Loading...
HomeMy WebLinkAboutAGENDA REPORT 2001 0718 CC REG ITEM 10FMOORPARK CITY COUNCIL AGENDA REPORT IT _ I Q n'F of C T.�d!1�c1 -VF F re'+urrn wl+k Gt��ucic�e A(lac for BY. TO: The Honorable City Council FROM: Mary K. Lindley, Director of Community Services DATE: July 1, 2001 (CC Meeting of July 18, 2001) SUBJECT: Consider Status Report and Revised Time Line for the Completion of the AVCP Phase II Restroom/ Concession /Storage Facility SUMMARY This Agenda Report is presented to provide the City Council with the status of the AVCP Phase II Rest room/ Concess ion/ Storage, Facility (restroom facility) . It was the Council's desire to have the facility completed and open to the public by the start of football and soccer season (September) . As a result of several unanticipated factors involving water and sewer services and staff -time limitations, the timeline for this project has been delayed. Additionally, staff would like more time to identify the various utility options for the facility since the water, sewer, and electrical services for the future aquatic facility and the undeveloped portion of AVCP relate to this project. The new timeline pushes back the completion of the restroom facility to May 2002. DISCUSSION Project Budget On December 6, 2000, the City Council approved the allocation of $120,000 for design of the building and utilities (water, sewer, and electrical) and preliminary site work. This budget did not include grading and construction work associated with the project. It was understood at that time that additional funds would be needed to construct the facility and site improvements. The estimated cost of the facility and the work necessary to provide water and sewer services is estimated to be $460,000. As M: \MLindley \PARKS \AVCP Restrooms \AVCP Phase II restroom status ccagd.doc AVCP Phase II Restrooms Page 2 stated above, the City has already allocated $120,000, leaving $340,000 to be allocated once construction bids are received. The total budget figure is based on preliminary findings by the civil engineer regarding existing capacity and future needs. A portion of the $460,000 may be attributable to other future projects, specifically the aquatics facility and AVCP Phase II. As a result, when budgets for those projects are developed, proportionate charges for the construction of utility lines and connections will be transferred, thereby lowering the overall cost of the restroom facility. Another factor driving the cost of the facility is the desire to provide a large storage area to address the storage needs of the youth sports organizations that currently maintain storage bins at AVCP. The storage room area in the new facility is currently designed to be twice the size of the storage area in the existing restroom facility, located at the softball fields. The existing storage room is approximately 600 square feet. The storage room in the new facility is proposed at 1,012 square feet. The estimated difference in construction cost is approximately $78,000. If the Council is concerned about the total cost of the restroom facility, it may want to reconsider the size of the storage room. If the size of the storage area is reduced, the approximately $78,000 in savings could be used to relocate and screen the existing storage bins. Attachment A to this Agenda Report identifies the estimated costs of the new restroom /concession /storage facility. In order to fully consider funding for the restroom facility, it is helpful to review future revenues and expenditures anticipated in the Park Improvement Fund - Community Zone. Attachment B to this Agenda Report identifies the various residential development projects anticipated through fiscal year 2005/06. This Attachment provides estimates of the amount of fees the City could potentially collect in the Community Zone of the Park Improvement Fund. The Community Zone includes AVCP and other community -wide park improvements. Attachment C attempts to project the estimated fund balances in the Community Zone each year through FY 2005/06 based on anticipated revenue (park improvement fees) and expenditures (park improvement projects). The projected fund balances on Attachment C assume that Moorpark Unified School District (MUSD) will not participate financially in the design and construction C-001091? AVCP Phase II Restrooms Page 3 of the aquatics facility, thereby leaving the City to fund the entire project. To date MUSD has indicated that it is evaluating an option to place funding for a portion of the aquatics facility on its proposed bond measure, but no final decision has been made. Furthermore, the projections on Attachment C are based on anticipated development of residential and commercial projects, as well as project construction costs for park improvements. If the pace of residential development slows down or certain anticipated projects do not materialize, the funds available for improvements will be delayed. The financial information contained in Attachment IB and C should also be evaluated when