CITY OF MOORPARK
TO: The Honorable City Council T
FROM: Dirk Lovett, Assistant City Engineer Co
DATE: April 26, 1993 (CC Meeting of May 4, 1994)
SUBJECT: Tierra Rejada Widening Improvements
BACKGROUND:
The City Council awarded the `;ie:�-a Rejada Widening Project to R &
H Paving, Inc. on April 7, 19,)3. As awarded, the project involved
the reconstruction of Tierra Rej (1a Rd. from 200 ft east of
Moorpark Rd. South to 300 ft wes' ( )f Spring Rd. The improvements
included widening of the road fr in two lane undivided to a 4 lane
divided roadway and transitio:i is prc venerits on Spring Rd. and
Moorpark Rd. Work was substa:iti. Li} ccmpleted in late December
with only punchl i st items out .:t a i r I f c project completion.
DISCUSSION•
Construction began on May 10, 19-3 and was finished on April 5,
1994. Twelve change orders were Iequired for the contract as
outlined in Attachment A. A job walk was conducted in February and
items for that punch list hav-- n w 1,eer completed.
All work specified as part of th• :ont.iact plans and specifications
in addition to all punch list it -im.; been completed and
accepted by the City Engineer ar. Flt;bli- Works Director. A Notice
of Completion t:as been prepai c-! ;-ec >rdat ion (Exhibit. 1) .
FISCAL IMPACT•
1. CONSTRUCTION COSTS
Original aid Amount $1,354,317
Quanr. i t y Adjustments <$ 43,487>
Actual Co:istructloi. " $1 , 310, 830
Change Oriers 41 -1. $ 43,886
TOTAL CONSTRUCTION " $1,354,716
2. PROJECT COST
A preliminary recap of tots, project costs are
summarized in Attachment B Final costs will be
determined by means of j pt -e , iudit.
RECOMMENDATION•
1. Accept the described work complete.
2. Instruct the City Clerk to le tho Notice Of Completion.
3. Authorize release of the ret =nni on upon sati3factory
clearance of tho thirty f i-v , 10 ! �ay lien por:iod.
At_ t ach¢� •n' ;
:x!:i`;irs :l
TIERRA REJADA WIDENING CHANGE ORDERS
C. O. #1 (Terraace. Drain) 1
LS
$2,120.00
C.O. #2 (Relocate 12" Waterline) 1
LS
$4,307.50
C.O. #3 (Place K -Rail) 1
LS
$5,611.00
C.O. #4 (Revised Detour) 1
LS
$2,500.00
C.O. #5 (Add C.B. Sta. 53 +00) 1
LS
$2,875.00
C.O. #6 (Rip -Rap Modifications.) 1
LS
$4,388.00
C.O. #7 (Revise. Waterline) 1
LS
$3,421.25
C.O. #8 ( Modify. Seed Mix) 1
LS
$1,247.75
C.O. #9 (Add Temp. Left. Turn.) 1
LS
$3,500.00
C.O. #10 (Add Tack Coat) 1
LS
$4,600.00
C.O. #11 (Add Conduit) 1
LS
$5,000.00
C.O. #12 (Swale & Berm) 1
LS
$4,315.00
TOTAi $43,886
Attachment A
LEGA1, FEES
Pre 2/21/9'1
Tierra Rejada Rd - South (039)
Tierra Rejada Rd - North (042)
S` Cal Edison (066)
Pacifica Ccrp (055)
2/21111 - CLrrert
Tierra Rejada Construction (071)
Tierra Rejada Rd - South (039)
Tierra Rejada Rd - North (042)
Canresa Water Distr (065)
So Cal Edison (066)
S ^ell Oil Co (069)
Pacific Bell (068)
So Cal Gas (retainer)
Pacifica Corp (055)
TIERRA REJADA CONSTRUCTION
BAST OF SPRING ROM
COST SUMMARY
?. 5GINEFRING CI'GFS
Coordination with Title Co in prep of title reports (89 -i8)
. -erra Reiada Rd ROW - south side (88 -34)
Tierra Rejada Rd ROW - north side (88 -33)
Tierra Rejada Rd project coordination - north side (89-47)
.Terra Reja_3 Rd project coordination - south side (39 -4133)
P -ep cf AC- for TR Rd improvements east of Spring Rd r� SR 23
(90 -28
Tierra Rejada Rd widening administration
(90 -�6, 91 -05, 91 -12, 91 -13)
Tierra Rejada Rd widening public bid (91 -04)
F;bassy design reversion (91-868)
'^ierra Rejada Rd widening II (93 -01, 93 -02 93 -03)
Tierra Rejada Rd construction nanagenent (93 -04)
Traffic signal - TR Rd +Mtn Trail / TR Rd - Brockwocr
18- Mar -94
15 471.3•
13 ^.3J
1,4'i3.4�
59, 653. i�
1,759.E
472.0:,
12. �,
336...
