,
1-0 Dela139A.
11) 1-0 R61 sgn m evsmg R26(S) Sign Post
x,12 Construct 8' radius curb hose (Paint curb nose ywde).
T3 1Conshd 10' wide ladder W M wak. ladder ships shell be spaced
14 .� TraRC mnbd shA be per WATCH Manual .
s
m
P
I
1
-
.
co
Irriaalion Notes
Protect Sze a !• • !
200'x /6 Medan $ ). , . _
200', it PlanW,rigation Area
1' Mow Strip both skies (5 cum) - J, _ - 8
Valve A-1
Dnp System
v 5!
200' South of Campus Pak Drive earl side ¢tins
of Princeton Avenue (Sleeved to Median) y. 16'
50 PSI rang a( 30 PSI @ 16 G.P.M.
Size: 1'
Elostilo Irriaalion a
Remove driplbubbler system distributed via
individual 44im tubing manifold to pants !.
Remove 200' of 1,04ntlh PVC Instigation line R—W Concrete
and installed of manifolds from (to mach exmbq)
Campus Pak Drive 200'soNh I 2 J
T / 1 6.
Ex sna Plants
Re van shrubs (Agapanlhus) and ground AC. AC --
cover (Geaanla) 4 ' / -
�.; t
a r.e
w e
Secton A -A
(N.. .
Y
a
K
O
F
U
Z
W
O
Z
W U
Q M
00
Uj
Z
za
O. W
C
L
ll_t t
�I 2
Attachment
page 2 of 2
Mar" Line STAd41l7_
Match
OFF-RAMP
W-
3
�Sl RTE 1111
'.gn Do,."
STA 73.54
End Detail 39
STA 67+5
S STA67+53
to
Begin Detail 39
ye
S
OC
P:Ts Alt
fJ
Ill
End Detail J9 7 , 7,
STA
Begin Detail 39
E13 ON -RAMP
EB OFF-RAMP
Z
ST RTE. . I18
ST . RTE. 118
M
I I
H+
Attachment
page 2 of 2
Mar" Line STAd41l7_
Match
STA68+6
4=111 1
YRkN1 11
Ral 4po .1
OFF-RAMP
W-
ST. RTE. 118
�Sl RTE 1111
'.gn Do,."
STA 73.54
End Detail 39
STA 67+5
S STA67+53
End Detail 39A
Begin Detail 39
9
OC
P:Ts Alt
STA 70 +20
*,I',�
Ill
End Detail J9 7 , 7,
STA
Begin Detail 39
E13 ON -RAMP
EB OFF-RAMP
ST RTE. . I18
ST . RTE. 118
STA68+6
4=111 1
YRkN1 11
Ral 4po .1
L.
STA 68+13(9@gin Detail 39A)
STA 67+5
S STA67+53
End Detail 39A
Begin Detail 39
tCONDOR
DRIVE
odbo hil
E-ti ESTA66-45
Signal Pole
STA
_Mt45 Beg o Detail 39A
F End Detail 39
S'
-6 Bike Lane (Typloal)
E. RN(S)
IMatch
_Line
000
PRINCETON AVENUE CITY OF MOO RP AR K
Yugal K. Lab (RCE 44038)
MEDIAN MODIFICATION City Ergineer/Public Works Directcr
.3