Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0317 CC REG ITEM 08MMOORPARK, CALIFORNIA City CounGl Meeting of 199,3 ACTION: 4?aoio�r41 By TO: FROM: DATE: SUBJECT: AGENDA RE PORT C Z TY OF MOORPARK The Honorable City Council Kenneth C. Gilbert, Director of Public March 11, 1993 (CC Meeting: 3- 17 -93) ITEM Go A * Works Zk Consider Authorization to Advertise for Receipt of Bids for the 1993 Slurry Seal Project One of the elements of the pavement maintenance program for the City of Moorpark is the application of slurry seal. Historically, the City has sealed selected streets on a bi- annual basis. The last time a designated list of street received this treatment was in the summer of 1990. The demands posed by other programs and project prevented staff from bringing forward a project in 1992. It is recommended that a project be advertised for a list of streets to include the equivalent of two Slurry Seal Projects. DISCUSSION A. Proposed Scope of Work The streets which have been identified as being in need of slurry seal are listed on Exhibit 'A' and illustrated on the maps attached as Exhibit 'B'. A preliminary estimate of quantities and costs are set forth in Exhibit 'C'. The proposed project will includes the application of Type I Slurry on a number of residential streets and the application of Type II Slurry on a number of collector and arterial streets. The project also calls for the removal and replacement of asphalt in poor condition at certain designated locations and the restriping of the streets after the new surface is applied. In addition, the project also includes the application of slurry seal to the Community Center parking lot, said work to be funded to a source other than the Gas Tax fund. alury93ad L/ Slurry Seal 1993 Advertise Page 2 B. Committee Review The proposed project was discussed at a recent meeting of the Transportation and Streets Committee and staff was directed to proceed with finalizing the project plans and specifications. C. Plans and Specifications The Plans and Specifications for the project will be distributed to the City Council under separate cover on Monday, March 15, 1993. D. Schedule It is anticipated that bids for the subject project will be opened in late April and be presented to the City Council for consideration in May. Asphalt repairs are anticipated to be completed in June, followed by the application of Slurry Seal in July. E. Fiscal Impact 1. Cost Estimate: A preliminary estimate of project costs is as follows: Element Est Cost • Design $500 • Construction $300,000 • Inspection $7,000 Sub -Total $307,500 Contingency $32,500 Total $340,000 2. Funding Source: The project will be funded by the Gas Tax Fund. The FY 1992/93 year end balance for this fund is approximately $2.3 million. There are sufficient funds to undertake the scope of work recommended. slury93ed Slurry Seal 1993 Advertise Page 3 3. Budget: The FY 1992/93 Budget only provides $150,000 for this project. It is proposed that an additional