86 593, 1,
3,604...
145.! %..
6,394.`'1
6,22'0....
'0,932. .
49,127.
4,182.
94,232. 3
15,068..)0
1,569. ,7
.4133 a. ^98.94
I;ie -Je
From From
Edison Camrosa
Pie Due
_. From From
Totai
S*-. Shell
9,4G2.22
9 2. 2
9,059.2
9,6 9. 22
31.2;
31.25
15 471.3•
13 ^.3J
1,4'i3.4�
59, 653. i�
1,759.E
472.0:,
12. �,
336...
86 593, 1,
3,604...
145.! %..
6,394.`'1
6,22'0....
'0,932. .
49,127.
4,182.
94,232. 3
15,068..)0
1,569. ,7
.4133 a. ^98.94
I;ie -Je
From From
Edison Camrosa
r
f
TIM REJADA CONSTRUCTION
EAST OF SPRING ROAD
COST SUMMARY
II. ENGINEERING CHARGES (con`t)
Tierra Rejada Rd construction inspection (93 -14)
Tierra Rejada Rd construction administration (93 -13)
Tierra Rejada Rd / Moorpark Rd signal conduit plan (93 -21)
?ctal Engineering
III. Ccnstructicn
Construction survey
R 6 H Paving c `1
%I :1 '('.'1 \ �N. -'e C C V
Geolabs
I7. t ILITY RrRiOCATION COSTS
Shell oil
Pacific Bell
SO Cal "icon
Catrosa
J. KHER
Fees
Maps, plans, nailing
Rig ^t of Hay costs - Pacifica
RiGht of Nay costs - Carlsberg
ibtal Cost
40,501.`o
53,579. 0
1,493.t`.
309,867. A 4 y33.66
55,LJa.��
1,336,920,,',
51,x82. ,
1,14U,137.
-0,304.05 52,608.10
222,6:;. x21.30 50,693.27
35,910.') 71'7 .0 :'_,477.50 42,955.00
_L
471.
4,2;6.`.71
66,936. 4' 4 8.:a 371,468.24
2,525,843.11 1,060,375,54 1,319,211.23 52,608.10 50,693.27 42,955.00 0.00
18-Mar-94
Page 2 of 2
Lae Die
Die Dune
From From
From From
Total ^ar? UWC Shell
Edison Canrosa
40,501.`o
53,579. 0
1,493.t`.
309,867. A 4 y33.66
55,LJa.��
1,336,920,,',
51,x82. ,
1,14U,137.
-0,304.05 52,608.10
222,6:;. x21.30 50,693.27
35,910.') 71'7 .0 :'_,477.50 42,955.00
_L
471.
4,2;6.`.71
66,936. 4' 4 8.:a 371,468.24
2,525,843.11 1,060,375,54 1,319,211.23 52,608.10 50,693.27 42,955.00 0.00
Attachment 'B' i
VI. Funding Sources for City Share
SB -821 55.000.00
State Local TransportaLon Partnership ProQrim 283,410.00
Local Transportaion Fund 732,665.54
'a: 1,071,075.54