considering the selection of the architect for the aquatics facility which is also 'on the City Council's July 18, 2001, Agenda. Based on staff's projections of anticipated revenue and expenditures in the Park Improvement Fund - Community Zone, through FY 2001/02, the City will have sufficient funds to complete the restroom project. However, looking at all of the short -term future improvements proposed by the Council for AVCP (aquatics facility and Completion of AVCP Phase II), and the uncertainty of financial', participation by MUSD in the aquatics facility, the City will run short of funds in the Community Zone by FY 2002/03. Therefore, it is recommended that the City proceed with the construction of the restroom /concession /storage facility, as well as the aquatics facility (as the City begins the aquatics facility design process, it will be able to explore the potential phasing opportunities should anticipated funding not materialize): It is also recommended that the City delay the full completion of AVCP Phase II and only proceed with very limited improvements confined to grading, irrigation and hydroseeding of athletic fields. If MUSD later decides to participate in the funding of the aquatics facility, the City will be in a better financial position to proceed with the completion of AVCP Phase II. Upon the completion of !the bidding process for the restroom facility, the City Council will be asked to appropriate the remaining costs for the completion of the project. 090098 AVCP Phase II Restrooms Page 4 Project Status In February 2001, the City secured the services of an architect to design the facility, an electrical engineer, and a civil engineer. Both the architect and electrical engineer have performed preliminary design services; the architect is about eighty percent complete. The civil engineering component of the project has been delayed and as a result, the ability of the other two components (architect and electrical) to complete their tasks has also been delayed. The City secured the services of Hawks and Associates, a qualified civil engineering firm, to design the water and sewer services to the restroom facility and to survey elevation and site the facility pad. In order to design the water and sewer services, the engineer needs to determine existing and future demand and capacity; identify existing water and sewer lines; identify and cost out options (if more that one alternative is available); and design the approved system. The best -case scenario is to construct a gravity sewer system between the facility and the sewer pump station; therefore, siting the restroom pad so that the sewage flows westward in a down -hill manner is critical. Initially, the civil engineer's work was delayed a month when the City employee assigned to the project resigned his position with the City. The project was then left to the Director of Community Services to coordinate. Another month was lost when the civil engineer had difficulty locating and identifying existing water lines. The As -Built plans for existing water services differed from those actually in place. This was not discovered until later in the process. Lastly, it was determined that in order to adequately plan for the new restroom, the City needs to evaluate the capacity of the existing sewer pump station to ensure that it can handle any additional capacity. The existing pump station could easily be overloaded and as a result, be non - functioning. This step was not a part of the engineer's original scope of work and additional time is needed to address it. In the best of situations, staff recognized that the original timeline was tight and required that all of the various components proceed without delay. Any delay encountered had the potential of pushing the completion of construction into late AVCP Phase II Restrooms Page 5 fall 2001. This is the situation we are facing now. As of the date of the City Council's meeting, the City needs three weeks to complete plans for the construction of the restroom facility and associated utilities and prepare a bid document. The bid process would take approximately five weeks and, with no additional delays, construction could start four to six weeks after award of bid (contractor must order materials and supplies). It is estimated that construction will take approximately 90 days to complete; this includes the extension of the water line. Based on this information, construction would take place towards the end of October or early November - too late to address the need for the upcoming football and soccer seasons. From staff's perspective, it is not desirable to have construction activity taking place along the access road and around the football field area while both Packer Football and AYSO are using the park. Therefore, staff intends to postpone construction until after the Packer Football and AYSO season until about January 2002. By delaying construction, the City will have an opportunity to evaluate the water and sewer needs associated with the aquatic