appropriation and budget amendment be considered at the time the bids are considered. Approve the Plans and Specifications and Authorize staff to advertise for receipt of bids for the construction of the subject project. slury97sd Page 1 1993 Slurry Seal Project r4w,C-SXT Appeedi 'A' SLURRY SEAL AREAS File: Slury93.wkl St. List Trash Map Code Street From To Day A 1 Trojan Ct A 2 Queens Ct A 3 Luther Cir A 4 Loyola St A 5 Marquette St A 6 Marquette Cir A 7 Reedley St A 8 Julliard Ave A 9 Loyola P1 A 10 Wheaton Ct A 11 Marymount St A 12 Campus Park Dr A 13 Princeton Ave A 14 Campus Park Dr B 1 Lassen B 2 Shasta Ave B 3 Diablo Ave B 4 Palomar Ave B 5 Sierra Ave B 6 Lassen Ave B 7 Whitney Ave B 8 Everest Ave B 9 Cornett Ave Loyola St Marymount St Marymount St Campus Park Dr Loyola St Marquette St Julliard Ave Campus Park Dr Loyola St Loyola St Marquette St Princeton Ave Campus Park Dr Princeton Ave Shasta Ave L. A. Ave Shasta Ave Shasta Ave Shasta Ave Sierra Ave Sierra Ave Shasta Ave Poindexter Ave End Mon End Mon End Mon End Mon 'i 7501+ East Mon jl End Mon 1,270'+ East Mon Reedley St Mon End Mon End Mon End Mon II 'I N. to End N/A Frwy Ramps N/A `I Collins Ave N/A it End Fri Sierra Ave Fri Sierra Ave Fri Sierra Ave Fri Ii i' Poindexter Ave I� Fri End Fri Palomar Ave Fri End II Fri End I, Fri Asphalt Repair Area (SF) 44 9 176 133 06 12- Mar -93 Slurry Seal ------------------------------------ Dimensions Quantity -------- - - - - -- --------------- -- Length Width Type I Type II (ft) (ft) (ELT) (ELT) = = = = == = = = == I = = = = = == = = = = = == 800 365 485 180 759 347 1,273 250 373 539 950 1830 1000 4500 8o 2,250 380 380 1,925 80 770 100 800 32 34 33 36 37 33 37 36 I 32 32 36 I 62 67 67 32 35 I 32 32 35 32 31 32 37 15.14 7.34 9.47 3.83 16.61 6.77 27.86 5.32 7.06 10.20 20.23 1.51 46.59 7.19 7.19 39.86 1.51 14.12 1.89 17.51 113.46 67.00 301.50 Page 2 1993 Slurry Seal Project E,,kN\?s 7z ,A, SLURRY SEAL AREAS File: Slury93.wk1 Asphalt St. List Repair Trash Area Map Code Street From To Day I (SF) .I I I 12- Mar -93 Slurry Seal ------------------------------------ Dimensions Quantity -------- - - - - -- --------------- -- Length Width Type I Type II -(ft)- - 1 - - - (ft) B 10 McFadden Ave Poindexter Ave End Fri ij 10.5 800 B 11 Sir Georqe Ct Charles St End Tue 542 B 12 Lucille Ct Charles St End �i Tue 634 B 13 Warren Cir Charles St End Tue 329 B 14 Heddyland Ct Charles St End Tue j 634 B 15 Lucille Cir Charles St End Tue 383 B 16 Charles St Spring Rd End Tue 1 1,640 B 17 City Hall Parking Lot (See Map E) - -- 845 II 1,422 i B 18 Poindexter Ave Gabbert Rd RxR N/A j1 42 1100 B 19 Gabbert Rd RxR N. to End N/A 4000 B 20 Gabbert Rd RxR L. A. Ave N/A 138 1525 C 1 Christian Brt St Peach Hill Rd Spring Rd Tue /Fri '.' 37.59 5,000 C 2 Candlewood Ct Christian Brt St End Fri j� 580 C 3 Shaddy Point Dr Candlewood Ct Cedarpine Ln Fri 950 C 4 Cedargrove Ln Shaddy Point Dr End Fri 'I I 150 I C 5 Cedarpine Ln Gunsmoke Rd Christian Brt Fri � I 1 1,160 I C 6 Gunsmoke N. Cedarpine Ln End Fri I 845 C 7 Hillburn Ct Cedarpine Ln End Fri ! I i! 260 �! C 8 Deering Ln Cedarpine Ln End Fri 11.6 830 C 9 Donneybrook Ln Cedarpine Ln End Fri 13 1,400 C 10 Meeham Way Southampton Rd End Fri 21 400 C 11 Oakcliff Dr Christian Brt St End Fri i� 600 36 1 17.04 i 36 11.54 28 i 10.50 29 5.64 29 10.88 29 I 6.57 I 37 35.90 27 22.71 33 20 48 40 118.32 I 32 10.98 32 j 17.98 43 3.82 35 24.02 33 16.50 I 33 j 5.08 33 16.20 I 33 ; 27.33 33 7.81 33 11.71 36.30 80.00 73.20 Page 3 1993 Slurry Seal Project PP 'A' SLURRY SEAL AREAS File: Slury93.wk1 St. List Trash Map Code Street From To Day C 12 Willow Creek Ln N. End S. End Fri C 13 Atwood Ct Willow Creek Ln End Fri C 14 Hargrove Ct Willow Creek Ln End Fri II C 15 Southampton Rd Donneybrook Ln Tierra Rejada Fri ! C 16 Hatfield Ct Weeping Willow Dr End Fri I' C 17 Weeping Willow Dr Donneybrook Ln End Fri C 18 Shaddyknoll Ct Christian Brt St End Fri C 19 Grovedale Ln Cedarpine Ln End Fri C 20 Ashbrook Ln Christian Brt St End Fri C 21 Woodlake Manor Cedarpine Ln End Fri I C 22 Ashbourne Ln Blairwood Dr End Tue C 23 Cedarpine Ln Christian Brt St Christian Brt Fri C 24 Greenbush Ln Trailcrest Dr End I Tue C 25 Trailcrest Dr Christian Brt St Blairwood Dr Tue C 26 Blairwood Dr Christian Brt St Trailcrest Dr Tue i C 27 Springtime Ln Blairwood Dr End Tue C 28 Summershade Ln Elmrock Ave End Tue C 29 Elmrock Ave Blairwood Dr Trailcrest Dr Tue C 30 Vinewood Ln Christian Brt St End i Tue C 31 Spring Rd L. A. Ave Peach Hill Rd N!A D 1 Heather Ct Courtney St End Tue D 2 Nightingale St Penrose Ave Eldenberry Ave Tue D 3 Courtney St Tierra Rejada Rd Eldenberry Ave Tue Asphalt Repair Area (SF) 12- Mar -93 Slurry Seal ------------------------------------ Dimensions Quantity Length Width Type I Type II (ft) (ft) (ELT) (ELT) 475 430 300 1,300 i� II 730 II 1,425 225 260 81 475 390 300 �I I! 1,300 I j� 225 1,100 1,300 200 350 650 510 i 60 3,500 i 2.90 I 550 �i 670 33 I 9.27 33 8.39 33 5.86 35 26.92 33 14.25 33 27.82 33 4.39 33 5.08 32 8.99 I 33 7.61 32 5.68 31 23.84 32 4.26 I 32 i 20.82 33 25.38 32 3.79 32 6.63 32 12.30 33 9.96 i 45 32 5.49 I 32 10.41 32 12.68 I! 157.50 Page 4 1993 Slurry Seal Project SLURRY SEAL AREAS File: Slury93.wk1 I Asphalt St. List I Repair Trash Area Map Code Street From To Day I (SF) - - - -- - - - - - -- D 4 Eldenberry Ave Nightingale St Harvester St Tue !I D 5 Justin Ct Harvester St End Tue II D 6 Harvester St Tierra Rejada Rd Eldenberry Ave Tue II D 7 Penrose Ave Nightingale St Harvester St Tue �I I D 8 Willow Grove Ct Willow Springs Dr End Tue D 9 Willow Springs Dr Mt Trail St Mt Meadows Dr Tue D 10 Willow Forest Dr Willow Springs Dr Mt Meadows Dr Tue D 11 Willow Hill Dr Willow Springs Dr Mt Meadows Dr Tue D 12 Mt Trail St Tierra Rejada Rd N & E to End Wed D 13 Summerglen Ct Mt Trail St End Wed D 14 Honeyqlen Ct Mt Trail St End Wed D 15 Appleqlen Ct Mt Trail St End Wed D 16 Skyqlen Ct Mt Trail St End Wed D 17 Cedarglen Ct Mt Meadows Dr End Wed D 18 Stoneyglen Ct Mt Meadows Dr End