facility and undeveloped portion of AVCP. These needs were not a part of the scope of work for the restroom because of the desired short time frame and because preliminary analysis assumed that water needs could be met by extending the existing one inch water line. By designing utilities that will accommodate all future amenities, the City will save money in the long run by not having to make significant improvements twice. For example, we know that a larger capacity sewer pump station will be needed for the aquatics facility locker room, but we do not know what the final capacity of the new pump should be. If the new restrooms facility requires a larger capacity sewer pump, it make sense to ensure that the new pump for the restroom will also accommodate a future locker room facility as well. We have a similar situation with regards to the potable water line. Initial evaluations have shown that there is not sufficient water pressure to carry water out to the new restroom facility via the existing water line. The City has at least two options or carrying water to the new restrooms east of the `4.. AVCP Phase II Restrooms Page 6 football field. One option will provide sufficient water for the new restroom, but not for a fire hydrant that would. be needed if the City installs a cover pavilion as shown in the conceptual plans for AVCP Phase II. The second option will provide for the new restrooms and future needs in AVCP Phase II and would require a second water meter. If the City installs a second water meter, it would be a good time to look at stubbing a meter of the future aquatics facility and locker room. However, planning for future needs will require additional time. The scope of work for the civil engineer has been amended to include an analysis of the sewer pump station, and the various options for providing potable water needs at the east end of AVCP. As a result, a new timeline is in place. If a larger sewer pump station is not needed for the restroom facility, all design work on the project should be completed by September 1. However, with additional time, the civil engineer can look at future improvements and their potential water and sewer needs and prepare preliminary plans to address them. A bid document could be released by November and the City could conceivably award a construction contract by January 2002. Construction could be scheduled to begin in February and it is estimated that that it will take approximately 90 days to complete. This would place the opening of the restroom facility in May 2002. During a portion of the construction period, Girls Softball will be using the fields at AVCP, but their participation numbers are smaller than the combined soccer and football season, and the softball fields are located away from the site of the new restroom facility. STAFF RECOMMENDATION Approved the revised time line for the design and construction of the AVCP Phase II Restroom Facility as outlined in the Agenda Report. Attachments 1x90101 ATTACHMENT A AVCP PHASE II Restroom /Storage /Concession Facility Estimate Budget nPSinn Cncf Buildin2 $8,000 Civil (water, sewer, grading) * $21,100 Electrical $1,200 Plan Check $3,000 Sub Total $33,300 Siff Imnrnv4amcnf Sewer * $67,000 Water * $110,000 Grading $10,000 Inspection 1 $5,500 Sub Total $192,500 Buildina Cnnsfrucfinn Proposed Facility 1,012 s . ft. storage room $227,500 [option 600 sq ft storage room 149,500 ** Inspection $7,200 Sub Total $234,700 Total $460,500 * A portion of this cost may be attributable to other future projects. Total cost of restroom facility would be less. ** Reducing the size of the storage facility would reduce overall costs by approximately $78,000. Comm Zone 7/01 ioI ATTACHMENT B Community Zone Park Improvement Fund Revenue Projections 2001/02 2002/03 1 2003/04 1 2004/05 1 2005/06 Beyond Noll Brothers * $1,116,000 $0 $492,000 $492,000 $492,000 Pacific Comm ** $200,000 $400,000 $536,000 ISun Cal * ** $300,000 $300,000 $300,000 Far West * ** $60,000 $98,000 Colmer * ** $44,000 ISPI * $3,750,000 West Point * $500,000 $500,000 $500,000 $500,000 $500,000 Cabrillo * ** $66,000 Annual Total $1,376,000 $1,408,000 $1,828,000 $1,292,000 $992,000 $4,250,000 * 100 Percent to Community Zone ** 80 Percent to Community Zone * ** 40 Percent to Community Zone (These figures are estimates used for discussion purposes only. Actual park improvement fees may differ.) Comm Zone 7/01 C-00 ATTACHMENT C Community Zone Estimate Fund Balance Activity Fiscal Year Expenditures /Proiects Estimated Cost Revenue Fund Balance 2001 -2002 $1,376,000 $1,000,000 Aquatics Facility $250,000 Restroom Facility $460,000 AVCP Phase II 1 $500,000 1 $1,166,000 2002 -2003 $1,408,000 Aquatics Facility $2,350,000 AVCP Phase II Completion $1,000,000 ($776,000) 2003 -2004 $1,828,000 Aquatics Facility $50,000 1 $1,002,000 2004 -2005 $1,292,000 $2,294,000 2005 -2006 $992,000 $3,286,000 Beyond $4,250,000 $7,536,000 These are estimates for discussion purposes only. Actual expenditure and revenue figures may change Comm Zone 7/01 000104