Wed D 19 Forestglen Ct Mt Meadows Dr End Wed ! I D 20 Autugnglen Ct Mt Meadows Dr End Wed D 21 Sunsetmeadow Ct Country Meadow St End Wed �I D 22 Vistameadow Ct Country Meadow St End Wed it D 23 Terracemeadow Ct Country Meadow St End I Wed D 24 Crescentmeadow Ct Wanut Creek Rd End Wed D 25 Sunrisemeadow Ct Terraceseadow Ct End Wed 4 12- Mar -93 Slurry Seal ------------------------------------ Dimensions Quantity Length Width Type I Type II (ft) (ft) (ELT) (ELT) - - - - -- - - - -- I - - - - - -= - - - - - -= 990 420 720 �I 1,000 535 ii 1,200 1,200 1,730 2,400 600 640 600 620 620 420 420 II 560 290 300 570 430 250 32 ! 18.74 32 j 7.95 36 15.33 31 18.34 33 10.44 32 22.72 32 22.72 32 32.75 36 51.11 32 ! 11.36 32 j 12.12 32 i 11.36 32 11.74 32 11.74 32 7.95 32 7.95 32 10.60 33 5.66 33 5.86 32 10.79 32 8.14 29 4.29 Page 5 ElU3, %P3Cf SLURRY SEAL AREAS File: Slury93.wk1 St. List 1993 Slurry Seal Project Trash Map Code Street Fron To Day - -- - - -- ----------- - - - - -- ---------- - - - - -- -------- - - - - -- - - - -- D 26 Autumnmeadow Ct Country Meadow St End Wed D 27 Country Meadow St Wanut Creek Rd End Wed D 28 Cedarmeadow Ct Deemeadow St End Wed D 29 Deermeadow St Wanut Creek Rd Cntry Mdow St Wed D 30 Mistymeadow St Wanut Creek Rd Ambermeadow St Wed D 31 Ambermeadow St Deemeadow St End Wed D 32 Peach Slope Rd Williams Ranch Rd End Wed D 33 Hillside Dr Wanut Creek Rd Laurel Glen Dr Wed D 34 Laurel Glen Dr Williams Ranch Rd Hillside Dr Wed D 35 Spring Creek Ct Wanut Creek Rd End Wed D 36 Williams Ranch Rd L/S Barricade West to end Wed D 37 Summer St Cliffrose Ave End Wed D 38 Crystal Ranch Rd Wanut Creek Rd Cliffrose Ave Wed D 39 Oak Glen Ct Crystal Ranch Rd End Wed D 40 Cliffrose Ave Summer St Winter Ave Wed D 41 Winter Ave Cliffrose Ave End Wed D 42 Walnut Creek Rd Tierra Rejada Rd N. to Mt Trail Wed D 43 Doneva Rd Crystal Ranch Rd End Wed D 44 Westmont Dr Wanut Creek Rd Crystal Ranch Rd Wed D 45 Crystal Ranch Rd Wanut Creek Rd West to end Wed D 46 Hillside Dr Wanut Creek Rd Spring Creek Rd Wed D 47 Spring Creek Rd Wanut Creek Rd West to end Wed D 48 Riverglen St Alderqlen St Brookglen St Wed Asphalt Repair Area (SF) 3 12- Har -93 Slurry Seal ------------------------------------ Dimensions Quantity -------- - - - - -- --------------- -- Length Width Type I Type II (ft) (ft) (ELT) (ELT) 250 1,880 340 630 190 920 700 720 500 440 �I 940 it 590 450 260 710 570 3,900 480 560 1,050 ` 600 I 960 450 29 I 4.29 35 38.93 I 33 6.64 35 13.04 33 3.71 32 17.42 32 13.25 36 15.33 36 10.65 32 8.33 36 20.02 32 11.17 32 8.52 I 28 ! 4.31 33 I 13.86 32 j 10.79 i 36 83.06 32 9.09 32 10.60 28 17.39 36 12.78 32 18.17 33 8.78 Page 6 Fa.11� Ib "T A ipe"di t 'A, SLURRY SEAL AREAS File: Slury93.wk1 St. List Map Code Street D 49 Alderglen St D 50 Brookglen St D 51 Sunnyglen Dr D 52 Mt Meadows Dr 1993 Slurry Seal Project Trash From To Day Asphalt Repair Area (SF) 12- Mar -93 Slurry Seal ------------------------------------ Dimensions Quantity -------- - - - - -- --------------- -- Length Width Type I Type II (ft) (ft) (ELT) (ELT) = = = = == = = = == I = = = = = =_ Wanut Creek Rd West to end Wed 650 33 12.69 Alderglen St Riverglen St Wed 370 33 7.22 Mt Trail Ct E. to Walnut Ck Wed 1 1,430 33 27.92 Tierra Rejada Rd N to Mt Trail Wed 1,140 35 23.60 Total 1724.7 1658.8 829.0 ---------------------------------------------------------- ---------------------------------------------------------- I X111 t 1 I , , ;' : v --r- -• ,'� .,n..,.. �, _ , I II — \ M00RPAR(< ; 'ate ,� _ ~ ; , -_ % ORP K `II M; 00RPA'RK or'u - 6-.l 105 VALLEY FRW� � w L I � I I 'y ■]�i - -- i— I . ov �'1 �y.e°' -�i/ 4,� HGELES -m-•• y• _r_._�t; ; IS t �• tl ARAV ANGCLES AVI.. to � AJW�f! I . nv j yuWr.M I rJ w:, ,,, s �y,�:7�• I nlftf� L; I N i1ERR1 REJ D4 •. OORPARK - _'_ MOOR i'vr_ vi/O S'A , r.a2r �`•.. `� _ � �:'n'<' l.; � �- L't� I r I . I ;., I , • ' ^ v �`rsa.,. .�i - ���'�w'fL3,t�s:i;0 YY?. .^ jT� +.'S:Q�'F::�i`K..T47�L����'~� `� I " ' nl I nS,.` I I - I I _. _, iii' � ^.1.. •�, ' �, 70 „ .. loallip-mm�MER as I �1 S I 19 ru ,,,110' A.,,R" Io SI 97 95 w7 70 1� ^ irr a I� :O - Fugggigg am. it 1 ^ Ir ° 0 na 14 0 �•o s�iy•: 10 e3 se �•' ' Ate' 1 4 'T ,.) w 7 • / l� i ;lei —�-- �— I I I \,• / i� /-1 ---------- -- -------- ® "�~ (See Map _ .71 ■!'� 19 E for �- • �;;;�� i` illli��uli' � �" i�' ulll�l,� details) PO I No�-..:X TER qW'SO SCH�OL someone Sol LA■ A I -all OWNS M R P 1E, 08 Tv kA Mm , v. c 4 , d., oal. 005. wel o I rx sm ZZ ti qw ISO&a dj4 NJ, 4 119M lot 1 " I FN �rr. �T "�l 1 'T I - � -; �11' awl O I I , - . . I — —1 N I - r, — , I I MOORPARK ComMUNITf CEWrER i .e....r....vn.m:J. —t <\ f x��k,�,��. •.'ri .�,'F rCY �:�!t<fi��i�;;ie2r`, +r,. rte'.. r'^• r,. �;, trh.: c:✓.'.: Ci' . i- :+��i•�iir__Ct•:Sr4�?i�"r�rPS a�iN / \ � U04 kg\-t -------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------- PROJECT COST ESTIMATE Page 1 of 2 II 12- Mar -93 1993 Slurry Seal Project TOTAL UNIT ITEM DESCRIPTION UNITS EST QTY BID PRICE TOTAL 1 I , Traffic Control L.S. I 1 j 3,000.00 3,000.00 it i; 2 I Public Notice L.S. 1 1,500.00 1,500.00 3 Repair Areas S.F. I 2,500 6.00 15,000.00 II 4 AC Fill Tons 1 10.0 175.00 I 1,750.00 5 Crack Sealing L.S. 1 4,000.00 4,000.00 1 6 Slurry Seal (Type I) Extr 1,700 100.00 170,000.00 Long 7 Slurry Seal (Type II) Tons 900 i 100.00 90,000.00 8 Striping 1 --------------------- i 11 Broken White (411) L.F. 1760 0.17 299.20 2 12 Solid White (4 ") L.F. 9900 0.20 1,980.00 .3 ( 16 Solid White (8 ") L.F. I 80 0.22 17.60 II .4 17 Limit Bar (12 ") I L.F. j 1200 j 0.60 1 720.00 .5 19 Crosswalk (121) L.F. 100 0.60 j 60.00 .6 112 Brkn Yellow - 4" ( L.F. 780 0.18 140.40 I .7 114 Dbl Yellow L.F. 1800 0.44 792.00 .8 115 Dbl -Dbl Yellow L.F. 2200 I 0.5 1,100.00 1 .9 116 Yel Crosswalk L.F. 1300 0.59 767.00 .10 (23) Words & Symb 1 CH 250 I 8.10 2,025.00 1 .11 (23) Bike Lane CH 54 I. 5.00 270.00 1 .12 I (23) Arrows EA 5 8.00 40.00 .13 I Parking Lot Re- stripi L.S. 1 2,000 2,000.00 8 Release on Contract 1 L.S. 1 1.00 1.00 1 - 11 Total I 295 461.20